36C25618Q0375-003.docx
DOCX document 27 KB Posted
- Attached to
- Elevator Maintenance Contract Federal contract opportunity
- Solicitation number
- 36C25618Q0375
About this file
36C25618Q0375 S02-ATTH B QUALITY ASSURANCE SURVEILLANCE PLAN.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25618Q0375-A00003002.xlsx | XLSX spreadsheet | |
| 36C25618Q0375-A00003000.docx | DOCX document | |
| 36C25618Q0375-A00003001.docx | DOCX document | |
| 36C25618Q0375-A00002002.xlsx | XLSX spreadsheet | |
| 36C25618Q0375-A00002000.docx | DOCX document | |
| 36C25618Q0375-A00002001.pdf | ||
| 36C25618Q0375-A00001001.docx | DOCX document | |
| 36C25618Q0375-A00001000.docx | DOCX document | |
| 36C25618Q0375-006.docx | DOCX document | |
| 36C25618Q0375-002.docx | DOCX document | |
| 36C25618Q0375-004.docx | DOCX document | |
| 36C25618Q0375-005.docx | DOCX document | |
| 36C25618Q0375-001.docx | DOCX document | |
| 36C25618Q0375-000.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT C – QUALITY ASSURANCE SURVEILLANCE PLAN
36C25618Q0375
QUALITY ASSURANCE SURVEILLANCE PLAN
For: Engineering Service
Contract Number: (The government will enter contract number upon award.)
Contract Description: Elevator Maintenance Services
Contractor’s name: (hereafter referred to as the contractor).
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored.
· How monitoring will take place.
· Who will conduct the monitoring.
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Danette R. Impey Organization or Agency: Department of Veterans Affairs, Network Contracting Office (NCO)16, Gulf Coast Veterans Health Care System, Biloxi, MS 39531.
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: Dean Hughes
c. Other Key Government Personnel: N/A
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s program manager for this contract.
a. Program Manager – (Contractor please provide name here)
b. Other Contractor Personnel – (Contractor please enter name(s) or delete these lines if not applicable) Title: (Contractor please enter title(s) or delete these lines if not applicable.)
4. PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
Performance Requirements Summary Matrix:
The Government will use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
| Task |
| Standard |
| Acceptable Quality Level |
| Method of Surveillance |
| Incentive |
Certifications Current Meet SOW (para. 3)
| 100% (no deviation) |
| COR random review |
| Failure affects performance evaluations |
Inspections (timeliness) Submit management report as required Meet SOW (para. 4 & 5)
| 98% (slight deviation) |
| COR random review |
| Failure affects performance evaluations |
Call backs and call back timeliness Meet SOW (para. 13)
| No more than nine (9) call backs per month when averaged over six-month period, also response |
| COR random review |
| Failure affects performance evaluations |
Reporting Meet SOW (para.14)
| 90% |
| COR random review |
| Failure affects performance evaluations |
Corrections of deficiencies Meet SOW (para.16)
| 98% |
| COR random review |
| Failure affects performance evaluations |
5. INCENTIVES
The Government shall use Exercise of Option Period and Past Performance as incentives. Incentives shall be based on exceeding, meeting, or not meeting performance standards.
6. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. PERFORMANCE MANAGEMENT APPROACH. (The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives.)
b. PERIODIC INSPECTION. (Independent Contractor shall perform the periodic inspection on an annual basis and report findings to the CO and COR.
c. CUSTOMER FEEDBACK. (Elements of validated user complaints.)
d. REPORTING. (Demonstrates whether the contractor meets the stated objectives and/or performance standards.)
e. REVIEWS AND RESOLUTIONS. Meeting with contractor and COR and/or CO to discuss performance evaluation, such as cost, schedules, etc.)
7. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
Excellent = Exceeds Standards Satisfactory = Meets Standards Unsatisfactory = Fails To Meet Standards
8. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE
The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
b. UNACCEPTABLE PERFORMANCE
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's program manager.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
9. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement.
During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings.
The COR shall meet with the contractor quarterly to assess performance and shall provide a written assessment.
(After award, both the contractor’s Program Manager and the COR shall sign this document.)
Signature – Contractor Program Manager
Signature – Contracting Officer’s Representative
Contract Discrepancy Report
| Contract No. |
| Report No. for this Discrepancy: |
Contractor/Manager’s Name:
From: (Name of Project Officer)
Dates
Prepared:
Returned by Contractor:
Action Complete:
Discrepancy or Problem:
Signature of Contracting Officer:
To: (Contracting Officer)
From: (Contractor)
Contractor Response as to Cause, Corrective Action and Actions to Prevent Recurrence (Attach Continuation Sheet if Necessary)
Signature of Contractor Representative:
Date:
Government Evaluation:
Government Actions:
Close Out
| Name |
| Title |
| Signature |
| Date |
Contractor Notified
Project Officer
Contracting Officer
File details come from the government source that posted it.