36C26220R0116_3.docx

DOCX document 19 KB Posted

Attached to
R425-- STORMWATER MANAGMENT Federal contract opportunity
Solicitation number
36C26220R0116
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22

View the file

Other files for this federal contract opportunity

Other files attached to R425-- STORMWATER MANAGMENT, newest first.
File Type Posted
36C26220R0116_2.docx DOCX document
36C26220R0116_1.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Opportunity Amendment to a Previous Combined Solicitation

PRODUCT SERVICE CODE

SUBJECT

CONTRACTING OFFICE'S

ZIP-CODE

SOLICITATION NUMBER

BASE NOTICE TYPE

RESPONSE DATE/TIME/ZONE

ARCHIVE

DAYS AFTER THE RESPONSE DATE

RECOVERY ACT FUNDS

SET-ASIDE

NAICS CODE

CONTRACTING OFFICE

ADDRESS

POINT OF CONTACT

(POC Information Automatically Filled from User Profile Unless Entered)

DESCRIPTION

See Attachment

AGENCY'S URL

URL DESCRIPTION

AGENCY CONTACT'S EMAIL

ADDRESS

EMAIL DESCRIPTION

ADDRESS

POSTAL CODE

COUNTRY

ADDITIONAL INFORMATION

GENERAL INFORMATION

PLACE OF PERFORMANCE

* = Required Field Contract Opportunity Amendment to a Previous Combined Solicitation R425

STORMWATER MANAGMENT

90815 36C26220R0116 08-10-2020 10:00

PACIFIC TIME, LOS ANGELES, USA

N

SDVOSBC

541330 Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite 600 Long Beach CA 90815

The purpose of this Amendment is to:

1. Publish the answers to questions.

2. Update Page 11, B.3.1 SCOPE

3. Update B.2 SCHEDULE OF SERVICES AND PRICE

4. Add line item 0002, 1002, 2002, 3002, 4002

5. The offeror is reminded to acknowledge receipt of amendments to the Solicitation.

6. Offerors shall submit proposals via email to Lee Tanner at lee.tanner@va.gov by 08/10/2020, 10:00 AM (PDT): All proposals/attachments in response to this RFP shall be in Adobe or Microsoft Word Format. It is the offeror’s responsibility to ensure all required documents are included and received by the solicitation due date and time. Offeror(s) may be precluded from further consideration if all requested information is not received by the specified due date and time.

Page 11, B.3.1 Scope The Contractor shall provide all labor, materials, reports, parts, equipment, tools, transportation, parking, hazardous/nonhazardous waste disposal, and all permits as required to perform Storm Water Management Services at VASDHS. The Contractor shall develop and implement a comprehensive five-year Storm Water Management Plan for VASDHS. The Government will reimburse all permit fees.

B.2 SCHEDULE OF SERVICES AND PRICE

The Department of Veterans Affairs intends to award a Fixed-Price contract to provide Storm Water Management Services for the Department of Veterans Affairs, San Diego Healthcare System (VASDHS).

The contract period shall be for one (1) base year, with the Government having the option to exercise four (4) one-year option periods.

Base Year – 09/01/2020 – 08/31/2021

Item Number
Description
Quantity
Unit
Unit Price
Total
0001
Storm Water Management Services
12
MO
$
0002
Permit Reimbursement
TBD
JB
$
$

Total Cost

Option Year 1 – 09/01/2021 – 08/31/2022

Item Number
Description
Quantity
Unit
Unit Price
Total
1001
Storm Water Management Services
12
MO
$
1002
Permit Reimbursement
TBD
JB
$
$

Option Year 2 –09/01/2022 – 08/31/2023

Item Number
Description
Quantity
Unit
Unit Price
Total
2001
Storm Water Management Services
12
MO
$
2002
Permit Reimbursement
TBD
JB
$
$

Option Year 3 – 09/01/2023 – 08/31/2024

Item Number
Description
Quantity
Unit
Unit Price
Total
3001
Storm Water Management Services
12
MO
$
3002
Permit Reimbursement
TBD
JB
$
$

Option Year 4 – 09/01/2024 – 08/31/2025

Item Number
Description
Quantity
Unit
Unit Price
Total
4001
Storm Water Management Services
12
MO
$
4002
Permit Reimbursement
TBD
JB
$
$

PRICE TOTAL SUMMARY

Base Year

09/01/2020 – 08/31/2021
$

Option Year 1

09/01/2021 – 08/31/2022
$

Option Year 2

09/01/2022 – 08/31/2023
$

Option Year 3

09/01/2023 – 08/31/2024
$

Option Year 4

09/01/2024 – 08/31/2025
$

TOTAL AGGERATE COST FOR BASE PLUS FOUR (4) OPTION YEARS

STORM WATER MANAGEMENT VASD 36C26220R0116

QUESTIONS
ANSWERS

1. Is this related to the SMARTS Industrial permit application id 461195?

Yes Industrial Stormwater Program

2. Are there any new disturbances (Clearing/Grading/new parking lots/utilities)? If so, How Many acres been disturbed?
No
3. What materials, parts, equipment, tools will be required to provide?
All materials, parts, equipment, tools as required to meet SMARTS Compliance for the facility.
4. Is the Hazardous/nonhazardous waste disposal the responsibility of the prime contractor?
Yes
5. By “all permits”, is Contractor responsible for the permit fees?
The Government will pay all permit fees.
6. Is the Contractor responsible for drain cleaning & service, spill kits, spills cleaning, inlet protector’s placement & maintenance, waste disposal, secondary containments?
Yes
7. Specific Task 2.8 call for contractor to “correct all noted deficiencies”. That is difficult to quantify and price as deficiencies are currently unknown as are future deficiencies. Can VA provide an allowance to use for bidding purposes?
No. The Contractor is not responsible for installing post-construction BMP’s. The Contractor is responsible to ensure they are installed. This will be coordinated with the COR.
8. Specific Task 2.13 calls for contractor to “ensure post-construction stabilization BMPs installed to reduce or eliminate pollutants are effective and properly maintained”. Is contractor to ensure BMPs by others are effective or is contractor responsible for installing?
Ensure BMP’s by others are effective
9. If contractor is responsible for installing post-construction BMPs, how is that to be quantified over 5 years not knowing what construction projects will be taking place?
The Contractor is not responsible for installing post-construction BMP’s. The Contractor is responsible to ensure they are installed. This will be coordinated with the COR.
10. Please clarify if the scope of work under this solicitation is for the implementation and management of the stormwater plan or does it include the procurement and implementation of BMPs?
Implementation and management of the stormwater plan
11. Do As-Built drawings exist for the on-site stormwater infrastructure? If so, Are they available for review before the proposal due date?
Unknown
12. Section 2.8 of the Specific Tasks (Pg. 9 of Solicitation) states “The contractor shall document and correct all noted deficiencies to ensure that VASDHS remains compliant.” Are any existing deficiencies known at this time? If so, can details be provided?
None known at this time
13. Task 2.3: Is contractor to provide labels, stickers, or placards for each inlet structure?
Yes
14. Task 2.7: Is any sampling or testing (turbidity, TSS, etc.) required. Is all monitoring subjective and then followed-up with corrective action to effectively implement BMPs or fix ineffective installations?
As required to meet SMARTS Compliance for the facility.
15. Can a portion of the fee proposal be structured as hourly as much of the investigative work would need to be done to determine the magnitude of scope?
The contract is a firm fixed price.
16. The project area is ~38 acres. What is intended scope of survey? Location and pipe size only? Structure inverts and rim elevations?
All as required to meet SMARTS Compliance for the facility.
17. What is the desired output/platform of the storm survey? GIS or CAD? IS there any existing data or historical information that the VA is wanting integrated into the new survey?
PDF and or to be determined by the COR.

File details come from the government source that posted it. Updated .