36C25819B0021-0001000.docx

DOCX document 66 KB Posted

Attached to
664-19-3-5033-0055 Federal contract opportunity
Solicitation number
36C25819B0021
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22

About this file

36C25819B0021 0001 36C25819B0021 0001.docx

View the file

Other files for this federal contract opportunity

Other files attached to 664-19-3-5033-0055, newest first.
File Type Posted
36C25819B0021-0002003.msg MSG file
36C25819B0021-0002001.msg MSG file
36C25819B0021-0002000.docx DOCX document
36C25819B0021-0002002.msg MSG file
36C25819B0021-0001001.pdf PDF
36C25819B0021-001.docx DOCX document
36C25819B0021-002.docx DOCX document
36C25819B0021-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 05-30-2019 N/A Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix

AZ

85014 Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix

AZ

85014 To all Offerors/Bidders

36C25819B0021

X X X

A. The purpose of this amendment is to provide a copy of the RFI log and sign in sheet from the site visit.

See attached document: Sign-in-sheet San Diego VA Chiller Electrical and Plumbing 2019-May-23.

Request for Information (RFI) Log (Pre-Award) Project: Chiller, Electrical, and Plumbing San Diego, California VA Health Care System (664) Solicitation No: 36C258-19-B-0022

RFI Number
Date
Question
Answer
001
28 May 2019
Will each Chiller Motor Control Centers need 2) 4" EMT conduits or 4) 4" EMT conduits?

Each chiller needs four (04) 4-inch EMT conduits.

002
30 May 2019
The Statement of Work Section B.5, Paragraph A states to “upsize the electrical wire and the circuit breakers”. Paragraph B says to “replace two (2) existing . . breakers”. Please clarify if the breaker is to be Upsized or Replaced.
Breakers are to be upsized requirements for the new upsized conductors.
003
30 May 2019
The Statement of Work does not call for the new sprinkler pipe to be painted by contractor. Will this be completed by VA Facility Staff or to be included in contractor pricing?

New sprinkler pipe paint must be painted to match existing system. Contractor is responsible for the paint and shall include related cost in their biding pricing.

004
30 May 2019
The Statement of Work Section B.5, Paragraph C (d) requires contractor to setup and operate dehumidification units within the affected rooms to dry out the area. Electrical work and relocation of sprinkler will be performed in the Chiller Room in Building 2 and no other rooms. Neither scope of work should create a humidity problem. Are dehumidifiers necessary for this project?
The intent of this section is for contractor to ensure cleanliness of space during work (free of standing water and debris). In the event of water spill from sprinkler related work, any standing water and wet area shall be cleaned immediately and dried out.

image1.jpeg

File details come from the government source that posted it.