Sewer Line Drawings.pdf
PDF 78 KB Posted
- Attached to
- Sewer Line Repair Federal contract opportunity
- Solicitation number
- 36C25725Q0131
About this file
This file contains technical drawings showing details for a sewer line repair project at a VA facility. The drawings include two views: a storage pad diagram and a sanitary connection detail. The storage pad diagram shows an 8" SS (sanitary sewer) line, 6" W (water) line, and other utilities including an 8" FL out and 12" SD line. The lower drawing details the connection requirements to the VA campus sanitary main, with instructions to field verify the location of the existing main pipe. The drawings specify a 6" SAN (sanitary) line connection and include dimensions and tie-in points.
These technical drawings appear to be part of the documentation for a VA sewer line repair project that involves rerouting drainage from Building 45W. The drawings provide specific pipe sizes, connection points, and installation requirements that contractors would need to follow when performing the repair work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Pictures.pdf | ||
| Questions and Answers.pdf | ||
| S02 36C25725Q0131.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .