36C26118B0604-0003001.pdf

PDF 97 KB Posted

Attached to
Construction, Remodel B3 Lobby Area (ICU) Project 654-18-825 Federal contract opportunity
Solicitation number
36C26118B0604
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21

About this file

36C26118B0604 0003 S05-B3 Lobby Remodel (Site Visit Clarifications from COR).pdf

View the file

Other files for this federal contract opportunity

Other files attached to Construction, Remodel B3 Lobby Area (ICU) Project 654-18-825, newest first.
File Type Posted
36C26118C0143-000.docx DOCX document
36C26118B0604-0006001.pdf PDF
36C26118B0604-0006003.pdf PDF
36C26118B0604-0006002.pdf PDF
36C26118B0604-0006000.docx DOCX document
36C26118B0604-0005001.pdf PDF
36C26118B0604-0005000.docx DOCX document
36C26118B0604-0004001.pdf PDF
36C26118B0604-0004000.docx DOCX document
36C26118B0604-0004002.pdf PDF
36C26118B0604-0003000.docx DOCX document
36C26118B0604-0002007.pdf PDF
36C26118B0604-0002006.pdf PDF
36C26118B0604-0002008.docx DOCX document
36C26118B0604-0002002.pdf PDF
36C26118B0604-0002005.pdf PDF
36C26118B0604-0002010.pdf PDF
36C26118B0604-0002004.pdf PDF
36C26118B0604-0002003.pdf PDF
36C26118B0604-0002009.docx DOCX document
36C26118B0604-0002000.docx DOCX document
36C26118B0604-0002001.pdf PDF
36C26118B0604-0001004.pdf PDF
36C26118B0604-0001003.docx DOCX document
36C26118B0604-0001001.pdf PDF
36C26118B0604-0001002.pdf PDF
36C26118B0604-0001000.docx DOCX document
36C26118B0604-003.pdf PDF
36C26118B0604-005.docx DOCX document
36C26118B0604-004.pdf PDF
36C26118B0604-001.docx DOCX document
36C26118B0604-002.pdf PDF
36C26118B0604-000.docx DOCX document
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation: 36C26118B0604 8/27/2018 Site Visit Clarifications

Clarification #1:

The existing handrail in front of B3243 should be removed in its entirety and the wall patched and painted to match existing. The new handrail should be installed to the extent of the construction area as shown on the floorplan provided with the contract documents.

Clarification #2:

The direction of the ceiling grid should be parallel to the front wall of the ICU area behind the lobby area being remodeled, as shown:

Clarification #3:

“Photographic Documentation” paragraph in the General Requirements spec (01 00 00 Para. 1.30 & 1.31) shall be revised to say:

1.30 PHOTOGRAPHIC DOCUMENTATION

A. During the construction period through completion, provide photographic documentation of pre-construction condition and final construction condition.

B. Photographic documentation elements:

a. Each digital image shall be taken with a professional grade camera with minimum size of 6 megapixels (MP) capable of producing 200x250mm (8 x 10 inch) prints with a minimum of 2272 x 1704 pixels and 400x500mm (16 x 20 inch) prints with a minimum 2592 x 1944 pixels.

C. Photography Requirements:

a. Pre-construction photos: Before construction, the construction area and adjacent areas shall be documented for pre-construction condition. This includes finishes, utilities, and adjacent structures surrounding the construction area. Pre-construction photos shall be provided to the VA COR prior to starting construction.

b. Final construction photos: After construction, the construction area and adjacent areas shall be documented for post-construction condition (“as-built finished condition”).

This includes finishes, utilities, and adjacent structures surrounding the construction area. Final construction photos shall be provided to the VA COR within 5 working days of project completion.

1.31 FINAL ELEVATION DIGITAL IMAGES

Not required.

File details come from the government source that posted it.