CTX Gutter Installation Questions Answers.docx
DOCX document 13 KB Posted
- Attached to
- J056--Amend: Correct RFQ and Post: Tech Qs & As, Sign-in, Site Map Gutter Installation Federal contract opportunity
- Solicitation number
- 36C25723Q0928
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Gutter Buildings Map.pdf | ||
| S02 36C25723Q0928 Corrected.docx | DOCX document | |
| 36C25723Q0928 0001_1.docx | DOCX document | |
| Site Visit Sigin.pdf | ||
| P07 Wage Determination 2015-5237.pdf | ||
| 36C25723Q0928_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CTX Gutter Installation
RFQ 36C25723Q0928
1) Are old gutters still on the building and how much? There is an old down spout on 45E north side that needs to be removed. That is all I found when I walked the area.
2) What gauge guttering and downspouts are required? .032 minimum
3) Sect B states to remove any existing guttering but during the walkthrough the VA Rep stated they want to keep the new section of gutter on the north side of building 46E. Are we to leave that section of gutter alone? Are there any other areas like this? So correction to the walkthrough. They want all the gutter to be new. So, this section will need to be replaced.
4) Please confirm the contractor does not need to put new guttering on the corridor between buildings and where the corridor meets each building. That is correct, the central hallway does not need to have gutter.