Previous Report.pdf
PDF 1003 KB Posted
- Attached to
- J041--HVAC Balancing & Testing Federal contract opportunity
- Solicitation number
- 36C26324Q0896
About this file
This document is a Test, Adjust, & Balance Analysis Report for the VAMC 2023 ORs, SPD & Cath Labs Certification project in Iowa City, IA. It provides detailed testing and certification information for the operating rooms, sterile processing department, and cardiac catheterization labs at the Veterans Affairs Medical Center.
The report includes critical room outlet schedules, air flow measurements, pressure differentials, and other technical details for each room and associated HVAC systems. It also contains an inventory of the testing instruments used and their calibration data. Overall, the report certifies that the mechanical systems have been completely tested and balanced to their optimum capabilities in accordance with the engineering design.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| 36C26324Q0896 0001.pdf | ||
| 36C26324Q0896 0001_1.docx | DOCX document | |
| 36C26324Q0896_1.docx | DOCX document | |
| S02. RFQ 36C26324Q0896.pdf | ||
| P07 Wage Det. 2015-4983.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Veterans Affairs Medical Center
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
December 11, 2023
DATE: December 11, 2023
APPROVED:
TEST, ADJUST & BALANCE ANALYSIS REPORT
FOR
PROJECT: VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
OWNER: Veterans Affairs Medical Center Iowa City, IA
CUSTOMER: AWG Services, LLC Iowa City, IA
CERTIFICATION
Mechanical systems have been completely tested and balanced to their optimum capabilities, and in accordance with engineering design.
CERTIFICATION NUMBER: 09-04-35
BY: SYSTEMS MANAGEMENT & BALANCING, INC.
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
Table of Contents Operating Rooms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1OR-1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4OR-2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7OR-3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10OR-4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13OR-5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16OR-6 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .19OR-8
SPD
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21BC04 Anteroom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22BW101 Clean Storage Supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .24BW101 Clean Storage Exhaust . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .25BW101-B Office Area Supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .26BW101-B Office Area Exhaust . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .27BW102 Decontamination Supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .28BW102 Decontamination Exhaust . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .29BW102 Preparation Supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .30BW107 Logistics Medical Supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31BW107 Logistics Medical Exhaust Cath Labs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .322W179 Cath Lab Supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .342W180 Cath Lab Supply
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Terminal Box: TU-1-4-22 Box Size: 24x16 DDC Mult: 2.15 DDC Add: 22
Outlet # Room # Room Description Outlet Type Outlet
Size (In.) K Factor Req'd Vel Req'd CFM Final Vel Final CFM Notes
59 4W108 N Endovascular OR-1 L2 10 1.0 260 260 300 300
60 4W108 Endovascular OR-1 L2 10 1.0 260 260 288 288
61 4W108 Endovascular OR-1 L2 10 1.0 260 260 286 286
62 4W108 Endovascular OR-1 L2 10 1.0 260 260 270 270 1
63 4W108 Endovascular OR-1 L2 10 1.0 260 260 271 271 1
64 4W108 S Endovascular OR-1 L2 10 1.0 260 260 286 286
65 4W108 N Endovascular OR-1 LCD 14'-0" 1.0 462 462 396 396
66 4W108 S Endovascular OR-1 LCD 14'-0" 1.0 462 462 399 399
67 4W108 E Endovascular OR-1 LCD 21'-0" 1.0 693 693 527 527
68 4W108 W Endovascular OR-1 LCD 21'-0" 1.0 693 693 499 499
TOTAL 3870 3522
Req'd Final
3870 3522
OR-1
Air Changes Per Hour ACH CFM Room Volume
(Ft³)
Req'd Final 3522 10420
20.0 20.3
Max CFM Min CFM Heating CFM
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: Operating Rooms
OR-1
Reference Room Pressure Differential (In.)
From To Req'd Final Display
4W108 OR-1 Corridor 0.01 0.02 0.02
4W108 OR-1 Clean Corridor Positive 0.001 N/A
Associated Terminal Box/System: RTU-1-9
Notes:
1. There is no means available for accurate airflow measurement of the individual outlet airflow due to nearby medical equipment. Final CFM is the difference of the VAV total airflow by 24"x16" duct traverse and the remaining outlets.
VAV box damper is 100% open; maximum airflow possible at current system static pressure set point.
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: Operating Rooms
OR-1
Terminal Box: RTU-1-9
DDC Mult: 1.63
Size (In.) K Factor Req'd Vel Req'd CFM Final Vel Final CFM Notes
115 4W108 NE Endovascular OR-1 S 18x48 1.1 591 650 375 413
116 4W108 SE Endovascular OR-1 S 18x48 1.1 591 650 313 344
117 4W108 SW Endovascular OR-1 S 18x48 1.1 591 650 225 248
118 4W108 NW Endovascular OR-1 S 18x48 1.1 591 650 285 314
TOTAL 2600 1319
2600 1319
2600 1319
Associated Terminal Box/System: TU-1-4-22
Notes:
RTU-1-9 controls to a -999 CFM offset.
Max CFM Min CFM
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: Operating Rooms
OR-1 Return
Terminal Box: TU-1-4-26
DDC Mult: 1.18 DDC Add: 28
Size (In.) K Factor Req'd Vel Req'd CFM Final Vel Final CFM Notes
69 4W102 N Neuro-Surgery OR-2 L2 10 1.0 280 280 330 330
70 4W102 Neuro-Surgery OR-2 L2 10 1.0 280 280 325 325
71 4W102 Neuro-Surgery OR-2 L2 10 1.0 280 280 420 420
72 4W102 Neuro-Surgery OR-2 L2 10 1.0 280 280 306 306
74 4W102 S Neuro-Surgery OR-2 L2 10 1.0 280 280 274 274
75 4W102 N Neuro-Surgery OR-2 LCD 11'-0" 1.0 410 410 351 351
76 4W102 S Neuro-Surgery OR-2 LCD 11'-0" 1.0 410 410 232 232
77 4W102 E Neuro-Surgery OR-2 LCD 17'-0" 1.0 640 640 500 500
78 4W102 W Neuro-Surgery OR-2 LCD 17'-0" 1.0 640 640 478 478
TOTAL 3500 3216
3500 3216
OR-2
Air Changes Per Hour ACH CFM Room Volume
(Ft³)
Req'd Final 3216 8192
20.0 23.6
Max CFM Min CFM Heating CFM
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: Operating Rooms
OR-2
4W102 OR-2 Corridor 0.01 0.06 0.05
4W102 OR-2 Clean Corridor Positive 0.04 N/A
Associated Terminal Box/System: RTU-1-5
Notes:
VAV box damper is 100% open; maximum airflow possible at current system static pressure set point.
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: Operating Rooms
OR-2
Terminal Box: RTU-1-5
DDC Mult: 2.33
Size (In.) K Factor Req'd Vel Req'd CFM Final Vel Final CFM Notes
119 4W102 N Neuro-Surgery OR-2 S 22x48 1.1 1023 1125 575 633
120 4W102 S Neuro-Surgery OR-2 S 22x48 1.1 1023 1125 625 688
TOTAL 2250 1321
2250 1321
2250 1321
Associated Terminal Box/System: TU-1-4-26
Notes:
RTU-1-5 controls to a -999 CFM offset.
Max CFM Min CFM
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: Operating Rooms
OR-2 Return
Terminal Box: TU-1-4-10 Box Size: 16 DDC Mult:
DDC Add: 17
Size (In.) K Factor Req'd Vel Req'd CFM Final Vel Final CFM Notes
79 4W114 E General Eye OR-3 L1 10 1.0 240 240
80 4W114 General Eye OR-3 L1 10 1.0 240 240
81 4W114 General Eye OR-3 L3 8 1.0 120 120
82 4W114 General Eye OR-3 L1 10 1.0 240 240
83 4W114 W General Eye OR-3 L1 10 1.0 240 240
84 4W114 N General Eye OR-3 LCD 13'-0" 1.0 440 440
85 4W114 S General Eye OR-3 LCD 13'-0" 1.0 440 440
86 4W114 E General Eye OR-3 LCD 11'-0" 1.0 370 370
87 4W114 W General Eye OR-3 LCD 11'-0" 1.0 370 370
TOTAL 2700 0
OR-3
Air Changes Per Hour ACH CFM Room Volume
(Ft³)
Req'd Final 6115
20.0
Max CFM Min CFM Heating CFM
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: Operating Rooms
OR-3
4W114 OR-3 Corridor 0.01
4W114 OR-3 Clean Corridor Positive
Associated Terminal Box/System: RTU-1-4
Notes:
OR-3 under construction at time of test. July 12, 2023
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: Operating Rooms
OR-3
Terminal Box: RTU-1-4
DDC Mult:
Size (In.) K Factor Req'd Vel Req'd CFM Final Vel Final CFM Notes
121 4W114 N General Eye OR-3 S 18x48 1.1 818 900
122 4W114 S General Eye OR-3 S 18x48 1.1 818 900
TOTAL 1800 0
Associated Terminal Box/System: TU-1-4-10
Notes:
RTU-1-4 controls to a -999 CFM offset.
OR-3 under construction at time of test. July 12, 2023
Max CFM Min CFM
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: Operating Rooms
OR-3 Return
Terminal Box: TU-1-4-8
DDC Mult: 4.30 DDC Add: 14
Size (In.) K Factor Req'd Vel Req'd CFM Final Vel Final CFM Notes
88 4W116 N General OR-4 L1 10 1.0 260 260 264 264
89 4W116 General OR-4 L1 10 1.0 260 260 309 309
90 4W116 General OR-4 L3 8 1.0 130 130 144 144
91 4W116 General OR-4 L1 10 1.0 260 260 324 324
92 4W116 S General OR-4 L1 10 1.0 260 260 334 334
93 4W116 N General OR-4 LCD 11'-0" 1.0 405 405 260 260
94 4W116 S General OR-4 LCD 11'-0" 1.0 405 405 346 346
95 4W116 E General OR-4 LCD 13'-0" 1.0 475 475 184 184
96 4W116 W General OR-4 LCD 13'-0" 1.0 475 475 256 256
TOTAL 2930 2421
2930 2421
OR-4
Air Changes Per Hour ACH CFM Room Volume
(Ft³)
Req'd Final 2421 7143
20.0 20.3
Max CFM Min CFM Heating CFM
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: Operating Rooms
OR-4
4W116 OR-4 Corridor 0.01 0.022 0.022
4W116 OR-4 Clean Corridor Positive 0.007 N/A
Associated Terminal Box/System: RTU-1-2
Notes:
VAV box damper is 100% open; maximum airflow possible at current system static pressure set point.
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: Operating Rooms
OR-4
Terminal Box: RTU-1-2
DDC Mult: 1.82
Size (In.) K Factor Req'd Vel Req'd CFM Final Vel Final CFM Notes
123 4W116 N General OR-4 S 18x48 1.1 1000 1100 735 809
124 4W116 S General OR-4 S 18x48 1.1 1000 1100 700 770
TOTAL 2200 1579
2200 1579
2200 1579
Associated Terminal Box/System: TU-1-4-8
Notes:
RTU-1-2 controls to a -720 CFM offset.
Max CFM Min CFM
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: Operating Rooms
OR-4 Return
Terminal Box: TU-1-4-6
DDC Mult: 2.91 DDC Add: 11
Size (In.) K Factor Req'd Vel Req'd CFM Final Vel Final CFM Notes
97 4W118 N Urology/General OR-5 L2 10 1.0 250 250 246 246
98 4W118 Urology/General OR-5 L2 10 1.0 250 250 243 243
99 4W118 Urology/General OR-5 L2 10 1.0 250 250 236 236
100 4W118 Urology/General OR-5 L2 10 1.0 250 250 296 296
101 4W118 S Urology/General OR-5 L2 10 1.0 250 250 252 252
102 4W118 N Urology/General OR-5 LCD 11'-0" 1.0 415 415 302 302
103 4W118 S Urology/General OR-5 LCD 11'-0" 1.0 415 415 294 294
104 4W118 E Urology/General OR-5 LCD 14'-0" 1.0 525 525 298 298
105 4W118 W Urology/General OR-5 LCD 14'-0" 1.0 525 525 420 420
TOTAL 3130 2587
3130 2587
OR-5
Air Changes Per Hour ACH CFM Room Volume
(Ft³)
Req'd Final 2587 7465
20.0 20.8
Max CFM Min CFM Heating CFM
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: Operating Rooms
OR-5
4W118 OR-5 Corridor 0.01 0.04 0.04
4W118 OR-5 Clean Corridor Positive 0.007 N/A
Associated Terminal Box/System: RTU-1-1
Notes:
VAV box damper is 100% open; maximum airflow possible at current system static pressure set point.
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: Operating Rooms
OR-5
Terminal Box: RTU-1-1
DDC Mult: 1.56
Size (In.) K Factor Req'd Vel Req'd CFM Final Vel Final CFM Notes
125 4W118 N Urology/General OR-5 T 22x48 1.1 909 1000 450 495
126 4W118 S Urology/General OR-5 T 22x48 1.1 909 1000 513 564
TOTAL 2000 1059
2000 1059
2000 1059
Associated Terminal Box/System: TU-1-4-6
Notes:
RTU-1-1 controls to a -999 CFM offset.
Max CFM Min CFM
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: Operating Rooms
OR-5 Return
Terminal Box: TU-1-4-1
DDC Mult: 2.88 DDC Add: 5
Size (In.) K Factor Req'd Vel Req'd CFM Final Vel Final CFM Notes
106 4W119 N Orthopedic OR-6 L2 10 1.0 280 280 225 225
107 4W119 Orthopedic OR-6 L2 10 1.0 280 280 287 287
108 4W119 Orthopedic OR-6 L2 10 1.0 280 280 335 335
109 4W119 Orthopedic OR-6 L2 10 1.0 280 280 291 291
110 4W119 S Orthopedic OR-6 L2 10 1.0 280 280 286 286
111 4W119 N Orthopedic OR-6 LCD 11'-0" 1.0 370 370 170 170
112 4W119 S Orthopedic OR-6 LCD 11'-0" 1.0 370 370 483 483
113 4W119 E Orthopedic OR-6 LCD 20'-0" 1.0 680 680 373 373
114 4W119 W Orthopedic OR-6 LCD 20'-0" 1.0 680 680 436 436
TOTAL 3500 2886
3500 2886
OR-6
Air Changes Per Hour ACH CFM Room Volume
(Ft³)
Req'd Final 2886 8164
20.0 21.2
Max CFM Min CFM Heating CFM
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: Operating Rooms
OR-6
4W119 OR-6 Corridor 0.01 0.042 0.037
4W119 OR-6 Clean Corridor Positive 0.001 N/A
Associated Terminal Box/System: RTU-1-6
Notes:
VAV box damper is fully open; maximum airflow possible at current system static pressure set point.
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: Operating Rooms
OR-6
Terminal Box: RTU-1-6
DDC Mult: 1.48
Size (In.) K Factor Req'd Vel Req'd CFM Final Vel Final CFM Notes
127 4W119 N Orthopedic OR-6 T 22x48 1.1 1023 1125 517 569
128 4W119 S Orthopedic OR-6 T 22x48 1.1 1023 1125 661 727
TOTAL 2250 1296
2250 1296
2250 1296
Associated Terminal Box/System: TU-1-4-1
Notes:
RTU-1-6 controls to a -999 CFM offset.
Max CFM Min CFM
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: Operating Rooms
OR-6 Return
Terminal Box: TU-1-413 Box Size: 12 DDC Mult: 7.38 DDC Add: 27
Size (In.) K Factor Req'd Vel Req'd CFM Final Vel Final CFM Notes
129 4S05A Scrub CD 6 1.0 90 90 200 200
130 4S05B Sterile CD 6 1.0 90 90 132 132
131 4S05 E Cystoscopy OR-8 CD 8 1.0 490 490 271 271
132 4S05 W Cystoscopy OR-8 CD 8 1.0 490 490 343 343
TOTAL 1160 946
1160 946
OR-8
Air Changes Per Hour ACH CFM Room Volume
(Ft³)
Req'd Final 946 3510
12.0 16.2
Reference Room Pressure Differential (In.)
From To Req'd Final Display
4S05 OR-8 Corridor Positive 0.01 0.008
Max CFM Min CFM Heating CFM
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: Operating Rooms
OR-8
Notes:
VAV box damper is fully open; maximum airflow possible at current system static pressure set point.
OR-8 is utilized as a Procedure Room with a reduced 12.0 ACH requirement.
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: Operating Rooms
OR-8
Size (In.) K Factor Final Vel Final CFM Notes
1 BC04 N Anteroom CD EX 1.0
2 BC04 S Anteroom CD EX 1.0
TOTAL 0
BC04 Anteroom
Air Changes Per Hour ACH CFM Room Volume
(Ft³)
Req'd Final 999
Reference Room Pressure Differential (In.)
From To Req'd Final Display
BC04 Ante Room Corridor Positive
Notes:
Room could not be located. Area was under renovation during testing in 2022.
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: SPD
BC04 Anteroom
Terminal Box: TAB-BW101-1 & 2 DDC Type: Air Valve
Room # Room Description Outlet Type
Size (In.) K Factor Final Vel Final CFM Notes
BW101 N Clean Storage CD EX 1.0 291 291
BW101 Clean Storage CD EX 1.0 315 315
BW101 S Clean Storage CD EX 1.0 296 296
BW101 SE Clean Storage CD EX 1.0 272 272
BW101 Clean Storage CD EX 1.0 313 313
BW101 Clean Storage CD EX 1.0 304 304
BW101 Clean Storage CD EX 1.0 291 291
BW101 SW Clean Storage CD EX 1.0 291 291
TOTAL 2373
Req'd Final
1920 2373
BW101 Clean Storage
Air Changes Per Hour ACH CFM Room Volume
(Ft³)
Req'd Final 2373 23213
4.0 6.1
Max CFM
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: SPD
BW101 Clean Storage Supply
BW101 Clean Storage BW107 Positive 0.004 N/A
BW101 Clean Storage Corridor (SE) Positive 0.010 N/A
BW101 Clean Storage BW101B Positive -0.002 N/A
BW101 Clean Storage Corridor (N) Positive 0.012 N/A
BW101 Clean Storage BW102 Positive 0.001 N/A
Associated Terminal Box/System: EAV-BW101
Notes:
BW101 Clean Storage is served by two (2) Air Valves; TAB-BW101-1 and TAB-BW101-2 at 960 CFM each.
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: SPD
BW101 Clean Storage Supply
Terminal Box: EAV-BW101
Size (In.) K Factor Final Vel Final CFM Notes
BW101 NE Clean Storage EG EX 1.1 178 196
BW101 SE Clean Storage EG EX 1.1 67 74
BW101 SW Clean Storage EG EX 1.1 100 110
TOTAL 380
Req'd Final
0 380
Associated Terminal Box/System: BW101-1 & BW101-2
Notes:
EAV-BW101 serves other areas (including BW101-B Office Areas), the maximum CFM setpoint is 2250 CFM and the DDC system reported 2254 CFM.
Max CFM
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: SPD
BW101 Clean Storage Exhaust
Terminal Box: TAB-BW101-B
Size (In.) K Factor Final Vel Final CFM Notes
BW101-B Office Area CD EX 1.0 114 114
BW101-B Office Area CD EX 1.0 111 111
BW101-B Office Area CD EX 1.0 123 123
BW101-B Office Area CD EX 1.0 111 111
TOTAL 459
Req'd Final
500 459
BW101-B Office Area
Air Changes Per Hour ACH CFM Room Volume
(Ft³)
Req'd Final 459 3654
7.5
Reference Room Pressure Differential (In.)
From To Req'd Final Display
BW101-B Office Area BW101 Clean Storage Negative 0.002 N/A
Associated Terminal Box/System: EAV-BW101
Max CFM
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: SPD
BW101-B Office Area Supply
Terminal Box: EAV-BW101
Size (In.) K Factor Final Vel Final CFM Notes
BW101-B Office Area EG EX 1.1 112 123
TOTAL 123
Req'd Final
0 123
Reference Room Pressure Differential (In.)
From To Req'd Final Display
BW101-B Office Area BW101 Clean Storage Negative 0.001 N/A
Notes:
EAV-BW101 serves other areas (including BW101 Clean Storage), the maximum CFM setpoint is 2250 CFM and the DDC system reported 2254 CFM.
Max CFM
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: SPD
BW101-B Office Area Exhaust
Terminal Box: TAB-BW102B
Size (In.) K Factor Final Vel Final CFM Notes
BW102 NW Decontamination CD Ex 1.0 76 76
BW102 Decontamination CD Ex 1.0 177 177
BW102 NE Decontamination CD Ex 1.0 138 138
BW102 SW Decontamination CD Ex 1.0 96 96
BW102 Decontamination CD Ex 1.0 100 100
BW102 SE Decontamination CD Ex 1.0 125 125
TOTAL 712
Req'd Final
0 712
Associated Terminal Box/System: EAV-BW102-1
Max CFM
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: SPD
BW102 Decontamination Supply
Terminal Box: EAV-BW102-1
Size (In.) K Factor Final Vel Final CFM Notes
BW102 Decontamination CD EX 1.1 300 330
BW102 Decontamination EG EX 1.1 595 655
TOTAL 985
Req'd Final
0 985
BW102 Decontamination
Air Changes Per Hour ACH CFM Room Volume
(Ft³)
Req'd Final 985 7235
6.0 8.2
Reference Room Pressure Differential (In.)
From To Req'd Final Display
BW102 Decontamination BC04 Ateroom Negative 0.002 0.002
Associated Terminal Box/System: TAB-BW102B
Notes:
EAV-BW102-1 serves other areas, the maximum CFM setpoint is 2500 CFM and the DDC system reported 2485 CFM.
Max CFM
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: SPD
BW102 Decontamination Exhaust
Terminal Box: TAB-BW102-2
Size (In.) K Factor Final Vel Final CFM Notes
BW102 NW Preparation CD EX 1.0 368 368
BW102 Preparation CD EX 1.0 368 368
BW102 SW Preparation CD EX 1.0 330 330
BW102 NE Preparation CD EX 1.0 469 469
BW102 SE Preparation CD EX 1.0 365 365
TOTAL 1900
Req'd Final
1800 1900
BW102 Preparation
Air Changes Per Hour ACH CFM Room Volume
(Ft³)
Req'd Final 1900 9609
4.0 11.9
Reference Room Pressure Differential (In.)
From To Req'd Final Display
BW102 Preapration BW101 Clean Storage Positive -0.001 N/A
Max CFM
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: SPD
BW102 Preparation Supply
Terminal Box: TAB-BW107
Size (In.) K Factor Final Vel Final CFM Notes
BW107 NW Logistics Medical CD EX 1.0 81 81
BW107 NE Logistics Medical CD EX 1.0 117 117
BW107 SW Logistics Medical CD EX 1.0 118 118
BW107 SE Logistics Medical CD EX 1.0 133 133
TOTAL 449
Req'd Final
0 449
BW107 Logistics Medical
Air Changes Per Hour ACH CFM Room Volume
(Ft³)
Req'd Final 449 3307
8.1
Reference Room Pressure Differential (In.)
From To Req'd Final Display
BW107 Logistics Medical BW101 Clean Storage Negative -0.007 N/A
BW107 Logistics Medical Corridor Positive 0.008 N/A
BW107 Logistics Medical BW101-B Office Area N/A -0.002 N/A
Associated Terminal Box/System: BW107 Exhaust
Max CFM
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: SPD
BW107 Logistics Medical Supply
Terminal Box: EAV
Size (In.) K Factor Final Vel Final CFM Notes
BW107 Logistics Medical EG EX 1.1 68 75
TOTAL 75
Req'd Final
0 75
Associated Terminal Box/System: TAB-BW107
Max CFM
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: SPD
BW107 Logistics Medical Exhaust
Terminal Box: TAB-2W179
DDC Mult: 2.03 DDC Add: 5
Size (In.) K Factor Final Vel Final CFM Notes
2W179 NW Cath Lab LD EX 1.0 408 408
2W179 SW Cath Lab LD EX 1.0 420 420
2W179 NE Cath Lab LD EX 1.0 398 398
2W179 SE Cath Lab LD EX 1.0 383 383
TOTAL 1609
Req'd Final
1600 1609
2W179 Cath Lab
Air Changes Per Hour ACH CFM Room Volume
(Ft³)
Req'd Final 1609 6693
12.0 14.4
Reference Room Pressure Differential (In.)
From To Req'd Final Display
2W179 Cath Lab Corridor Positive 0.001 0.001
Max CFM
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: Cath Labs
2W179 Cath Lab Supply
Reported supply airflow is the required airflow to obtain proper room pressure relationship. The two (2) return/exhaust inlets are capped off with sheet metal.
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: Cath Labs
2W179 Cath Lab Supply
Terminal Box: TAB-2W180
DDC Mult: 1.63 DDC Add: 9
Size (In.) K Factor Final Vel Final CFM Notes
2W180 NW Cath Lab LD EX 1.0 413 413
2W180 SW Cath Lab LD EX 1.0 400 400
2W180 SE Cath Lab LD EX 1.0 391 391
2W180 NE Cath Lab LD EX 1.0 366 366
TOTAL 1570
Req'd Final
1600 1570
2W180 Cath Lab
Air Changes Per Hour ACH CFM Room Volume
(Ft³)
Req'd Final 1570 6690
12.0 14.1
Reference Room Pressure Differential (In.)
From To Req'd Final Display
2W180 Cath Lab Corridor Positive 0.010 0.007
Max CFM
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: Cath Labs
2W180 Cath Lab Supply
The two (2) return/exhaust inlets are capped off with sheet metal.
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Critical Room Outlet Schedule
Associated System: Existing Description: Cath Labs
2W180 Cath Lab Supply
OR-1 to OR-6 Room Layout
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Instrument List & Calibration Data
Following are the standard instruments utilized for the Testing, Adjusting & Balancing work.
Copy(s) of the current calibration certificate(s) for specific instrumentation used for the project is/are included.
Airflow Measurements:
Shortridge Instruments electronic manometer. Shortridge Instruments recommends calibration every two (2) years.
Evergreen Telemetry Air TAB Kit. Evergreen Telemetry recommends calibration every two
(2) years.
Water Flow Measurements:
Shortridge Instruments hydrodata mutlimeter. Shortridge Instruments recommends calibration every two (2) years.
Alnor hydronic manometer. Alnor recommends annual calibration.
Evergreen Telemetry Water TAB Kit. Evergreen Telemetry recommends calibration every two (2) years.
Fuji Ultrasonic Flow Meter. Fuji recommends calibration every two (2) years.
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
Evergreen Telemetry Air Meter
Systems Management & Balancing, Inc.
925 S.E. Olson Drive Waukee, IA 50263
PH 515-987-2825
VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA
| TEST, ADJUST & BALANCE ANALYSIS REPORT |
| Table of Contents |
| Notes: |
| Notes: |
| Notes: |
| Notes: |
| Notes: |
| Notes: |
| Notes: |
| Notes: |
| Notes: |
| Notes: |
| Notes: |
| Notes: |
| Notes: |
| Notes: |
| Notes: |
| Notes: |
| Notes: |
| Notes: |
| Notes: |
| Notes: |
| OR-1 to OR-6 Room Layout |
| Instrument List & Calibration Data |
| Evergreen Telemetry Air Meter |