S06 AMENDMENT 36C77023Q0394 0003_q.a._bk.pdf

PDF 398 KB Posted

Attached to
3930--FORKLIFT, ELECTRIC Federal contract opportunity
Solicitation number
36C77023Q0394
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15

About this file

This document is an amendment to a solicitation for an electric forklift. The amendment answers questions from potential bidders regarding specifications for the forklift. It clarifies that safety items such as a backup alarm, strobe lights, and fan are desired. It provides details on the power supply in the building and existing watering system for the batteries. The amendment identifies the incumbent equipment as a Clarke TM15 forklift with 3925 hours of use. It advises bidders that the forklift will be used for a two-shift operation of over 10 hours per day. The contracting office contact is provided.

View the file

Other files for this federal contract opportunity

Other files attached to 3930--FORKLIFT, ELECTRIC, newest first.
File Type Posted
S06 AMENDMENT 36C77023Q0394 0004_bk.pdf PDF
S06 AMENDMENT 36C77023Q0394 0002_bk.pdf PDF
S02 RFQ 36C77023Q0394.pdf PDF
S02 PRICING SCHEDULE - 36C77023Q0394.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

NCO 15 Contracting Ofc - CMOP

1 2

0003 766-23-4-604-0194

36C770

Department of Veterans Affairs

NCO 15 Contracting Ofc - CMOP

3450 S. 4th St. Trafficway

Leavenworth KS 66048-5012

36C770

Department of Veterans Affairs

NCO 15 Contracting Ofc - CMOP

3450 S. 4th St. Trafficway

Leavenworth KS 66048-5012

To all Offerors/Bidders 36C77023Q0394

09-13-2023 X

X X

9-13-23 AT 10AM CDT

X ONE

The purpose of this amendment is to answer questionS asked regarding the solicitation and to to advise, this is one of two amendments posted (#0002 & #0003), there was not a #0001.

Please see below.

Brigitte Kidder

Contracting Officer

9-7-2023

The follow questions were asked by a potential bidder and were answered (in red) by the Charleston

CMOP.

1. Do you need a side shifter? (forks move left to right) Yes

2. Any safety items? Such as back up alarm, strobe, blue lights on front and or rear, operator fan, steer knob for steering wheel.(As they were not listed in SOW). Yes to back-up alarm, strobe lights on front, and fan would be nice)

3. Can you share mode/serial number of unit they have and how many hours are on it? Very old Clarke TM15 and has 3925 hours if they do not roll over.

4. What power do you have coming in the building? Single or three phase 220,240, 440, 480? 3 phase 480

5. How are you watering batteries now? Do you need a watering system on your new batteries?

We have a watering system now in place.

On application:

1. For the charger & battery setup –

a. Is this unit to be used on a single-shift or three-shift operation? (2 shift operation from

5am in the morning until 1:30am the following morning.)

2. What are the expected hours of actual rolling time per day?

a. More than 5 hours/day impacts charger and battery specs. (Probably close to 10 hours per day)