36C26119Q0345-0003000.docx

DOCX document 29 KB Posted

Attached to
654-19-1-055-0007 Ceiling lifts 36C261-19-AP-4313 Federal contract opportunity
Solicitation number
36C26119Q0345
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21

About this file

36C26119Q0345 0003 36C26119Q0345 0003.docx

View the file

Other files for this federal contract opportunity

Other files attached to 654-19-1-055-0007 Ceiling lifts 36C261-19-AP-4313, newest first.
File Type Posted
-17026.docx DOCX document
36C26119Q0345-0003001.pdf PDF
36C26119Q0345-0003002.pdf PDF
36C26119Q0345-001.docx DOCX document
36C26119Q0345-002.docx DOCX document
36C26119Q0345-005.pdf PDF
36C26119Q0345-003.docx DOCX document
36C26119Q0345-006.docx DOCX document
36C26119Q0345-004.docx DOCX document
36C26119Q0345-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26119Q0345 Amendment 0002

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION

OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM

INISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 3

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO

MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 04-26-2019 654-19-1-055-0007 654-412 36C261 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System Kirman Avenue Reno NV 89502-2597 36C261 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System 975 Kirman Avenue Reno NV 89502-2597 To all Offerors/Bidders

36C26119Q0345 03-27-2019

X X X May 2, 2019 at 1:00 PM Pacific Time 654-19-1-055-0007 X The purpose of this amendment is to extend the closing date to May 2, 2019 at 1:00 PM Pacific time, to provide responses to Request for Information (RFI) and to provide information on the early mobility program, which is being implemented at the VA Sierra Nevada Healthc are System.

All other terms and conditions shall remain unchanged.

Charee Harris Contract Specialist

Question 1 - We hoped to clarify- Which functions are required on the lifts? Do you require: Scales, power drive, constant charging?

Answer 1- Yes to all please see salient characteristics sheet

Question 2 - Are slings required as part of the project?

Answer 2 – No, slings are not being purchased in this requirement. The patient lift must have the ability to use universal slings, so that the facility may use slings already in stock.

Question 3 - Just to clarify: item c. Must be motorized. Is this motorized raising and lowering? I'm wondering if the intention is to have them as motorized driving mechanism which is more of a homecare function where patients can move themselves on the track or does it only require it to be motorized raising and lowering which is more of the standard for institutions?

Answer 3 - About the basic raising and lowering functions of the lift system, our needs for the ceiling lift unit is to be a motorized, electronic to lift and lower patient by utilizing the hand control and the unit must be capable of lifting patients up off the floor – lifting strap of 96 inches or greater.

In addition, the lift system must have the powered rail positioning lock to promote early mobility.

Question 4 - Is this motorized raising and lowering? I'm wondering if the intention is to have them as motorized driving mechanism which is more of a homecare function where patients can move themselves on the track or does it only require it to be motorized raising and lowering which is more of the standard for institutions?

Answer 4 - In regards to the basic raising and lowering functions of the lift system, our needs for the ceiling lift unit is to be a motorized, electronic to lift and lower patient by utilizing the hand control and the unit must be capable of lifting patients up off the floor – lifting strap of 96 inches or greater due to varying ceiling heights.

Question 5 – It is believed powered rail travel locks is proprietary to Guldmanns and that is the item that restricts competition.

Answer 5- We have not heard this form any other source. However, to address your concerns the following is how the hospital staff plan to use this element.

Positioning lock into the overhead lift allows staff to lock the ceiling lift in a fixed location and do more than just transfers such as:

· Staff can lock the ceiling lift above the patient in their bed attach elastic training bands which allows the patient to exercise upper/lower extremities, shoulders, and pelvis to build strength while they are in bed.

· Staff can lock the ceiling lift above the patient who is up in the chair and attach bands for the patient to perform exercises.

· Staff can lock the ceiling lift in a fixed location place a supportive sling on the patient to provide safe upright standing, balance training and ambulation.

The technical evaluation board will consider those items without this specific feature, but they must demonstrate how their patient lift can be used for the Early Mobility program. Additional information regarding this program is attached for contractor information.

Attachments:

Patient-Handling-Supplement-821a_Transforming Early mobility rehab.

File details come from the government source that posted it.