36C26220Q0585-0001001.pdf
PDF Posted
- Attached to
- J058--Microwave Comm System Repair Federal contract opportunity
- Solicitation number
- 36C26220Q0585
About this file
This is a combined synopsis/solicitation for commercial services from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22. The solicitation seeks a firm fixed price contract to repair a microwave communication system connecting VA campuses in Greater Los Angeles. Services include installing microwave dishes and ice shields at Mount Disappointment; performing link alignments; upgrading network switches, controllers, and storage servers; and running and terminating cables. The contractor must have tower climbing and rigging certifications and coordinate access to Mount Disappointment at least five days prior. Quotes are due by April 10, 2020. The solicitation is 100% set aside for Service-Disabled Veteran-Owned Small Businesses. The applicable NAICS code is 517919 and size standard is $35 million.
36C26220Q0585 0001 S05-Initial RFIs.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26220Q0585-0002001.docx | DOCX document | |
| 36C26220Q0585-0001002.pdf | ||
| 36C26220Q0585-0001003.zip | ZIP file | |
| 36C26220Q0585-0001000.docx | DOCX document | |
| 36C26220Q0585-000.docx | DOCX document | |
| 36C26220Q0585-002.docx | DOCX document | |
| 36C26220Q0585-001.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Initial RFIs Solicitation 36C26220Q0585
1. Please share the switch: / radio mfg type: per 2.A.1.C. Perform link alignment and point-to-point functional test to/from Mount Disappointment:
VA RESPONSE: Extreme Networks and Cambium Networks switch, Cambium Networks PTP 820C FIPS-140 compliant
2. Is the equipment called out in RFP Government furnished? If yes, are availability requirements and equipment specifications able to be shared at each site?
VA RESPONSE: Yes
3. What Tool / Tools are being utilized to manage the current network environment?
VA RESPONSE: N/A Proposed in Point to Point Upgrade Cambium Networks controller appliance and cnMaestro wireless network manager
4. Please provide installation specifications for all equipment.
VA RESPONSE: See enclosed Installation Specifications PDF
5. Given CA shelter in place mandate, do we need to bring PPE to Site Survey and will we need to utilize own vehicles to access sites?
VA RESPONSE: The wear of PPE would be user discretion; vendors would bring their own vehicles.
6. How many Total links are part of the OVERAL Greater Los Angeles Healthcare System?
VA RESPONSE: Two microwave links, SACC to Mt. Disappointment and LAOPC to Mt.
Disappointment
7. Please provide a network path design / assessment for each site, each link, and as a system.
VA RESPONSE: See enclosed VA 02_20_2020 with Freq from NTIA PDF
8. Which Frequency Band / Bands is the system currently operating: NTIA Certified, FCC (Part 101), FCC (Part 15)?
VA RESPONSE: LAOPC Tx 7465.000MHz Rx 7165MHz, SACC Tx 8425.000MHz Rx 8065.000MHz See attached Freq VA 130085 and Freq VA 130087
Project VA 02_20_2020 with Freq from NTIA LINKPlanner PTP Installation Report
03 April 2020 Cambium Networks
Organization: Cambium Networks Phone: 1-888-863-5250 m ile s miles center = 34.14894N 118.29361W
0 10-10
-10
Cambium Networks - LINKPlanner
Bldg. SACC 16m-55' Mt. Disappointment
Bldg.LAOPC 27m-80'
MT.D 45'
Table of Contents
31. Project Summary
62. Bldg. SACC 16m-55' to Mt. Disappointment
123. Bldg.LAOPC 27m-80' to Mt. Disappointment
18Disclaimer
1. Project Summary
Project: VA 02_20_2020 with Freq from NTIA
General Information Customer Name Company Name VA Federal Police Address Phone Cell Phone Email
Network Map m ile s miles center = 34.14894N 118.29361W
0 10-10
-10
-20
Cambium Networks - LINKPlanner
Bldg. SACC 16m-55' Mt. Disappointment
Bldg.LAOPC 27m-80'
MT.D 45'
Project VA 02_20_2020 with Freq from NTIA - 1. Project Summary LINKPlanner version 5.2.3 Installation Report
Link name Product
Primary Local antenna
Primary Remote antenna
Max aggregate IP throughput
Bldg. SACC 16m-55' to Mt.
Disappointment
PTP08820G with
RFU-C
Cambium Networks 4ft Single Pol (NA & CALA Only) N070082D308 - Direct
Cambium Networks 4ft Single Pol (NA & CALA Only) N070082D308 - Direct 518.28 Mbps
Bldg.LAOPC 27m-80' to Mt.
Disappointment
PTP07820G with
RFU-C
Cambium Networks 4ft Single Pol (NA & CALA Only) N070082D308 - Direct
Cambium Networks 4ft Single Pol (NA & CALA Only) N070082D308 - Direct 504.72 Mbps
Bill of Materials : PTP Network Part Number Qty Description 01010419001 2 Coaxial Cable Grounding Kits for 1/4" and 3/8" Cable
07009304001 8 Hoisting Grip for CNT-400 cable
30010194001 4 50 Ohm Braided Coaxial Cable - 75 meter
C000082M021 4 PTP 820G NTIA FIPS-140 Ready, Dual Modem, Eth + 16 E1/T1
C070082R261 2 PTP 820 RFU-C,NTIA 7GHz,TR300,Ch1W5,Hi,7434.5-7585.5MHz
C070082R262 2 PTP 820 RFU-C,NTIA 7GHz,TR300,Ch1W5,Lo,7134.5-7285.5MHz
C080082R167 2 PTP 820 RFU-C,NTIA 8GHz,TR360,Ch9W13,Hi,8335-8485MHz
C080082R168 2 PTP 820 RFU-C,NTIA 8GHz,TR360,Ch9W13,Lo,7975-8125MHz
EW-E4PT82M2-WW 4 PTP 820G IDU (Dual Modem) Extended Warranty, 4 Addl Years
EW-E4PT82RC-WW 8 PTP820G RFU-C Extended Warranty, 4 Additional Years
N000000D037 4 SIDE STRUTS / STABILIZER ARMS 4/6FT
N000081L006 8 TNC Male Right Angle for CNT-400 braided cable
N000082K027 8 PTP 820 Act.Key - AES Key 256 bit - Per Tx Chan
N000082L028 4 PTP 820G Act.Key - 2nd Modem Activation
N000082L133 8 PTP 820 Act.Key - Capacity 300M with ACM Enabled, Per Tx Chan
N070082D308 4 PTP 820 4' ANT,SP,7_8GHz,RFU-C TYPE&UBR84 - Radiowave.
Only available for order in North America and CALA regions
N070082L301 4 PTP 820 RFU-C 7_8GHz Coupler KIT
N070082L304 4 PTP 820 RFU-C 7_8GHz Twist Adaptor KIT
WB3616 8 Coaxial Cable Installation Assembly Kit (W/O LPU End Kit)
WB3657 8 LPU End Kit PTP 800/820
Project VA 02_20_2020 with Freq from NTIA - 1. Project Summary LINKPlanner version 5.2.3 Installation Report
2. Bldg. SACC 16m-55' to Mt. Disappointment
Summary (Primary to Primary) Link Name Bldg. SACC 16m-55' to Mt. Disappointment Customer Company Name VA Federal Police Profile Type Line-of-Sight Equipment Type PTP08820G with RFU-C Maximum Obstruction 40 feet Link Distance 21.611 miles Free Space Path Loss 141.47 dB Excess Path Loss 0.00 dB User IP Throughput Expectation Aggregate Aggregate 518.28 Mbps assuming PTP-820 Series running the Release 10.9.6 software RF Frequency Band 8 GHz (7750 to 8500 MHz) RF Channel Bandwidth 30 MHz Description 8065.000 L TDM Channels 0 E1 with a reliability of 100.0000 %
Path Profile (Primary to Primary)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Range on path (miles)
He ig ht A bo ve
S ea
L ev el (f ee t)
Bldg. SACC 16m-55' Mt. Disappointment
Cambium Networks - LINKPlanner
He ig ht A bo ve
S ea
L ev el (f ee t)
Link Configuration Link Type 1+1 HSB Radio Protection T/R Spacing 360 MHz Bandwidth 30 MHz Modulation Mode Adaptive Maximum Mod Mode 10 - 2048QAM Minimum Mod Mode 0 - QPSK Polarization Vertical ATPC Disabled
Link Configuration (continued) Header Compression Disabled TDM Type None Hi Bldg. SACC 16m-55' Lo Mt. Disappointment
Bill of Materials Part Number Qty Description 07009304001 4 Hoisting Grip for CNT-400 cable
30010194001 2 50 Ohm Braided Coaxial Cable - 75 meter
C000082M021 2 PTP 820G NTIA FIPS-140 Ready, Dual Modem, Eth + 16 E1/T1
C080082R167 2 PTP 820 RFU-C,NTIA 8GHz,TR360,Ch9W13,Hi,8335-8485MHz
C080082R168 2 PTP 820 RFU-C,NTIA 8GHz,TR360,Ch9W13,Lo,7975-8125MHz
EW-E4PT82M2-WW 2 PTP 820G IDU (Dual Modem) Extended Warranty, 4 Addl Years
EW-E4PT82RC-WW 4 PTP820G RFU-C Extended Warranty, 4 Additional Years
N000000D037 2 SIDE STRUTS / STABILIZER ARMS 4/6FT
N000081L006 4 TNC Male Right Angle for CNT-400 braided cable
N000082K027 4 PTP 820 Act.Key - AES Key 256 bit - Per Tx Chan
N000082L028 2 PTP 820G Act.Key - 2nd Modem Activation
N000082L133 4 PTP 820 Act.Key - Capacity 300M with ACM Enabled, Per Tx Chan
N070082D308 2 PTP 820 4' ANT,SP,7_8GHz,RFU-C TYPE&UBR84 - Radiowave.
Only available for order in North America and CALA regions
N070082L301 2 PTP 820 RFU-C 7_8GHz Coupler KIT
N070082L304 2 PTP 820 RFU-C 7_8GHz Twist Adaptor KIT
WB3616 4 Coaxial Cable Installation Assembly Kit (W/O LPU End Kit)
WB3657 4 LPU End Kit PTP 800/820
Physical Installation Notes for Bldg. SACC 16m-55' Link Name Bldg. SACC 16m-55' to Mt. Disappointment Latitude 34.24452N Longitude 118.48241W Site Elevation 942 feet AMSL Antenna Configuration Common Antenna - Asymmetric Coupling Polarization Vertical Hardware Platform (Primary) PTP08820G with RFU-C - C080082R167 Hardware Platform (Secondary) PTP08820G with RFU-C - C080082R167 Antenna Type Cambium Networks 4ft Single Pol (NA & CALA Only)
N070082D308 - Direct Antenna Beamwidth 2.4° Antenna Gain 37.16 dBi Antenna Height 55.0 feet AGL
Project VA 02_20_2020 with Freq from NTIA - 2. Bldg. SACC 16m-55' to Mt. DisappointmentLINKPlanner version 5.2.3 Installation Report
Physical Installation Notes for Bldg. SACC 16m-55' (continued) Antenna Tilt Angle 2.4° (uptilt) Bearing to Mt. Disappointment 89.57° from True North
77.66° from Magnetic North Magnetic Declination 11.92° E ±0.33° changing by 0.09° W per year RF Feeder Loss (Primary) 1.6 dB RF Feeder Loss (Secondary) 6.0 dB
Physical Installation Notes for Mt. Disappointment Link Name Bldg. SACC 16m-55' to Mt. Disappointment Latitude 34.24627N Longitude 118.10487W Site Elevation 5931 feet AMSL Antenna Configuration Common Antenna - Asymmetric Coupling Polarization Vertical Hardware Platform (Primary) PTP08820G with RFU-C - C080082R168 Hardware Platform (Secondary) PTP08820G with RFU-C - C080082R168 Antenna Type Cambium Networks 4ft Single Pol (NA & CALA Only)
N070082D308 - Direct Antenna Beamwidth 2.4° Antenna Gain 36.94 dBi Antenna Height 10.0 feet AGL Antenna Tilt Angle -2.6° (downtilt) Bearing to Bldg. SACC 16m-55' 269.79° from True North
257.95° from Magnetic North Magnetic Declination 11.84° E ±0.33° changing by 0.09° W per year RF Feeder Loss (Primary) 1.6 dB RF Feeder Loss (Secondary) 6.0 dB
Radio Commissioning Notes for Bldg. SACC 16m-55' - Primary Radio Interface Radio:Slot 2, port 1 Tx Frequency 8425.000 MHz Rx Frequency 8065.000 MHz Tx to Rx Frequency Separation 360.000 MHz Tx Level 26 dBm MRMC Script FCC 1005 MRMC Script Operational Mode Adaptive MRMC Script Maximum Profile 10, 2048QAM MRMC Script Minimum Profile 0, QPSK Adaptive Tx Power Admin Enable ATPC Configuration Disabled Header Compression Disabled Radio Protection Group Type 1+1-HSB Radio Protection Group Number 1 Radio Protection Group Member 1 Radio: Slot 1, port 1
Project VA 02_20_2020 with Freq from NTIA - 2. Bldg. SACC 16m-55' to Mt. DisappointmentLINKPlanner version 5.2.3 Installation Report
Radio Commissioning Notes for Bldg. SACC 16m-55' - Primary (continued) Radio Protection Group Member 2 Radio: Slot 1, port 2 BNC Voltage 1.41 to 1.49 Volts Predicted Receive Power (Primary to Primary) -45 dBm ± 4 dB while aligning
Radio Commissioning Notes for Bldg. SACC 16m-55' - Secondary Radio Interface Radio:Slot 2, port 2 Tx Frequency 8425.000 MHz Rx Frequency 8065.000 MHz Tx to Rx Frequency Separation 360.000 MHz Tx Level 26 dBm MRMC Script FCC 1005 MRMC Script Operational Mode Adaptive MRMC Script Maximum Profile 10, 2048QAM MRMC Script Minimum Profile 0, QPSK Adaptive Tx Power Admin Enable ATPC Configuration Disabled Header Compression Disabled Radio Protection Group Type 1+1-HSB Radio Protection Group Number 1 Radio Protection Group Member 1 Radio: Slot 1, port 1 Radio Protection Group Member 2 Radio: Slot 1, port 2 BNC Voltage 1.46 to 1.54 Volts Predicted Receive Power (Secondary to Secondary) -50 dBm ± 4 dB while aligning
Radio Commissioning Notes for Mt. Disappointment - Primary Radio Interface Radio:Slot 2, port 1 Tx Frequency 8065.000 MHz Rx Frequency 8425.000 MHz Tx to Rx Frequency Separation 360.000 MHz Tx Level 26 dBm MRMC Script FCC 1005 MRMC Script Operational Mode Adaptive MRMC Script Maximum Profile 10, 2048QAM MRMC Script Minimum Profile 0, QPSK Adaptive Tx Power Admin Enable ATPC Configuration Disabled Header Compression Disabled Radio Protection Group Type 1+1-HSB Radio Protection Group Number 1 Radio Protection Group Member 1 Radio: Slot 1, port 1 Radio Protection Group Member 2 Radio: Slot 1, port 2 BNC Voltage 1.41 to 1.49 Volts Predicted Receive Power (Primary to Primary) -45 dBm ± 4 dB while aligning
Project VA 02_20_2020 with Freq from NTIA - 2. Bldg. SACC 16m-55' to Mt. DisappointmentLINKPlanner version 5.2.3 Installation Report
Radio Commissioning Notes for Mt. Disappointment - Secondary Radio Interface Radio:Slot 2, port 2 Tx Frequency 8065.000 MHz Rx Frequency 8425.000 MHz Tx to Rx Frequency Separation 360.000 MHz Tx Level 26 dBm MRMC Script FCC 1005 MRMC Script Operational Mode Adaptive MRMC Script Maximum Profile 10, 2048QAM MRMC Script Minimum Profile 0, QPSK Adaptive Tx Power Admin Enable ATPC Configuration Disabled Header Compression Disabled Radio Protection Group Type 1+1-HSB Radio Protection Group Number 1 Radio Protection Group Member 1 Radio: Slot 1, port 1 Radio Protection Group Member 2 Radio: Slot 1, port 2 BNC Voltage 1.45 to 1.53 Volts Predicted Receive Power (Secondary to Secondary) -49 dBm ± 4 dB while aligning
Regulatory Conditions Regulation NTIA Band 8 GHz Max EIRP 61.6 dBm Output Power 26.0 dBm
Installation Instruction Perform the following checks during the installation (Check the deployment guide and the User Guide.)
1. Check with a GPS that you are installing at the correct location.
2. Check carefully the direction to the other end of the link. Either use a corrected compass or use the GPS waypoint feature about 300 meters from the installation location.
3. When aligning antennas, it is important to find the centre of the main beam. This is done by adjusting the antenna at each end of the link in turn and monitoring the receive level until the peak is found. Once the peak level is found, it should be checked against the prediced receive power to ensure that the antennas have not been aligned on a side lobe.
4. An hour after alignment is complete, if ATPC is disabled, check that the mean value for the RSL is as predicted (see previous tables). Also check that the received power is not greater than -30dBm with ATPC enabled or disabled.
Bldg. SACC 16m-55' Performance (Bldg. SACC 16m-55' to Mt. Disappointment) * Frame Size 1518 Bytes Mean IP Throughput Predicted 258.99 Mbps Mean IP Throughput Required 250.00 Mbps Minimum IP Throughput Required 205.00 Mbps Minimum IP Throughput Availability Predicted 99.9977% (unavailable for 12.2 mins/year)
Project VA 02_20_2020 with Freq from NTIA - 2. Bldg. SACC 16m-55' to Mt. DisappointmentLINKPlanner version 5.2.3 Installation Report
Mt. Disappointment Performance (Bldg. SACC 16m-55' to Mt. Disappointment) * Frame Size 1518 Bytes Mean IP Throughput Predicted 259.29 Mbps Mean IP Throughput Required 250.00 Mbps Minimum IP Throughput Required 205.00 Mbps Minimum IP Throughput Availability Predicted 99.9980% (unavailable for 10.5 mins/year)
* Multipath availability calculated using ITU-R
Mode Max
Aggregate User IP
Throughput (Mbps)
Max User IP
Throughput in Either Direction (Mbps)
Bldg. SACC 16m-55' - Primary Mt. Disappointment - Primary
Fade Margin
(dB)
IP
Throughput Availability
Receive time in Mode
Fade Margin
(dB)
IP
Throughput Availability
Receive time in Mode
10 519.15 259.57 2.63 97.3286 97.3286 3.07 98.7137 98.7137 9 475.86 237.93 8.13 99.9738 2.6452 8.57 99.9794 1.2657 8 449.17 224.59 9.13 99.9846 0.0107 9.57 99.9876 0.0082 7 411.89 205.95 13.63 99.9977 0.0131 14.07 99.9980 0.0104 6 386.50 193.25 15.63 99.9988 0.0011 16.07 99.9990 0.0010 5 336.05 168.03 20.63 99.9997 0.0009 21.07 99.9997 0.0008 4 279.24 139.62 23.63 99.9999 0.0001 24.07 99.9999 0.0001 3 226.88 113.44 26.63 99.9999 0.0001 27.07 99.9999 0.0001 2 172.36 86.18 31.13 100.0000 0.0000 31.57 100.0000 0.0000 1 122.57 61.29 33.63 100.0000 0.0000 34.07 100.0000 0.0000 0 84.27 42.14 43.38 100.0000 0.0000 43.82 100.0000 0.0000
* Multipath availability calculated using ITU-R
Project VA 02_20_2020 with Freq from NTIA - 2. Bldg. SACC 16m-55' to Mt. DisappointmentLINKPlanner version 5.2.3 Installation Report
3. Bldg.LAOPC 27m-80' to Mt. Disappointment
Summary (Primary to Primary) Link Name Bldg.LAOPC 27m-80' to Mt. Disappointment Customer Company Name VA Federal Police Profile Type Near Line-of-Sight Equipment Type PTP07820G with RFU-C Maximum Obstruction 350 feet Link Distance 15.446 miles Free Space Path Loss 137.79 dB Excess Path Loss 4.78 dB User IP Throughput Expectation Aggregate Aggregate 504.72 Mbps assuming PTP-820 Series running the Release 10.9.6 software RF Frequency Band 7 GHz (7125 to 7750 MHz) RF Channel Bandwidth 30 MHz TDM Channels 0 E1 with a reliability of 100.0000 %
Path Profile (Primary to Primary)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Range on path (miles)
He ig ht A bo ve
S ea
L ev el (f ee t)
Bldg.LAOPC 27m-80' Mt. Disappointment
Cambium Networks - LINKPlanner
He ig ht A bo ve
S ea
L ev el (f ee t)
Link Configuration Link Type 1+1 HSB Radio Protection T/R Spacing 300 MHz Bandwidth 30 MHz Modulation Mode Adaptive Maximum Mod Mode 10 - 2048QAM Minimum Mod Mode 0 - QPSK Polarization Vertical ATPC Disabled Header Compression Disabled
Link Configuration (continued) TDM Type None Hi Bldg.LAOPC 27m-80' Lo Mt. Disappointment
Bill of Materials Part Number Qty Description 01010419001 2 Coaxial Cable Grounding Kits for 1/4" and 3/8" Cable
07009304001 4 Hoisting Grip for CNT-400 cable
30010194001 2 50 Ohm Braided Coaxial Cable - 75 meter
C000082M021 2 PTP 820G NTIA FIPS-140 Ready, Dual Modem, Eth + 16 E1/T1
C070082R261 2 PTP 820 RFU-C,NTIA 7GHz,TR300,Ch1W5,Hi,7434.5-7585.5MHz
C070082R262 2 PTP 820 RFU-C,NTIA 7GHz,TR300,Ch1W5,Lo,7134.5-7285.5MHz
EW-E4PT82M2-WW 2 PTP 820G IDU (Dual Modem) Extended Warranty, 4 Addl Years
EW-E4PT82RC-WW 4 PTP820G RFU-C Extended Warranty, 4 Additional Years
N000000D037 2 SIDE STRUTS / STABILIZER ARMS 4/6FT
N000081L006 4 TNC Male Right Angle for CNT-400 braided cable
N000082K027 4 PTP 820 Act.Key - AES Key 256 bit - Per Tx Chan
N000082L028 2 PTP 820G Act.Key - 2nd Modem Activation
N000082L133 4 PTP 820 Act.Key - Capacity 300M with ACM Enabled, Per Tx Chan
N070082D308 2 PTP 820 4' ANT,SP,7_8GHz,RFU-C TYPE&UBR84 - Radiowave.
Only available for order in North America and CALA regions
N070082L301 2 PTP 820 RFU-C 7_8GHz Coupler KIT
N070082L304 2 PTP 820 RFU-C 7_8GHz Twist Adaptor KIT
WB3616 4 Coaxial Cable Installation Assembly Kit (W/O LPU End Kit)
WB3657 4 LPU End Kit PTP 800/820
Physical Installation Notes for Bldg.LAOPC 27m-80' Link Name Bldg.LAOPC 27m-80' to Mt. Disappointment Latitude 34.05149N Longitude 118.23817W Site Elevation 298 feet AMSL Antenna Configuration Common Antenna - Asymmetric Coupling Polarization Vertical Hardware Platform (Primary) PTP07820G with RFU-C - C070082R261 Hardware Platform (Secondary) PTP07820G with RFU-C - C070082R261 Antenna Type Cambium Networks 4ft Single Pol (NA & CALA Only)
N070082D308 - Direct Antenna Beamwidth 2.4° Antenna Gain 36.6 dBi Antenna Height 91.0 feet AGL
Project VA 02_20_2020 with Freq from NTIA - 3. Bldg.LAOPC 27m-80' to Mt. DisappointmentLINKPlanner version 5.2.3 Installation Report
Physical Installation Notes for Bldg.LAOPC 27m-80' (continued) Antenna Tilt Angle 3.8° (uptilt) Bearing to Mt. Disappointment 29.60° from True North
17.77° from Magnetic North Magnetic Declination 11.83° E ±0.33° changing by 0.09° W per year RF Feeder Loss (Primary) 1.6 dB RF Feeder Loss (Secondary) 6.0 dB
Physical Installation Notes for Mt. Disappointment Link Name Bldg.LAOPC 27m-80' to Mt. Disappointment Latitude 34.24627N Longitude 118.10487W Site Elevation 5931 feet AMSL Antenna Configuration Common Antenna - Asymmetric Coupling Polarization Vertical Hardware Platform (Primary) PTP07820G with RFU-C - C070082R262 Hardware Platform (Secondary) PTP07820G with RFU-C - C070082R262 Antenna Type Cambium Networks 4ft Single Pol (NA & CALA Only)
N070082D308 - Direct Antenna Beamwidth 2.4° Antenna Gain 36.42 dBi Antenna Height 55.0 feet AGL Antenna Tilt Angle -4.0° (downtilt) Bearing to Bldg.LAOPC 27m-80' 209.68° from True North
197.84° from Magnetic North Magnetic Declination 11.84° E ±0.33° changing by 0.09° W per year RF Feeder Loss (Primary) 1.6 dB RF Feeder Loss (Secondary) 6.0 dB
Radio Commissioning Notes for Bldg.LAOPC 27m-80' - Primary Radio Interface Radio:Slot 2, port 1 Tx Frequency 7465.000 MHz Rx Frequency 7165.000 MHz Tx to Rx Frequency Separation 300.000 MHz Tx Level 26 dBm MRMC Script FCC 1005 MRMC Script Operational Mode Adaptive MRMC Script Maximum Profile 10, 2048QAM MRMC Script Minimum Profile 0, QPSK Adaptive Tx Power Admin Enable ATPC Configuration Disabled Header Compression Disabled Radio Protection Group Type 1+1-HSB Radio Protection Group Number 1 Radio Protection Group Member 1 Radio: Slot 1, port 1
Project VA 02_20_2020 with Freq from NTIA - 3. Bldg.LAOPC 27m-80' to Mt. DisappointmentLINKPlanner version 5.2.3 Installation Report
Radio Commissioning Notes for Bldg.LAOPC 27m-80' - Primary (continued) Radio Protection Group Member 2 Radio: Slot 1, port 2 BNC Voltage 1.42 to 1.53 Volts Predicted Receive Power (Primary to Primary) -47 dBm ± 5 dB while aligning
Radio Commissioning Notes for Bldg.LAOPC 27m-80' - Secondary Radio Interface Radio:Slot 2, port 2 Tx Frequency 7465.000 MHz Rx Frequency 7165.000 MHz Tx to Rx Frequency Separation 300.000 MHz Tx Level 26 dBm MRMC Script FCC 1005 MRMC Script Operational Mode Adaptive MRMC Script Maximum Profile 10, 2048QAM MRMC Script Minimum Profile 0, QPSK Adaptive Tx Power Admin Enable ATPC Configuration Disabled Header Compression Disabled Radio Protection Group Type 1+1-HSB Radio Protection Group Number 1 Radio Protection Group Member 1 Radio: Slot 1, port 1 Radio Protection Group Member 2 Radio: Slot 1, port 2 BNC Voltage 1.46 to 1.57 Volts Predicted Receive Power (Secondary to Secondary) -52 dBm ± 5 dB while aligning
Radio Commissioning Notes for Mt. Disappointment - Primary Radio Interface Radio:Slot 2, port 1 Tx Frequency 7165.000 MHz Rx Frequency 7465.000 MHz Tx to Rx Frequency Separation 300.000 MHz Tx Level 26 dBm MRMC Script FCC 1005 MRMC Script Operational Mode Adaptive MRMC Script Maximum Profile 10, 2048QAM MRMC Script Minimum Profile 0, QPSK Adaptive Tx Power Admin Enable ATPC Configuration Disabled Header Compression Disabled Radio Protection Group Type 1+1-HSB Radio Protection Group Number 1 Radio Protection Group Member 1 Radio: Slot 1, port 1 Radio Protection Group Member 2 Radio: Slot 1, port 2 BNC Voltage 1.41 to 1.52 Volts Predicted Receive Power (Primary to Primary) -47 dBm ± 5 dB while aligning
Project VA 02_20_2020 with Freq from NTIA - 3. Bldg.LAOPC 27m-80' to Mt. DisappointmentLINKPlanner version 5.2.3 Installation Report
Radio Commissioning Notes for Mt. Disappointment - Secondary Radio Interface Radio:Slot 2, port 2 Tx Frequency 7165.000 MHz Rx Frequency 7465.000 MHz Tx to Rx Frequency Separation 300.000 MHz Tx Level 26 dBm MRMC Script FCC 1005 MRMC Script Operational Mode Adaptive MRMC Script Maximum Profile 10, 2048QAM MRMC Script Minimum Profile 0, QPSK Adaptive Tx Power Admin Enable ATPC Configuration Disabled Header Compression Disabled Radio Protection Group Type 1+1-HSB Radio Protection Group Number 1 Radio Protection Group Member 1 Radio: Slot 1, port 1 Radio Protection Group Member 2 Radio: Slot 1, port 2 BNC Voltage 1.46 to 1.57 Volts Predicted Receive Power (Secondary to Secondary) -51 dBm ± 5 dB while aligning
Regulatory Conditions Regulation NTIA Band 7 GHz Max EIRP 61.0 dBm Output Power 26.0 dBm
Installation Instruction Perform the following checks during the installation (Check the deployment guide and the User Guide.)
1. Check with a GPS that you are installing at the correct location.
2. Check carefully the direction to the other end of the link. Either use a corrected compass or use the GPS waypoint feature about 300 meters from the installation location.
3. When aligning antennas, it is important to find the centre of the main beam. This is done by adjusting the antenna at each end of the link in turn and monitoring the receive level until the peak is found. Once the peak level is found, it should be checked against the prediced receive power to ensure that the antennas have not been aligned on a side lobe.
4. An hour after alignment is complete, if ATPC is disabled, check that the mean value for the RSL is as predicted (see previous tables). Also check that the received power is not greater than -31dBm with ATPC enabled or disabled.
Bldg.LAOPC 27m-80' Performance (Bldg.LAOPC 27m-80' to Mt. Disappointment) * Frame Size 1518 Bytes Mean IP Throughput Predicted 251.35 Mbps Mean IP Throughput Required 250.00 Mbps Minimum IP Throughput Required 205.00 Mbps Minimum IP Throughput Availability Predicted 99.9981% (unavailable for 9.7 mins/year)
Project VA 02_20_2020 with Freq from NTIA - 3. Bldg.LAOPC 27m-80' to Mt. DisappointmentLINKPlanner version 5.2.3 Installation Report
Mt. Disappointment Performance (Bldg.LAOPC 27m-80' to Mt. Disappointment) * Frame Size 1518 Bytes Mean IP Throughput Predicted 253.37 Mbps Mean IP Throughput Required 250.00 Mbps Minimum IP Throughput Required 205.00 Mbps Minimum IP Throughput Availability Predicted 99.9984% (unavailable for 8.3 mins/year)
* Multipath availability calculated using ITU-R
Mode Max
Aggregate User IP
Throughput (Mbps)
Max User IP
Throughput in Either Direction (Mbps)
Bldg.LAOPC 27m-80' - Primary Mt. Disappointment - Primary
Fade Margin
(dB)
IP
Throughput Availability
Receive time in Mode
Fade Margin
(dB)
IP
Throughput Availability
Receive time in Mode
10 519.15 259.57 0.60 62.1211 62.1211 0.96 71.3935 71.3935 9 475.86 237.93 6.10 99.8892 37.7681 6.46 99.9189 28.5254 8 449.17 224.59 7.10 99.9662 0.0770 7.46 99.9752 0.0562 7 411.89 205.95 11.60 99.9981 0.0319 11.96 99.9984 0.0233 6 386.50 193.25 13.60 99.9992 0.0010 13.96 99.9993 0.0009 5 336.05 168.03 18.60 99.9998 0.0007 18.96 99.9999 0.0006 4 279.24 139.62 21.60 99.9999 0.0001 21.96 99.9999 0.0001 3 226.88 113.44 24.60 100.0000 0.0000 24.96 100.0000 0.0000 2 172.36 86.18 29.10 100.0000 0.0000 29.46 100.0000 0.0000 1 122.57 61.29 31.60 100.0000 0.0000 31.96 100.0000 0.0000 0 84.27 42.14 41.35 100.0000 0.0000 41.71 100.0000 0.0000
* Multipath availability calculated using ITU-R
Project VA 02_20_2020 with Freq from NTIA - 3. Bldg.LAOPC 27m-80' to Mt. DisappointmentLINKPlanner version 5.2.3 Installation Report
Disclaimer
Cambium Networks assumes no responsibility for the accuracy of the information produced by the Cambium LINKPlanner. Reference to products or services which are not provided by Cambium Networks is for information purposes only and constitutes neither an endorsement nor a recommendation. All information provided by the Cambium LINKPlanner is provided without warranty of any kind, either expressed or implied.
All product or service names are the property of their respective owners. © Cambium Networks. 2020
Project VA 02_20_2020 with Freq from NTIA LINKPlanner PTP Proposal Report
03 April 2020 Cambium Networks
Organization: Cambium Networks Phone: 1-888-863-5250 m ile s miles center = 34.14894N 118.29361W
0 10-10
-10
Cambium Networks - LINKPlanner
Bldg. SACC 16m-55' Mt. Disappointment
Bldg.LAOPC 27m-80'
MT.D 45'
Table of Contents
31. Project Summary
62. Bldg. SACC 16m-55' to Mt. Disappointment
93. Bldg.LAOPC 27m-80' to Mt. Disappointment
12Disclaimer
03 April 2020 2 LINKPlanner version 5.2.3 Proposal Report
1. Project Summary
Project: VA 02_20_2020 with Freq from NTIA
General Information Customer Name Company Name VA Federal Police Address Phone Cell Phone Email
03 April 2020 3
Network Map m ile s miles center = 34.14894N 118.29361W
0 10-10
-10
-20
Cambium Networks - LINKPlanner
Bldg. SACC 16m-55' Mt. Disappointment
Bldg.LAOPC 27m-80'
MT.D 45'
Project VA 02_20_2020 with Freq from NTIA - 1. Project Summary
03 April 2020 4
Link name Product
Primary Local antenna
Primary Remote antenna
Max aggregate IP throughput
Bldg. SACC 16m-55' to Mt.
Disappointment
PTP08820G with
RFU-C
Cambium Networks 4ft Single Pol (NA & CALA Only) N070082D308 - Direct
Cambium Networks 4ft Single Pol (NA & CALA Only) N070082D308 - Direct 518.28 Mbps
Bldg.LAOPC 27m-80' to Mt.
Disappointment
PTP07820G with
RFU-C
Cambium Networks 4ft Single Pol (NA & CALA Only) N070082D308 - Direct
Cambium Networks 4ft Single Pol (NA & CALA Only) N070082D308 - Direct 504.72 Mbps
Bill of Materials : PTP Network Part Number Qty Description 01010419001 2 Coaxial Cable Grounding Kits for 1/4" and 3/8" Cable
07009304001 8 Hoisting Grip for CNT-400 cable
30010194001 4 50 Ohm Braided Coaxial Cable - 75 meter
C000082M021 4 PTP 820G NTIA FIPS-140 Ready, Dual Modem, Eth + 16 E1/T1
C070082R261 2 PTP 820 RFU-C,NTIA 7GHz,TR300,Ch1W5,Hi,7434.5-7585.5MHz
C070082R262 2 PTP 820 RFU-C,NTIA 7GHz,TR300,Ch1W5,Lo,7134.5-7285.5MHz
C080082R167 2 PTP 820 RFU-C,NTIA 8GHz,TR360,Ch9W13,Hi,8335-8485MHz
C080082R168 2 PTP 820 RFU-C,NTIA 8GHz,TR360,Ch9W13,Lo,7975-8125MHz
EW-E4PT82M2-WW 4 PTP 820G IDU (Dual Modem) Extended Warranty, 4 Addl Years
EW-E4PT82RC-WW 8 PTP820G RFU-C Extended Warranty, 4 Additional Years
N000000D037 4 SIDE STRUTS / STABILIZER ARMS 4/6FT
N000081L006 8 TNC Male Right Angle for CNT-400 braided cable
N000082K027 8 PTP 820 Act.Key - AES Key 256 bit - Per Tx Chan
N000082L028 4 PTP 820G Act.Key - 2nd Modem Activation
N000082L133 8 PTP 820 Act.Key - Capacity 300M with ACM Enabled, Per Tx Chan
N070082D308 4 PTP 820 4' ANT,SP,7_8GHz,RFU-C TYPE&UBR84 - Radiowave.
Only available for order in North America and CALA regions
N070082L301 4 PTP 820 RFU-C 7_8GHz Coupler KIT
N070082L304 4 PTP 820 RFU-C 7_8GHz Twist Adaptor KIT
WB3616 8 Coaxial Cable Installation Assembly Kit (W/O LPU End Kit)
WB3657 8 LPU End Kit PTP 800/820
Project VA 02_20_2020 with Freq from NTIA - 1. Project Summary
03 April 2020 5
Bldg. SACC 16m-55' to Mt. Disappointment
Equipment: Cambium Networks PTP08820G with RFU-C - 1+1 Hot Standby Cambium Networks 4ft Single Pol (NA & CALA Only) N070082D308 - Direct @ 55 ft
Cambium Networks 4ft Single Pol (NA & CALA Only) N070082D308 - Direct @ 10 ft
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Range on path (miles)
He ig ht A bo ve
S ea
L ev el (f ee t)
Bldg. SACC 16m-55' Mt. Disappointment
Cambium Networks - LINKPlanner
He ig ht A bo ve
S ea
L ev el (f ee t)
Performance to Bldg. SACC 16m-55' (Primary)
Performance to Mt. Disappointment (Primary)
Mean IP 259.0 Mbps 259.3 Mbps IP Availability 99.9977 % for 205.0 Mbps 99.9980 % for 205.0 Mbps
Link Summary (Primary to Primary) Link Length 21.611 mi. Mean Aggregate Data Rate 518.3 Mbps Band 8 GHz Annual Link Availability 100.0000 % Regulation NTIA Annual Link Unavailability 1 secs/year Modulation Adaptive Frame Size 1518 Bytes Bandwidth 30 MHz E1 Channels 0 Total Path Loss 141.80 dB TDM Availability 100.0000% System Gain 185.18 dB TDM Annual Unavailability 1 secs/year System Gain Margin 43.38 dB Prediction Model ITU-R
03 April 2020 6
Performance Charts (Primary to Primary)
0 100 200 Capacity (Mbps)
99.99999%
99.999%
99.9%
90.0%
Av ai la bi lit y
Performance to Bldg. SACC 16m-55'
0 100 200 Capacity (Mbps)
99.99999%
99.999%
99.9%
90.0%
Av ai la bi lit y
Performance to Mt. Disappointment
Climatic Factors, Losses and Standards (Primary to Primary) dN/dH not exceeded for 1% of time
-338.18 N units/km Excess Path Loss 0.00 dB
Area roughness 110x110km
505.65 metre
Annual 2-way Availability 100.0000 %
Geoclimatic factor 9.53e-05
Annual 2-way Unavailability 1 secs/year
Fade Occurrence Factor (P0) 2.07e-03 Rain Availability 100.0000 % Path inclination 43.33 mr Rain Unavailability 0 secs/year Value of K Exceeded for 99.99% (ke) 0.72 Atmospheric Gasses ITU-R P.676-7, ITU-R P.835-4 Excess Path Loss at ke 0.00 dB Diffraction Loss ITU-R P.526-10 0.01% Rain rate 24.34 mm/hr Propagation ITU-R P.530-12 Free Space Path Loss 141.47 dB Rain Rate ITU-R P.837-5 Gaseous Absorption Loss 0.33 dB Refractivity Index ITU-R P.453-9 Profile Type Line-of-Sight
Bill of Materials Part Number Qty Description 07009304001 4 Hoisting Grip for CNT-400 cable
30010194001 2 50 Ohm Braided Coaxial Cable - 75 meter
C000082M021 2 PTP 820G NTIA FIPS-140 Ready, Dual Modem, Eth + 16 E1/T1
C080082R167 2 PTP 820 RFU-C,NTIA 8GHz,TR360,Ch9W13,Hi,8335-8485MHz
C080082R168 2 PTP 820 RFU-C,NTIA 8GHz,TR360,Ch9W13,Lo,7975-8125MHz
EW-E4PT82M2-WW 2 PTP 820G IDU (Dual Modem) Extended Warranty, 4 Addl Years
EW-E4PT82RC-WW 4 PTP820G RFU-C Extended Warranty, 4 Additional Years
N000000D037 2 SIDE STRUTS / STABILIZER ARMS 4/6FT
N000081L006 4 TNC Male Right Angle for CNT-400 braided cable
Project VA 02_20_2020 with Freq from NTIA - 2. Bldg. SACC 16m-55' to Mt. Disappointment
03 April 2020 7
Bill of Materials (continued) Part Number Qty Description N000082K027 4 PTP 820 Act.Key - AES Key 256 bit - Per Tx Chan
N000082L028 2 PTP 820G Act.Key - 2nd Modem Activation
N000082L133 4 PTP 820 Act.Key - Capacity 300M with ACM Enabled, Per Tx Chan
N070082D308 2 PTP 820 4' ANT,SP,7_8GHz,RFU-C TYPE&UBR84 - Radiowave.
Only available for order in North America and CALA regions
N070082L301 2 PTP 820 RFU-C 7_8GHz Coupler KIT
N070082L304 2 PTP 820 RFU-C 7_8GHz Twist Adaptor KIT
WB3616 4 Coaxial Cable Installation Assembly Kit (W/O LPU End Kit)
WB3657 4 LPU End Kit PTP 800/820
Project VA 02_20_2020 with Freq from NTIA - 2. Bldg. SACC 16m-55' to Mt. Disappointment
03 April 2020 8
Bldg.LAOPC 27m-80' to Mt. Disappointment
Equipment: Cambium Networks PTP07820G with RFU-C - 1+1 Hot Standby Cambium Networks 4ft Single Pol (NA & CALA Only) N070082D308 - Direct @ 91 ft
Cambium Networks 4ft Single Pol (NA & CALA Only) N070082D308 - Direct @ 55 ft
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Range on path (miles)
He ig ht A bo ve
S ea
L ev el (f ee t)
Bldg.LAOPC 27m-80' Mt. Disappointment
Cambium Networks - LINKPlanner
He ig ht A bo ve
S ea
L ev el (f ee t)
Performance to Bldg.LAOPC 27m-80' (Primary)
Performance to Mt. Disappointment (Primary)
Mean IP 251.4 Mbps 253.4 Mbps IP Availability 99.9981 % for 205.0 Mbps 99.9984 % for 205.0 Mbps
Link Summary (Primary to Primary) Link Length 15.446 mi. Mean Aggregate Data Rate 504.7 Mbps Band 7 GHz Annual Link Availability 100.0000 % Regulation NTIA Annual Link Unavailability 1 secs/year Modulation Adaptive Frame Size 1518 Bytes Bandwidth 30 MHz E1 Channels 0 Total Path Loss 142.79 dB TDM Availability 100.0000% System Gain 184.14 dB TDM Annual Unavailability 1 secs/year System Gain Margin 41.35 dB Prediction Model ITU-R
03 April 2020 9
Performance Charts (Primary to Primary)
0 100 200 Capacity (Mbps)
99.99999%
99.999%
99.9%
90.0%
Av ai la bi lit y
Performance to Bldg.LAOPC 27m-80'
0 100 200 Capacity (Mbps)
99.99999%
99.999%
99.9%
90.0%
Av ai la bi lit y
Performance to Mt. Disappointment
Climatic Factors, Losses and Standards (Primary to Primary) dN/dH not exceeded for 1% of time
-358.75 N units/km Excess Path Loss 4.78 dB
Area roughness 110x110km
515.21 metre
Annual 2-way Availability 100.0000 %
Geoclimatic factor 1.09e-04
Annual 2-way Unavailability 0 secs/year
Fade Occurrence Factor (P0) 7.12e-04 Rain Availability 100.0000 % Path inclination 68.63 mr Rain Unavailability 0 secs/year Value of K Exceeded for 99.99% (ke) 0.64 Atmospheric Gasses ITU-R P.676-7, ITU-R P.835-4 Excess Path Loss at ke 7.18 dB Diffraction Loss ITU-R P.526-10 0.01% Rain rate 24.36 mm/hr Propagation ITU-R P.530-12 Free Space Path Loss 137.79 dB Rain Rate ITU-R P.837-5 Gaseous Absorption Loss 0.23 dB Refractivity Index ITU-R P.453-9 Profile Type Near Line-of-Sight
Bill of Materials Part Number Qty Description 01010419001 2 Coaxial Cable Grounding Kits for 1/4" and 3/8" Cable
07009304001 4 Hoisting Grip for CNT-400 cable
30010194001 2 50 Ohm Braided Coaxial Cable - 75 meter
C000082M021 2 PTP 820G NTIA FIPS-140 Ready, Dual Modem, Eth + 16 E1/T1
C070082R261 2 PTP 820 RFU-C,NTIA 7GHz,TR300,Ch1W5,Hi,7434.5-7585.5MHz
C070082R262 2 PTP 820 RFU-C,NTIA 7GHz,TR300,Ch1W5,Lo,7134.5-7285.5MHz
EW-E4PT82M2-WW 2 PTP 820G IDU (Dual Modem) Extended Warranty, 4 Addl Years
EW-E4PT82RC-WW 4 PTP820G RFU-C Extended Warranty, 4 Additional Years
N000000D037 2 SIDE STRUTS / STABILIZER ARMS 4/6FT
Project VA 02_20_2020 with Freq from NTIA - 3. Bldg.LAOPC 27m-80' to Mt. Disappointment
03 April 2020 10
Bill of Materials (continued) Part Number Qty Description N000081L006 4 TNC Male Right Angle for CNT-400 braided cable
N000082K027 4 PTP 820 Act.Key - AES Key 256 bit - Per Tx Chan
N000082L028 2 PTP 820G Act.Key - 2nd Modem Activation
N000082L133 4 PTP 820 Act.Key - Capacity 300M with ACM Enabled, Per Tx Chan
N070082D308 2 PTP 820 4' ANT,SP,7_8GHz,RFU-C TYPE&UBR84 - Radiowave.
Only available for order in North America and CALA regions
N070082L301 2 PTP 820 RFU-C 7_8GHz Coupler KIT
N070082L304 2 PTP 820 RFU-C 7_8GHz Twist Adaptor KIT
WB3616 4 Coaxial Cable Installation Assembly Kit (W/O LPU End Kit)
WB3657 4 LPU End Kit PTP 800/820
Project VA 02_20_2020 with Freq from NTIA - 3. Bldg.LAOPC 27m-80' to Mt. Disappointment
03 April 2020 11
Disclaimer
Cambium Networks assumes no responsibility for the accuracy of the information produced by the Cambium LINKPlanner. Reference to products or services which are not provided by Cambium Networks is for information purposes only and constitutes neither an endorsement nor a recommendation. All information provided by the Cambium LINKPlanner is provided without warranty of any kind, either expressed or implied.
All product or service names are the property of their respective owners. © Cambium Networks. 2020
03 April 2020 12
| S05-Initial RFIs |
| Installation Specifications |
| Project VA 02_20_2020 with Freq from NTIA |
| Table of Contents |
| 1. Project Summary |
| 2. Bldg. SACC 16m-55' to Mt. Disappointment |
| 3. Bldg.LAOPC 27m-80' to Mt. Disappointment |
| Disclaimer |
| VA 02_20_2020 with Freq from NTIA |
| Project VA 02_20_2020 with Freq from NTIA |
| Table of Contents |
| 1. Project Summary |
| 2. Bldg. SACC 16m-55' to Mt. Disappointment |
| 3. Bldg.LAOPC 27m-80' to Mt. Disappointment |
| Disclaimer |
File details come from the government source that posted it. Updated .