36C26318Q0172-002.pdf
PDF 158 KB Posted
- Attached to
- X-Ray Services Marshalltown CBOC Federal contract opportunity
- Solicitation number
- 36C26318Q0172
About this file
36C26318Q0172 S02 Attachment 1 - QASP_Radiology Services_Marshalltown CBOC_VACIHCS[1].pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| -13001.docx | DOCX document | |
| 36C26318Q0172-00002000.docx | DOCX document | |
| 36C26318Q0172-00001000.docx | DOCX document | |
| 36C26318Q0172-00001001.docx | DOCX document | |
| 36C26318Q0172-001.pdf | ||
| 36C26318Q0172-007.pdf | ||
| 36C26318Q0172-006.pdf | ||
| 36C26318Q0172-008.pdf | ||
| 36C26318Q0172-009.pdf | ||
| 36C26318Q0172-004.pdf | ||
| 36C26318Q0172-000.docx | DOCX document | |
| 36C26318Q0172-005.pdf | ||
| 36C26318Q0172-003.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1 Quality Assurance Surveillance Plan (QASP)
The contractor will be evaluated in accordance with the following:
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
• What will be monitored?
• How monitoring will take place.
• Who will conduct the monitoring?
• How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship.
The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO:
Contracting Officer Network Contracting Office 23 708 South Third Street, Suite 200E Minneapolis, MN 55415 Phone: 612-344-2143 Fax: 612-333-3667
Organization or Agency:
b. Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file.
The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: Amy DoBraska 3600 30th Street Des Moines, IA 50310-5774 Phone: 515-699-5908 Fax: 515-699-5909
Organization or Agency: VA Central Iowa Health Care System
3. CONTRACTOR REPRESENTATIVES
The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract.
Primary Contact: Amy DoBraska
4. PERFORMANCE STANDARDS
The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined. Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.
The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.
5. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a) PERIODIC INSPECTION. Inspections scheduled and reported quarterly per COR delegation or as needed. Ten
(10) randomly selected patient files will be reviewed per inspection period. All inspections and reports will be conducted in compliance with VA Privacy and Information security standards.)
b) RANDOM SAMPLING. Ten (10) randomly selected patient files will be reviewed per quarter. All reviews and reports will be conducted in compliance with VA Privacy and Information security standards.)
c) VERIFICATION AND/OR DOCUMENTATION PROVIDED BY CONTRACTOR. Contractor shall provide verification of licensing upon initiating contract to COR for contract physician(s). Contractor shall provide verification and documents on licensing, registration(s) and certification(s) for contract physician (s) shall be provided as they are renewed. Licensing and registration information is to be kept current. Contractor shall provide proof of training completion to VA.
1. Performance Measures
Measures PWS Reference
Performance Requirement
Standard Acceptable Quality Level
Surveillance Method
Met AQL/DID NOT
MEET AQL-
CPAR
RATING/ADD
COMMENTS
1-Schedule of Services Section I. Images on CD delivered to a government representative within 24 Hours (routine) and 1 hour for emergencies.
97% of the cases are transmitted to the VA within 24 hours. 100% for emergencies.
97% Routine/100% emergencies.
Periodic Inspection
2 - Qualifications of Key Personnel
Section I. The contractor is required to maintain a current competence assessment checklist (an assessment of knowledge, skills, abilities, and behaviors required to perform a job correctly and skillfully.
All (100%) Contractor’s employee files are maintained
100% Verification and/or documentation provided by Contractor
3 – Billing for Services Section II., 3.6.4
The invoices shall be accurate and shall display the date of procedure, the name of the patient, the detailed list of the CPTs performed, unit price, and total invoice amount.
100% 95% of the invoices will not require re-work.
Periodic Inspection
4- Patient Access Section I. Patient wait time for x-rays shall not exceed 30 minutes
95% of the time 95% Periodic Inspection
a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORT (CPAR).
b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines formal written communication is required, the COR shall prepare a Contract Report (CR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.
The contractor shall acknowledge receipt of the CR in writing. The CR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CR will also state how long after receipt the contractor has to present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.
Any CRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO. See Sample CR on the following page.
9. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP
SIGNED:
COR NAME/TITLE DATE
SIGNED:
CONTRACTOR NAME/TITLE DATE
vhacihdobraa Typewritten Text vhacihdobraa Typewritten Text vhacihdobraa Typewritten Text 06/26/2017 vhacihdobraa Typewritten Text
CONTRACT REPORT
1. CONTRACT NUMBER 2. REPORT NUMBER FOR THIS DISCREPANCY
3. TO: (Contracting Officer) 4. FROM: (Name of COR)
5. DATES
a. CR PREPARED
b. RETURNED BY
CONTRACTOR:
c. ACTION COMPLETE
6. Issue Identified (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)
7. SIGNATURE OF COR Date:
8. SIGNATURE OF CONTRACTING OFFICER Date:
9a. TO (Contracting Officer) 9a. FROM (Contractor)
10. CONTRACTOR RESPONSE AS TO CAUSE AND ACTIONS TO PREVENT RECURRENCE.
(Cite applicable quality control program procedures or new procedures. Attach continuation sheet(s) if necessary.)
11. SIGNATURE OF CONTRACTOR REPRESENTATIVE Date:
12. GOVERNMENT EVALUATION.
13. GOVERNMENT ACTIONS
14. CLOSE OUT
NAME TITLE SIGNATURE DATE
CONTRACTOR
NOTIFIED
COR
CONTRACTING
OFFICER
| Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP. |
| a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORT (CPAR). |
| 2017-06-27T14:58:39-0500 | |
| AMY C. DOBRASKA 282916 |
File details come from the government source that posted it.