36C25919Q0404-0001000.docx
DOCX document 46 KB Posted
- Attached to
- Water Testing Federal contract opportunity
- Solicitation number
- 36C25919Q0404
About this file
36C25919Q0404 0001 36C25919Q0404 0001.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25919C0226-000.docx | DOCX document | |
| 36C25919Q0404-003.docx | DOCX document | |
| 36C25919Q0404-002.docx | DOCX document | |
| 36C25919Q0404-001.docx | DOCX document | |
| 36C25919Q0404-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION
OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM
INISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 3
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO
MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 07-02-2019 660-19-2-5059-0230 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 To all Offerors/Bidders
36C25919Q0404 06-24-2019
X X X
660-3690162A1-5059-854100-2543 010050190 X The purpose of this amendment is answer questions from the vendors.
See continuation page.
All other terms and conditions remain the same.
Timothy J. Myers
PCOE15L3-2709
CONTINUATION PAGE
Question and Answer:
Question 1: Im a Certified Service Disabled Veteran Owned Small Business interested in bidding on Solicitation Number: 36C25919Q0404 . I was hoping you could answer a few questions…….Is this a new requirement, or is there an incumbent contractor? There is no incumbent. If existing, can you provide me the contractor and award amount? None Answer 1: See above, in red font.
Question 2: I had a question about this solicitation. These samples that are done monthly can they all be collected at the same time. So for example the Legionalla says 35 tests per month, are we able to collect these samples all at the same time?
Answer 2: All samples for each type of test will be collected and delivered to the lab at the same time. For instance, all 35 of the legionella samples will be pulled at once and delivered to the lab. On another day the two Lead and Copper samples will be taken and delivered. But I do want to be clear that VA staff will collect the samples and deliver them to the lab for testing, the Contractor will NOT be required to come to the VA campus and collect the samples.
Question 3. What type of Bacteria testing? Legionella is listed separately as tested 35 times per month, is there a specific type of additional bacterial testing that is required during the 7 times per month test?
Answer 3: Coliform (TCR)
Question 4. How often are the lab results and written explanations required? Lab results are currently received in about a week after samples are submitted; must explain what results are. Is a weekly consolidated report of all the testing done that week acceptable? Report and explanation required for each test Or is a report and explanation required for each test? Since legionella is tested more than every day per month, is a daily individual report and explanation required for each sample? All 30 legionella samples are collected at the same time, report and explanation required for each test
Answer 4. See above, in red font.
Question 5 a&b: Can you please clarify the following (referencing ‘b.’ & ‘e.’ on page 7 of 53 of SOW):
Question 5a. b. – Which ‘Disinfection byproducts’ do you want tested for on the culinary water system?
Answer 5a. From the Utah Dept of Environmental Quality website:
Monitoring Requirements: Water systems that use Stage 1 disinfectants such as: ozone, chlorine dioxide, or chlorination for disinfection, or purchased water that uses disinfectant is required to sample for Disinfection By Products (DBPs). Samples are collected at Entry Point to Distribution System and in the Distribution system depending on disinfectant used.
All requirements for testing can be found at:
https://deq.utah.gov/drinking-water/compliance-rules-division-of-drinking-water
Question 5b. e. – Can emergency retesting be broken out per Analyte? There is a big difference in cost for the different analyses. Legionella and HPC are fine to average, the byproducts is where it could be a major cost difference. Please advise which ones and if you know how you would like them reported ie in concentration or presence/absence.
Answer 5b. There is no way to know in advance which tests will require emergency re-testing, so that cannot be broken down by Analyte. Recommend that you provide unit pricing for each type of re-test. Reports of re-tests require the same information as initial tests. For instance, if the ppm of a monthly Legionella test is higher than allowed limits, then we will perform mitigation, then re-test. The re-test must give us the same information as the initial so we know if the mitigation has been effective.
Question 6. Could you please tell me if this is a new requirement, or if there is a current or previous contractor who has performed similar services? No incumbent. If available, can you please send along the incumbent contract or task order number? None.
Answer 6. See above, in red font.
Question 7. RFP Page 7, 6 a. and CLINs - Can the government please specify what kind of bacteria they need tested? Coliform (TCR) RFP Page 7, 6 – Refers to “tests” in 6 a, b, & c: Can the government clarify if “tests” are the number of samples to be tested? Yes, “tests” equals the number of samples to be tested RFP Page 7, 6 d. – Refers to “Two per month/24 per year.” Can the government clarify if this is two samples per month? Two samples per month.
RFP Page 6, B.2, – Refers to “disinfection-byproducts” in section A. Can the government clarify what is meant by “disinfection-byproducts” as in for which chemicals will the culinary water system need to be tested? From the Utah Dept of Environmental Quality website:
Monitoring Requirements: Water systems that use Stage 1 disinfectants such as: ozone, chlorine dioxide, or chlorination for disinfection, or purchased water that uses disinfectant is required to sample for Disinfection By Products (DBPs). Samples are collected at Entry Point to Distribution System and in the Distribution system depending on disinfectant used.
All requirements for testing can be found at:
https://deq.utah.gov/drinking-water/compliance-rules-division-of-drinking-water Regarding samples:
How many shipments of samples will be sent per month? Four shipments, one shipment for each type of test, plus any required emergency shipments for re-tests of results outside of acceptable parameters such as positive Legionella results How many days per month are samples collected and shipped? For instance, Page 7, 6 d. calls for 35 tests per month, will all 35 samples be shipped on the same day or will the difference quantities of samples be shipped on different days to total 35 in the month? All samples for each type of test will be collected and delivered to the lab at the same time. For instance, all 35 of the legionella samples will be pulled at once and delivered to the lab. On another day the two Lead and Copper samples will be taken and delivered.
Answer 7. See above, in red font.
Question 8. In CLIN: 0002, 1002, 2002, 3002, and 4002, Are there any specific byproduct that need to be tested for (chlorine, bromine)? Would reporting below 0.05 ppm chlorine be acceptable?
Answer 8. From the Utah Dept of Environmental Quality website:
Monitoring Requirements: Water systems that use Stage 1 disinfectants such as: ozone, chlorine dioxide, or chlorination for disinfection, or purchased water that uses disinfectant is required to sample for Disinfection By Products (DBPs). Samples are collected at Entry Point to Distribution System and in the Distribution system depending on disinfectant used.
Question 9. In CLIN: 0001, 1001, 2001, 3001, and 4001, Does the project require a specific method to follow in regards to testing for total bacteria?
Answer 9. All requirements for testing can be found at:
https://deq.utah.gov/drinking-water/compliance-rules-division-of-drinking-water
(End of Page) image1.png
File details come from the government source that posted it.