36C26118B0402-002.docx
DOCX document 31 KB Posted
- Attached to
- Replace 4 Compressor on AC Condenser Bldg. 348 and 351 (VA-18-00036132) Federal contract opportunity
- Solicitation number
- 36C26118B0402
About this file
36C26118B0402 General Requirements.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26118B0402-00006001.pdf | ||
| 36C26118B0402-00006000.docx | DOCX document | |
| 36C26118B0402-00005000.docx | DOCX document | |
| 36C26118B0402-00004000.docx | DOCX document | |
| 36C26118B0402-00003000.docx | DOCX document | |
| 36C26118B0402-00002000.docx | DOCX document | |
| 36C26118B0402-00001000.docx | DOCX document | |
| 36C26118B0402-001.docx | DOCX document | |
| 36C26118B0402-004.pdf | ||
| 36C26118B0402-005.docx | DOCX document | |
| 36C26118B0402-003.doc | DOC document | |
| 36C26118B0402-000.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11-01-15
SECTION 01 00 00
GENERAL REQUIREMENTS
TABLE OF CONTENTS
| 1.2 GENERAL INTENTION | 1 |
| 1.3 STATEMENT OF BID ITEM(S) | 2 |
| 1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR | 3 |
| 1.5 CONSTRUCTION SECURITY REQUIREMENTS | 3 |
| 1.6 OPERATIONS AND STORAGE AREAS | 6 |
| 1.8 DISPOSAL AND RETENTION | 16 |
| 1.28 CONSTRUCTION SIGN | 42 |
11-01-15 i
SECTION 01 00 00
GENERAL REQUIREMENTS
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for to replace (1) compressor on the AC condenser of the HVAC unit at Bldg. 351 for the Veterans Affairs Palo Alto Health Care System (VAPAHCS), 795 Willow Road; Menlo Park, CA 94025 as required by specifications.
B. Visits to the site by Bidders may be made only by appointment with the Maintenance and Construction Foreman.
E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, GENERAL CONSTRUCTION Work includes general construction, roads, walks, grading, necessary removal of existing structures and construction and certain other items.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense,.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
| 1. | The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations. |
| B. | Security Procedures: |
| 1. | General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site. |
| 2. | Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. |
| 3. | No photography of VA premises is allowed without written permission of the Contracting Officer. |
| 4. | VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer. |
| E. | Document Control: |
| 1. | The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project. |
1.6 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
| D. | Working space and space available for storing materials shall be determined by the COR. |
| E. | Workmen are subject to rules of Medical Center applicable to their |
| 1. | Do not store materials and equipment in other than assigned areas. |
| 2. | The Contractor is required to discontinue his work sufficiently in advance of Easter Sunday, Mother's Day, Father's Day, Memorial Day, Veteran's Day and/or Federal holidays, to permit him to clean up all areas of operation adjacent to existing burial plots before these dates. |
| 3. | Cleaning up shall include the removal of all equipment, tools, materials and debris and leaving the areas in a clean, neat condition. |
1.8 DISPOSAL AND RETENTION
| A. | Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows: |
| 2. | Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center. |
| B. | Upon completion of contract, deliver work complete and undamaged. Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work. |
| C. | At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment. |
1.28 CONSTRUCTION SIGN
A. Provide a Construction Sign where directed by the COR. All wood members shall be of framing lumber. Cover sign frame with 0.7 mm (24 gage) galvanized sheet steel nailed securely around edges and on all bearings. Provide three 100 by 100 mm (4 inch by 4 inch) posts (or equivalent round posts) set 1200 mm (four feet) into ground. Set bottom of sign level at 900 mm (three feet) above ground and secure to posts with through bolts. Make posts full height of sign. Brace posts with 50 x 100 mm (two by four inch) material as directed.
- - - END
01 00 00 -1
File details come from the government source that posted it.