36C26118Q0347-00003000.docx
DOCX document 24 KB Posted
- Attached to
- Stryker GoBed II LX Federal contract opportunity
- Solicitation number
- 36C26118Q0347
About this file
36C26118Q0347 00003 36C26118Q0347 00003.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26118Q0347-00002000.docx | DOCX document | |
| 36C26118Q0347-00001000.docx | DOCX document | |
| 36C26118Q0347-002.docx | DOCX document | |
| 36C26118Q0347-001.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS
ENTERED INTO
PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14.
DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME
AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS
OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 00003
VA261-18-AP-4954
640-18-1-532-0086 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Palo Alto Health Care System (90/NCA) 3801 Miranda Ave Palo Alto CA 94304-1207 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Palo Alto Health Care System (90/NCA) 3801 Miranda Ave Palo Alto CA 94304-1207 To all Offerors/Bidders
36C26118Q0347 04-24-2018
X X X
MAY 4, 2018 AT
12:
00 PM
PST
X THE PURPOSE OF THIS AMENDMENT IS TO MAKE THE FOLLOWING CHANGES AND/OR CLARIFICATIONS:
1. PLEASE SEE
CONTINUATION P
AGE FOR ANSWERS TO REQUEST FOR
INFORMATION (RFI).
2. SOLICITATION 36C26118Q0347 IS EX
TENDED TO MAY 4, 2018 AT 12:00
PM PST.
3. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED AND IN EFFECT.
MANDY THOMPSON
CONTRACTING OFFICER
CONTINUATION PAGE
RFI: 36C26118Q0347
1. Retractable fifth-wheel steering: Would you consider a bed with 2 steering casters system that does not impede tables and lifts under bed access an acceptable equivalent?
Yes, as long as under bed access remains unobstructed for Housekeeping Dept.
2. 6’’ casters: Would you consider TENTE 5’’ twin casters with optimised manoeuvrability and optimised steering mechanism that allows a push force of only 12 lb (3x lower than most competitor) an acceptable equivalent? Yes, but not necessary – if more expensive.
3. Minimum of 6” casters
a. Is it acceptable to have 5” casters with a 6” under bed clearance?
i. Response: Yes, it is acceptable to have 5” casters with a 6” under bed clearance.
4. Trend. Display on footboard
a. Is it acceptable to have Trend. Display on side rail?
i. Response: Yes, it is acceptable to have Trend. Display on the side rail.
5. Nurse controls on footboard and side rails
a. Is it acceptable to have nurse controls on the both side rails?
i. Response: Yes, it is acceptable to have nurse controls on both side rails.
6. Weight capacity: 500 lbs.
a. Is this referring to patient weight or safe working load?
i. Response: Weight capacity is referring to both safe working load and patient weight. Safe working load: 500 lbs. Bed shall accommodate patients weighing up to 500 lbs.
7. Gel support Surface
a. Is it acceptable to have a non-powered air/foam surface?
i. Response: No, the non-powered air/foam surface is not suitable for the WBRC patient population.
8. Is it required to comply with IEC 60601-2-52?
i. Response: Yes, the medical bed must comply with IEC 60601-2-52. The mattress and medical bed combination must meet the IEC 60601-2-52 gap requirements.
File details come from the government source that posted it.