36C26018Q0169-00001003.docx
DOCX document 20 KB Posted
- Attached to
- Replacement Beds (VA-18-902581) Federal contract opportunity
- Solicitation number
- 36C26018Q0169
About this file
36C26018Q0169 00001 36C26018Q0169 00001.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| -13207.docx | DOCX document | |
| 36C26018Q0169-00001002.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 00001 03-07-2018 36C26018Q0169 N/A Department of Veterans Affairs Network Contracting Office 20 5115 NE 82nd Ave, Suite 102 Vancouver
WA
98662 Y Department of Veterans Affairs Network Contracting Office 20 5115 NE 82nd Ave, Suite 102 Vancouver
WA
98662 To all Offerors/Bidders
36C26018Q0169
X X x 03/08/2018 The purpose of this modification is to post answers to technical questions that were submitted during the open period of the solicitation. If you have already submitted a quote, you are not required to respond to this amendment. If you wish to submit a new or revised quote, please do so prior to COB of the date listed in block 11.
Jonathan Jewel
CONTINUATION PAGE
Answers to technical questions:
Q. Regarding CLIN 0001, the bed we have to offer, LINET’s Eleganza 3, comes with a straight power cord (not coiled). Is coiled a requirement?
A. No Q. The LINET mattress includes a cover. Is CLIN 0003 a special cover or an extra cover?
A. It is a special cover that equalizes pressure redistribution while balancing the Micro‐climate of the skin through it highly breathable fabric.
Q. Weight capacity of 500lbs. -Please clarify if this is patient weight or safe working load.
A. Patient Weight
Q. Stay-put retractable bed from to avoid bed movement when changing settings and avoids bed sliding on floor damaging cords, drain tubes etc. or injury to staff members. - Please describe the purpose of this function- 1) to shorten (retraction) and to lengthen (extension) of the bed deck for patient height adjustments: and/or 2) for the bed deck to adjust and maintain patient position in bed with changes in the elevation of the head section.
A. This is to avoid the bed frame/wheels from moving when changing the frame position like to a sitting up position. Incident when this happened on a different brand and pinched an 02 tubing flow to patient.
Q. Must include full single post trapeze system that turns and locks to either side as well as over bed for ease of patient assist movements and use of ceiling lift. -Is a fixed single post with movable trapeze system acceptable A. No, needs to have locking positions to the side without having to remove the post ensuring a stay in position when using ceiling lift or giving cares.
Q. Staff controls on both side rails and footboard. Is it acceptable to have caregiver controls on both side rails and caregiver graphical control interface on the side rail that is touchscreen, instead of staff controls on the footboard?
A. No, because with bedside table, iv poles, etc. blocking access at times to controls on side rails. Especially during procedures and meal times.
Q. 3 mode Bed exit alarm system. Is a tone or verbal prompt in multiple languages required/preferred? A. No Is an alarm auto reset required? A. No Q. Is powered (push of a button) or manual extension required?
A. Currently use manual method with foot extender and pad. Push button would only work on air mattresses or you would still have to add cushion/pad if frame auto extended.
Q. Is a USB Port required?
A.No Q. Is a motion activated nightlight required?
A. No Q. Is a patient pendant required?
A. No Q. Is it acceptable to provide a Powered Air Surface that includes integrated Blower (no blower box at foot-end of bed), Comfort Controls, Turn Assist and Focused Microclimate® Management to help manage pressure, shear and moisture to deliver optimal wound prevention and healing, instead of a gel/foam convertible mattress?
A. No. We use these beds on multiple degree of care units and areas such as our Med Surge Unit, air mattresses hinder and do not support independent patients exit and entry especially with post-op ortho surgeries. We need to have the option to switch from the gel/foam to powered air surface depending on individual patient needs.
Q. Is turn assist required?
A. No-air mattress surface not wanted for this request Q. Are comfort controls required?
A. No Q. Is a blower box required for every mattress?
A. No Q. Is it acceptable to provide a 1 year mattress warranty, since 10 years is not the industry standard?
A. No, that would not be cost effective and replace date for frames is 10-15 years.
Q. Will you please consider Brand Name or Equal for Salient Characteristics, the reason I ask is because the solicitation language is steered towards Stryker A. This is because the rest of our beds no due for replacement are Stryker’s with the isoflex mattresses in our Med Surg, SDU & CLC buildings.. This is to support continuity regarding mattress surfaces, staff training and Bio‐Med trained staff for annual PM’s and repair.)
Q. Is the 10 year warranty requested on both the core and cover?
A. Core is 10 years and cover is 3 years
Q. Would you consider an equivalent therapeutic mattress with foam an acceptable equivalent (some think superior) to the therapeutic mattress with gel?
A. No. We actually purchased Isoflex mattresses with the therapeutic gel to remove the foam equivalent and have had a significant decrease in hospital acquired pressure ulcers. We also trialed both types and our wound care team completed extensive mapping of the surfaces using varied patient weights.
File details come from the government source that posted it.