36C25618U0203-0001005.xlsx
XLSX spreadsheet 239 KB Posted
- Attached to
- Wall-to-Wall Inventory Federal contract opportunity
- Solicitation number
- 36C25618U0203
About this file
36C25618U0203 0001 Preliminary NOLA Equipment Listing CFM 08182018.xlsx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25618U0203-0001002.pdf | ||
| 36C25618U0203-0001006.xlsx | XLSX spreadsheet | |
| 36C25618U0203-0001001.docx | DOCX document | |
| 36C25618U0203-0001003.xlsx | XLSX spreadsheet | |
| 36C25618U0203-0001000.docx | DOCX document | |
| 36C25618U0203-0001007.xlsb | XLSB spreadsheet | |
| 36C25618U0203-0001004.xls | XLS spreadsheet | |
| 36C25618U0203-003.xlsx | XLSX spreadsheet | |
| 36C25618U0203-001.docx | DOCX document | |
| 36C25618U0203-002.docx | DOCX document | |
| 36C25618U0203-000.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building 1 - INP
| *Discipline | *System | *Equipment | *Type | Subtype | *Site | *Building | *Tag Number | Quantity |
| Mechanical | HVAC | Air handling Unit | Custom | VA Medical Center | Building 1 | 01-5B1-AHU-1 | 1 | |
| Mechanical | HVAC | Air handling unit | Heat Recovery Wheel | VA Medical Center | Building 1 | 01-5B1-AHU-1a | 1 | |
| Mechanical | HVAC | Air handling Unit | Custom | VA Medical Center | Building 1 | 01-5C1-AHU-11 | 1 | |
| Mechanical | HVAC | Air handling Unit | Custom | VA Medical Center | Building 1 | 01-5C1-AHU-2 | 1 | |
| Mechanical | HVAC | Air handling unit | Heat Recovery Wheel | VA Medical Center | Building 1 | 01-5C1-AHU-2a | 1 | |
| Mechanical | HVAC | Exhaust Fan | VA Medical Center | Building 1 | Multiple | 6 | ||
| Mechanical | HVAC | Exhaust Fan | Isolation Room | VA Medical Center | Building 1 | 01-5B1-EF-3A | 1 | |
| Mechanical | HVAC | Exhaust Fan | Isolation Room | VA Medical Center | Building 1 | 01-5B1-EF-3B | 1 | |
| Mechanical | HVAC | Exhaust Fan | Isolation Room | VA Medical Center | Building 1 | 01-5C2-EF-4A | 1 | |
| Mechanical | HVAC | Exhaust Fan | Isolation Room | VA Medical Center | Building 1 | 01-5C2-EF-4B | 1 | |
| Mechanical | HVAC | Exhaust Hood | Kitchen | VA Medical Center | Building 1 | 01-5C1-EF-5 | 1 | |
| Mechanical | HVAC | Purge Fan | Patient Ward | VA Medical Center | Building 1 | 01-5C1-EF-6 | 1 | |
| Mechanical | HVAC | Fan Coil Unit | VA Medical Center | Building 1 | Multiple | 24 | ||
| Mechanical | HVAC | Fan Coil Unit | 4-pipe | VA Medical Center | Building 1 | 01-1B1-FCU-1 | 1 | |
| Mechanical | HVAC | Fan Coil Unit | 4-pipe | VA Medical Center | Building 1 | 01-1B1-FCU-2 | 1 | |
| Mechanical | HVAC | Fan Coil Unit | 4-pipe | VA Medical Center | Building 1 | 01-1B2-FCU-1 | 1 | |
| Mechanical | HVAC | Fan Coil Unit | 4-pipe | VA Medical Center | Building 1 | 01-1C1-FCU-1 | 1 | |
| Mechanical | HVAC | Fan Coil Unit | 4-pipe | VA Medical Center | Building 1 | 01-1C1-FCU-2 | 1 | |
| Mechanical | HVAC | Fan Coil Unit | 4-pipe | VA Medical Center | Building 1 | 01-1C2-FCU-1 | 1 | |
| Mechanical | HVAC | Fan Coil Unit | 4-pipe | VA Medical Center | Building 1 | 01-2B1-FCU-1 | 1 | |
| Mechanical | HVAC | Fan Coil Unit | 4-pipe | VA Medical Center | Building 1 | 01-2C1-FCU-1 | 1 | |
| Mechanical | HVAC | Fan Coil Unit | 4-pipe | VA Medical Center | Building 1 | 01-3B1-FCU-1 | 1 | |
| Mechanical | HVAC | Fan Coil Unit | 4-pipe | VA Medical Center | Building 1 | 01-3C1-FCU-1 | 1 | |
| Mechanical | HVAC | Fan Coil Unit | 4-pipe | VA Medical Center | Building 1 | 01-3C1-FCU-2 | 1 | |
| Mechanical | HVAC | Fan Coil Unit | 4-pipe | VA Medical Center | Building 1 | 01-4B1-FCU-1 | 1 | |
| Mechanical | HVAC | Fan Coil Unit | 4-pipe | VA Medical Center | Building 1 | 01-4C1-FCU-1 | 1 | |
| Mechanical | HVAC | Fan Coil Unit | 4-pipe | VA Medical Center | Building 1 | 01-5B1-FCU-1 | 1 | |
| Mechanical | HVAC | Fan Coil Unit | 4-pipe | VA Medical Center | Building 1 | 01-5B1-FCU-2 | 1 | |
| Mechanical | HVAC | Fan Coil Unit | 4-pipe | VA Medical Center | Building 1 | 01-5B1-FCU-3 | 1 | |
| Mechanical | HVAC | Fan Coil Unit | 4-pipe | VA Medical Center | Building 1 | 01-5C1-FCU-1 | 1 | |
| Mechanical | HVAC | Fan Coil Unit | 4-pipe | VA Medical Center | Building 1 | 01-5C1-FCU-2 | 1 | |
| Mechanical | HVAC | Fan Coil Unit | 4-pipe | VA Medical Center | Building 1 | 01-5C1-FCU-3 | 1 | |
| Mechanical | HVAC | Fan Coil Unit | 4-pipe | VA Medical Center | Building 1 | 01-5C1-FCU-4 | 1 | |
| Mechanical | HVAC | Fan Coil Unit | 4-pipe | VA Medical Center | Building 1 | 01-5C1-FCU-5 | 1 | |
| Mechanical | HVAC | Fan Coil Unit | 4-pipe | VA Medical Center | Building 1 | 01-5C1-FCU-6 | 1 | |
| Mechanical | HVAC | Fan Coil Unit | 4-pipe | VA Medical Center | Building 1 | 01-5C1-FCU-7 | 1 | |
| Mechanical | HVAC | Fan Coil Unit | 4-pipe | VA Medical Center | Building 1 | 01-5C1-FCU-8 | 1 | |
| Mechanical | HVAC | Terminal Unit | VA Medical Center | Building 1 | Multiple | 23 | ||
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1B1-S-10 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1B1-S-11 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1B1-S-12 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Cooling Only | VA Medical Center | Building 1 | 01-1B1-S-13 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Cooling Only | VA Medical Center | Building 1 | 01-1B1-S-14 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1B1-S-15 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1B1-S-16 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1B1-S-17 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1B1-S-18 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1B1-S-19 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1B1-S-20 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1B1-S-21 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1B1-S-22 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-1B1-S-23 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1B1-S-1 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1B1-S-2 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1B1-S-3 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1B1-S-4 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1B1-S-5 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-1B1-S-6 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1B1-S-7 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-1B1-S-8 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-1B1-S-9 | 1 |
| Mechanical | HVAC | Terminal Unit | VA Medical Center | Building 1 | Multiple | 10 | ||
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1B2-S-1 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1B2-S-10 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1B2-S-2 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-1B2-S-3 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1B2-S-4 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1B2-S-5 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1B2-S-6 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1B2-S-7 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1B2-S-8 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1B2-S-9 | 1 |
| Mechanical | HVAC | Terminal Unit | VA Medical Center | Building 1 | Multiple | 26 | ||
| Mechanical | HVAC | Terminal Unit | Constant Volume | Cooling Only | VA Medical Center | Building 1 | 01-1C1-S-1 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C1-S-10 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-1C1-S-11 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C1-S-12 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C1-S-13 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C1-S-14 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C1-S-15 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C1-S-16 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C1-S-17 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C1-S-18 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-1C1-S-19 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C1-S-2 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C1-S-20 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C1-S-21 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C1-S-22 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C1-S-23 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C1-S-24 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C1-S-25 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C1-S-26 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Cooling Only | VA Medical Center | Building 1 | 01-1C1-S-3 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C1-S-4 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C1-S-5 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C1-S-6 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C1-S-7 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C1-S-8 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C1-S-9 | 1 |
| Mechanical | HVAC | Terminal Unit | VA Medical Center | Building 1 | Multiple | 16 | ||
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C2-S-1 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C2-S-10 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C2-S-11 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C2-S-12 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C2-S-13 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C2-S-14 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C2-S-15 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C2-S-16 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C2-S-2 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-1C2-S-3 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C2-S-4 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C2-S-5 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C2-S-6 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C2-S-7 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C2-S-8 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-1C2-S-9 | 1 |
| Mechanical | HVAC | Terminal Unit | VA Medical Center | Building 1 | Multiple | 28 | ||
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B1-S-1 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B1-S-10 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B1-S-11 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Cooling Only | VA Medical Center | Building 1 | 01-2B1-S-12 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Cooling Only | VA Medical Center | Building 1 | 01-2B1-S-13 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-2B1-S-14 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-2B1-S-15 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B1-S-16 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-2B1-S-17 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B1-S-18 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B1-S-19 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-2B1-S-2 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B1-S-20 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B1-S-21 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B1-S-22 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B1-S-23 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B1-S-24 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B1-S-25 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B1-S-26 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B1-S-3 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-2B1-S-4 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B1-S-5 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B1-S-6 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-2B1-S-7 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B1-S-8 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B1-S-9 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Exhaust | VA Medical Center | Building 1 | 01-2B1-E-1 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Exhaust | VA Medical Center | Building 1 | 01-2B1-E-2 | 1 |
| Mechanical | HVAC | Terminal Unit | VA Medical Center | Building 1 | Multiple | 18 | ||
| Mechanical | HVAC | Terminal Unit | Constant Volume | Exhaust | VA Medical Center | Building 1 | 01-2B2-E-1 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-2B2-S-1 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B2-S-2 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B2-S-3 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B2-S-4 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B2-S-5 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B2-S-6 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B2-S-7 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B2-S-8 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B2-S-9 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B2-S-10 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B2-S-11 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B2-S-12 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B2-S-13 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-2B2-S-14 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-2B2-S-15 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B2-S-16 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2B2-S-17 | 1 |
| Mechanical | HVAC | Terminal Unit | VA Medical Center | Building 1 | Multiple | 27 | ||
| Mechanical | HVAC | Terminal Unit | Constant Volume | Exhaust | VA Medical Center | Building 1 | 01-2C1-E-1 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Exhaust | VA Medical Center | Building 1 | 01-2C1-E-2 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Cooling Only | VA Medical Center | Building 1 | 01-2C1-S-1 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-2C1-S-10 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-2C1-S-11 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C1-S-12 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C1-S-13 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-2C1-S-14 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Cooling Only | VA Medical Center | Building 1 | 01-2C1-S-2 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C1-S-22 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C1-S-23 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C1-S-24 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C1-S-25 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-2C1-S-3 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C1-S-4 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-2C1-S-5 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C1-S-6 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-2C1-S-7 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C1-S-8 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C1-S-9 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-2C1-S-15 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C1-S-16 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-2C1-S-17 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C1-S-18 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C1-S-19 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C1-S-20 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C1-S-21 | 1 |
| Mechanical | HVAC | Terminal Unit | VA Medical Center | Building 1 | Multiple | 17 | ||
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C2-S-1 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-2C2-S-10 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C2-S-11 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-2C2-S-12 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C2-S-13 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C2-S-14 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C2-S-15 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C2-S-16 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C2-S-17 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C2-S-2 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-2C2-S-3 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C2-S-4 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C2-S-5 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C2-S-6 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C2-S-7 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C2-S-8 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-2C2-S-9 | 1 |
| Mechanical | HVAC | Terminal Unit | VA Medical Center | Building 1 | Multiple | 28 | ||
| Mechanical | HVAC | Terminal Unit | Constant Volume | Exhaust | VA Medical Center | Building 1 | 01-3B1-E-1 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Exhaust | VA Medical Center | Building 1 | 01-3B1-E-2 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B1-S-1 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B1-S-10 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B1-S-11 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Cooling Only | VA Medical Center | Building 1 | 01-3B1-S-12 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Cooling Only | VA Medical Center | Building 1 | 01-3B1-S-13 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-3B1-S-14 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-3B1-S-15 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B1-S-16 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-3B1-S-17 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B1-S-18 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B1-S-19 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-3B1-S-2 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B1-S-20 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B1-S-21 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B1-S-22 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B1-S-23 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B1-S-24 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B1-S-25 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B1-S-26 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B1-S-3 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-3B1-S-4 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B1-S-5 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B1-S-6 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-3B1-S-7 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B1-S-8 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B1-S-9 | 1 |
| Mechanical | HVAC | Terminal Unit | VA Medical Center | Building 1 | Multiple | 18 | ||
| Mechanical | HVAC | Terminal Unit | Constant Volume | Exhaust | VA Medical Center | Building 1 | 01-3B2-E-1 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-3B2-S-1 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B2-S-10 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B2-S-11 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B2-S-12 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B2-S-13 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-3B2-S-14 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-3B2-S-15 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B2-S-16 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B2-S-17 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B2-S-2 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B2-S-3 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B2-S-4 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B2-S-5 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B2-S-6 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B2-S-7 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B2-S-8 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3B2-S-9 | 1 |
| Mechanical | HVAC | Terminal Unit | VA Medical Center | Building 1 | Multiple | 28 | ||
| Mechanical | HVAC | Terminal Unit | Constant Volume | Exhaust | VA Medical Center | Building 1 | 01-3C1-E-1 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Exhaust | VA Medical Center | Building 1 | 01-3C1-E-2 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Cooling Only | VA Medical Center | Building 1 | 01-3C1-S-1 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-3C1-S-10 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C1-S-11 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-3C1-S-12 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C1-S-13 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C1-S-14 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-3C1-S-15 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-3C1-S-16 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C1-S-17 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-3C1-S-18 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C1-S-19 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-3C1-S-2 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C1-S-20 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C1-S-21 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C1-S-22 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C1-S-23 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C1-S-24 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C1-S-25 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C1-S-26 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Cooling Only | VA Medical Center | Building 1 | 01-3C1-S-3 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-3C1-S-4 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C1-S-5 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C1-S-6 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C1-S-7 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C1-S-8 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C1-S-9 | 1 |
| Mechanical | HVAC | Terminal Unit | VA Medical Center | Building 1 | Multiple | 18 | ||
| Mechanical | HVAC | Terminal Unit | Constant Volume | Exhaust | VA Medical Center | Building 1 | 01-3C2-E-1 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C2-S-1 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C2-S-10 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C2-S-11 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C2-S-12 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C2-S-13 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-3C2-S-14 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-3C2-S-15 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C2-S-16 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C2-S-17 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C2-S-2 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C2-S-3 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C2-S-4 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C2-S-5 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C2-S-6 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-3C2-S-7 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C2-S-8 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-3C2-S-9 | 1 |
| Mechanical | HVAC | Terminal Unit | VA Medical Center | Building 1 | Multiple | 30 | ||
| Mechanical | HVAC | Terminal Unit | Constant Volume | Exhaust | VA Medical Center | Building 1 | 01-4B1-E-1 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Exhaust | VA Medical Center | Building 1 | 01-4B1-E-2 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B1-S-1 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B1-S-10 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B1-S-11 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B1-S-12 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-4B1-S-13 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Cooling Only | VA Medical Center | Building 1 | 01-4B1-S-14 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Cooling Only | VA Medical Center | Building 1 | 01-4B1-S-15 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-4B1-S-16 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-4B1-S-17 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B1-S-18 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-4B1-S-19 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-4B1-S-2 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B1-S-20 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B1-S-21 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B1-S-22 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B1-S-23 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B1-S-24 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B1-S-25 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B1-S-26 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B1-S-27 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B1-S-28 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B1-S-3 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B1-S-4 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-4B1-S-5 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B1-S-6 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-4B1-S-7 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B1-S-8 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B1-S-9 | 1 |
| Mechanical | HVAC | Terminal Unit | VA Medical Center | Building 1 | Multiple | 18 | ||
| Mechanical | HVAC | Terminal Unit | Constant Volume | Exhaust | VA Medical Center | Building 1 | 01-4B2-E-1 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-4B2-S-1 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B2-S-10 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B2-S-11 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B2-S-12 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B2-S-13 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-4B2-S-14 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-4B2-S-15 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B2-S-16 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B2-S-17 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B2-S-2 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B2-S-3 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B2-S-4 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B2-S-5 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B2-S-6 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B2-S-7 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B2-S-8 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4B2-S-9 | 1 |
| Mechanical | HVAC | Terminal Unit | VA Medical Center | Building 1 | Multiple | 22 | ||
| Mechanical | HVAC | Terminal Unit | Constant Volume | Exhaust | VA Medical Center | Building 1 | 01-4C1-E-1 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Cooling Only | VA Medical Center | Building 1 | 01-4C1-S-1 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4C1-S-10 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4C1-S-11 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4C1-S-12 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4C1-S-13 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4C1-S-14 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4C1-S-15 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4C1-S-16 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4C1-S-17 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4C1-S-18 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4C1-S-19 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Cooling Only | VA Medical Center | Building 1 | 01-4C1-S-2 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4C1-S-20 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-4C1-S-21 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-4C1-S-3 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-4C1-S-4 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4C1-S-5 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4C1-S-6 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4C1-S-7 | 1 |
| Mechanical | HVAC | Terminal Unit | Constant Volume | Reheat | VA Medical Center | Building 1 | 01-4C1-S-8 | 1 |
| Mechanical | HVAC | Terminal Unit | Variable Volume | Reheat | VA Medical Center | Building 1 | 01-4C1-S-9 | 1 |
| Mechanical | Steam | Steam-HW IST | VA Medical Center | Building 1 | Multiple | 1 | ||
| Mechanical | Steam | Pressure Reducing Station | 100-150PSIG to 65PSIG | VA Medical Center | Building 1 | 01-SV-1 | ||
| Mechanical | Steam | Pressure Reducing Station | 100-150PSIG to 65PSIG | VA Medical Center | Building 1 | 01-SV-2 | ||
| Mechanical | Hot Water | Heat Exchanger | Shell and Tube | Steam to Water | VA Medical Center | Building 1 | 01-5C1-HEX-1 | |
| Mechanical | Hot Water | Heat Exchanger | Shell and Tube | Steam to Water | VA Medical Center | Building 1 | 01-5C1-HEX-2 | |
| Mechanical | Hot Water | Pump | Base Mounted | End Suction | VA Medical Center | Building 1 | 01-5C1-HWP-1 | |
| Mechanical | Hot Water | Pump | Base Mounted | End Suction | VA Medical Center | Building 1 | 01-5C1-HWP-2 | |
| Mechanical | Steam Condensate | Pump | Duplex | VA Medical Center | Building 1 | 01-4C1-CP-1 | 1 | |
| Mechanical | BAS | Misc BAS Pts | VA Medical Center | Building 1 | Misc BAS Pts | 1 | ||
| Mechanical | HVAC | Floor Pressure Control IST | VA Medical Center | Building 1 | Multiple | 1 |
| Electrical | Normal Power | Unit Secondary Substation | 13.2/277/480v | 1500kva | VA Medical Center | Building 1 | USS01-A/B | 1 |
| Electrical | Emergency Power | Automatic Transfer Switch | 800A/4POLE | Open Transition | VA Medical Center | Building 1 | ATS-EC1-1 | 1 |
| Electrical | Emergency Power | Automatic Transfer Switch | 800A/4POLE | Open Transition | VA Medical Center | Building 1 | ATS-EC1-2 | 1 |
| Electrical | Emergency Power | Automatic Transfer Switch | 800A/4POLE | Open Transition | VA Medical Center | Building 1 | ATS-EIT1-1 | 1 |
| Electrical | Emergency Power | Automatic Transfer Switch | 800A/3POLE | Delayed Transition | VA Medical Center | Building 1 | ATS-EL1-1 | 1 |
| Electrical | Emergency Power | Automatic Transfer Switch | 800A/4POLE | Open Transition | VA Medical Center | Building 1 | ATS-ELS1-1 | 1 |
| Electrical | Emergency Power | Automatic Transfer Switch | 1600A/4POLE | Delayed Transition | VA Medical Center | Building 1 | ATS-EQ1-1 | 1 |
| Electrical | Emergency Power | Switchboard | 277/480v/3P/4W | VA Medical Center | Building 1 | EQD1451 | 1 | |
| Electrical | Fire Alarm | Fire Alarm IST | VA Medical Center | Building 1 | FA | 1 | ||
| Electrical | Emergency Power | Emergency Power IST | VA Medical Center | Building 1 | EMER PWR IST | 1 | ||
| Electrical | Emergency Power | Panelboard | VA Medical Center | Building 1 | Multiple | 52 | ||
| Electrical | Emergency Power | Distribution Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | ECD1221 | 1 | |
| Electrical | Emergency Power | Distribution Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | ECD1222 | 1 | |
| Electrical | Emergency Power | Distribution Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | ECD1231 | 1 | |
| Electrical | Emergency Power | Distribution Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | ECD1232 | 1 | |
| Electrical | Emergency Power | Distribution Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | ECD1241 | 1 | |
| Electrical | Emergency Power | Distribution Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | EITD1251 | 1 | |
| Electrical | Emergency Power | Distribution Panelboard | 480v/3P/3W/Wye Grounded | VA Medical Center | Building 1 | ELSD1451 | 1 | |
| Electrical | Emergency Power | Distribution Panelboard | 480v/3P/3W/Wye Grounded | VA Medical Center | Building 1 | EQ4B1 | 1 | |
| Electrical | Emergency Power | Distribution Panelboard | 480v/3P/3W/Wye Grounded | VA Medical Center | Building 1 | EQ4C1 | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | ECR1211 | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | ECR1212 | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | EIT1211 | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | EIT1212 | 1 | |
| Electrical | Emergency Power | Panelboard | 277/480v/3P/4W | VA Medical Center | Building 1 | ECL1421 | 1 | |
| Electrical | Emergency Power | Panelboard | 277/480v/3P/4W | VA Medical Center | Building 1 | ECL1422 | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | ECR12211A/B | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | ECR12212 | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | ECR12221A/B | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | ECR12222 | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | EIT1221 | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | EIT1222 | 1 | |
| Electrical | Emergency Power | Panelboard | 277/480v/3P/4W | VA Medical Center | Building 1 | ELSL1421 | 1 | |
| Electrical | Emergency Power | Panelboard | 277/480v/3P/4W | VA Medical Center | Building 1 | ELSL1422 | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | ELSR1221 | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | ELSR1222 | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | EQR1221 | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | EQR1222 | 1 | |
| Electrical | Emergency Power | Panelboard | 277/480v/3P/4W | VA Medical Center | Building 1 | ECL1431 | 1 | |
| Electrical | Emergency Power | Panelboard | 277/480v/3P/4W | VA Medical Center | Building 1 | ECL1432 | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | ECR12311A/B | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | ECR12312 | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | ECR12321A/B | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | ECR12322 | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | EIT1231A/B | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | EIT1232A/B | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | EIT1233 | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | EIT1234 | 1 | |
| Electrical | Emergency Power | Panelboard | 277/480v/3P/4W | VA Medical Center | Building 1 | ECL1441 | 1 | |
| Electrical | Emergency Power | Panelboard | 277/480v/3P/4W | VA Medical Center | Building 1 | ECL1442 | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | ECR12411A/B | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | ECR12412 | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | ECR12421A/B | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | EIT1241 | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | EIT1242 | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | EIT1243 | 1 | |
| Electrical | Emergency Power | Panelboard | 277/480v/3P/4W | VA Medical Center | Building 1 | ELSL1441 | 1 | |
| Electrical | Emergency Power | Panelboard | 277/480v/3P/4W | VA Medical Center | Building 1 | ELSL1442 | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | EQR1241 | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | ELSR1251 | 1 | |
| Electrical | Emergency Power | Panelboard | 480v/3P/3W/Wye Grounded | VA Medical Center | Building 1 | EQP1451A/B | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | EQR1242 | 1 | |
| Electrical | Emergency Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | EQR1251 | 1 | |
| Electrical | Normal Power | Panelboard | VA Medical Center | Building 1 | Multiple | 46 | ||
| Electrical | Normal Power | Distribution Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | D1211 | 1 | |
| Electrical | Normal Power | Distribution Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | D1212 | 1 | |
| Electrical | Normal Power | Distribution Panelboard | 277/480v/3P/4W | VA Medical Center | Building 1 | D1411 | 1 | |
| Electrical | Normal Power | Distribution Panelboard | 277/480v/3P/4W | VA Medical Center | Building 1 | D1412 | 1 | |
| Electrical | Normal Power | Distribution Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | D1221 | 1 | |
| Electrical | Normal Power | Distribution Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | D1222 | 1 | |
| Electrical | Normal Power | Distribution Panelboard | 277/480v/3P/4W | VA Medical Center | Building 1 | D1421 | 1 | |
| Electrical | Normal Power | Distribution Panelboard | 277/480v/3P/4W | VA Medical Center | Building 1 | D1422 | 1 | |
| Electrical | Normal Power | Distribution Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | D1231 | 1 | |
| Electrical | Normal Power | Distribution Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | D1232 | 1 | |
| Electrical | Normal Power | Distribution Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | D1241 | 1 | |
| Electrical | Normal Power | Distribution Panelboard | 480v/3P/3W/Wye Grounded | VA Medical Center | Building 1 | D1451 | 1 | |
| Electrical | Normal Power | Panelboard | 277/480v/3P/4W | VA Medical Center | Building 1 | L1411 | 1 | |
| Electrical | Normal Power | Panelboard | 277/480v/3P/4W | VA Medical Center | Building 1 | L1412 | 1 | |
| Electrical | Normal Power | Panelboard | 480v/3P/3W/Wye Grounded | VA Medical Center | Building 1 | P1411 | 1 | |
| Electrical | Normal Power | Panelboard | 480v/3P/3W/Wye Grounded | VA Medical Center | Building 1 | P1412 | 1 | |
| Electrical | Normal Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | R12111A/B | 1 | |
| Electrical | Normal Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | R12112A/B | 1 | |
| Electrical | Normal Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | R12113A/B | 1 | |
| Electrical | Normal Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | R12121A/B | 1 | |
| Electrical | Normal Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | R12122A/B | 1 | |
| Electrical | Normal Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | R12123A/B | 1 | |
| Electrical | Normal Power | Panelboard | 277/480v/3P/4W | VA Medical Center | Building 1 | L1421 | 1 | |
| Electrical | Normal Power | Panelboard | 277/480v/3P/4W | VA Medical Center | Building 1 | L1422 | 1 | |
| Electrical | Normal Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | R12211A/B | 1 | |
| Electrical | Normal Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | R12212A/B | 1 | |
| Electrical | Normal Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | R12213A/B | 1 | |
| Electrical | Normal Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | R12221A/B | 1 | |
| Electrical | Normal Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | R12222A/B | 1 | |
| Electrical | Normal Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | R12223A/B | 1 | |
| Electrical | Normal Power | Panelboard | 277/480v/3P/4W | VA Medical Center | Building 1 | L1431 | 1 | |
| Electrical | Normal Power | Panelboard | 277/480v/3P/4W | VA Medical Center | Building 1 | L1432 | 1 | |
| Electrical | Normal Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | R12311A/B | 1 | |
| Electrical | Normal Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | R12312A/B | 1 | |
| Electrical | Normal Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | R12313A/B | 1 | |
| Electrical | Normal Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | R12321A/B | 1 | |
| Electrical | Normal Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | R12322A/B | 1 | |
| Electrical | Normal Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | R12323A/B | 1 | |
| Electrical | Normal Power | Panelboard | 277/480v/3P/4W | VA Medical Center | Building 1 | L1441 | 1 | |
| Electrical | Normal Power | Panelboard | 277/480v/3P/4W | VA Medical Center | Building 1 | L1442 | 1 | |
| Electrical | Normal Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | R12411A/B | 1 | |
| Electrical | Normal Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | R12412A/B | 1 | |
| Electrical | Normal Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | R12413A/B | 1 | |
| Electrical | Normal Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | R12421A/B | 1 | |
| Electrical | Normal Power | Panelboard | 480v/3P/3W/Wye Grounded | VA Medical Center | Building 1 | P1451 | 1 | |
| Electrical | Normal Power | Panelboard | 120/208v/3P/4W | VA Medical Center | Building 1 | R1251 | 1 | |
| Electrical | Normal Power | Lighting Control FPT | VA Medical Center | Building 1 | Ltg Cntrl | 1 | ||
| Electrical | Normal Power | Lighting Control Relay | 277/480v/3P/4W | VA Medical Center | Building 1 | LC1411 | 1 | |
| Electrical | Normal Power | Lighting Control Relay | 277/480v/3P/4W | VA Medical Center | Building 1 | LC1412 | 1 | |
| Electrical | Normal Power | Lighting Control Relay | 277/480v/3P/4W | VA Medical Center | Building 1 | LC1413 | 1 | |
| Electrical | Normal Power | Lighting Control Relay | 277/480v/3P/4W | VA Medical Center | Building 1 | LC1421 | 1 | |
| Electrical | Normal Power | Lighting Control Relay | 277/480v/3P/4W | VA Medical Center | Building 1 | LC1422 | 1 | |
| Electrical | Normal Power | Lighting Control Relay | 277/480v/3P/4W | VA Medical Center | Building 1 | LC1431 | 1 | |
| Electrical | Normal Power | Lighting Control Relay | 277/480v/3P/4W | VA Medical Center | Building 1 | LC1432 | 1 | |
| Electrical | Normal Power | Lighting Control Relay | 277/480v/3P/4W | VA Medical Center | Building 1 | LC1441 | 1 | |
| Electrical | Normal Power | Lighting Control Relay | 277/480v/3P/4W | VA Medical Center | Building 1 | LC1442 | 1 |
| Plumbing | Drainage | Sump Pump | Elevator Pit Sump Pump | VA Medical Center | Building 1 | 01-1B-ESP-1 | 1 |
| Plumbing | Drainage | Sump Pump | Elevator Pit Sump Pump | VA Medical Center | Building 1 | 01-1B-ESP-2 | 1 |
| Plumbing | Drainage | Sump Pump | Elevator Pit Sump Pump | VA Medical Center | Building 1 | 01-1B-ESP-3 | 1 |
| Plumbing | Domestic Hot Water | Domestic Hot Water System IST | VA Medical Center | Building 1 | Multiple | 1 | |
| Plumbing | Domestic Hot Water | Heat Exchanger | Shell and Tube | VA Medical Center | Building 1 | 01-5C-DWH-1 | 1 |
| Plumbing | Domestic Hot Water | Heat Exchanger | Shell and Tube | VA Medical Center | Building 1 | 01-5C-DWH-2 | 1 |
| Plumbing | Domestic Hot Water | Pump | Recirculation | VA Medical Center | Building 1 | 01-5C-HWP-1 | 1 |
| Plumbing | Domestic Hot Water | Pump | Recirculation | VA Medical Center | Building 1 | 01-5C-HWP-2 | 1 |
| Plumbing | Domestic Hot Water | Pump | Recirculation | VA Medical Center | Building 1 | 01-5C-HWP-3 | 1 |
| Plumbing | Domestic Hot Water | Pump | Recirculation | VA Medical Center | Building 1 | 01-5C-HWP-4 | 1 |
| Plumbing | Domestic Hot Water | Mixing Valve | Thermostatic | VA Medical Center | Building 1 | 01-5C-TMV-1 | 1 |
Building 2 - DNT
| *Discipline | *System | *Equipment | *Type | Subtype | *Site | *Building | *Tag Number | Quantity |
| Mechanical | HVAC | Air handling unit | Custom | VA Medical Center | Building 2 | 02-6D-AHU-01 | 1 | |
| Mechanical | HVAC | Air handling unit | Custom | VA Medical Center | Building 2 | 02-6D-AHU-02 | 1 | |
| Mechanical | HVAC | Air handling unit | Custom | VA Medical Center | Building 2 | 02-5E-AHU-03 | 1 | |
| Mechanical | HVAC | Air handling unit | Custom | VA Medical Center | Building 2 | 02-5F-AHU-04 | 1 | |
| Mechanical | HVAC | Air handling unit | Custom | VA Medical Center | Building 2 | 02-5F-AHU-05 | 1 | |
| Mechanical | HVAC | Air handling unit | Custom | VA Medical Center | Building 2 | 02-5G-AHU-06 | 1 | |
| Mechanical | HVAC | Air handling unit | Custom | VA Medical Center | Building 2 | 02-5G-AHU-07 | 1 | |
| Mechanical | HVAC | Air handling unit | Heat Recovery Wheel | VA Medical Center | Building 2 | 02-6D-AHU-01a | 1 | |
| Mechanical | HVAC | Air handling unit | Heat Recovery Wheel | VA Medical Center | Building 2 | 02-6D-AHU-02a | 1 | |
| Mechanical | HVAC | Air handling unit | Heat Recovery Wheel | VA Medical Center | Building 2 | 02-5E-AHU-03a | 1 | |
| Mechanical | HVAC | Air handling unit | Heat Recovery Wheel | VA Medical Center | Building 2 | 02-5F-AHU-04a | 1 | |
| Mechanical | HVAC | Air handling unit | Heat Recovery Wheel | VA Medical Center | Building 2 | 02-5F-AHU-05a | 1 | |
| Mechanical | HVAC | Air handling unit | Heat Recovery Wheel | VA Medical Center | Building 2 | 02-5G-AHU-06a | 1 |