About this file

This document is a Test, Adjust, & Balance Analysis Report for the VAMC 2023 ORs, SPD & Cath Labs Certification project in Iowa City, IA. It provides detailed testing and certification information for the operating rooms, sterile processing department, and cardiac catheterization labs at the Veterans Affairs Medical Center.

The report includes critical room outlet schedules, air flow measurements, pressure differentials, and other technical details for each room and associated HVAC systems. It also contains an inventory of the testing instruments used and their calibration data. Overall, the report certifies that the mechanical systems have been completely tested and balanced to their optimum capabilities in accordance with the engineering design.

View the file

Other files for this federal contract opportunity

Other files attached to J041--HVAC Balancing & Testing, newest first.
File Type Posted
Questions and Answers.pdf PDF
36C26324Q0896 0001.pdf PDF
36C26324Q0896 0001_1.docx DOCX document
36C26324Q0896_1.docx DOCX document
S02. RFQ 36C26324Q0896.pdf PDF
P07 Wage Det. 2015-4983.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Veterans Affairs Medical Center

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

December 11, 2023

DATE: December 11, 2023

APPROVED:

TEST, ADJUST & BALANCE ANALYSIS REPORT

FOR

PROJECT: VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

OWNER: Veterans Affairs Medical Center Iowa City, IA

CUSTOMER: AWG Services, LLC Iowa City, IA

CERTIFICATION

Mechanical systems have been completely tested and balanced to their optimum capabilities, and in accordance with engineering design.

CERTIFICATION NUMBER: 09-04-35

BY: SYSTEMS MANAGEMENT & BALANCING, INC.

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

Table of Contents Operating Rooms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1OR-1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4OR-2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7OR-3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10OR-4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13OR-5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16OR-6 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .19OR-8

SPD

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21BC04 Anteroom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22BW101 Clean Storage Supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .24BW101 Clean Storage Exhaust . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .25BW101-B Office Area Supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .26BW101-B Office Area Exhaust . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .27BW102 Decontamination Supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .28BW102 Decontamination Exhaust . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .29BW102 Preparation Supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .30BW107 Logistics Medical Supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31BW107 Logistics Medical Exhaust Cath Labs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .322W179 Cath Lab Supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .342W180 Cath Lab Supply

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Terminal Box: TU-1-4-22 Box Size: 24x16 DDC Mult: 2.15 DDC Add: 22

Outlet # Room # Room Description Outlet Type Outlet

Size (In.) K Factor Req'd Vel Req'd CFM Final Vel Final CFM Notes

59 4W108 N Endovascular OR-1 L2 10 1.0 260 260 300 300

60 4W108 Endovascular OR-1 L2 10 1.0 260 260 288 288

61 4W108 Endovascular OR-1 L2 10 1.0 260 260 286 286

62 4W108 Endovascular OR-1 L2 10 1.0 260 260 270 270 1

63 4W108 Endovascular OR-1 L2 10 1.0 260 260 271 271 1

64 4W108 S Endovascular OR-1 L2 10 1.0 260 260 286 286

65 4W108 N Endovascular OR-1 LCD 14'-0" 1.0 462 462 396 396

66 4W108 S Endovascular OR-1 LCD 14'-0" 1.0 462 462 399 399

67 4W108 E Endovascular OR-1 LCD 21'-0" 1.0 693 693 527 527

68 4W108 W Endovascular OR-1 LCD 21'-0" 1.0 693 693 499 499

TOTAL 3870 3522

Req'd Final

3870 3522

OR-1

Air Changes Per Hour ACH CFM Room Volume

(Ft³)

Req'd Final 3522 10420

20.0 20.3

Max CFM Min CFM Heating CFM

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: Operating Rooms

OR-1

Reference Room Pressure Differential (In.)

From To Req'd Final Display

4W108 OR-1 Corridor 0.01 0.02 0.02

4W108 OR-1 Clean Corridor Positive 0.001 N/A

Associated Terminal Box/System: RTU-1-9

Notes:

1. There is no means available for accurate airflow measurement of the individual outlet airflow due to nearby medical equipment. Final CFM is the difference of the VAV total airflow by 24"x16" duct traverse and the remaining outlets.

VAV box damper is 100% open; maximum airflow possible at current system static pressure set point.

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: Operating Rooms

OR-1

Terminal Box: RTU-1-9

DDC Mult: 1.63

Size (In.) K Factor Req'd Vel Req'd CFM Final Vel Final CFM Notes

115 4W108 NE Endovascular OR-1 S 18x48 1.1 591 650 375 413

116 4W108 SE Endovascular OR-1 S 18x48 1.1 591 650 313 344

117 4W108 SW Endovascular OR-1 S 18x48 1.1 591 650 225 248

118 4W108 NW Endovascular OR-1 S 18x48 1.1 591 650 285 314

TOTAL 2600 1319

2600 1319

2600 1319

Associated Terminal Box/System: TU-1-4-22

Notes:

RTU-1-9 controls to a -999 CFM offset.

Max CFM Min CFM

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: Operating Rooms

OR-1 Return

Terminal Box: TU-1-4-26

DDC Mult: 1.18 DDC Add: 28

Size (In.) K Factor Req'd Vel Req'd CFM Final Vel Final CFM Notes

69 4W102 N Neuro-Surgery OR-2 L2 10 1.0 280 280 330 330

70 4W102 Neuro-Surgery OR-2 L2 10 1.0 280 280 325 325

71 4W102 Neuro-Surgery OR-2 L2 10 1.0 280 280 420 420

72 4W102 Neuro-Surgery OR-2 L2 10 1.0 280 280 306 306

74 4W102 S Neuro-Surgery OR-2 L2 10 1.0 280 280 274 274

75 4W102 N Neuro-Surgery OR-2 LCD 11'-0" 1.0 410 410 351 351

76 4W102 S Neuro-Surgery OR-2 LCD 11'-0" 1.0 410 410 232 232

77 4W102 E Neuro-Surgery OR-2 LCD 17'-0" 1.0 640 640 500 500

78 4W102 W Neuro-Surgery OR-2 LCD 17'-0" 1.0 640 640 478 478

TOTAL 3500 3216

3500 3216

OR-2

Air Changes Per Hour ACH CFM Room Volume

(Ft³)

Req'd Final 3216 8192

20.0 23.6

Max CFM Min CFM Heating CFM

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: Operating Rooms

OR-2

4W102 OR-2 Corridor 0.01 0.06 0.05

4W102 OR-2 Clean Corridor Positive 0.04 N/A

Associated Terminal Box/System: RTU-1-5

Notes:

VAV box damper is 100% open; maximum airflow possible at current system static pressure set point.

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: Operating Rooms

OR-2

Terminal Box: RTU-1-5

DDC Mult: 2.33

Size (In.) K Factor Req'd Vel Req'd CFM Final Vel Final CFM Notes

119 4W102 N Neuro-Surgery OR-2 S 22x48 1.1 1023 1125 575 633

120 4W102 S Neuro-Surgery OR-2 S 22x48 1.1 1023 1125 625 688

TOTAL 2250 1321

2250 1321

2250 1321

Associated Terminal Box/System: TU-1-4-26

Notes:

RTU-1-5 controls to a -999 CFM offset.

Max CFM Min CFM

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: Operating Rooms

OR-2 Return

Terminal Box: TU-1-4-10 Box Size: 16 DDC Mult:

DDC Add: 17

Size (In.) K Factor Req'd Vel Req'd CFM Final Vel Final CFM Notes

79 4W114 E General Eye OR-3 L1 10 1.0 240 240

80 4W114 General Eye OR-3 L1 10 1.0 240 240

81 4W114 General Eye OR-3 L3 8 1.0 120 120

82 4W114 General Eye OR-3 L1 10 1.0 240 240

83 4W114 W General Eye OR-3 L1 10 1.0 240 240

84 4W114 N General Eye OR-3 LCD 13'-0" 1.0 440 440

85 4W114 S General Eye OR-3 LCD 13'-0" 1.0 440 440

86 4W114 E General Eye OR-3 LCD 11'-0" 1.0 370 370

87 4W114 W General Eye OR-3 LCD 11'-0" 1.0 370 370

TOTAL 2700 0

OR-3

Air Changes Per Hour ACH CFM Room Volume

(Ft³)

Req'd Final 6115

20.0

Max CFM Min CFM Heating CFM

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: Operating Rooms

OR-3

4W114 OR-3 Corridor 0.01

4W114 OR-3 Clean Corridor Positive

Associated Terminal Box/System: RTU-1-4

Notes:

OR-3 under construction at time of test. July 12, 2023

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: Operating Rooms

OR-3

Terminal Box: RTU-1-4

DDC Mult:

Size (In.) K Factor Req'd Vel Req'd CFM Final Vel Final CFM Notes

121 4W114 N General Eye OR-3 S 18x48 1.1 818 900

122 4W114 S General Eye OR-3 S 18x48 1.1 818 900

TOTAL 1800 0

Associated Terminal Box/System: TU-1-4-10

Notes:

RTU-1-4 controls to a -999 CFM offset.

OR-3 under construction at time of test. July 12, 2023

Max CFM Min CFM

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: Operating Rooms

OR-3 Return

Terminal Box: TU-1-4-8

DDC Mult: 4.30 DDC Add: 14

Size (In.) K Factor Req'd Vel Req'd CFM Final Vel Final CFM Notes

88 4W116 N General OR-4 L1 10 1.0 260 260 264 264

89 4W116 General OR-4 L1 10 1.0 260 260 309 309

90 4W116 General OR-4 L3 8 1.0 130 130 144 144

91 4W116 General OR-4 L1 10 1.0 260 260 324 324

92 4W116 S General OR-4 L1 10 1.0 260 260 334 334

93 4W116 N General OR-4 LCD 11'-0" 1.0 405 405 260 260

94 4W116 S General OR-4 LCD 11'-0" 1.0 405 405 346 346

95 4W116 E General OR-4 LCD 13'-0" 1.0 475 475 184 184

96 4W116 W General OR-4 LCD 13'-0" 1.0 475 475 256 256

TOTAL 2930 2421

2930 2421

OR-4

Air Changes Per Hour ACH CFM Room Volume

(Ft³)

Req'd Final 2421 7143

20.0 20.3

Max CFM Min CFM Heating CFM

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: Operating Rooms

OR-4

4W116 OR-4 Corridor 0.01 0.022 0.022

4W116 OR-4 Clean Corridor Positive 0.007 N/A

Associated Terminal Box/System: RTU-1-2

Notes:

VAV box damper is 100% open; maximum airflow possible at current system static pressure set point.

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: Operating Rooms

OR-4

Terminal Box: RTU-1-2

DDC Mult: 1.82

Size (In.) K Factor Req'd Vel Req'd CFM Final Vel Final CFM Notes

123 4W116 N General OR-4 S 18x48 1.1 1000 1100 735 809

124 4W116 S General OR-4 S 18x48 1.1 1000 1100 700 770

TOTAL 2200 1579

2200 1579

2200 1579

Associated Terminal Box/System: TU-1-4-8

Notes:

RTU-1-2 controls to a -720 CFM offset.

Max CFM Min CFM

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: Operating Rooms

OR-4 Return

Terminal Box: TU-1-4-6

DDC Mult: 2.91 DDC Add: 11

Size (In.) K Factor Req'd Vel Req'd CFM Final Vel Final CFM Notes

97 4W118 N Urology/General OR-5 L2 10 1.0 250 250 246 246

98 4W118 Urology/General OR-5 L2 10 1.0 250 250 243 243

99 4W118 Urology/General OR-5 L2 10 1.0 250 250 236 236

100 4W118 Urology/General OR-5 L2 10 1.0 250 250 296 296

101 4W118 S Urology/General OR-5 L2 10 1.0 250 250 252 252

102 4W118 N Urology/General OR-5 LCD 11'-0" 1.0 415 415 302 302

103 4W118 S Urology/General OR-5 LCD 11'-0" 1.0 415 415 294 294

104 4W118 E Urology/General OR-5 LCD 14'-0" 1.0 525 525 298 298

105 4W118 W Urology/General OR-5 LCD 14'-0" 1.0 525 525 420 420

TOTAL 3130 2587

3130 2587

OR-5

Air Changes Per Hour ACH CFM Room Volume

(Ft³)

Req'd Final 2587 7465

20.0 20.8

Max CFM Min CFM Heating CFM

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: Operating Rooms

OR-5

4W118 OR-5 Corridor 0.01 0.04 0.04

4W118 OR-5 Clean Corridor Positive 0.007 N/A

Associated Terminal Box/System: RTU-1-1

Notes:

VAV box damper is 100% open; maximum airflow possible at current system static pressure set point.

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: Operating Rooms

OR-5

Terminal Box: RTU-1-1

DDC Mult: 1.56

Size (In.) K Factor Req'd Vel Req'd CFM Final Vel Final CFM Notes

125 4W118 N Urology/General OR-5 T 22x48 1.1 909 1000 450 495

126 4W118 S Urology/General OR-5 T 22x48 1.1 909 1000 513 564

TOTAL 2000 1059

2000 1059

2000 1059

Associated Terminal Box/System: TU-1-4-6

Notes:

RTU-1-1 controls to a -999 CFM offset.

Max CFM Min CFM

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: Operating Rooms

OR-5 Return

Terminal Box: TU-1-4-1

DDC Mult: 2.88 DDC Add: 5

Size (In.) K Factor Req'd Vel Req'd CFM Final Vel Final CFM Notes

106 4W119 N Orthopedic OR-6 L2 10 1.0 280 280 225 225

107 4W119 Orthopedic OR-6 L2 10 1.0 280 280 287 287

108 4W119 Orthopedic OR-6 L2 10 1.0 280 280 335 335

109 4W119 Orthopedic OR-6 L2 10 1.0 280 280 291 291

110 4W119 S Orthopedic OR-6 L2 10 1.0 280 280 286 286

111 4W119 N Orthopedic OR-6 LCD 11'-0" 1.0 370 370 170 170

112 4W119 S Orthopedic OR-6 LCD 11'-0" 1.0 370 370 483 483

113 4W119 E Orthopedic OR-6 LCD 20'-0" 1.0 680 680 373 373

114 4W119 W Orthopedic OR-6 LCD 20'-0" 1.0 680 680 436 436

TOTAL 3500 2886

3500 2886

OR-6

Air Changes Per Hour ACH CFM Room Volume

(Ft³)

Req'd Final 2886 8164

20.0 21.2

Max CFM Min CFM Heating CFM

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: Operating Rooms

OR-6

4W119 OR-6 Corridor 0.01 0.042 0.037

4W119 OR-6 Clean Corridor Positive 0.001 N/A

Associated Terminal Box/System: RTU-1-6

Notes:

VAV box damper is fully open; maximum airflow possible at current system static pressure set point.

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: Operating Rooms

OR-6

Terminal Box: RTU-1-6

DDC Mult: 1.48

Size (In.) K Factor Req'd Vel Req'd CFM Final Vel Final CFM Notes

127 4W119 N Orthopedic OR-6 T 22x48 1.1 1023 1125 517 569

128 4W119 S Orthopedic OR-6 T 22x48 1.1 1023 1125 661 727

TOTAL 2250 1296

2250 1296

2250 1296

Associated Terminal Box/System: TU-1-4-1

Notes:

RTU-1-6 controls to a -999 CFM offset.

Max CFM Min CFM

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: Operating Rooms

OR-6 Return

Terminal Box: TU-1-413 Box Size: 12 DDC Mult: 7.38 DDC Add: 27

Size (In.) K Factor Req'd Vel Req'd CFM Final Vel Final CFM Notes

129 4S05A Scrub CD 6 1.0 90 90 200 200

130 4S05B Sterile CD 6 1.0 90 90 132 132

131 4S05 E Cystoscopy OR-8 CD 8 1.0 490 490 271 271

132 4S05 W Cystoscopy OR-8 CD 8 1.0 490 490 343 343

TOTAL 1160 946

1160 946

OR-8

Air Changes Per Hour ACH CFM Room Volume

(Ft³)

Req'd Final 946 3510

12.0 16.2

Reference Room Pressure Differential (In.)

From To Req'd Final Display

4S05 OR-8 Corridor Positive 0.01 0.008

Max CFM Min CFM Heating CFM

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: Operating Rooms

OR-8

Notes:

VAV box damper is fully open; maximum airflow possible at current system static pressure set point.

OR-8 is utilized as a Procedure Room with a reduced 12.0 ACH requirement.

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: Operating Rooms

OR-8

Size (In.) K Factor Final Vel Final CFM Notes

1 BC04 N Anteroom CD EX 1.0

2 BC04 S Anteroom CD EX 1.0

TOTAL 0

BC04 Anteroom

Air Changes Per Hour ACH CFM Room Volume

(Ft³)

Req'd Final 999

Reference Room Pressure Differential (In.)

From To Req'd Final Display

BC04 Ante Room Corridor Positive

Notes:

Room could not be located. Area was under renovation during testing in 2022.

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: SPD

BC04 Anteroom

Terminal Box: TAB-BW101-1 & 2 DDC Type: Air Valve

Room # Room Description Outlet Type

Size (In.) K Factor Final Vel Final CFM Notes

BW101 N Clean Storage CD EX 1.0 291 291

BW101 Clean Storage CD EX 1.0 315 315

BW101 S Clean Storage CD EX 1.0 296 296

BW101 SE Clean Storage CD EX 1.0 272 272

BW101 Clean Storage CD EX 1.0 313 313

BW101 Clean Storage CD EX 1.0 304 304

BW101 Clean Storage CD EX 1.0 291 291

BW101 SW Clean Storage CD EX 1.0 291 291

TOTAL 2373

Req'd Final

1920 2373

BW101 Clean Storage

Air Changes Per Hour ACH CFM Room Volume

(Ft³)

Req'd Final 2373 23213

4.0 6.1

Max CFM

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: SPD

BW101 Clean Storage Supply

BW101 Clean Storage BW107 Positive 0.004 N/A

BW101 Clean Storage Corridor (SE) Positive 0.010 N/A

BW101 Clean Storage BW101B Positive -0.002 N/A

BW101 Clean Storage Corridor (N) Positive 0.012 N/A

BW101 Clean Storage BW102 Positive 0.001 N/A

Associated Terminal Box/System: EAV-BW101

Notes:

BW101 Clean Storage is served by two (2) Air Valves; TAB-BW101-1 and TAB-BW101-2 at 960 CFM each.

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: SPD

BW101 Clean Storage Supply

Terminal Box: EAV-BW101

Size (In.) K Factor Final Vel Final CFM Notes

BW101 NE Clean Storage EG EX 1.1 178 196

BW101 SE Clean Storage EG EX 1.1 67 74

BW101 SW Clean Storage EG EX 1.1 100 110

TOTAL 380

Req'd Final

0 380

Associated Terminal Box/System: BW101-1 & BW101-2

Notes:

EAV-BW101 serves other areas (including BW101-B Office Areas), the maximum CFM setpoint is 2250 CFM and the DDC system reported 2254 CFM.

Max CFM

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: SPD

BW101 Clean Storage Exhaust

Terminal Box: TAB-BW101-B

Size (In.) K Factor Final Vel Final CFM Notes

BW101-B Office Area CD EX 1.0 114 114

BW101-B Office Area CD EX 1.0 111 111

BW101-B Office Area CD EX 1.0 123 123

BW101-B Office Area CD EX 1.0 111 111

TOTAL 459

Req'd Final

500 459

BW101-B Office Area

Air Changes Per Hour ACH CFM Room Volume

(Ft³)

Req'd Final 459 3654

7.5

Reference Room Pressure Differential (In.)

From To Req'd Final Display

BW101-B Office Area BW101 Clean Storage Negative 0.002 N/A

Associated Terminal Box/System: EAV-BW101

Max CFM

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: SPD

BW101-B Office Area Supply

Terminal Box: EAV-BW101

Size (In.) K Factor Final Vel Final CFM Notes

BW101-B Office Area EG EX 1.1 112 123

TOTAL 123

Req'd Final

0 123

Reference Room Pressure Differential (In.)

From To Req'd Final Display

BW101-B Office Area BW101 Clean Storage Negative 0.001 N/A

Notes:

EAV-BW101 serves other areas (including BW101 Clean Storage), the maximum CFM setpoint is 2250 CFM and the DDC system reported 2254 CFM.

Max CFM

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: SPD

BW101-B Office Area Exhaust

Terminal Box: TAB-BW102B

Size (In.) K Factor Final Vel Final CFM Notes

BW102 NW Decontamination CD Ex 1.0 76 76

BW102 Decontamination CD Ex 1.0 177 177

BW102 NE Decontamination CD Ex 1.0 138 138

BW102 SW Decontamination CD Ex 1.0 96 96

BW102 Decontamination CD Ex 1.0 100 100

BW102 SE Decontamination CD Ex 1.0 125 125

TOTAL 712

Req'd Final

0 712

Associated Terminal Box/System: EAV-BW102-1

Max CFM

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: SPD

BW102 Decontamination Supply

Terminal Box: EAV-BW102-1

Size (In.) K Factor Final Vel Final CFM Notes

BW102 Decontamination CD EX 1.1 300 330

BW102 Decontamination EG EX 1.1 595 655

TOTAL 985

Req'd Final

0 985

BW102 Decontamination

Air Changes Per Hour ACH CFM Room Volume

(Ft³)

Req'd Final 985 7235

6.0 8.2

Reference Room Pressure Differential (In.)

From To Req'd Final Display

BW102 Decontamination BC04 Ateroom Negative 0.002 0.002

Associated Terminal Box/System: TAB-BW102B

Notes:

EAV-BW102-1 serves other areas, the maximum CFM setpoint is 2500 CFM and the DDC system reported 2485 CFM.

Max CFM

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: SPD

BW102 Decontamination Exhaust

Terminal Box: TAB-BW102-2

Size (In.) K Factor Final Vel Final CFM Notes

BW102 NW Preparation CD EX 1.0 368 368

BW102 Preparation CD EX 1.0 368 368

BW102 SW Preparation CD EX 1.0 330 330

BW102 NE Preparation CD EX 1.0 469 469

BW102 SE Preparation CD EX 1.0 365 365

TOTAL 1900

Req'd Final

1800 1900

BW102 Preparation

Air Changes Per Hour ACH CFM Room Volume

(Ft³)

Req'd Final 1900 9609

4.0 11.9

Reference Room Pressure Differential (In.)

From To Req'd Final Display

BW102 Preapration BW101 Clean Storage Positive -0.001 N/A

Max CFM

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: SPD

BW102 Preparation Supply

Terminal Box: TAB-BW107

Size (In.) K Factor Final Vel Final CFM Notes

BW107 NW Logistics Medical CD EX 1.0 81 81

BW107 NE Logistics Medical CD EX 1.0 117 117

BW107 SW Logistics Medical CD EX 1.0 118 118

BW107 SE Logistics Medical CD EX 1.0 133 133

TOTAL 449

Req'd Final

0 449

BW107 Logistics Medical

Air Changes Per Hour ACH CFM Room Volume

(Ft³)

Req'd Final 449 3307

8.1

Reference Room Pressure Differential (In.)

From To Req'd Final Display

BW107 Logistics Medical BW101 Clean Storage Negative -0.007 N/A

BW107 Logistics Medical Corridor Positive 0.008 N/A

BW107 Logistics Medical BW101-B Office Area N/A -0.002 N/A

Associated Terminal Box/System: BW107 Exhaust

Max CFM

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: SPD

BW107 Logistics Medical Supply

Terminal Box: EAV

Size (In.) K Factor Final Vel Final CFM Notes

BW107 Logistics Medical EG EX 1.1 68 75

TOTAL 75

Req'd Final

0 75

Associated Terminal Box/System: TAB-BW107

Max CFM

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: SPD

BW107 Logistics Medical Exhaust

Terminal Box: TAB-2W179

DDC Mult: 2.03 DDC Add: 5

Size (In.) K Factor Final Vel Final CFM Notes

2W179 NW Cath Lab LD EX 1.0 408 408

2W179 SW Cath Lab LD EX 1.0 420 420

2W179 NE Cath Lab LD EX 1.0 398 398

2W179 SE Cath Lab LD EX 1.0 383 383

TOTAL 1609

Req'd Final

1600 1609

2W179 Cath Lab

Air Changes Per Hour ACH CFM Room Volume

(Ft³)

Req'd Final 1609 6693

12.0 14.4

Reference Room Pressure Differential (In.)

From To Req'd Final Display

2W179 Cath Lab Corridor Positive 0.001 0.001

Max CFM

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: Cath Labs

2W179 Cath Lab Supply

Reported supply airflow is the required airflow to obtain proper room pressure relationship. The two (2) return/exhaust inlets are capped off with sheet metal.

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: Cath Labs

2W179 Cath Lab Supply

Terminal Box: TAB-2W180

DDC Mult: 1.63 DDC Add: 9

Size (In.) K Factor Final Vel Final CFM Notes

2W180 NW Cath Lab LD EX 1.0 413 413

2W180 SW Cath Lab LD EX 1.0 400 400

2W180 SE Cath Lab LD EX 1.0 391 391

2W180 NE Cath Lab LD EX 1.0 366 366

TOTAL 1570

Req'd Final

1600 1570

2W180 Cath Lab

Air Changes Per Hour ACH CFM Room Volume

(Ft³)

Req'd Final 1570 6690

12.0 14.1

Reference Room Pressure Differential (In.)

From To Req'd Final Display

2W180 Cath Lab Corridor Positive 0.010 0.007

Max CFM

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: Cath Labs

2W180 Cath Lab Supply

The two (2) return/exhaust inlets are capped off with sheet metal.

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Critical Room Outlet Schedule

Associated System: Existing Description: Cath Labs

2W180 Cath Lab Supply

OR-1 to OR-6 Room Layout

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Instrument List & Calibration Data

Following are the standard instruments utilized for the Testing, Adjusting & Balancing work.

Copy(s) of the current calibration certificate(s) for specific instrumentation used for the project is/are included.

Airflow Measurements:

Shortridge Instruments electronic manometer. Shortridge Instruments recommends calibration every two (2) years.

Evergreen Telemetry Air TAB Kit. Evergreen Telemetry recommends calibration every two

(2) years.

Water Flow Measurements:

Shortridge Instruments hydrodata mutlimeter. Shortridge Instruments recommends calibration every two (2) years.

Alnor hydronic manometer. Alnor recommends annual calibration.

Evergreen Telemetry Water TAB Kit. Evergreen Telemetry recommends calibration every two (2) years.

Fuji Ultrasonic Flow Meter. Fuji recommends calibration every two (2) years.

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

Evergreen Telemetry Air Meter

Systems Management & Balancing, Inc.

925 S.E. Olson Drive Waukee, IA 50263

PH 515-987-2825

VAMC 2023 ORs, SPD & Cath Labs Certification Iowa City, IA

TEST, ADJUST & BALANCE ANALYSIS REPORT
Table of Contents
Notes:
Notes:
Notes:
Notes:
Notes:
Notes:
Notes:
Notes:
Notes:
Notes:
Notes:
Notes:
Notes:
Notes:
Notes:
Notes:
Notes:
Notes:
Notes:
Notes:
OR-1 to OR-6 Room Layout
Instrument List & Calibration Data
Evergreen Telemetry Air Meter

File details come from the government source that posted it. Updated .