SF30 36C25723Q0858 0001.pdf
PDF 175 KB Posted
- Attached to
- J046--Chilled Water Actuator Replacement Federal contract opportunity
- Solicitation number
- 36C25723Q0858
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25723Q0858 0001_1.docx | DOCX document | |
| RFQ 36C25723Q0858.pdf | ||
| SCA Wage Determination 2015-5261_12-27-2022 rv20.pdf | ||
| 36C25723Q0858_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 7
0001 06-02-2023
674-23-3-5065-2227
36C257
Department of Veterans Affairs Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building #171 Temple TX 76504
36C257
Department of Veterans Affairs Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building 171 Temple TX 76504
To all Offerors/Bidders
36C25723Q0858
06-02-2023
X
X X
The purpose of this amendment is to:
1. Provide the answers to the technical questions received.
2. Provide an updated Statement of Work (updates highlighted).
3. The offeror due date remains June 9, 2023, 4PM CST.
Technical Questions 6C25723Q0858 | Chilled Water Actuator Replacement
1. Will it be required to install new controls from the valve to a new location? If so, it will be requiring to install new 4x4 junction boxes? What are the locations for the new install (linear footage)?
Answer: Yes, there will need to be 4 x 4 Junctions boxes for the actuators.
Contractor will need run all wire in EMT conduit. They will need to be ran to the southwest corner of the energy center. All field measurements are supposed to be measured by the contractor. Refer to Section F. Other Considerations 1.
STATEMENT OF WORK
CHILL WATER ACTUATOR REPLACEMENT
A. REQUIREMENTS
1. The contractor shall be responsible for providing all labor, materials and equipment required for the services to replace 8 Chill Water Actuators. All work performed will be done at the Doris Miller VAMC in Waco, at 4800 Memorial Drive, Waco, Texas 76711.
After all work is completed, the contractor will have a walkthrough with a VA representative to ensure all work is completed and ready for invoicing.
2. The contractor shall provide all personnel, services, vehicles, transportation, tools, equipment, materials, supplies, facility supervision, administration supervision and any other item(s) necessary to perform and accomplish this service. The contractor shall be familiar with all the terms, conditions, and requirement herein contained.
3. The contractor’s Period of Performance (POP) is 120 days from the award date
4. All work shall be done according to the Infection Control Risk Assessment (ICRA) specified for the respective areas where work is performed.
5. Note: “The C&A requirements do not apply, and that a Security Accreditation Package is not required for this contract.”
B. PROJECT REQUIREMENTS
1. Contractor shall provide all labor, materials, and equipment to replace 8 Chill Water Actuator to Proportional.
a. All actuators shall have an add flow meter, an add controller and panels.
b. Also, the contractor must program the flow meters to have the right settings program to the correct sequences.
2. Specifications:
Quantity Requirements
8 4 VAC, 4450 in-lb (500Nm) Proportional, 2Aux SW, w/Heater Without electrical interface ACE; In 2-10V; Out 2-10V; stp
Dual turbine insertion flow meter with frequency, scaled pulse and analog output, plated brass stem, NEMA 4 enclosure and 10' PVC cable. Suitable line size range:
1.25" to 72".
Insertion flow meter installation kit for pipe size range from 1.25 to 42". Wetted materials are bronze, brass and steel, for use in carbon steel piping systems.
Designed for use in hydronic systems
Insertion flow meter installation kit for pipe size range from 1.25 to 42". Wetted materials are bronze, brass and steel, for use in carbon steel piping systems.
Designed for use in hydronic systems
The Input/Output Module (IOM) Series expansion modules have integral RS-485 MS/TP communications and integrate into the web-based Metasys® system. A full range of Metasys Field Equipment Controller (FEC) family controllers combined with IOMs can be applied to a wide variety of building applications. The IOM Series serves two functions in the Metasys system: as point expansion modules for Metasys FEC family controllers and as point multiplexors for Metasys network engines.
C. SCOPE OF WORK:
1. The contractor will shut down any electrical where it is required for lockout/tagout of the electrical system when necessary. (The VA is not responsible for any electrical work).
2. Contractor must cut off any Isolating valves when necessary.
3. Contractor will remove any insulation if required and replace it when job is complete.
4. Contractor shall provide 8 hot tap well assembly kits with valves.
5. Contractor shall install hot tap wells & assembly kits.
6. Contractor will provide & install (QTY-8) new flow meters.
7. Contractor will run wire & EMT conduit back to 1 new control panel.
8. Contractor will provide (QTY-2) new IOM Modules to add the new points.
9. Contractor will disassemble defective valve actuators.
10. The contractor will provide & install (QTY-8) new Belimo matching actuators to a
“Proportional Modulating Style”.
11. Contractor will also provide 4x4 Junction boxes for the actuators and run EMT conduit to the new proposed area, if need be, in the Energy Center.
a. All field measurements must be done by contractor, the VA is not responsible for field measures: Refer to Section, F. Other Considerations 1.
12. Then the contractor will need a certified Johnson Controls International (JCI) Technician to program and connect to Johnson Controls Metasys to the Building Automation Control System & verify functionality.
13. The JCI Controls Technician will then program and sequence the operation with assistance of a VA Chiller Mechanic.
14. Then the JCI Chiller Mechanic will provide support on Chillers & verify flows & operations of chillers while raining VA mechanics to run and use the system as well as show them how to use the system remotely.
15. Then the JCI mechanic will run an operational test for the VA mechanics and supervisor.
16. Then the JCI mechanic will provide the VA customer with a commissioning report as well as any deficiencies for any further pertinent recommendations to ensure the system runs properly.
D. PROGRAM OFFICE POINTS OF CONTACT:
1. Coordinate with VA COR before the start of this service. See information below:
a. Contracting Officer’s Representative (COR): Rene’ Flores, Engineering Tech (COR) – Engineering Service, 254-297-3722, Rene.Flores2@va.gov
b. Alternative (COR): Tracy Semmel, M&O Supervisor – Engineering Service, 254-749-8843, Tracy.Semmel@va.gov
2. Government Holidays:
New Year's Day January 1st
Martin Luther King's Birthday Third Monday in January
Washington's Birthday Third Monday in February
Memorial Day Last Monday in May
Juneteenth National Independence Day June 19th
Independence Day July 4th
Labor Day First Monday in September
Columbus Day Second Monday in October
Veterans Day November 11th
Thanksgiving Day Fourth Thursday in November
Christmas Day December 25th
1. In addition to the days designated as holidays, the Government observes the following days:
a. Any other day designated by Federal Statute.
b. Any other day designated by Executive Order.
c. Any other day designated by the President’s Proclamation.
It is understood and agreed between the Government and the Contractor that observance of such days by Government personnel shall not otherwise be a reason for an additional period of performance, or entitlement of compensation. In the event the Contractor's personnel work during the holiday, they may be reimbursed by the Contractor, however, no form of holiday or other premium compensation will be reimbursed either as a direct or indirect cost, other than their normal compensation for the time worked.
E. INVOICES AND PAYMENT. Submit the proper documentation and reports to receive payment on this service. See information below:
1. Payment to be made monthly, in arrears, following satisfactory performance by Contractor’s personnel and upon receipt of a properly prepared invoice.
2. Contractor shall be required to invoice through the Tungsten System at http://www.tungsten-network.com/us/en/veterans-affairs/. Additional information regarding Tungsten shall be provided upon award.
3. The contract shall have current registration in the System for Award Management (SAM) for this solicitation; URL: www.sam.gov.
4. The invoice MUST be itemized to include the following information. Any information listed below, and not provided on an invoice, will render that invoice incomplete and the invoice will be returned for immediate correction.
a. Time period being invoiced for.
b. Description of services performed.
c. Unit Cost billed.
d. Extended amount due.
e. Invoice number, date, and;
f. Contract and obligation numbers.
F. OTHER CONSIDERATIONS
1. The contractor shall be responsible for the verification of all requirements for this service. All measurements and conditions must be verified by the contractor.
Any discrepancies between field conditions, project documents, and this SOW shall be immediately brought to the Contracting Officer Representative’s (COR) attention.
2. It is the contractor’s responsibility to provide adequate documentation and verifying that any equipment and/or materials proposed will meet or exceed all federal government requirements.
3. Note: Contractor shall provide written proof that all parts/ materials used in the performance of this service contract were of new OEM parts/materials.
4. Majority of the work shall be performed during normal working hours, Monday- Friday 7:00am to 7:00 pm and extended late hours as needed, noted by the COR. Major shutdowns shall take place after hours starting after 9:00 pm to 5:00 am and weekends as well.
5. Note: This project is consistent. Contractor must work Monday thru Friday until contract completion.
6. The contractor’s supervisor shall always be available to address any needs the VA COR may have during the POP.
7. Contractor will provide own lockout/tagout while working on the VA premises.
8. The contractor shall be responsible for the removal of project demo materials/debris /equipment from this facility when complete.
9. The contractor must thoroughly insulate any piping that had the insulation removed as well as any new piping exposed.
10. Any extended fabrication outside of the hot taps (Welding) must be performed by the contractor to ensure a turkey project.
11. Note: VA personnel will not help in any of the process.
12. Contractor must contract a 3rd party vendor to water balance the system when complete and provide the VA COR with the commission report when complete.
13. In the Commissioning Report it must identify any troubleshooting deficiencies:
a. Pumps needing repairs.
b. Variable Speed Drives needing repairs or replacements.
c. Any differential switches or sensors that also need replacements.
14. At the time of the offers, the contractor must provide a certificate of the certified Johnson Control (JCI) technician.
G. CODES AND STANDARDS
1. The project shall be in accordance with the latest Uniform Building Code (UBC), National Fire Protection Associate (NFPA) standard, Uniform Federal Accessibility Standard (UFAS), VA Specifications and Standards, and local facility requirements. In the event there is a conflict between any of the standards/codes, the more stringent standard/code shall apply.
2. The contractor shall provide all applicable safety signage and barricades applicable to OSHA, VHA and DOD regulations. Contractor shall comply with VHA DIRECTIVE 2004-012 and all VA Center Policy Memorandums, including but not limited to the following:
a. Protection of patients, visitors, and employees from traumatic injury, as well as occupational and facility–associated infections.
b. Compliance with OSHA and State construction safety regulations.
Construction contracts require that the general contractor’s on-site “competent person” have completed the OSHA 30-hour construction worker course and that all other general and sub-contractor’s workers have completed the OSHA 10-hour construction worker course or other relevant competency training. The determination for training is based on the project hazards and complexity, State and Federal regulations and VA requirements. Verification of completion of training will be required prior to performing work.
c. Compliance with EPA and State environmental regulations.
H. SAFETY PLAN REQUIREMENTS
1. Prior to performing any work, the contractor will be required to submit a safety plan in accordance with OSHA and VA Regulations.
2. The safety plan shall include, but not limited to the following:
3. Safety and Health Policy (i.e. company policy)
4. Safety and Health Objectives (i.e. company goals, procedures, etc)
5. Job Site Inspections (i.e. safety inspection/potential hazards/prevention, etc)
6. Contractor Safety Administrator (i.e. competent person/safety officer)
7. Personal Protective Equipment (i.e. head, hearing, and eye protection, footwear, clothing, gloves, etc.).
8. Safety Rules (i.e. rules applicable to the work/task being performed, equipment, ladders, confined spaces, open flame, etc.).
9. Job Safety Training (i.e. OSHA, safety meetings, etc).
a. 30 Hour OSHA Construction Safety Course – competent person.
b. 10 Hour OSHA Construction Safety Course – all others.
10. Safety Discipline (i.e. correction of violations, etc).
11. Hot Work Permit (i.e. responsibilities, procedures, etc).
12. Emergency Procedures (i.e. responsibilities, procedures, etc).
13. Written Hazard Communication Program (i.e. responsibilities, procedures, list of hazards, MSDS, etc).
14. Clothing:
a. PPE is available and properly worn.
b. Clothing is relatively dust free with the construction area and patient areas.
End Statement of Work