36C26119Q0848 SOW VOCIA Upgrade.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26119Q0848-002.docx | DOCX document | |
| 36C26119Q0848-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BIAMP VOCIA PAGING SYSTEM UPGRADE
DESCRIPTION, SPECIFICATIONS AND WORK STATEMENT
1. SCOPE: - The contractor shall furnish all labor, transportation, parts, expertise, and programming necessary to replace our end of life Varizone overhead paging system with a BIAMP VOCIA Public Address system at the VA Sierra Nevada Health Care System (VASNHCS) located at 975 Kirman Avenue, Reno, NV 89502. This installation upgrade will also require the contractor to remove all the Varizone paging equipment and infrastructure. BIAMP VOCIA is currently installed in our recently remodeled departments. Description of equipment requirements to be provided by the contractor to complete the expansion includes:
| Description | Model # | Qty | Manufacturer | |||
| 4-Channel 300-Watt Constant Voltage | VA-4300CV | 5 | BIAMP |
Amplifier 8-Channel 150-Watt Constant Voltage VA-8150CV 5 BIAMP Amplifier
| Passive End of the Line Supervision | PLD-2 | 15 | BIAMP | |||||
| 4 Line SIP VoIP Real time paging | VIOP-1-4 | 1 | BIAMP | |||||
| 10-Button Desktop microphone | DS-10 | 1 | BIAMP | |||||
| 4RU Vertical Wall Mount | VR-4 | 10 | Lowell | |||||
| 750VA 2RU Li-Ion UPS | SMTL750RM2UC | 11 | APC | |||||
| 1’x2’ Layin Speaker Baffle 25/70V | System5 | 475 | Quam | |||||
| 5-Port Harden Network switch | SLX-5EG | 11 | Red Lion | |||||
| MM Fiber SFP | GMFIBer-SFP-500 | 22 | Red Lion | |||||
| 48V 2Amp power supply | NTOS-48-2 | 11 | Red Lion | |||||
| 24-port Managed Network cage | NT24-AC1 | 1 | Red Lion | |||||
| 8-Port 1000BaseT module | TX8 | 1 | Red Lion | |||||
| 8-port SPF module | SFP8 | 2 | Red Lion | |||||
| 16/2 CMP Pink | 324694PK | 20 | Paige | |||||
| CAT5E CMP Pink | 710536EPk | 3 | Paige | |||||
| Ground Shipping and Handling | UPSGround | 1 | UPS | |||||
| Misc Items/Screws/Wire Nuts/Patch Cords/ | Misc | 1 | Misc |
etc need to complete the project Labor to install above Labor 1 ICS items/Program/Test/Train on operations
2. QUALIFICATIONS: - Contractor must be an authorized factory distributor and installer of BIAMP VOCIA products and have been engaged in installing/maintaining/ servicing public address systems for a minimum of 5 years. Contractor must provide, upon request, evidence of appropriate training of any field service representatives providing above services/equipment. Subcontracting of maintenance services will not be allowed without coordination with the contracting officer’s representative (COR) and written permission of the Contracting Officer.
3. SERVICES TO BE PROVIDED:
A. Specific:
1) Contractor shall install all equipment listed in Paragraph 1 and perform all required connections to provide a fully operational PA system.
2) Contractor shall program the VOCIA system to new zoning addresses provided by VASNHCS.
3) Contractor shall ensure that the VOCIA system will communicate with our CISCO system and with the facility’s PBX system over SIP interface.
4) All paging zones shall be tested for correct operation and proper programming. All testing results shall be documented and presented to the VASNHCS Biomedical Engineering Section.
5) Training shall be provided to VASNHCS staff on the operation and new zoning of the combined public address system. Up to two full days of training shall be set aside by contractor to ensure the maximum attendance of staff.
B. General:
1) The contractor shall offer a 5-year warranty on new equipment and installation. The current operational VOCIA Overhead Paging equipment is under a 5-year warranty and Contractor shall pick up the remaining warranty on the existing VOCIA equipment.
2) Contractor must furnish all tools and materials (e.g., service manuals, diagnostic software, etc.) required to maintain the equipment to manufacturer’s operational specifications.
C. Repair:
1) Due to the criticality of devices/systems listed in Paragraph 1 (i.e. Code Paging), the contracted vendor must have a field service representative located in the Reno, NV area who has received maintenance training specific to the models of equipment listed above.
2) Contractor will provide the necessary manpower and supervision to properly execute the maintenance and repair program.
3) The service contractor will maintain a sufficient parts inventory to keep equipment downtime to a minimum. The inventory will be replenished as needed to support the services outlined in this statement of work.
4) In the event of a system/device malfunction, the service contractor shall respond on-site within 2 hours after a service call is placed.
5) All repairs will be performed during normal VA business hours, 7:30 AM - 4:00 PM, Monday – Friday, except Federal Holidays. Contractor may work outside normal business hours by arrangement with Biomedical Engineering if such services are provided without additional charge to the government. Contractor may also work outside of normal business hours if a request for services outside of the scope of this contract is coordinated with Biomedical Engineering.
6) Only manufacturer approved factory service parts and equipment shall be used.
4. SECURITY REQUIREMENTS:
A. Minimum Statutory Requirements: At a minimum, maintenance/installation (warranty) contracts, in which VA sensitive information and/or systems are accessed by a VA contractor/subcontractor requires the following five requirements per 38 U.S.C. § 5723 and 5725:
B. VA Maintenance/Installation Contracts
1) A prohibition on unauthorized disclosure: “Information made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA.” See VA Handbook 6500.6, Appendix C, paragraph 3.a.
2) A requirement for data breach notification: Upon discovery of any known or suspected security/privacy incidents, or any unauthorized disclosure of sensitive information, including that contained in system(s) to which the contractor/subcontractor has access, the contractor/subcontractor shall immediately and simultaneously notify the COIR, the designated ISO, and Privacy Officer for the contract. The term ‘security incident’ means an event that has, or could have, resulted in unauthorized access to, loss or damage to VA assets, or sensitive information, or an action that breaches VA security procedures. See VA Handbook 6500.6, Appendix C, paragraph 6.a.
3) A requirement to pay liquidated damages in the event of a data breach: “In the event of a data breach or privacy incident involving any SPI the contractor processes or maintains under this contract, the contractor shall be liable to VA for liquidated damages for a specified amount per affected individual to cover the cost of providing credit protection services to those individuals.” See VA Handbook 6500.6, Appendix C, paragraph 7.a., 7.d.
4) A requirement for annual security/privacy awareness training: Before being granted access to VA information or information systems, all contractor employees and subcontractor employees requiring such access shall complete on an annual basis either: (i) the VA security/privacy awareness training (contains VA’s security/privacy requirements) within 1 week of the initiation of the contract, or (H) security awareness training provided or arranged by the contractor that conforms to VA’s security/privacy requirements as delineated in the hard copy of the VA security awareness training provided to the contractor. If the contractor provides their own training that conforms to VA’s requirements, they will provide the COTR or CO, a yearly report (due annually on the date of the contract initiation) stating that all applicable employees involved in VA’s contract have received their annual security/privacy training that meets VA’s requirements and the total number of employees trained. See VA Handbook 6500.6, Appendix C, paragraph 9.
5) A requirement to sign VA’s Rules of Behavior: “Before being granted access to VA information or information systems, all contractor employees and subcontractor employees requiring such access shall sign on an annual basis an acknowledgment that they have read, understand, and agree to abide by VA’s Contractor Rules of Behavior which is attached to this contract.” See VA Handbook 6500.6, Appendix C, paragraph 9, Appendix D. Note: If a medical device vendor anticipates that the services under the contract will be performed by 10 or more individuals, the Contractor Rules of Behavior may be signed by the vendor’s designated representative. The contract must reflect by signing the Rules of Behavior on behalf of the vendor that the designated representative agrees to ensure that all such individuals review and understand the Contractor Rules of Behavior when accessing VA’s information and information systems.
C. Requirements under VA Handbook 6500.6, Contract Security: Maintenance/installation (warranty) contracts for bio-medical devices should also contain the following language from Appendix C, 5.h. to address the return of systems containing VA sensitive information by the vendor: “Bio-Medical devices and other equipment or systems containing media (hard drives, optical disks, etc.) with VA sensitive information must not be returned to the vendor at the end of lease, for trade-in, or other purposes.” See VA Handbook 6500.6, Appendix C, paragraph 5.h., for the specific options.
1. GENERAL
Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.
2. ACCESS TO VA INFORMATION AND VA INFORMATION SYSTEMS
a. A contractor/subcontractor shall request logical (technical) or physical access to VA information and VA information systems for their employees, subcontractors, and affiliates only to the extent necessary to perform the services specified in the contract, agreement, or task order.
b. All contractors, subcontractors, and third-party servicers and associates working with VA information are subject to the same investigative requirements as those of VA appointees or employees who have access to the same types of information. The level and process of background security investigations for contractors must be in accordance with VA Directive and Handbook 0710, Personnel Suitability and Security Program. The Office for Operations, Security, and Preparedness is responsible for these policies and procedures.
c. Contract personnel who require access to national security programs must have a valid security clearance. National Industrial Security Program (NISP) was established by Executive Order 12829 to ensure that cleared U.S. defense industry contract personnel safeguard the classified information in their possession while performing work on contracts, programs, bids, or research and development efforts. The Department of Veterans Affairs does not have a Memorandum of Agreement with Defense Security Service (DSS). Verification of a Security Clearance must be processed through the Special Security Officer located in the Planning and National Security Service within the Office of Operations, Security, and Preparedness.
d. Custom software development and outsourced operations must be located in the U.S. to the maximum extent practical. If such services are proposed to be performed abroad and are not disallowed by other VA policy or mandates, the contractor/subcontractor must state where all non-U.S. services are provided and detail a security plan, deemed to be acceptable by VA, specifically to address mitigation of the resulting problems of communication, control, data protection, and so forth. Location within the U.S. may be an evaluation factor.
e. The contractor or subcontractor must notify the Contracting Officer immediately when an employee working on a VA system or with access to VA information is reassigned or leaves the contractor or subcontractor’s employ. The Contracting Officer must also be notified immediately by the contractor or subcontractor prior to an unfriendly termination.
3. VA INFORMATION CUSTODIAL LANGUAGE
a. Information made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA. This clause expressly limits the contractor/subcontractor's rights to use data as described in Rights in Data - General, FAR 52.227-14(d) (1).
b. VA information should not be co-mingled, if possible, with any other data on the contractors/subcontractor’s information systems or media storage systems in order to ensure VA requirements related to data protection and media sanitization can be met. If co-mingling must be allowed to meet the requirements of the business need, the contractor must ensure that VA’s information is returned to the VA or destroyed in accordance with VA’s sanitization requirements. VA reserves the right to conduct on-site inspections of contractor and subcontractor IT resources to ensure data security controls, separation of data and job duties, and destruction/media sanitization procedures are in compliance with VA directive requirements.
c. Prior to termination or completion of this contract, contractor/subcontractor must not destroy information received from VA, or gathered/created by the contractor in the course of performing this contract without prior written approval by the VA. Any data destruction done on behalf of VA by a contractor/subcontractor must be done in accordance with National Archives and Records Administration (NARA) requirements as outlined in VA Directive 6300, Records and Information Management and its Handbook 6300.1 Records Management Procedures, applicable VA Records Control Schedules, and VA Handbook 6500.1, Electronic Media Sanitization. Self-certification by the contractor that the data destruction requirements above have been met must be sent to the VA Contracting Officer within 30 days of termination of the contract.
d. The contractor/subcontractor must receive, gather, store, back up, maintain, use, disclose and dispose of VA information only in compliance with the terms of the contract and applicable Federal and VA information confidentiality and security laws, regulations and policies. If Federal or VA information confidentiality and security laws, regulations and policies become applicable to the VA information or information systems after execution of the contract, or if NIST issues or updates applicable FIPS or Special Publications (SP) after execution of this contract, the parties agree to negotiate in good faith to implement the information confidentiality and security laws, regulations and policies in this contract.
e. The contractor/subcontractor shall not make copies of VA information except as authorized and necessary to perform the terms of the agreement or to preserve electronic information stored on contractor/subcontractor electronic storage media for restoration in case any electronic equipment or data used by the contractor/subcontractor needs to be restored to an operating state. If copies are made for restoration purposes, after the restoration is complete, the copies must be appropriately destroyed.
f. If VA determines that the contractor has violated any of the information confidentiality, privacy, and security provisions of the contract, it shall be sufficient grounds for VA to withhold payment to the contractor or third party or terminate the contract for default or terminate for cause under Federal Acquisition Regulation (FAR) part 12.
g. If a VHA contract is terminated for cause, the associated BAA must also be terminated and appropriate actions taken in accordance with VHA Handbook 1600.01, Business Associate Agreements. Absent an agreement to use or disclose protected health information, there is no business associate relationship.
h. The contractor/subcontractor must store, transport, or transmit VA sensitive information in an encrypted form, using VA-approved encryption tools that are, at a minimum, FIPS 140-2 validated.
i. The contractor/subcontractor’s firewall and Web services security controls, if applicable, shall meet or exceed VA’s minimum requirements. VA Configuration Guidelines are available upon request.
j. Except for uses and disclosures of VA information authorized by this contract for performance of the contract, the contractor/subcontractor may use and disclose VA information only in two other situations: (i) in response to a qualifying order of a court of competent jurisdiction, or (ii) with VA’s prior written approval. The contractor/subcontractor must refer all requests for, demands for production of, or inquiries about, VA information and information systems to the VA contracting officer for response.
k. Notwithstanding the provision above, the contractor/subcontractor shall not release VA records protected by Title 38 U.S.C. 5705, confidentiality of medical quality assurance records and/or Title 38 U.S.C. 7332, confidentiality of certain health records pertaining to drug addiction, sickle cell anemia, alcoholism or alcohol abuse, or infection with human immunodeficiency virus. If the contractor/subcontractor is in receipt of a court order or other requests for the above mentioned information, that contractor/subcontractor shall immediately refer such court orders or other requests to the VA contracting officer for response.
l. For service that involves the storage, generating, transmitting, or exchanging of VA sensitive information but does not require C&A or an MOU-ISA for system interconnection, the contractor/subcontractor must complete a Contractor Security Control Assessment (CSCA) on a yearly basis and provide it to the COR.
4. SECURITY INCIDENT INVESTIGATION
a. The term “security incident” means an event that has, or could have, resulted in unauthorized access to, loss or damage to VA assets, or sensitive information, or an action that breaches VA security procedures. The contractor/subcontractor shall immediately notify the COR and simultaneously, the designated ISO and Privacy Officer for the contract of any known or suspected security/privacy incidents, or any unauthorized disclosure of sensitive information, including that contained in system(s) to which the contractor/subcontractor has access.
b. To the extent known by the contractor/subcontractor, the contractor/subcontractor’s notice to VA shall identify the information involved, the circumstances surrounding the incident (including to whom, how, when, and where the VA information or assets were placed at risk or compromised), and any other information that the contractor/subcontractor considers relevant.
c. With respect to unsecured protected health information, the business associate is deemed to have discovered a data breach when the business associate knew or should have known of a breach of such information. Upon discovery, the business associate must notify the covered entity of the breach. Notifications need to be made in accordance with the executed business associate agreement.
d. In instances of theft or break-in or other criminal activity, the contractor/subcontractor must concurrently report the incident to the appropriate law enforcement entity (or entities) of jurisdiction, including the VA OIG and Security and Law Enforcement. The contractor, its employees, and its subcontractors and their employees shall cooperate with VA and any law enforcement authority responsible for the investigation and prosecution of any possible criminal law violation(s) associated with any incident. The contractor/subcontractor shall cooperate with VA in any civil litigation to recover VA information, obtain monetary or other compensation from a third party for damages arising from any incident, or obtain injunctive relief against any third party arising from, or related to, the incident.
5. LIQUIDATED DAMAGES FOR DATA BREACH
a. Consistent with the requirements of 38 U.S.C. §5725, a contract may require access to sensitive personal information. If so, the contractor is liable to VA for liquidated damages in the event of a data breach or privacy incident involving any SPI the contractor/subcontractor processes or maintains under this contract.
b. The contractor/subcontractor shall provide notice to VA of a “security incident” as set forth in the Security Incident Investigation section above. Upon such notification, VA must secure from a non-Department entity or the VA Office of Inspector General an independent risk analysis of the data breach to determine the level of risk associated with the data breach for the potential misuse of any sensitive personal information involved in the data breach. The term 'data breach' means the loss, theft, or other unauthorized access, or any access other than that incidental to the scope of employment, to data containing sensitive personal information, in electronic or printed form, that results in the potential compromise of the confidentiality or integrity of the data. Contractor shall fully cooperate with the entity performing the risk analysis. Failure to cooperate may be deemed a material breach and grounds for contract termination.
c. Each risk analysis shall address all relevant information concerning the data breach, including the following:
(1) Nature of the event (loss, theft, unauthorized access);
(2) Description of the event, including:
(a) date of occurrence;
(b) data elements involved, including any PII, such as full name, social security number, date of birth, home address, account number, disability code;
(3) Number of individuals affected or potentially affected;
(4) Names of individuals or groups affected or potentially affected;
(5) Ease of logical data access to the lost, stolen or improperly accessed data in light of the degree of protection for the data, e.g., unencrypted, plain text;
(6) Amount of time the data has been out of VA control;
(7) The likelihood that the sensitive personal information will or has been compromised (made accessible to and usable by unauthorized persons);
(8) Known misuses of data containing sensitive personal information, if any;
(9) Assessment of the potential harm to the affected individuals;
(10) Data breach analysis as outlined in 6500.2 Handbook, Management of Security and Privacy Incidents, as appropriate; and
(11) Whether credit protection services may assist record subjects in avoiding or mitigating the results of identity theft based on the sensitive personal information that may have been compromised.
d. Based on the determinations of the independent risk analysis, the contractor shall be responsible for paying to the VA liquidated damages in the amount of $37.50 per affected individual to cover the cost of providing credit protection services to affected individuals consisting of the following:
(1) Notification;
(2) One year of credit monitoring services consisting of automatic daily monitoring of at least 3 relevant credit bureau reports;
(3) Data breach analysis;
(4) Fraud resolution services, including writing dispute letters, initiating fraud alerts and credit freezes, to assist affected individuals to bring matters to resolution;
(5) One year of identity theft insurance with $20,000.00 coverage at $0 deductible; and
(6) Necessary legal expenses the subjects may incur to repair falsified or damaged credit records, histories, or financial affairs.
6. TRAINING
a. All contractor employees and subcontractor employees requiring access to VA information and VA information systems shall complete the following before being granted access to VA information and its systems:
(1) Sign and acknowledge (either manually or electronically) understanding of and responsibilities for compliance with the Contractor Rules of Behavior, Appendix E relating to access to VA information and information systems;
(2) Successfully complete the VA Cyber Security Awareness and Rules of Behavior training and annually complete required security training;
(3) Successfully complete the appropriate VA privacy training and annually complete required privacy training; and
(4) Successfully complete any additional cyber security or privacy training, as required for VA personnel with equivalent information system access [to be defined by the VA program official and provided to the contracting officer for inclusion in the solicitation document – e.g., any role-based information security training required in accordance with NIST Special Publication 800-16, Information Technology Security Training Requirements.]
b. The contractor shall provide to the contracting officer and/or the COR a copy of the training certificates and certification of signing the Contractor Rules of Behavior for each applicable employee within 1 week of the initiation of the contract and annually thereafter, as required.
c. Failure to complete the mandatory annual training and sign the Rules of Behavior annually, within the timeframe required, is grounds for suspension or termination of all physical or electronic access privileges and removal from work on the contract until such time as the training and documents are complete.
5. NARA RECORDS MANAGEMENT LANGUAGE FOR CONTRACTS (MAY 2017):
RECORDS MANAGEMENT OBLIGATIONS
a. Applicability This clause applies to all Contractors whose employees create, work with, or otherwise handle Federal records, as defined in Section B, regardless of the medium in which the record exists.
b. Definitions “Federal Record” as defined in 44 U.S.C. § 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them.
The term Federal record:
1) includes Veteran’s Health Administration (VHA) records.
2) does not include personal materials.
3) applies to records created, received, or maintained by Contractors pursuant to their VHA contract.
4) may include deliverables and documentation associated with deliverables.
c. Requirements
1) Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.
2) In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.
3) In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.
4) VASNHCS and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of VASNHCS or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to VASNHCS. The agency must report promptly to NARA in accordance with 36 CFR 1230.
5) The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to VASNHCS control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).
6) The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and VASNHCS guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.
7) The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with VASNHCS policy.
8) The Contractor shall not create or maintain any records containing any non-public VASNHCS information that are not specifically tied to or authorized by the contract.
9) The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.
10) The VASNHCS owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which VASNHCS shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.
11) Training. All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take VHA-provided records management training, Talent Management System (TMS) Item #3873736, Records Management for Records Officers and Liaisons. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.
d. Flowdown of requirements to Subcontractors
1) The Contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this acquisition, and require written subcontractor acknowledgment of same.
2) Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.
File details come from the government source that posted it.