36C26118B0605-003.pdf
PDF 9 MB Posted
- Attached to
- Pharmacy USP 800 Federal contract opportunity
- Solicitation number
- 36C26118B0605
About this file
36C26118B0605 C27 Construction Drawings - Final.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26118C0120-000.docx | DOCX document | |
| 36C26118B0605-0003001.pdf | ||
| 36C26118B0605-0003000.docx | DOCX document | |
| 36C26118B0605-0002000.docx | DOCX document | |
| 36C26118B0605-0002001.pdf | ||
| 36C26118B0605-0001001.pdf | ||
| 36C26118B0605-0001000.docx | DOCX document | |
| 36C26118B0605-002.pdf | ||
| 36C26118B0605-007.docx | DOCX document | |
| 36C26118B0605-006.docx | DOCX document | |
| 36C26118B0605-008.docx | DOCX document | |
| 36C26118B0605-004.pdf | ||
| 36C26118B0605-005.pdf | ||
| 36C26118B0605-001.docx | DOCX document | |
| 36C26118B0605-000.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
DRAWING NUMBER
DWG. OF
PROJECT TITLE
ISSUE DATE CHECKED DRAWN
PHASEDRAWING TITLE
FULLY
SPRINKLERED
LOCATION
BUILDING
PROJECT NUMBER
Approved: Chief, Engineering Service
Brian C. McClung
Approved: VA Medical Center Director
Peggy Kearns, MS, RD, FACHE
ARCHITECT/ENGINEER OF RECORD SEALEngineering Service
COVER SHEET AND SHEET INDEX CONSTRUCTION
DOCUMENTS
LAS VEGAS PHARMACY
RENOVATION
05/21/18 BAJ JTB
GI001
1 49
NORTH LAS VEGAS, NV
593-18-104
SHEET INDEX
MH104 ONCOLOGY AREA ROOF PLAN
MP101 ONCOLOGY AREA MECHANICAL
PIPING PLAN
MP102 MAIN PHARMACY AREA
MECHANICAL PIPING PLAN
MH501 MECHANICAL DETAILS
MH502 MECHANICAL DETAILS
MH601 MECHANICAL SCHEDULES
MH701 MECHANICAL CONTROLS
MH702 MECHANICAL CONTROLS
PG001 PLUMBING ABBREVIATIONS
PD101 ONCOLOGY AREA PLUMBING
DEMO PLAN
PD102 MAIN PHARMACY AREA
PLUMBING DEMO PLAN
PL101 ONCOLOGY AREA PLUMBING
PLAN
PL102 MAIN PHARMACY AREA
PLUMBING PLAN
PL501 PLUMBING DETAILS
PL601 PLUMBING SCHEDULES
EG001 ELECTRICAL NOTES, SYMBOLS,
AND ABBREVIATIONS
ED101 ONCOLOGY AREA DEMO POWER
PLAN
ED102 MAIN PHARMACY AREA DEMO
POWER PLAN
ED103 ONCOLOGY AREA DEMO
LIGHTING PLAN
ED104 MAIN PHARMARCY AREA DEMO
LIGHTING PLAN
EL101 ONCOLOGY AREA LIGHTING
PLAN
EL102 MAIN PHARMARCY AREA
LIGHTING PLAN
EP101 ONCOLOGY AREA 1A219 AND
1A116 POWER PLANS
EP102 MAIN PHARMACY AREA AND
1D238 POWER PLANS
EP103 ONCOLOGY AREA ROOF POWER
PLAN AND DETAILS
EP601 PANEL SCHEDULES I
EP602 PANEL SCHEDULES II
EP603 PANEL SCHEDULES III
SHEET INDEX
GI001 COVER SHEET AND SHEET
INDEX
GI002 GENERAL ABBREVIATIONS,
SYMBOLS, AND MATERIALS
AE101 MAIN PHARMACY AND
ONCOLOGY EXISTING AREA
FLOOR PLANS
AE102 MAIN PHARMACY AND
ONCOLOGY AREA EXISTING RCP
AD101 MAIN PHARMACY AND
ONCOLOGY AREA DEMO PLANS
AD102 MAIN PHARMACY AND
ONCOLOGY AREA DEMO RCP
A-101 MAIN PHARMACY AND
ONCOLOGY AREA FLOOR PLANS
A-102 MAIN PHARMACY AND
ONCOLOGY AREA REFLECTED
CEILING PLANS
A-103 MAIN PHARMACY AND
ONCOLOGY EQUIPMENT PLANS
A-301 FINISH SCHEDULE INT., SECTION
/ ELEVATION AND WALL TYPES
A-302 SLIDING DOOR DETAILS
S-001 GENERAL STRUCTURAL NOTES
S-101 STRUCTURAL PLAN AND
DETAILS
FP101 MAIN PHARMACY AND
ONCOLOGY FIRE PROTECTION
DEMO PLAN
FP102 MAIN PHARMACY AND
ONCOLOGY FIRE PROTECTION
PLAN
MG001 MECHANICAL ABBREVIATIONS
AND SYMBOLS
MD101 ONCOLOGY AREA MECHANICAL
DEMO PLAN
MD102 MAIN PHARMACY AREA
MECHANICAL DEMO PLAN
MH101 ONCOLOGY AREA OVERALL
PLAN
MH102 ONCOLOGY AREA MECHANICAL
PLAN
MH103 MAIN PHARMACY AREA
MECHANICAL PLAN
SOUTHERN NEVADA HEALTHCARE SYSTEM
PHARMACY RENOVATION
PROJECT NUMBER: 593-18-104
CONTRACT NUMBER: VA261-17-D-0090
CONSTRUCTION DOCUMENTS
AREA MAP
BRUCE WOODBURY BELTWAY
BRUCE W
OODBURY BELTW
AY
I-15
E TROPICAL PKWY
E AZURE AVE
CENTENNIAL PKWY
N P
EC
O
S R
D
N L
AM
B
BL
VD
LO
SE
E R
D
PROJECT SITE: ONCOLOGY
AND MAIN PHARMACIES
REVISIONS DATE
N/A NOT APPLICABLE
N NORTH
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OFF OFFICE
OFD OVERFLOW DRAIN
OH OVERHEAD
OPNG OPENING
OPOI OWNER PROVIDED, OWNER INSTALLED
OPP OPPOSITE
ORIG ORIGINAL
OVHD OVERHEAD
PA PUBLIC ADDRESS
PCF POUNDS PER CUBIC FOOT
PLF POUNDS PER LINEAL FOOT
PFN PRE-FINISHED
PH PHASE
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PNL PANEL
POC POINT OF CURVE/CONTACT
POI POINT OF INTERSECTION
POT POINT OF TANGENT
PPL PEOPLE
PR PAIR
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT CONC POST-TENSIONED CONCRETE
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
RAD RADIUS
RB RUBBER BASE
RCP REINFORCED CONCRETE PIPE,
REFLECTED CEILING PLAN
RD ROOF DRAIN
RE REFER TO, REFERENCE
REIN REINFORCE(D)(ING)
RECP RECEPTACLE
RCYL RECYCLE AREA
REFR REFRIGERATOR
RO ROUGH OPENING
ROW RIGHT OF WAY
S SOUTH
SAFB SOUND ATTENUATION FIRE BATTS
SAN SANITARY
SB SPLASH BLOCK
SC SOLID CORE
SCH SCHEDULE
SD STORM DRAIN
SECT SECTION
SEW SEWER
SHT SHEET
SIM SIMILAR
SPF SPRAY APPLIED POLYURETHANE FOAM
INSULATION
SPEC SPECIFICATION
SQ SQUARE
SS SERVICE SINK, STORM SEWER,
STAINLESS STEEL
STM STORM
STD STANDARD
STL STEEL
STRUCT STRUCTURAL
SWBD SWITCHBOARD
T&G TONGUE AND GROOVE
TCU THIN CLAD UNIT
TEL TELEPHONE
THK THICK(NESS)
THRU THROUGH
TJI TRUSJOIST INCORPORATED
T.O. TOP OF
TOB TOP OF BEAM
TOC TOP OF CONCRETE
TOM TOP OF MASONRY
TOS TOP OF STEEL/TOP OF SLAB
TOW TOP OF WALL
TYP TYPICAL
ABV ABOVE
ACI AMERICAN CONCRETE INSTITUTE
ACT ACOUSTICAL CEILING TILE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLER UNIT
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
AISI AMERICAN IRON & STEEL INSTITUTE
ALUM ALUMINUM
ALM ALARM
ALT ALTERNATE
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECT(URAL)
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATING & AIR
CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF
MECHANICAL ENGINEERS
ASTM AMERICAN SOCIETY FOR TESTING
AND MATERIALS
AWG AMERICAN WIRE GAGE
AWS AMERICAN WELDING SOCIETY
AWWA AMERICAN WATER WORKS
ASSOCIATION
BL BUILDING LINE
BLDG BUILDING
B.O. BOTTOM OF
BRK BRICK
BR BROCHURE RACK
BUR BUILT UP ROOFING
CAB CABINET
CF CUBIC FOOT
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CJ CONTROL JOINT
CKT CIRCUIT
CL CENTERLINE
CLOS CLOSET
CLG CEILING
CLR CLEAR(ANCE)
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CND CONDUIT
CO CLEANOUT
COL COLUMN
CONC CONCRETE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CORR CORRIDOR
CRS COURSE(S)
CTR CENTER
CNTR COUNTER
CU IN CUBIC INCH
CU YD CUBIC YARD
CW CLEAR WIDTH
d PENNY (NAILS, ETC.)
DEMO DEMOLITION
DET DETAIL
DIAM,Ø DIAMETER
DC DISPLAY CASE
DP DAMP PROOFING
DPR DAMPER
DR DOOR
DS DOWNSPOUT
DSP DRY STANDPIPE
DWG DRAWING
DWS DOMESTIC WATER SUPPLY
E EAST
EA EACH
ELEV ELEVATION
EJ EXPANSION JOINT
ELEC ELECTRIC(AL)
EMER EMERGENCY
EP ELECTRICAL PANEL
EPDM ETHYLENE-PROPYLENE-DIENE-
MONOMER
EF EXHAUST FAN
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXH EXHAUST
EXP EXPOSED
EXT EXTERIOR
FA FIRE ALARM
FB FACE BRICK
FC FOOT-CANDLE
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEB FIRE EXTINGUISHER BRACKET
FEC FIRE EXTINGUISHER CABINET
FFE FURNITURE, FIXTURES AND EQUIPMENT
FG FIXED GLASS
FIN FL FINISHED FLOOR
FIN FL EL FINISHED FLOOR ELEVATION
FIX FIXTURE
FL FLOOR
FH FIRE HYDRANT
FLUOR FLUORESCENT
FMS FACILITY MANAGEMENT SERVICES
FND FOUNDATION
FO FACE OF
FOC FACE OF CONCRETE / CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUDS
FT FOOT / FEET
FTG FOOTING
FURR FURRED(ING)
GA GAGE, GAUGE
GALV GALVANIZE(D)
GFE GOVERNMENT FURNISHED EQUIPMENT
GFCI GOVERNMENT FURNISHED,
CONTRACTOR INSTALLED
GFGI GOVERNMENT FURNISHED,
GOVERNMENT INSTALLED
GFI GROUND FAULT CIRCUIT INTERRUPTER
GL GLASS, GLAZING
GWB GYPSUM WALL BOARD
GRND GROUND
GRT GROUT
HAC HOUSEKEEPING AIDS CLOSET
HB HOSE BIB
HNDCP HANDICAP
HDW HARDWARE
HJT HEAD JOINT
HM HOLLOW METAL
HORZ HORIZONTAL
HP HORSE POWER / HIGH PRESSURE
HSKP HOUSEKEEPING
HT HEIGHT
HVAC HEATING, VENTILATION, AIR
CONDITIONING
HWS HOT WATER SUPPLY
ID INSIDE DIAMETER
IES ILLUMINATING ENGINEERING SOCIETY
IGU INSULATED GLASS UNIT
IN INCH (“)
INC INCORPORATED
INFO INFORMATION
INSULINSULATION/INSULATE(D)(ING)
INT INTERIOR
INV INVERT
JT JOINT
K KIP (1,000 LB.)
LDR LADDER
LAM LAMINATE
LAV LAVATORY
LB POUND
LAG LAG SCREW
LG LENGTH / LONG
LTG LIGHTING
LVL LAMINATED VENEER LUMBER
LW CONC LIGHTWEIGHT CONCRETE
M METER(S)
MAX MAXIMUM
MECH MECHANIC(AL)
MED MEDIUM
MTL METAL
MFR MANUFACTURE(R)
MH MANHOLE
MIN MINIMUM
MIR MIRROR
MISC MISCELLANEOUS
MM MILLIMETER
MO MASONRY OPENING
UC UNDERCUT
UG UNDERGROUND
UL UNDERWRITERS'
LABORATORIES, INC.
UNO ` UNLESS NOTED
OTHERWISE
V VOLT
VB VAPOR BARRIER
VCT VINYL COMPOSITION TILE
VENT VENTILATE
VERT VERTICAL
VIF VERIFY IN FIELD
VIT VITREOUS
VS VERSUS
VC VERTICAL CURVE
VOL VOLUME
VPT VERTICAL POINT OF
TANGENT
VPI VERTICAL POINT OF
INTERSECTION
VPC VERTICAL POINT OF
CURVATURE
W WEST / WIDTH / WIDE /
W/ WITH
WC WATER CLOSET
WD WOOD
WG WIRE GLASS
WH WATER HEATER
WDW WINDOW
W/O WITHOUT
WT WEIGHT
WTR WATER
WWF WELDED WIRE FABRIC
XFMR TRANSFORMER
XPAN CROSS PAN
XSECT CROSS SECTION
XSTR EXTRA STRONG
YD YARD
YR YEAR
ABBREVIATIONS
X
A101
VIEW NAME
SCALE: 1/8" = 1'-0"
A101
ROOM NAME
150 SF
XXX
A101
A
A
REVISION CLOUD
SECTION NUMBER
SHEET NUMBER
ELEVATION
NUMBER
SHEET NUMBER
DRAWING TITLE
DRAWING SCALE
SHEET NUMBER
ROOM NUMBER
GRAPHIC SCALE
0’ 16'8'4'
SCALE: 1/8" = 1'-0"
RGH FL ELEV ROUGH FLOOR
ELEVATION IN PLAN
XXX
SYMBOLS LEGEND AND NOTES:
LEVEL 1/8"=1'-0"
ELEVATION
ELEVATION HEIGHTS
COLUMN GRID LINE
CENTERLINE ID
+- PLUS OR MINUS
ø DIAMETER
CL
ELEVATION MARKER
PLATE LINE IDPL
ANGLE
+ PLUS
KEY PLAN HATCHING
INTERIOR
ELEVATION MARKER
SECTIONS
DRAWING TITLES
GRID LINE
NORTH SYMBOL
ROOM NAME AND
NUMBER
X KEY NOTE
PARTITION TYPE
TAG
DOOR TAG
XXX
REVISION NUMBER
1X
FURNITURE, FIXTURE AND
EQUIPMENT INDICATOR
MATERIAL LEGEND:
CONCRETE
EXISTING CONST. TO REMAIN
EXISTING CONST. TO REMOVE
NEW CONSTRUCTION
BATT INSULATION
RIGID INSULATION
DRAWING NUMBER
DWG. OF
PROJECT TITLE
ISSUE DATE CHECKED DRAWN
PHASEDRAWING TITLE
FULLY
SPRINKLERED
LOCATION
BUILDING
PROJECT NUMBER
Approved: Chief, Engineering Service
Brian C. McClung
Approved: VA Medical Center Director
Peggy Kearns, MS, RD, FACHE
ARCHITECT/ENGINEER OF RECORD SEALEngineering Service
GENERAL ABBREVIATIONS,
SYMBOLS, AND MATERIALS
CONSTRUCTION
DOCUMENTS
LAS VEGAS PHARMACY
RENOVATION
05/21/18 BAJ JTB
GI002
2 49
NORTH LAS VEGAS, NV
593-18-104
REF.
J
K
15 16
870 SF
1D341
COMPOUNDING
364 SF
1D337
SOLUTIONS STATIC
SHELVING
259 SF
1D324
BREAK OUT
190 SF
1D360
VAULT
292 SF
1D326
CORRIDOR
116 SF
1D354
IV CLEAN ROOM
59 SF
1D353
VESTIBULE
241 SF
1D328
STAFF
LOCKERS / LOUNGE
48 SF
1D327
STAFF
TOILET
45 SF
1D338
STORAGE CAROUSEL
K
2 3
180 SF
C1-38
CORRIDOR
231 SF
1A153
NURSES
STATION
37 SF
1A153A
NOURISHMENT
115 SF
1A151
CLEAN UTILITY
66 SF
1A149A
CHEMO
PREP
40 SF
1A169
EQUIPMENT
30 SF
1A141
HAC
54 SF
1A143
STAFF TOILET
48 SF
1A147
PATIENT TOILET158 SF
1A149
ANTE ROOM 14 SF
1A145
SCALE ALCOVE
SF
C
1-
C O
R R
ID
O
R
DRAWING NUMBER
DWG. OF
PROJECT TITLE
ISSUE DATE CHECKED DRAWN
PHASEDRAWING TITLE
FULLY
SPRINKLERED
LOCATION
BUILDING
PROJECT NUMBER
Approved: Chief, Engineering Service
Brian C. McClung
Approved: VA Medical Center Director
Peggy Kearns, MS, RD, FACHE
ARCHITECT/ENGINEER OF RECORD SEALEngineering Service
KEY PLAN
NORTH
MAIN PHARMACY AND ONCOLOGY
EXISTING AREA FLOOR PLANS
CONSTRUCTION
DOCUMENTS
LAS VEGAS PHARMACY
RENOVATION
05/21/18 BAJ LMF
AE101
3 49
NORTH LAS VEGAS, NV
593-18-104
4' 8'0 2'
SCALE:1/4"=1'-0"
AE101 SCALE: 1/4" = 1'-0"
MAIN PHARMACY AREA
EXISTING FLOOR PLAN
AE101 SCALE: 1/4" = 1'-0"
ONCOLOGY AREA EXISTING
FLOOR PLAN
S
S
S
S S
J
K
15 16
K
2 3
DRAWING NUMBER
DWG. OF
PROJECT TITLE
ISSUE DATE CHECKED DRAWN
PHASEDRAWING TITLE
FULLY
SPRINKLERED
LOCATION
BUILDING
PROJECT NUMBER
Approved: Chief, Engineering Service
Brian C. McClung
Approved: VA Medical Center Director
Peggy Kearns, MS, RD, FACHE
ARCHITECT/ENGINEER OF RECORD SEALEngineering Service
KEY PLAN
NORTH
MAIN PHARMACY AND ONCOLOGY
AREA EXISTING RCP
CONSTRUCTION
DOCUMENTS
LAS VEGAS PHARMACY
RENOVATION
05/21/18 BAJ LMF
AE102
4 49
NORTH LAS VEGAS, NV
593-18-104
4' 8'0 2'
SCALE:1/4"=1'-0"
AE102 SCALE: 1/4" = 1'-0"
MAIN PHARMACY AREA
EXISTING RCP
AE102 SCALE: 1/4" = 1'-0"
ONCOLOGY AREA EXISTING
RCP
WALLS TO REMAIN
WALLS TO BE REMOVED
DOORS TO REMAIN
DOORS TO BE REMOVED
EXISTING CABINETRY TO
BE REMOVED
J
K
15 16
HAC
1D361
VESTIBULE
1D353
CHEMO PREP
1D355
IV CLEAN ROOM
1D354
ANTE ROOM
1D352
K
2 3
NURSES STATION
1A153
CLEAN UTILITY
1A151
NOURISHMENT
1A153A
ANTE ROOM
1A149
CHEMO PREP
1A149A
EQUIPMENT
1A169
FEC
FEC10
DRAWING NUMBER
DWG. OF
PROJECT TITLE
ISSUE DATE CHECKED DRAWN
PHASEDRAWING TITLE
FULLY
SPRINKLERED
LOCATION
BUILDING
PROJECT NUMBER
Approved: Chief, Engineering Service
Brian C. McClung
Approved: VA Medical Center Director
Peggy Kearns, MS, RD, FACHE
ARCHITECT/ENGINEER OF RECORD SEALEngineering Service
KEY PLAN
NORTH
MAIN PHARMACY AND ONCOLOGY
AREA DEMO PLANS
CONSTRUCTION
DOCUMENTS
LAS VEGAS PHARMACY
RENOVATION
05/21/18 BAJ LMF
AD101
5 49
NORTH LAS VEGAS, NV
593-18-104
KEY NOTES
LEGEND
4' 8'0 2'
SCALE:1/4"=1'-0"
AD101 SCALE: 1/4" = 1'-0"
MAIN PHARMACY AREA
DEMO PLAN
AD101 SCALE: 1/4" = 1'-0"
ONCOLOGY AREA DEMO
PLAN
GENERAL NOTES
1. REMOVE EXISTING VINYL COMPOSITION TILE
FLOORING, VINYL BASE AND ADHESIVE TO
BARE SUBSTRATE. PREP FOR NEW FLOOR
FINISH. REFER TO INTERIOR FINISH
SCHEDULE FOR MORE INFORMATION.
2. REMOVE SECTION OF GYPSUM PARTITION AS
REQUIRED FOR NEW WORK. REMOVAL OF
SUCH PARTITION REQUIRES THAT ITEMS SUCH
AS CONDUIT, OUTLETS, WALL BASES, PIPING,
ETC. ARE TO BE REMOVED AND REROUTED.
REFER TO MEP DRAWINGS FOR ADDITIONAL
INFORMATION. COORDINATE WITH NEW
CONSTRUCTION
3. REMOVE EXISTING DOOR, FRAME AND
RELATED HARDWARE IN ITS ENTIRETY. SAVE
AND STORE DOOR SYSTEMS INTENDED FOR
REUSE.
4. IDENTIFY ALL PLUMBING FIXTURES,
CASEWORK AND EQUIPMENT TO REMAIN AND
ENSURE THAT THESE ITEMS ARE PROTECTED
FROM DAMAGE DURING CONSTRUCTION
5. REMOVE EXISTING CASEWORK,
COUNTERTOPS, PLUMBING FIXTURES AND
ACCESSORIES LOCATED IN THE
NOURISHMENT CENTER. CAP ALL UNUSED
PLUMBING LINES AND PREPARE FOR
EXTENTIONS AS REQUIRED FOR NEW
PLUMBING LOCATION.
6. CONTRACTOR TO SAFELY STORE EXISTING
EQUIPMENT DURING WORK AND TO BE
RETURNED AFTER CONSTRUCTION IS
COMPLETED
7. CONTRACTOR TO PROVIDE DUST BARRIER
AROUND ALL CONSTRUCTION ACTIVITIES
INCLUDING THE BAGGING OF ALL AIR INTAKES
AND EXHAUST DIFFUSERS DURING ALL
CONSTRUCTION ACTIVITIES.
1. DEMO EXISTING WALLS
2. REMOVE DOORS, FRAMES, AND HARDWARE.
SAVE FOR FUTURE USE.
3. REMOVE EXISTING FLOORING, PREP SLAB
FOR NEW FLOOR.
4. REMOVE EXISTING CEILING TO INTEGRATE
NEW CEILING
5. REMOVE EXISTING CABINETRY
6. REMOVE EXISTING EQUIPMENT FOR FUTURE
USE.
7. REMOVE SINK AND FAUCET FOR FUTURE USE.
8. CUT OPENING IN WALL FOR NEW DOOR
9. REMOVE EMERGENCY SHOWER AND ALL
ASSOCIATED PIPING
10. REMOVE EXISTING FEC AND SAVE FOR
FUTURE INSTALLATION
S
S
S S
J
K
15 16
2 2
K
2 3
1 CEILING GRID TO BE REMOVED
EXISTING LIGHT FIXTURES TO REMAIN.
SUSPEND IN PLACE FOR REUSE IN NEW
LAYOUT
EXISTING SUPPLY DIFFUSERS TO BE
REMOVED AND STORED FOR REUSE
EXISTING RETURN AIR DIFFUSERS
TO BE REMOVED AND STORED FOR
REUSE
DRAWING NUMBER
DWG. OF
PROJECT TITLE
ISSUE DATE CHECKED DRAWN
PHASEDRAWING TITLE
FULLY
SPRINKLERED
LOCATION
BUILDING
PROJECT NUMBER
Approved: Chief, Engineering Service
Brian C. McClung
Approved: VA Medical Center Director
Peggy Kearns, MS, RD, FACHE
ARCHITECT/ENGINEER OF RECORD SEALEngineering Service
KEY PLAN
NORTH
MAIN PHARMACY AND ONCOLOGY
AREA DEMO RCP
CONSTRUCTION
DOCUMENTS
LAS VEGAS PHARMACY
RENOVATION
05/21/18 BAJ LMF
AD102
6 49
NORTH LAS VEGAS, NV
593-18-104
GENERAL NOTES
KEY NOTES
LEGEND
4' 8'0 2'
SCALE:1/4"=1'-0"
AD102 SCALE: 1/4" = 1'-0"
MAIN PHARMACY AREA
DEMO RCP
AD102 SCALE: 1/4" = 1'-0"
ONCOLOGY AREA DEMO
RCP
1. REMOVE SECTION OF GYPSUM PARTITION AS
REQUIRED FOR NEW WORK. REMOVAL OF
SUCH PARTITION REQUIRES THAT ITEMS SUCH
AS CONDUIT, OUTLETS, WALL BASES, PIPING,
ETC. ARE TO BE REMOVED AND REROUTED.
REFER TO MEP DRAWINGS FOR ADDITIONAL
INFORMATION. COORDINATE WITH NEW
CONSTRUCTION
2. REMOVE EXISTING ACOUSTICAL CEILING
SYSTEM IN ITS ENTIRETY. TEMPORARILY
SUSPEND AND EXISTING DEVICES TO REMAIN
AS REQUIRED FOR NEW WORK.
3. CONTRACTOR TO SAFELY STORE EXISTING
EQUIPMENT DURING WORK AND TO BE
RETURNED AFTER CONSTRUCTION IS
COMPLETED
4. CONTRACTOR TO PROVIDE DUST BARRIER
AROUND ALL CONSTRUCTION ACTIVITIES
INCLUDING THE BAGGING OF ALL AIR INTAKES
AND EXHAUST DIFFUSERS DURING ALL
CONSTRUCTION ACTIVITIES.
1. REMOVE CEILING GRID AND ACOUSTICAL TILE
WITHIN THIS AREA. STORE UNDAMAGED
PANELS FOR REUSE.
2. SUSPEND ELECTRICAL FIXTURES FOR REUSE
IN NEW LAYOUT.
K
15 16
1D324
BREAK OUT
1D355
HAZARDOUS
COMPOUNDING
1D354
NON-HAZARDOUS
COMPOUNDING
229 SF
1D352
ANTE ROOM
A-301 8
A-301
1 1
7'
4" 6'
2"
7' - 4" 7' - 4"
8' - 10"1' - 6"
7'
1/
2"
EXISTING
WALL TO
REMAIN
ALIGN WITH
EXISTING
WALL
EXISTING
WALL TO
REMAIN
K
2 3
EQUIP
1A169
A-301 1 2
A-301
NURSES STATION
1A153
NON-HAZARDOUS
COMPOUNDING
1A149B
HAZARDOUS
COMPOUNDING
1A149A
ANTE ROOM
1A149
49B
49A
49FEC
A-301
A-301
A-301
9 FEC
7' - 4"7'
4"
7' - 4"
8'
8"
ALIGN
EXISTING
WALL
ALIGN
2' - 7"
NEW WALLS
DRAWING NUMBER
DWG. OF
PROJECT TITLE
ISSUE DATE CHECKED DRAWN
PHASEDRAWING TITLE
FULLY
SPRINKLERED
LOCATION
BUILDING
PROJECT NUMBER
Approved: Chief, Engineering Service
Brian C. McClung
Approved: VA Medical Center Director
Peggy Kearns, MS, RD, FACHE
ARCHITECT/ENGINEER OF RECORD SEALEngineering Service
KEY PLAN
NORTH
MAIN PHARMACY AND ONCOLOGY
AREA FLOOR PLANS
CONSTRUCTION
DOCUMENTS
LAS VEGAS PHARMACY
RENOVATION
05/21/18 BAJ LMF
A-101 7 49
NORTH LAS VEGAS, NV
593-18-104
A-101 SCALE: 1/4" = 1'-0"
MAIN PHARMACY AREA
FLOOR PLAN
4' 8'0 2'
SCALE:1/4"=1'-0"
A-101 SCALE: 1/4" = 1'-0"
ONCOLOGY AREA FLOOR
PLAN
GENERAL NOTES
KEY NOTES#
1. PRIOR TO BIDDING THE WORK, THE
CONTRACTOR SHALL VISIT THE FACILITY TO
THOROUGHLY FAMILIARIZE THEMSELVES WITH
THE SCOPE OF THE WORK, THE EXISTING
CONDITION OF THE SITE AND THE LOGISTICS
REQUIRED IN PERFORMING THE WORK.
2. CONTRACTOR TO VERIFY THE SITE
CONDITIONS AND IMMEDIATELY NOTIFY THE
COR OF ANY DISCREPANCY BETWEEN
EXISTING CONDITIONS SHOWN AND
CONFIGURATIONS SHOWN BY THE
CONSTRUCTION DOCUMENTS.
3. CONTRACTOR TO COORDINATE THE WORK OF
ALL TRADES AND MATERIAL SUPPLIES
INVOLVED WITH AND WORKING ON THE
PROJECT.
4. REFER TO SHEET A-301 FOR FLOOR AND WALL
FINISHES.
5. CONTRACTOR TO AVOID DISRUPTION OF
EXISTING FACILITY SERVICES AT ALL TIMES.
6 CONTRACTOR MUST COORDINATE IN
ADVANCE ANY OPERATIONS THAT WILL
CREATE DISRUPTIVE NOISE OR VIBRATION
WITH THE COR 48 HOURS IN ADVANCE OF
BEGINNING SUCH WORK. WRITTEN NOTICE TO
COR IS REQUIRED 48 HOURS PRIOR TO
PERFORMANCE OF SUCH WORK UNLESS
OTHERWISE AGREED TO BY COR.
7. MAINTAIN (MINIMUM 48" WIDE) EGRESS
PATHWAYS THROUGH THE CONSTRUCTION
AREA THROUGHOUT THE CONSTRUCTION
PERIOD. COORDINATE EXISTING
REQUIREMENTS WITH VAMC COR.
1. INSTALL WELDED SHEET FLOORING (WSF).
2. INSTALL VINYL COMPOSITE TILE (VCT) TO
MATCH EXISTING COLOR.
3. INSTALL RUBBER WALL BASE WHERE IS
NEEDED TO MATCH EXISTING COLOR.
4. PROVIDE NEW TRACKLESS GLASS SLIDING
DOOR.
5. LAVATORY FAUCET WITH EYEWASH.
6 RELOCATE EXISTING DOOR AND FRAME.
7 PROVIDE NEW PASS-THROUGH CABINET
8 RELOCATE EXISTING PASS-THROUGH CABINET
9 EXISTING STORAGE UNIT TO REMAIN
10 REINSTALL SAVED FEC
LEGEND
S S
S
S
J
K
15 16
K
2 3
2 2
DRAWING NUMBER
DWG. OF
PROJECT TITLE
ISSUE DATE CHECKED DRAWN
PHASEDRAWING TITLE
FULLY
SPRINKLERED
LOCATION
BUILDING
PROJECT NUMBER
Approved: Chief, Engineering Service
Brian C. McClung
Approved: VA Medical Center Director
Peggy Kearns, MS, RD, FACHE
ARCHITECT/ENGINEER OF RECORD SEALEngineering Service
KEY PLAN
NORTH
MAIN PHARMACY AND ONCOLOGY
AREA REFLECTED CEILING PLANS
CONSTRUCTION
DOCUMENTS
LAS VEGAS PHARMACY
RENOVATION
05/21/18 BAJ LMF
A-102 8 49
NORTH LAS VEGAS, NV
593-18-104
4' 8'0 2'
SCALE:1/4"=1'-0"
A-102 SCALE: 1/4" = 1'-0"
1 MAIN PHARMACY AREA RCP
A-102 SCALE: 1/4" = 1'-0"
2 ONCOLOGY AREA RCP
GENERAL NOTES
KEY NOTES#
1. PRIOR TO BIDDING THE WORK, THE
CONTRACTOR SHALL VISIT THE FACILITY TO
THOROUGHLY FAMILIARIZE THEMSELVES WITH
THE SCOPE OF THE WORK, THE EXISTING
CONDITION OF THE SITE AND THE LOGISTICS
REQUIRED IN PERFORMING THE WORK.
2. CONTRACTOR TO VERIFY THE SITE
CONDITIONS AND IMMEDIATELY NOTIFY THE
COR OF ANY DISCREPANCY BETWEEN
EXISTING CONDITIONS SHOWN AND
CONFIGURATIONS SHOWN BY THE
CONSTRUCTION DOCUMENTS.
3. CONTRACTOR TO COORDINATE THE WORK OF
ALL TRADES AND MATERIAL SUPPLIES
INVOLVED WITH AND WORKING ON THE
PROJECT.
4. REFER TO SHEET A-301 FOR FLOOR AND WALL
FINISHES.
5. CONTRACTOR TO AVOID DISRUPTION OF
EXISTING FACILITY SERVICES AT ALL TIMES.
6 CONTRACTOR MUST COORDINATE IN
ADVANCE ANY OPERATIONS THAT WILL
CREATE DISRUPTIVE NOISE OR VIBRATION
WITH THE COR 48 HOURS IN ADVANCE OF
BEGINNING SUCH WORK. WRITTEN NOTICE TO
COR IS REQUIRED 48 HOURS PRIOR TO
PERFORMANCE OF SUCH WORK UNLESS
OTHERWISE AGREED TO BY COR.
7. MAINTAIN (MINIMUM 48" WIDE) EGRESS
PATHWAYS THROUGH THE CONSTRUCTION
AREA THROUGHOUT THE CONSTRUCTION
PERIOD. COORDINATE EXISTING
REQUIREMENTS WITH VAMC COR.
8. REMOVE EXISTING GRID CEILING INCLUDING
METAL GRID AND ACOUSTICAL PANELS.
STORE UNDAMAGED PANELS FOR
RE-INSTALLATION IN NEW GRID. REMOVE
EXISTING LIGHT FIXTURES AND STORE FOR
INSTALLATION IN NEW CEILING.
9. INSTALL NEW CEILING AT 9'-0" ABOVE FINISH
FLOOR
1. PROVIDE A NEW STEEL GRID 2'' X 2' CEILING AT
9'-0" A.F.F.
2. EXISTING LIGHT FIXTURES TO BE RELOCATED
3. CEILING ACCESS PANEL, COORDINATE
LOCATION WITH MECHANICAL
K
15 16
5355 SF
1D324
BREAK OUT
105 SF
1D355
HAZARDOUS
COMPOUNDING
A-301 8
A-301
119 SF
1D354
NON-HAZARDOUS
COMPOUNDING
48 SF
1D361
STAFF TOILET
241 SF
1D364
STAFF
LOCKERS/LOUNGE
229 SF
1D352
ANTE ROOM
FH-2 FH-1
K
2 3
40 SF
1A169
EQUIP
231 SF
1A153
NURSES STATION
66 SF
1A149B
NON-HAZARDOUS
COMPOUNDING
116 SF
1A149A
HAZARDOUS
COMPOUNDING
A-301
A-301
54 SF
1D359
STAFF TOILET
48 SF
1D360
PATIENT TOILET
158 SF
1A149
ANTE ROOM
REF
FH-4
FH-3
FH-5
FH-6
DRAWING NUMBER
DWG. OF
PROJECT TITLE
ISSUE DATE CHECKED DRAWN
PHASEDRAWING TITLE
FULLY
SPRINKLERED
LOCATION
BUILDING
PROJECT NUMBER
Approved: Chief, Engineering Service
Brian C. McClung
Approved: VA Medical Center Director
Peggy Kearns, MS, RD, FACHE
ARCHITECT/ENGINEER OF RECORD SEALEngineering Service
KEY PLAN
NORTH
MAIN PHARMACY AND ONCOLOGY
EQUIPMENT PLANS
CONSTRUCTION
DOCUMENTS
LAS VEGAS PHARMACY
RENOVATION
05/21/18 BAJ LMF
A-103 9 49
NORTH LAS VEGAS, NV
593-18-104
A-103 SCALE: 1/4" = 1'-0"
MAIN PHARMACY AREA
EQUIPMENT FLOOR PLAN
A-103 SCALE: 1/4" = 1'-0"
ONCOLOGY EQUIPMENT
AREA FLOOR PLAN
GENERAL NOTES
KEY NOTES#
1. CONTAINMENT TECHNOLOGIES GROUP, INC.
MIC SINGLE BIOLOGICAL SAFETY CABINET OR
EQUAL, SEE EQUIPMENT SCHEDULE ON
SHEET MH601 GFE
2. THERMOFISHER SCIENTIFIC JPR5004A HIGH
PERFORMANCE PHARMACY REFRIGERATOR
OR EQUAL, SEE EQUIPMENT SCHEDULE ON
SHEET MH601 GFE
3. BD PYXIS 6 DRAWER MEDSTATION OR EQUAL,
SEE EQUIPMENT SCHEDULE ON SHEET MH601
GFE
4. BD PYXIS MEDSTATION 4000 DOUBLE COLUMN
AUXILIARY OR EQUAL, SEE EQUIPMENT
SCHEDULE ON SHEET MH601 GFE
1. ALL EQUIPMENT INDICATED BY PLANS IS TO BE
FURNISHED AND INSTALLED BY THE VAMC
UNLESS OTHERWISE INDICATED.
4' 8'0 2'
SCALE:1/4"=1'-0"
B30B30
8' - 0"
W3030W3030 W3030
UNDERCOUNTER
REFRIGERATOR
A-301
1'
6"
3'
0" 1'
6"
2'
6"
LAMINATE
CABINETS
SOLID
SURFACE
COUNTERTO
P AND
BACKSPLASH
DRYWALL
SOFFIT
BLOCKING AS
REQUIRED
ACOUSTICAL
INSULATION
LAMINATE
CABINETS
SOLID SURFACE
COUNTERTOP
AND
BACKSPLASH
SOFFIT
8' - 0"
STRUCTURE ABOVE
3 5/8" X 20 GA. STUDS
@ 16" O.C. - BRACE TO
STRUCTURE AS REQ'D
5/8" TYPE "X" GYPSUM
BOARD
SOUND BATT
INSULATION
ACOUSTICAL
CEILING TILE TO
MATCH EXISTING
ALUMINUM CARRIER
BEAM WITH
AUTOMATIC DOOR
HARDWARE
TRACKLESS GLASS
SLIDING DOOR
NEW SEAMLESS
FLOOR
EXISTING VCT
FLOOR
STRUCTURE ABOVE
3 5/8" X 20 GA STUDS
@ 16" O.C. - BRACE
TO STRUCTURE AS
REQUIRED
5/8" TYPE "X"
GYPSUM
BOARD
SOUND BATT
INSULATION
ACOUSTICAL
CEILING TILE
TO MATCH
EXISTING
NEW SEAMLESS
FLOOR
INTEGRAL COVE
BASE
3 5/8" X 20 GA STUDS
@ 16" O.C. - BRACE
TO STRUCTURE AS
REQUIRED
5/8" TYPE "X"
GYPSUM
BOARD
ACOUSTICAL CEILING
TILE TO MATCH
EXISTING
NEW SEAMLESS
FLOOR
INTEGRAL COVE
BASE
6"
STRUCTURE ABOVE
3 5/8" X 20 GA. STUDS
@ 16" O.C. - BRACE TO
STRUCTURE AS REQ'D
5/8" TYPE "X" GYPSUM
BOARD
SOUND BATT
INSULATION
ACOUSTICAL CEILING
TILE TO MATCH
EXISTING
NEW SEAMLESS
FLOOR
EXISTING VCT
FLOOR
INTEGRAL COVE
BASE
AUTOMATIC
SLIDING DOOR
STOREFRONT
WALL BASE
3'
6"
ANTE ROOM
1A149
PASS-
THROUGH
CABINET
CRASH RAIL WALL BASE
RELOCATE
EXISTING FIRE
EXTINGUISHER
CABINET
A-302
A-302
CRASH RAIL
WALL BASE
EXISTING FIRE
EXTINGUISHER
CABINET TO
REMAIN
DRAWING NUMBER
DWG. OF
PROJECT TITLE
ISSUE DATE CHECKED DRAWN
PHASEDRAWING TITLE
FULLY
SPRINKLERED
LOCATION
BUILDING
PROJECT NUMBER
Approved: Chief, Engineering Service
Brian C. McClung
Approved: VA Medical Center Director
Peggy Kearns, MS, RD, FACHE
ARCHITECT/ENGINEER OF RECORD SEALEngineering Service
FINISH SCHEDULE INT., SECTION /
ELEVATION AND WALL TYPES
CONSTRUCTION
DOCUMENTS
LAS VEGAS PHARMACY
RENOVATION
05/21/18 BAJ LMF
A-301 10 49
NORTH LAS VEGAS, NV
593-18-104
LEGEND
ACT ACOUSTICAL CEILING TILE
E EXISTING
HM HOLLOW METAL
IB INTEGRAL BASE
RB RUBBER WALL BASE
VCT VINYL COMPOSITE TILE
WD WOOD DOOR
WSF WELDED SEAM SHEET
FLOORING
2' 4'0 1'
SCALE:1/2"=1'-0"
A-301 SCALE: 1/2" = 1'-0"
INTERIOR ELEVATION -
NURSE STATION 1A153
A-301 SCALE: 1/2" = 1'-0"
2 NURSE STATION CABINET
FINISH SCHEDULE
ROOM NO. ROOM NAME FLOOR WALL BASE
WALL FINISH
CEILING
CEILING
HEIGHT REMARKSNORTH EAST SOUTH WEST
1A149 ANTE ROOM WSF WSF (IB) MATCH EXISTING MATCH EXISTING MATCH EXISTING MATCH EXISTING ACT 9' - 0" * 1A149A HAZARDOUS COMPOUNDING WSF WSF (IB) MATCH EXISTING MATCH EXISTING MATCH EXISTING MATCH EXISTING ACT 9' - 0" * 1A149B NON-HAZARDOUS COMPOUNDING WSF WSF (IB) MATCH EXISTING MATCH EXISTING MATCH EXISTING MATCH EXISTING ACT 9' - 0" * 1A153 NURSES STATION VCT RB MATCH EXISTING MATCH EXISTING MATCH EXISTING MATCH EXISTING ACT 9' - 0" *** 1A169 EQUIP VCT RB MATCH EXISTING MATCH EXISTING MATCH EXISTING MATCH EXISTING ACT 9' - 0" *** 1D352 ANTE ROOM WSF WSF (IB) MATCH EXISTING MATCH EXISTING MATCH EXISTING MATCH EXISTING ACT 9' - 0" * 1D354 NON-HAZARDOUS COMPOUNDING WSF WSF (IB) MATCH EXISTING MATCH EXISTING MATCH EXISTING MATCH EXISTING ACT 9' - 0" * 1D355 HAZARDOUS COMPOUNDING WSF WSF (IB) MATCH EXISTING MATCH EXISTING MATCH EXISTING MATCH EXISTING ACT 9' - 0" *
* MATCH EXISTING INTERIOR COLOR PAINT
*** MATCH EXISTING INTERIOR COLOR PAINT, VCT AND WALL BASE
PROPOSED FINISHES:
ACOUSTICAL CEILING TILES (ACT):
CERTAINTEED
STYLE: PERFORMA VINYL, SHEET A
SIZE: 24" X 24" X 5/8"
COLOR: WHITE
WELDED SEAM SHEET FLOORING (WSF):
ARMSTRONG SHEET
STYLE: HOMOGENEOUS SHEET
SIZE: 6.58FT X UP TO 98.4 FT X 0.080 IN
COLOR: ALMOND 84163
A-301 SCALE: 1/2" = 1'-0"
6 WALL P4
A-301 SCALE: 1/2" = 1'-0"
5 WALL P3
A-301 SCALE: 1/2" = 1'-0"
4 WALL P2
A-301 SCALE: 1/2" = 1'-0"
3 WALL P1
WALL TYPES
DOOR SCHEDULE
ROOM NAME
DOOR
NUMBER
DOOR SIZE DOOR DOOR FRAME
HARDWARE
FIRE
RATING
DETAILS
REMARKSWIDTH HEIGHT THICKNESS MATERIAL DOOR TYPE MATERIAL FRAME TYPE HEAD JAMB SILL
1D325 ANTE ROOM 25 7' - 4" 7' - 6" 0' - 2" GL/ALUM 310 SLIDER ALUM DOUBLE WAVE OPERATOR - 1/A-302 (19) 21/A-302 SIM 9/A-302 AUTOMATIC SLIDING DOOR 1A149 ANTE ROOM 49 7' - 4" 7' - 6" 0' - 2" GL/ALUM 310 SLIDER ALUM DOUBLE WAVE WITH CARD
READER (E)
- 3/A-302 (16) 18/A-302 9/A-302 REUSE EXISTING CARD READER
1A149A HAZARDOUS
COMPOUNDING
49A 7' - 4" 7' - 6" 0' - 2" GL/ALUM 110 SLIDER ALUM DOUBLE WAVE OPERATOR - 3/A-302-SIM (4) 6/A-302 9/A-302 OPAQUE GLASS AT FIXED PANEL
1A149B NON-HAZARDOUS 49B 7' - 4" 7' - 6" 0' - 2" GL/ALUM 310 SLIDER ALUM DOUBLE WAVE OPERATOR - 1/A-302-SIM (5) 18/A-302 9/A-302 AUTOMATIC SLIDING DOOR 1D354 NON-HAZARDOUS COMP 54 7' - 4" 7' - 6" 0' - 2" GL/ALUM 310 SLIDER ALUM DOUBLE WAVE OPERATOR - 1/A-302-SIM (16) 18/A-302 9/A-302 AUTOMATIC SLIDING DOOR 1D355 HAZARDOUS COMP 55 7' - 4" 7' - 6" 0' - 2" GL/ALUM 310 SLIDER ALUM DOUBLE WAVE OPERATOR - 1/A-302-SIM (16) 18/A-302 9/A-302 AUTOMATIC SLIDING DOOR 1A169 EQUIPMENT 69 3' - 0" 7' - 0" 0' - 1 3/4" WD (E) SWING HM (E) SINGLE EXISTING TO REMAIN - 14/
A-302-SIM
14 / A-302 14/A-302 EXISTING DOOR RELOCATED
SCALE: 1/4" = 1'-0"A-301
PHARMACY ELEVATION8
A-301 SCALE: 1/4" = 1'-0"
10 ANTE ROOM ELEVATION
A-301 SCALE: 1/4" = 1'-0"
11 EYE WASH SINK ELEVATION
A-301 SCALE: 1/4" = 1'-0"
7 INTERIOR ELEVATION
A-301 SCALE: 1/4" = 1'-0"
9 INTERIOR ELEVATION
4' 8'0 2'
SCALE:1/4"=1'-0"
EXTENT OF NEW CONSTRUCTION
6" X 20 GA. STUDS@
16" O.C. W/ 5/8" GYPSUM
BOARD EACH SIDE.
STEEL BEAM
RE: STRUCTURAL
AUTOMATIC DRIVE MOTOR
WITHIN ALUMINUM ENCLOSURE
ALUMINUM SLIDING DOOR
4"
1/4" SHIM SPACE
SOLID WOOD BLOCKING
2" X SOLID WOOD BLOCKING
7'-8 1/2" A.F.F.
BACKER ROD AND SEALANT
ALUMINUM FIXED DOOR
ALUMINUM SLIDING DOOR
ALUMINUM FIXED DOOR
ALUMINUM SLIDING DOOR
DOOR PIVOT BEYOND
FINISH FLOOR
3 5/8" X 16 GA. JAMB STUDS
ALUMINUM FIXED DOOR
ALUMINUM DOOR FRAME
ALUMINUM SLIDING DOOR
DOOR PIVOT
ALUMINUM FIXED DOOR
3 5/8" X 16 GA. JAMB STUDS
ALUMINUM SLIDING DOOR
TOUCHLESS SENSOR
(WAVE TO OPEN)
FIXED DOOR PANEL
ALUMINUM DOOR FRAME
3 5/8" X 20 GA. STUDS @ 16" O.C.
SLIDE/SWING DOOR PANELOPAQUE SPANDREL GLASS
FIXED DOOR PANEL
1/4" CLEAR TEMPERED
GLAZING
ALUMINUM STOREFRONT
HORIZONTAL MEMBER
ALUMINUM STOREFRONT
6" X 20 GA. STEEL
STUD "CURB" WALL W/
5/8" GWB EA. SIDE
RUBBER BASE TO
MATCH EXISTING
FINISH FLOOR
WELDED SHEET FLOORING
WITH INTEGRAL COVED BASE
1/4" TEMPERED GLASS
BACKER ROD AND SEALANT
6"
2" X WOOD BLOCKING
6" X 20 GA. JAMB STUDS
AT EXISTING WALL
ALUMINUM FIXED DOOR
3 5/8" X 20 GA.
STUDS @ 16" O.C.
W/ 5/8" GWB EA. SIDE
AT NEW ADJACENT WALL
1/
4"
TOUCHLESS SENSOR
(WAVE TO OPEN)
ANODIZED ALUMINUM STOREFRONT
ALUMINUM SLIDING DOOR
TOUCHLESS SENSOR
(WAVE TO OPEN)
3"
3 5/8" STEEL STUDS
5/8" GWB
BACKER ROD
AND SEALANT
ALUMINUM STOREFRONT
BACKER ROD
AND SEALANT
TUBE STEEL COLUMN
RE: STRUCTURAL
SOLID WOOD BLOCKING
1/
2"
1 1/2"
5/8" GYPSUM BOARD
STEEL STUD
BACK-UP
MAPLE HANDRAIL TO
MATCH EXISTING
ALUMINUM RETAINER
MAPLE RETAINER AND
TOGGLE BOLT
6" X 20 GA. STUDS@
16" O.C. W/ 5/8" GYPSUM
BOARD EACH SIDE.
STEEL BEAM
RE: STRUCTURAL
1 3/4" X 4" ALUMINUM
STOREFRONT
1/4" CLEAR TEMPERED
PLATE GLASS
1/4" SHIM SPACE
SOLID WOOD BLOCKING
2" X SOLID WOOD
BLOCKING
7'-8 1/2" A.F.F.
BACKER ROD AND SEALANT
3 5/8" X 20 GA. STEEL
STUD WALL W/
5/8" GWB EA. SIDE
RUBBER BASE TO
MATCH EXISTING
FINISH FLOOR
WELDED SHEET FLOORING
WITH INTEGRAL COVED BASE3 5/8" X 20 GA. JAMB STUDS
EXISTING WOOD DOOR
EXISTING HOLLOW
METAL DOOR FRAME
THREE ANCHORS PER JAMB
3 5/8"" X 20 GA. STUDS@
16" O.C. W/ 5/8" GYPSUM
BOARD EACH SIDE.
BOX HEADER
AUTOMATIC DRIVE MOTOR
WITHIN ALUMINUM ENCLOSURE
ALUMINUM SLIDING DOOR
4"
1/4" SHIM SPACE
MUD BEAD
BACKER ROD AND SEALANT
TOUCHLESS SENSOR
(WAVE TO OPEN)
3 5/8" STEEL STUDS
WITH GWB EACH SIDE
BACKER ROD AND SEALANT
ALUMINUM DOOR FRAME
DRAWING NUMBER
DWG. OF
PROJECT TITLE
ISSUE DATE CHECKED DRAWN
PHASEDRAWING TITLE
FULLY
SPRINKLERED
LOCATION
BUILDING
PROJECT NUMBER
Approved: Chief, Engineering Service
Brian C. McClung
Approved: VA Medical Center Director
Peggy Kearns, MS, RD, FACHE
ARCHITECT/ENGINEER OF RECORD SEALEngineering Service
SLIDING DOOR DETAILS CONSTRUCTION
DOCUMENTS
LAS VEGAS PHARMACY
RENOVATION
05/21/18 BAJ LMF
A-302 11 49
NORTH LAS VEGAS, NV
593-18-104
A-302 SCALE: 3" = 1'-0"
SLIDING DOOR HEAD AT
1D352
A-302 SCALE: 3" = 1'-0"
7 SLIDING DOOR CROSS RAIL
A-302 SCALE: 3" = 1'-0"
9 SLIDING DOOR THRESHOLD
A-302 SCALE: 3" = 1'-0"
16 SLIDING DOOR FIXED JAMB
A-302 SCALE: 3" = 1'-0"
SLIDING DOOR MEETING
RAIL
A-302 SCALE: 3" = 1'-0"
18 SLIDING DOOR ACTIVE JAMB
A-302 SCALE: 3" = 1'-0"
MEETING RAIL AT
ONCOLOGY
A-302 SCALE: 3" = 1'-0"
8 STOREFRONT RAIL
A-302 SCALE: 3" = 1'-0"
10 STOREFRONT SILL
A-302 SCALE: 3" = 1'-0"
FIXED JAMB DETAIL AT
ONCOLOGY
A-302 SCALE: 3" = 1'-0"
6 JAMB DETAIL AT ONCOLOGY
A-302 SCALE: 3" = 1'-0"
SLIDING DOOR ACTIVE JAMB
AT STOREFRONT
A-302 SCALE: 3" = 1'-0"
20 STOREFRONT MULLION
A-302 SCALE: 3" = 1'-0"
STOREFRONT JAMB AT
PHARMACY
A-302 SCALE: 3" = 1'-0"
22 CORRIDOR HANDRAIL
SCALE: 3"=1'-0"
3" 6" 9" 12"
A-302 SCALE: 3" = 1'-0"
2 STOREFRONT HEAD
A-302 SCALE: 3" = 1'-0"
TYPICAL PARTITION AT
FLOOR
A-302 SCALE: 3" = 1'-0"
TYPICAL RELOCATED DOOR
JAMB
A-302 SCALE: 3" = 1'-0"
3 SLIDING DOOR HEAD
REVISIONS DATE
A-302 SCALE: 3" = 1'-0"
13 JAMB DETAIL AT PHARMACY
A-302 SCALE: 3" = 1'-0"
FIXED JAMB DETAIL AT
PHARMACY
A-302 SCALE: 3" = 1'-0"
12 MEETING RAIL
DRAWING NUMBER
DWG. OF
PROJECT TITLE
ISSUE DATE CHECKED DRAWN
PHASEDRAWING TITLE
FULLY
SPRINKLERED
LOCATION
BUILDING
PROJECT NUMBER
Approved: Chief, Engineering Service
Brian C. McClung
Approved: VA Medical Center Director
Peggy Kearns, MS, RD, FACHE
ARCHITECT/ENGINEER OF RECORD SEALEngineering Service
GENERAL STRUCTURAL NOTES CONSTRUCTION
DOCUMENTS
LAS VEGAS PHARMACY
RENOVATION
05/21/18 RID JTB
S-001 12 49
NORTH LAS VEGAS, NV
593-18-104
1. INTERNATIONAL BUILDING CODE - 2012 EDITION
2. AISC MANUAL OF STEEL CONSTRUCTION - 14th EDITION.
3. ACI BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE - ACI 318-11.
C. BUILDING OCCUPANCY:
D. DESIGN LOADS
A. SCOPE: THIS SPECIFICATION OUTLINES THE STRUCTURAL DESIGN
CRITERIA FOR SOUTHERN NEVADA VAMC, WHEN A DIFFERENCE
EXISTS BETWEEN THIS SPECIFICATION AND ANY OTHER GOVERNING
CODE, THE MORE STRINGENT SHALL CONTROL. ANY OTHER ITEMS
NOT COVERED THEREIN SHALL BE COMMENSURATE WITH GOOD
ENGINEERING PRACTICE.
B. APPLICABLE CODES AND STANDARDS
2. GRAVITY LIVE LOADS:
1. DEAD LOADS: WEIGHT OF STRUCTURE AND ALL
THINGS PERMANENTLY ATTACHED.
SELF WEIGHT OF BEAM: 15.62 LBS/FT
WEIGHT OF SLIDING DOOR: 200 LBS
LIVE LOAD 20 PSF
IV
DESIGN CRITERIA
GENERAL CONDITIONS
A. CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO
CONSTRUCTION. DO NOT SCALE DRAWINGS.
B. DO NOT REPRODUCE CONTRACT DOCUMENTS OR COPY STANDARD
PRINTED INFORMATION AS BASIS OF SHOP DRAWINGS.
C. STRUCTURAL CONSTRUCTION DOCUMENTS RELEASED BY THIS
OFFICE ARE ASSUMED TO BE COMPLETE AND ACCURATE YET
PROBLEMS MAY ARISE DURING CONSTRUCTION. COMMUNICATION
WITH CONTRACTOR, ENGINEER, ARCHITECT AND OTHER PARTIES
INVOLVED WITH THIS PROJECT WILL PROVIDE THE BEST POSSIBLE
BUILDING.
D. CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION
PRACTICES INCLUDING TECHNIQUES, PROCEDURES AND THE
SEQUENCE OF CONSTRUCTION. CONTRACTOR SHALL NOTIFY
STRUCTURAL ENGINEER IF A CONFLICT ARISES DUE TO
VARIATIONS OR OTHER PROBLEMS WITH THE CONSTRUCTION
DOCUMENTS.
E. DURING ERECTION OF THE BUILDING, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR TEMPORARY BRACING TO WITHSTAND ALL
LOADS TO WHICH THE STRUCTURE MAY BE SUBJECTED, INCLUDING
LATERAL LOADS, STOCKPILES OF MATERIALS AND EQUIPMENT.
SUCH BRACING SHALL BE LEFT IN PLACE AS LONG AS MAY BE
REQUIRED FOR SAFETY AND UNTIL ALL STRUCTURAL FRAMING AND
DIAPHRAGMS ARE IN PLACE WITH CONNECTIONS COMPLETED.
F. OBSERVATIONS OF JOBSITE OTHER THAN REQUIRED INSPECTIONS
BY ENGINEER ARE NOT CONSTRUCTION APPROVALS.
G. STRUCTURAL ENGINEER MUST BE NOTIFIED AT LEAST 48 HOURS
PRIOR TO ANY REQUIRED CONSTRUCTION OBSERVATION.
H. DO NOT PLACE BACKFILL AGAINST BASEMENT WALLS UNTIL ALL
SUPPORTING ELEMENTS ARE IN PLACE AND SECURELY
ANCHORED OR UNTIL ADEQUATE SHORING IS INSTALLED.
I. ISOLATE ALL DOOR JAMBS FROM FLOOR SLABS A MINIMUM OF 1/2"
TO ALLOW FOR POSSIBLE VERTICAL MOVEMENT
J. PROVIDE SLEEVES FOR ALL PIPES PLACED THROUGH CONCRETE
BEAMS, WALLS, COLUMNS OR SLABS.
K. THE BUILDER AND FUTURE OWNER SHOULD BE MADE AWARE OF
THE CHANCE OF MOVEMENT AND CRACKING OF CONCRETE SLABS
PLACED DIRECTLY ON COMPACTED SOIL.
L. L.VERIFY ALL OPENINGS THROUGH FLOOR, ROOF, AND WALLS WITH
MECHANICAL AND ELECTRICAL CONTRACTORS
STRUCTURAL STEEL
C. EXECUTION:
B. MATERIALS:
A. REFERENCED STANDARDS:
1. AISC 303-10, CODE OF STANDARD PRACTICE FOR STEEL
BUILDINGS AND BRIDGES
2. AISC 360-10, SPECIFICATION FOR STRUCTURAL STEEL
BUILDINGS
3. ASTM A36, STANDARD SPECIFICATION FOR CARBON
STRUCTURAL STEEL
4. ASTM A53, STANDARD SPECIFICATION FOR PIPE, STEEL,
BLACK AND HOT-DIPPED, ZINC-COATED WELDED AND
SEAMLESS
5. ASTM A325, STANDARD SPECIFICATION FOR STRUCTURAL
BOLTS, STEEL, HEAT TREATED, 120/105 KSI MINIMUM
TENSILE STRENGTH
6. ASTM A500, STANDARD SPECIFICATION FOR COLD
FORMED WELDED AND SEAMLESS CARBON STEEL
STRUCTURAL TUBING IN ROUNDS AND SHAPES
7. ASTM A501, STANDARD SPECIFICATION FOR HOT-FORMED
WELDED AND SEAMLESS CARBON STEEL STRUCTURAL
TUBING
8. ASTM A992, STANDARD SPECIFICATION FOR STRUCTURAL
STEEL SHAPES
9. ASTM F1554, STANDARD SPECIFICATION FOR ANCHOR
BOLTS, STEEL, 36, 55 AND 105 KSI YIELD STRENGTH
10. AWS D1.1, STRUCTURAL WELDING CODE-STEEL
1. DETAIL, FABRICATE AND ERECT STRUCTURAL STEEL IN
ACCORDANCE WITH AISC MANUAL OF STEEL
CONSTRUCTION, CODE OF STANDARD PRACTICE AND
CHAPTER 22 OF THE IBC PER THE REQUIREMENTS OF THE
AUTHORITY HAVING JURISDICTION.
2. WELDING SHALL BE PERFORMED BY AN AWS CERTIFIED
WELDER
3. WELDING SHALL BE DONE WITH LOW HYDROGEN
ELECTRODES OR USING A LOW HYDROGEN WELDING
PROCESS
4. WELDING PROCEDURES SHALL CONFORM WITH THE QUALITY
CONTROL REQUIREMENTS REQUIRED BY THE APPLICABLE
CODE
5. WELDING PROCEDURES ARE THE RESPONSIBILITY OF THE
STRUCTURAL STEEL CONTRACTOR
6. COMPLETE JOINT PENETRATION WELDS SHALL BE
ULTRASONICALLY INSPECTED WITH RESULTS SENT TO THE
ENGINEER OF RECORD
7. SHOP PRIME AND PAINT STEEL PER THE OWNER'S
SPECIFICATIONS
8. PAINTING DONE ON STEEL MEMBERS SHOULD BE AT LEAST
3" FROM FIELD WELDS UNLESS WELDS ARE COMPLETED.
9. EXPOSED STRUCTURAL STEEL, INCLUDING ANCHOR RODS,
SHALL BE HOT DIPPED GALVANIZED OR EQUALLY
PROTECTED
10. TEMPORARY SUPPORT (BRACING) SYSTEM SHALL MEET THE
REQUIREMENTS OF AISC SPECIFICATION AND AISC CODE OF
STANDARD PRACTICE. TEMPORARY SUPPORT (BRACING)
SYSTEM SHALL REMAIN IN PLACE UNTIL THE STEEL FRAME IS
COMPLETE AND ALL CONNECTING DIAPHRAGM AND
NON-STRUCTURAL-STEEL ELEMENTS ARE COMPLETE
1. STEEL WIDE FLANGE BEAMS ASTM A992
2. PLATES AND ANGLES ASTM A36
3. HOLLOW STRUCTURAL SECTIONS ASTM A500, GRADE B
4. PIPE COLUMNS ASTM A53, GRADE B
5. HIGH STRENGTH BOLTS A325, UNLESS NOTED OTHERWISE
6. BOLTS (OTHER THAN HIGH STRENGTH) A307, GRADE A
7. ANCHOR RODS ASTM F1554, GRADE 36 UNLESS NOTED
OTHERWISE
8. PLAIN WASHERS ANSI B 18.22.1-65 (R2006)
9. WELDING ELECTRODES E70XX RODS CONFORMING TO AWS A5.20,A5.18
OR A5.1
15 16
2'
2"
7' - 11"
T.
O
.S . 8
'-2
H
SS
6x 4x
1/
HSS4x 4x
1/4
HSS4x 4x
1/4
S-101
S-101
6x6x1/4" STEEL PLATE, BOTH SIDES
WITH (2) 3/4"Ø A325-N THRU BOLTS
1/2"
END OF BEAM, BEHIND 2"
1/
2"
3"
1/
2"
3/16
T.O. STEEL
SEE PLAN
HSS COLUMN, SEE PLAN
HSS BEAM, SEE PLAN
S-101
1 1/2"2"
1/
2"
TY
P.
1" , TYP.
6" 1' - 0"
HSS COLUMN, SEE PLAN 1/4" BASE PLATE, WITH (4)
3/4"Ø EPOXY ANCHORS,
MINIMUM 3 1/2 INCH
EMBEDMENT
3/16
5"
HSS POST
1/2" BASE PLATE
1/2"Ø S.S. EXP
ANCHORS W/ 2"
EMBED AT 8" O.C.
SECTION A-A
DUCT, SEE MECHANICAL
HSS 4x4x1/4"
2'-0" MIN.
3'-6" MAX.
4' -0
" M
AX
3' -6
" M
IN
ROOF DECK
HSS FRAME AT 8'-0"
MAX. O.C.
HSS 3"Øx1/4" TYP.
1/4" CAP PLATE
WITH SEAL WELD,
TYP.
6' -0
" M
AX
A A
1/4
TYP.
1/4
TYP.
NOTES:
1. SEE MH104 FOR LOCATION
2. ALL STEEL MEMBERS AND ANCHORS
ARE HDG AT EXTERIOR LOCATIONS
DRAWING NUMBER
DWG. OF
PROJECT TITLE
ISSUE DATE CHECKED DRAWN
PHASEDRAWING TITLE
FULLY
SPRINKLERED
LOCATION
BUILDING
PROJECT NUMBER
Approved: Chief, Engineering Service
Brian C. McClung
Approved: VA Medical Center Director
Peggy Kearns, MS, RD, FACHE
ARCHITECT/ENGINEER OF RECORD SEALEngineering Service
KEY PLAN
NORTH
STRUCTURAL PLAN AND DETAILS CONSTRUCTION
DOCUMENTS
LAS VEGAS PHARMACY
RENOVATION
05/21/18 RID JTB
S-101 13 49
NORTH LAS VEGAS, NV
593-18-104
S-101 SCALE: 1/4" = 1'-0"
MAIN PHARMACY AREA
STRUCTURAL PLAN
S-101 SCALE: 1 1/2" = 1'-0"
2 COLUMN SECTION
S-101 SCALE: 1 1/2" = 1'-0"
3 COLUMN BASE PLATE
1' 2'0 6"
SCALE:1-1/2"=1'-0"
4' 8'0 2'
SCALE:1/4"=1'-0"
GENERAL NOTES
1. PROVIDE HILTI HAS THREADED ANCHORS
WITH HILTI HIT-HY-100 ADHESIVE
REVISIONS DATE
S-101 SCALE: 1 1/2" = 1'-0"
4 DUCT SUPPORT
S
S
S S
J
K
15 16
F
F
F
K
2 3
F
F F
S FIRE ALARM SPEAKER
FIRE SPRINKLER
F
DRAWING NUMBER
DWG. OF
PROJECT TITLE
ISSUE DATE CHECKED DRAWN
PHASEDRAWING TITLE
FULLY
SPRINKLERED
LOCATION
BUILDING
PROJECT NUMBER
Approved: Chief, Engineering Service
Brian C. McClung
Approved: VA Medical Center Director
Peggy Kearns, MS, RD, FACHE
ARCHITECT/ENGINEER OF RECORD SEALEngineering Service
KEY PLAN
NORTH
MAIN PHARMACY AND ONCOLOGY
FIRE PROTECTION DEMO PLAN
CONSTRUCTION
DOCUMENTS
LAS VEGAS PHARMACY
RENOVATION
05/21/18 JM WBR
FP101
14 49
NORTH LAS VEGAS, NV
593-18-104
FP101 SCALE: 1/4" = 1'-0"
MAIN PHARMACY AREA
DEMO FIRE PROTECTION
PLAN
FP101 SCALE: 1/4" = 1'-0"
ONCOLOGY AREA DEMO
FIRE PROTECTION PLAN
1. ALL WORK ASSOCIATED WITH THE SPRINKLER
SYSTEM AND FIRE ALARM SYSTEM SHALL
CONFORM TO THE REQUIREMENTS OF THE VA
FIRE PROTECTION DESIGN GUIDE, NFPA 101
AND ITS REFERENCED STANDARDS.
GENERAL NOTES
KEY NOTES#
1. EXISTING FIRE SPRINKLER TO BE REMOVED.
ONCE REMOVED, EXISTING SPRINKLER SHALL
NOT BE RE-INSTALLED.
2. EXISTING FIRE ALARM SPEAKER TO BE
RELOCATED.
LEGEND
4' 8'0 2'
SCALE:1/4"=1'-0"
REVISIONS DATE
Randolph Image
Randolph Typewritten Text 10 April 2018
S
S
S
S
K
2 3
F
F
F
1 1
1 1
J
K
15 16
F
F
F
1 1
S FIRE ALARM SPEAKER
FIRE SPRINKLER
F
DRAWING NUMBER
DWG. OF
PROJECT TITLE
ISSUE DATE CHECKED DRAWN
PHASEDRAWING TITLE
FULLY
SPRINKLERED
LOCATION
BUILDING
PROJECT NUMBER
Approved: Chief, Engineering Service
Brian C. McClung
Approved: VA Medical Center Director
Peggy Kearns, MS, RD, FACHE
ARCHITECT/ENGINEER OF RECORD SEALEngineering Service
KEY PLAN
NORTH
MAIN PHARMACY AND ONCOLOGY
FIRE PROTECTION PLAN
CONSTRUCTION
DOCUMENTS
LAS VEGAS PHARMACY
RENOVATION
05/21/18 JM WBR
FP102
15 49
NORTH LAS VEGAS, NV
593-18-104
FP102 SCALE: 1/4" = 1'-0"
ONCOLOGY AREA FIRE
PROTECTION PLAN
FP102 SCALE: 1/4" = 1'-0"
MAIN PHARMACY AREA FIRE
PROTECTION PLAN
GENERAL NOTES
KEY NOTES#
1. NEW SPRINKLER AND PIPING TO BE INSTALLED
TO MEET THE SPACING REQUIREMENTS OF
NFPA 13 FOR A LIGHT HAZARD OCCUPANCY.
INSTALLED NEW SPRINKLERS IN LOCATIONS
AND QUANTITIES NECESSARY TO MEET
SPACING REQUIREMENTS AFTER
COORDINATION WITH EQUIPMENT INCLUDING
LIGHT FIXTURES AND DIFFUSERS. PROVIDE
ALL PIPING AND ASSOCIATED SUPPORTS AS
REQUIRED BY NFPA 13.
2. EXISTING FIRE ALARM SPEAKER TO BE
RELOCATED TO LOCATION SHOWN. PROVIDE
ALL WIRING, CONDUIT, BOXES AND SUPPORTS
AS REQUIRED. NEW WIRING SHALL BE OF
SAME SIZE AND TYPE AS EXISTING. ANY
REQUIRED SPLICES IN WIRING SHALL BE MADE
TO TERMINAL STRIPS IN A DEDICATED BOX.
THE USE OF WIRE NUTS IS PROHIBITED.
1. ALL WORK ASSOCIATED WITH THE SPRINKLER
SYSTEM AND FIRE ALARM SYSTEM SHALL
CONFORM TO THE REQUIREMENTS OF THE VA
FIRE PROTECTION DESIGN GUIDE, NFPA 101
AND ITS REFERENCED STANDARDS.
2. NEW SPRINKLER WORK SHALL BE IN
ACCORDANCE WITH SPECIFICATION SECTION
21 13 13
3. NEW FIRE ALARM WORK SHALL BE IN
ACCORDANCE WITH SPECIFICATION SECTION
28 31 00
4. AFTER INSTALLATION OF THE SPRINKLER
SYSTEM IS COMPLETE, THE ZONE(S)
AFFECTED BY THE WORK SHALL BE
HYDROSTATICALLY TESTED IN ACCORDANCE
WITH SPECIFICATION 21 13 13, SECTION 3.2
AND IN ACCORDANCE WITH NFPA 13
LEGEND
4' 8'0 2'
SCALE:1/4"=1'-0"
REVISIONS DATE
Randolph Image
Randolph Typewritten Text 10 April 2018
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
ACC AIR COOLED CONDENSER
ACCH AIR COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER,
TWO POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AHU AIR-HANDLING UNIT
AMP AMPERAGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF
MECHANICAL ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BG BOTTOM GRILLE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BR BOTTOM REGISTER
BSC BIOLOGICAL SAFETY CABINETS
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
BWT BOILER PLANT WATER TUBE
C CENTIGRADE (CELSIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE
DRAIN
CD CEILING DIFFUSER
CENT CENTRIFUGAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CG CEILING GRILLE
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CO CLEAN OUT
CO CARBON MONOXIDE
CO2 CARBON DIOXIDE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CR CEILING REGISTER
CS CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING COIL
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN
(TO COOLING TOWER)
CWS CONDENSER WATER SUPPLY
(FROM COOLING TOWER)
D DEMOLITION
DB DECIBELS
Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE
ASSEMBLY
DPS DIFFERENTIAL PRESSURE
SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING
COIL
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
ECU EVAPORATIVE CONDENSER UNIT
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL TEMP
EH EXHAUST HOOD
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ER EXHAUST REGISTER
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETO ETHYLENE OXIDE
EUH ELECTRIC UNIT HEATER
EWC EVAPORATIVE WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FHX FLUE GAS/FEEDWATER HEAT
EXCHANGER
FM FLOW METER
FOP FUEL OIL PUMP
FOT FUEL OIL TANK
FOHX FUEL OIL HEAT EXCHANGER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPTU FAN POWERED TERMINAL UNIT
FR FLOOR REGISTER
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSD COMBINATION FIRE SMOKE
DAMPER
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GLR GROUND LOOP RETURN
GLS GROUND LOOP SUPPLY
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
GSHP GROUND SOURCE HEAT PUMP
H HUMIDIFIER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HD HOOD
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP / HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN
(STEAM CONDENSATE)
HPS HIGH PRESSURE STEAM
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING)
PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HTM HUMIDIFIER TERMINAL
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HVD HOISTWAY VENT DAMPER
HX HEAT EXCHANGER
HZ HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN-LB INCH POUND
IPLV INTEGRATED PART LOAD VALUE
IRH INFRARED HEATER
IU INDUCTION UNIT
IV INLET VANES
kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
L LITER
L/h LITERS PER HOUR L/m LITERS PER MINUTE L/s LITERS PER SECOND
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LGT LEAVING GLYCOL TEMPERATURE
LH LATENT HEAT
LPG LIQUID PROPANE GAS
LPR LOW PRESSURE RETURN
(STEAM CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN
(CLEAN)
LLHX LIQUID TO LIQUID HEAT
EXCHANGER
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL
PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/s METERS PER SECOND
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT
AMPACITY
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN
(STEAM CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MTD MEAN TEMPERATURE
DIFFERENCE
MZ MULTI-ZONE
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NG NATURAL GAS
NGFM NATURAL GAS FLOWMETER
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC &
ATMOSPHERIC ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD
VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OFM OIL FLOWMETER
P PUMP
PA PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PGW PROPYLENE GLYCOL-WATER
(SOLUTION)
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE)
STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH
ABSOLUTE
PSIG POUNDS PER SQUARE INCH
GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
PTAC PACKAGED TERMINAL AIR
CONDITIONER
RA RETURN AIR
RAD REFRIGERANT AIR DRYER
RAF RADIO FREQUENCY
RAHX ROTARY AIR HEAT EXCHANGER
RAT RETURN AIR TEMPERATURE
RCCH REMOTE CONDENSER CHILLER
RCU RECIPROCATING CHILLER UNIT
RD REFRIGERANT DISCHARGE
REA RELIEF AIR
RF RETURN FAN
RFZ RADIANT FLOOR ZONE
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RS REFRIGERANT SUCTION LINE
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER
MINUTE
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SDPR SMOKE DAMPER
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SMACNA SHEET METAL AND AIR
CONDITIONING CONTRACTORS'
NATIONAL ASSOCIATION
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND
DISTRIBUTION
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SS STAINLESS STEEL
SSHX STEAM TO STEAM HEAT
EXCHANGER
SSR SOLID SEPARATOR
ST STEAM TRAP
SUH STEAM UNIT HEATER
SV STEAM PRESSURE REDUCING
VALVE
SVS STEAM VENT SILENCER
SWHX STEAM TO WATER HEAT
EXCHANGER
T & PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TG TRANSFER GRILLE
TP TRAP
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
UC UNDER CUT
UC UNIT COOLER
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
URV UPBLAST UNIT VENTILATOR
V VALVE
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER
VFD VARIABLE FREQUENCY DRIVE
VI VIBRATION ISOLATOR
VIV VARIABLE INLET VANES
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE)
RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WATTS
Wb WET-BULB (TEMPERATURE)
WC WATER COOLED
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING
UNIT
WCPU WATER COOLED PACKAGED UNIT
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
WSHP WATER SOURCE HEAT PUMP
YR YEAR
MECHANICAL ABBREVIATIONS GENERAL NOTES
1. ALL PIPING AND DUCTS IN FINISHED ROOMS OR
SPACES SHALL BE CONCEALED IN A FURRED CHASE OR
ABOVE THE HARD SUSPENDED CEILING.
2. THE FIRST FIGURE OF DUCT SIZE INDICATEDS
DIMENSION OF FACE SHOWN OR INDICATED. DUCT
SIZES ARE NET INSIDE DIMENSIONS.
3. ACCESS PANELS IN HARD CEILINGS ARE REQUIRED
FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS,
CONTROLS, ETC. [ACCESS PANELS SHALL BE
FURNISHED AND INSTALLED PER THE ARCHITECTURAL
SPECIFICATIONS].
4. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES
INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS,
COILS, ETC.
5. FOR TYPICAL STEAM AND WATER PIPING
CONNECTIONS TO EQUIPMENT, SEE STANDARD
EQUIPMENT DETAILS.
6. DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON
FLOOR PLANS ARE NECK SIZES.
7. WATER PIPE CONNECTIONS TO AIR HEATING AND
COOLING COILS SHALL BE MADE TO PROVIDE COUNTER
FLOW BETWEEN WATER AND AIR.
8. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS
FOR EXACT LOCATIONS OF CEILING DIFFUSERS,
REGISTERS AND GRILLES.
9. HANGERS SHALL BE ISOLATED BY TYPES OF ITEMS
THEY SUPPORT, DUCTS INDEPENDENT FROM PIPES,
CABLE TRAYS, ETC.
MECHANICAL SYMBOLS LEGEND
SUPPLY DUCT (UP & DOWN)
FLEXIBLE CONNECTION, EQUIPMENT, VIBRATION,
OR SEISMIC
UP
DN
UP DN
UP
DN
R
D
MD
FD
VANED ELBOW (PROVIDE ALL SQUARE OR RECTANGULAR
ELBOWS WITH VANES EVEN IF SYMBOL IS MISSING)
VANED ELBOW (SHORT RADIUS)
STANDARD RADIUS ELBOW (LONG RADIUS)
NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)
EXISTING DUCT TO REMAIN
EXISTING DUCT TO BE REMOVED
LOUVER (LOUVER SPECIFIED IN ARCHITECTURAL SECTION.)
FLEXIBLE DUCTWORK (INSULATED
DUCT WITH SOUND LINING
MANUAL VOLUME DAMPER
FIRE DAMPER
BACKDRAFT DAMPER
BDD
10x6
EXHAUST DUCT (UP & DOWN)
RETURN DUCT (UP & DOWN
ROUND AND SQUARE 4-WAY CEILING DIFFUSERS
SQUARE 3-WAY CEILING DIFFUSERS
SQUARE 2-WAY CEILING DIFFUSERS
SQUARE 1-WAY CEILING DIFFUSERS
LINEAR SLOT DIFFUSER
SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE (WALL TYPE)
EXHAUST OR RETURN REGISTER OR TOP GRILLE (WALL TYPE)
VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF
CONNECT NEW DUCT TO EXISTING DUCT
INCLINED RISE, IN DIRECTION OF AIRFLOW
INCLINDED DROP, IN DIRECTION OF AIR FLOW
LIMIT OF DEMOLITION
CD-1
#ø
##CFM
NECK SIZE (IN.)
DIFFUSER/GRILLE TAG
CFM
DRAWING NUMBER
DWG. OF
PROJECT TITLE
ISSUE DATE CHECKED DRAWN
PHASEDRAWING TITLE
FULLY
SPRINKLERED
LOCATION
BUILDING
PROJECT NUMBER
Approved: Chief, Engineering Service
Brian C. McClung
Approved: VA Medical Center Director
Peggy Kearns, MS, RD, FACHE
ARCHITECT/ENGINEER OF RECORD SEALEngineering Service
MECHANICAL ABBREVIATIONS AND
SYMBOLS
CONSTRUCTION
DOCUMENTS
LAS VEGAS PHARMACY
RENOVATION
05/21/18 CDL TJH
MG001
16 49
NORTH LAS VEGAS, NV
593-18-104
INDOOR OUTDOOR
SUMMER WINTER SUMMER WINTERROOM
DESCRIPTION
0.4% F Db 0.4% F Wb 99.6% F DbF Db % RH F Db
109.2 67.6 27.7
OUTSIDE DESIGN CONDITIONS PER VA HVAC DESIGN MANUAL 2017
GENERAL OFFICE
PHARMACY GENERAL
PHARM. COMPOUNDING AREAS
68 30-60
30-60
30-60 70
2 3
TU
-1
N 2-
(D )T
U -1
N 2-
(D )T
U -1
N 2-
TU
-7
-1
12"ø EA
EG-1
8"ø
EG-1
8"ø
EG-1
8"ø
CR-1
8"x6"
(D)CD-1
8"x6"
8"x6" RA
CR-2
14"x8…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.