Amendment 36C25721Q0103 0003.pdf

PDF 237 KB Posted

Attached to
H146--CTX Chemical Treatment Questions and Answers Federal contract opportunity
Solicitation number
36C25721Q0103
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

View the file

Other files for this federal contract opportunity

Other files attached to H146--CTX Chemical Treatment Questions and Answers, newest first.
File Type Posted
36C25721Q0103 0003_1.docx DOCX document
Amendment 36C25721Q0103 0002.pdf PDF
36C25721Q0103 0002_1.docx DOCX document
Solicitation Amendment 36C25721Q0103_0001.docx DOCX document
36C25721Q0103 0001_1.docx DOCX document
S02 - CONTRACT OPPORTUNITIES.docx DOCX document
WAGE DETERMINATION.pdf PDF
36C25721Q0103_1.docx DOCX document
S02 - SOLICITATION.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE C ONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, rema ins unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 4

0003 03-09-2021

674-21-1-5066-0009

Department of Veterans Affairs VISN17 Network Contracting Activity

7400 Merton Minter Blvd. (10N17/90C) San Antonio TX 78229

Department of Veterans Affairs VISN17 Network Contracting Activity

7400 Merton Minter Blvd. (10N17/90C) San Antonio TX 78229

To all Offerors/Bidders

36C25721Q0103

02-10-2021

X

X X

FRIDAY 03/12/2021 @ 2:00 PM CST

See CONTINUATION Page

X 1

This Solicitation amendment is issued to correct the following:

1. The purpose of this amendment is to provide answers to questions posed by vendors. Government responses to vendor questions are annotated below.

ALL OTHER TERMS AND CONDITIONS ARE UNCHANGED!

Continuation Page

Solicitation Number: 36C25721Q0103

Amendment Number: 0003

Questions and Answers

A. This amendment form is a part of the solicitation documents and amends the project solicitation as noted below. You must submit a signed copy of this amendment with your offer. Failure to do so may subject your offer to be disqualified. Amendments to the solicitation are as follows:

1. What are the condenser pump recirculation rates?

• 3000 GPM per pump with operation if 2 pumps are running above 75 degrees

2. What are the estimated condenser side water volume (tower basin plus piping)?

• 2400 gallon per cell (4) + piping

3. What are the volumes of the closed loops (especially the main chill loop)?

• As of 6/18/2014, the chilled water loops are sized to accommodate 3000T.

4. Cleaning chemical for loops need more clarification. Do the loops currently need cleaning?

• Yes, they need cleaning. Reference Page 4 (i – vii) of solicitation under SOW for chemical loop clarification.

5. Hot and chill closed loops are mentioned for chemical treatment. However, there is mention of

'heating water loop' in section vi. Is this a separate loop and, if so, what is its use?

• Each building has its own heating system. The chilled water system is on a common system that is operated from the chiller plant.

6. Does the chemical feed equipment belong to the VA?

• Yes, chemical feed equipment does belong to the VA.

7. (Closed Loop) Can we get a breakdown of what and how many systems (hot, chilled, dual temp) and their volumes (estimated sizes are fine) are included in this bid?

• We are unable to locate the exact information being requested but the approximate volumes are 5,000 gallons.

8. (Closed Loop) Is there any uncontrolled water lost in the systems?

• Not that we are aware of, but the testing and inspections of the systems will let us know for future reference.

9. (Closed Loop) Do all loops have operational pot feeders?

• Yes

10. (Cooling Tower) Can you confirm minimum of monthly service for the systems is required?

• Yes. There is a minimum of monthly service required for the systems.

11. (Cooling Tower) No equipment is currently owned by the site, and all is needed equipment is to be provided by the Water treatment vendor, correct?

• All chemical distribution equipment is currently owned by the VA and is in use on the property at the VA in the Energy Center.

12. (Cooling Tower) Can we get water usage for the cooling tower?

• There is a meter on the makeup. But since the City of Waco does not credit evaporation rates, the system real has not been monitored.

13. (Cooling Tower) Is the water supply for the cooling tower strictly city makeup?

• It is supplied from the campus’s domestic water then treated through a separate chemical program we have set in place.

14. (Cooling Tower) Can we get recirculation rate or tonnages?

• 4-1000T cells, fed typically by 2-3000gpm drums.

15. (Cooling Tower) How frequently are legionella tests required?

• Legionella Test are checked monthly on site but only for domestic water to the buildings not cooling towers.

16. (Cooling Tower) Currently only oxidizing biocide is specified, is a secondary biocide required by spec?

• No, a secondary biocide is not required.

17. How much city water make up is there?

• We have used 10.7 million gallons of water the last 8 years.

18. What is the System Metallurgy?

• Chilled water side and Condenser water side.

19. Are there current Charge pots already in place for the 10 systems? Are there other pieces of chemical feed equipment?

• Yes, new chemicals pots have been installed throughout the campus. Other than the pots, which are for htg water only, there are no chemical feeds.

20. Is Legionella testing required?

• Legionella testing is not required.

21. There is a comment in the terms about the other contract company handling? Please elaborate as we don’t understand what this means.

• This contract is for chilled water and heated water. Sorry no other company handling part of this contract.

22. Bleach is listed as one chemical. Unusual for a closed cooling system. What is the intention of the use of bleach?

• Biocide for the Cooling Towers

23. The RFP is asking for:

Service Billing Line – is this referring to the testing?

Chemistry Billing Line – is this for chemical only?

• Service Billing Line – Yes this is referring to testing

• Chemistry Billing Line – Yes this is for chemical only

• This contract will be a full-service contract that is turnkey.

24. How many TONS is the tower at building 225?

• The cooling towers have 4 cells rated at 941 TONS (NUM).

25. Is there chemical feed equipment available or does the vendor need to supply?

• The chiller plant has chemical feed equipment for the chilled water loop system, but the heating water loops of the building side will need to be supplied by the vendor.

26. What is the volume of the closed loops in the 10 buildings? Do they close loops leak? Rate (gpd)?

• The volume of the close loops in the 10 buildings is not known. Other than occasional valve leak or pump leak, we believe the system is pretty sound and sealed tightly.

27. Are there chemical pot feeders for each of the closed loops to be treated?

• Yes, there are chemical pot feeders for each closed loop that needs to be treated.

28. What debris needs to be cleaned monthly out of the closed loop systems? Can debris be flushed to drains in the building?

• The debris currently being flushed is rust iron/copper, algae, bio, and scale. Currently debris is being flushed down into the sewer drains of the buildings.

29. What debris do you want to run tests on (e.g. iron, copper, scale, bio)?

• The VA wants to test for iron, scale and bio.

B. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.