Presolicitation Notice Presolicitation Notice
| SUBJECT* |
| Fire Suppression Testing, STL |
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 66048 |
| SOLICITATION NUMBER* |
| 36C25521Q0556 |
| RESPONSE DATE/TIME/ZONE |
| 08-06-2021 10 AM CENTRAL TIME, CHICAGO, USA |
| ARCHIVE |
| 60 DAYS AFTER THE RESPONSE DATE |
| SET-ASIDE |
| SDVOSBC |
| PRODUCT SERVICE CODE* |
| H112 |
| NAICS CODE* |
| 541350 |
| PLACE OF PERFORMANCE |
| St. Louis VAMC |
John Cochran Division
919 N Grand Blvd
St. Louis MO
| POSTAL CODE |
| 63106 |
| COUNTRY |
| USA |
CONTACT INFORMATION
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway
Leavenworth KS 66048
POINT OF CONTACT*
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
AGENCY CONTACT’S EMAIL ADDRESS
EMAIL DESCRIPTION
DESCRIPTION
1.0 INTRODUCTION
1.1 The St. Louis VA Medical Center (John Cochran) requires services to perform maintenance on the fire pump and fire sprinkler system as required by the NFPA 25 standard.
1.2 Service work to the fire pump and sprinkler system must be completed in accordance with the following:
NFPA 25; Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems NFPA 13; Installation of Sprinkler Systems NFPA 20; Installation of Stationary Pumps for Fire Protection
1.3 The John Cochran, located at 915North, Grand Blvd. St. Louis MO, is protected by an existing fire sprinkler system with a fire pump. The sprinkler system includes a 500 gpm pump details below. This quote should be for a Base plus 4 years.
2.0 OBJECTIVES
2.1 The purpose of this scope of work is to define the requirements for the maintenance tasks associated with the wet fire protection system. The intent of this Task Order is to fully service and maintain operation of the John Cochran sprinkler system. Work shall be done in accordance with the project SOW, specifications and be compliant with referenced codes.
2.2 Let Pipe Shop know when work is completed so electric shop can restore full monitoring of fire sprinkler functions at fire detection/alarm panel.
2.3 The serviced fire sprinkler system shall operate in accordance with NFPA 13, 25 and 20 as well as the original design intent at installation.
3.0 GENERAL REQUIREMENTS
3.1 The Contractor shall provide all repair services necessary to meet objectives shown in 2.0 above.
3.2 All flow tests are to be performed at system designated test points/valves.
SPRINKLER/STANDPIPE SYSTEM MAINTENANCE REQUIREMENT CHART:
| Device | Monthly Semi-annual | Annual | 5 Year Test |
| All fire system valves including hydrants & yard sectional valves |
| Exercise |
| Exercise |
GPM Flow Test on Hydrants
Done in April
| Main Drain Gauges in stairwells |
| Inspect |
5.3.2.1 Gauges shall be replaced every 5 years or tested every 5 years by comparison with a calibrated gauge.
Sprinkler heads
Inspect
Main Drain: control assembly or valve
Flow Test; record static and residual Pressures and time for recovery. Give reports
Backflow Preventer Testing
Test Backflow Devices and give reports Done in October
Standpipe hose valves
13.5.6.2.1* Class I and Class III standpipe system hose valves shall be tested annually by fully opening and closing the valves. Record pressure and document
Antifreeze solution systems
Specific gravity The specific gravity of each solution shall be checked using a hydrometer with a suitable scale or a refractometer having a scale calibrated for the antifreeze solution.
Give reports
Done in October
Device Monthly Semi-annual Annual 5 Year Test Fire Department Connections
The piping from the fire department connection to the fire department check valve shall be hydrostatically tested at 150 psi (10 bar) for 2 hours at least once every 5 years
Riser Flow Test
6.3.1 Flow Tests.
6.3.1.1* A flow test shall be conducted every 5 years on all Class I and Class III standpipe systems to verify that the required flow and pressure are available at the hydraulically most remote hose valve outlet(s) while flowing the standpipe system demand.
Last test done Sept 3 2015
· There are two Hydrants on station located behind building one.
· Main Drain Standpipe risers are located in eleven stairwells.
· There are ten Fire Suppression Backflow preventers located throughout facility.
· Seventy nine Standpipe Hose valves located throughout stairwells.
· Antifreeze solution systems on station.
· There are six Fire Dept. Connections on station.
ELECTRIC FIRE PUMP MAINTENANCE REQUIREMENT CHART:
| Device | Annual | ||
| Fire | Pump (pressure start) |
Flow Test, Plot Curve Points
Coupling alignment
Inspect
Lubricate pump bearings
X
Operate manual start
Flow Test
Start on emergency power
Exercise
Start/stop pressure setting
Inspect
Gauges on Fire Pump
Inspect(replace or recalibrate when 5% out of calibration)
3.3 The Contractor shall provide all tools necessary to perform the work as specified in this SOW
3.4 The contractor shall be responsible for removal and replacement of all ceiling tiles affected by the work. Contractor shall dispose of any unused pipe, excess materials or other construction debris.
3.5 Qualified Mechanic. Contractor personnel conducting sprinkler and fire alarm system work and/or testing shall be qualified and experienced in accordance with Section 4.3.3 of NFPA 25; Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems.
3.6 Acceptance of Work. The Contractor shall provide all documentation of required testing of work was approved and accepted by the POC John Cochran Medical Center. The contractor must submit validation that work was completed satisfactorily with request for payment.
3.7 The Contractor shall coordinate all work and testing of systems with the Pipe Shop Foreman at Medical Center.
4.0 SPECIFIC REQUIREMENTS
4.1 System Checks:
a) No visible water leaks or standing water (clogged drains).
b) Record all test data, static pressures, residual pressures
c) Fire pump test shall not activate general alarm (denotes system pressure problems).
d) Jockey pump stop pressure shall be equal to or higher than fire pump churn (zero flow) pressure. Jockey pump run cycles should be no more than 10 runs within a 24hr period.
5.0 Required Timing of Tests / Inspections
5.1
| Tests / Inspections |
| Complete By |
| Allowance |
| Contract Year |
| Main Drain Riser Test |
| 4/13/2022 |
| + or – 14 Days |
| Base |
| Fire Pump Test |
| 4/13/2022 |
| + or – 14 Days |
| Base |
| Hydrant Flow Test |
| 4/13/2022 |
| + or – 14 Days |
| Base |
| Fire Department Connections |
| 4/13/2022 |
| + or – 14 Days |
| Base |
| Main Drain Gauges in stairwells |
| 4/13/2022 |
| + or – 14 Days |
| Base |
| Replace Main Drain Gauges (5 Year) |
| 4/13/2022 |
| + or – 14 Days |
| Base |
| Close Cycle Valves |
| 4/28/2022 |
| + or – 14 Days |
| Base |
| Fire Department Connection / Hydrostatic Test (5 year) |
| 4/28/2022 |
| + or – 14 Days |
| Base |
| FS Backflows |
| 10/3/2022 |
| + or – 14 Days |
| Base |
| Antifreeze Systems |
| 10/3/2022 |
| + or – 14 Days |
| Base |
| Main Drain Riser Test |
| 4/2023 |
| + or – 14 Days |
| Option Year 1 |
| Fire Pump Test |
| 4/2023 |
| + or – 14 Days |
| Option Year 1 |
| Hydrant Flow Test |
| 4/2023 |
| + or – 14 Days |
| Option Year 1 |
| Fire Department Connections |
| 4/2023 |
| + or – 14 Days |
| Option Year 1 |
| Main Drain Gauges in stairwells |
| 4/2023 |
| + or – 14 Days |
| Option Year 1 |
| Close Cycle Valves |
| 4/2023 |
| + or – 14 Days |
| Option Year 1 |
| FS Backflows |
| 10/2023 |
| + or – 14 Days |
| Option Year 1 |
| Antifreeze Systems |
| 10/2023 |
| + or – 14 Days |
| Option Year 1 |
| Main Drain Riser Test |
| 4/2024 |
| + or – 14 Days |
| Option Year 2 |
| Fire Pump Test |
| 4/2024 |
| + or – 14 Days |
| Option Year 2 |
| Hydrant Flow Test |
| 4/2024 |
| + or – 14 Days |
| Option Year 2 |
| Fire Department Connections |
| 4/2024 |
| + or – 14 Days |
| Option Year 2 |
| Main Drain Gauges in stairwells |
| 4/2024 |
| + or – 14 Days |
| Option Year 2 |
| Close Cycle Valves |
| 4/2024 |
| + or – 14 Days |
| Option Year 2 |
| FS Backflows |
| 10/2024 |
| + or – 14 Days |
| Option Year 2 |
| Antifreeze Systems |
| 10/2024 |
| + or – 14 Days |
| Option Year 2 |
| Main Drain Riser Test |
| 4/2025 |
| + or – 14 Days |
| Option Year 3 |
| Fire Pump Test |
| 4/2025 |
| + or – 14 Days |
| Option Year 3 |
| Hydrant Flow Test |
| 4/2025 |
| + or – 14 Days |
| Option Year 3 |
| Fire Department Connections |
| 4/2025 |
| + or – 14 Days |
| Option Year 3 |
| Main Drain Gauges in stairwells |
| 4/2025 |
| + or – 14 Days |
| Option Year 3 |
| Close Cycle Valves |
| 4/2025 |
| + or – 14 Days |
| Option Year 3 |
| 5 Year Riser Flow Test ( 5 Year) |
| 9/3/2025 |
| + or – 14 Days |
| Option Year 3 |
| FS Backflows |
| 10/2025 |
| + or – 14 Days |
| Option Year 3 |
| Antifreeze Systems |
| 10/2025 |
| + or – 14 Days |
| Option Year 3 |
| Main Drain Riser Test |
| 4/2026 |
| + or – 14 Days |
| Option Year 4 |
| Fire Pump Test |
| 4/2026 |
| + or – 14 Days |
| Option Year 4 |
| Hydrant Flow Test |
| 4/2026 |
| + or – 14 Days |
| Option Year 4 |
| Fire Department Connections |
| 4/2026 |
| + or – 14 Days |
| Option Year 4 |
| Main Drain Gauges in stairwells |
| 4/2026 |
| + or – 14 Days |
| Option Year 4 |
| Close Cycle Valves |
| 4/2026 |
| + or – 14 Days |
| Option Year 4 |
| FS Backflows |
| 10/2026 |
| + or – 14 Days |
| Option Year 4 |
| Antifreeze Systems |
| 10/2026 |
| + or – 14 Days |
| Option Year 4 |
6.0 COR at Location
5.1 All questions concerning the scope and requirements of the VA Medical Center, shall be directed to the COR (see below):
COR
Michael Stogsdill michael.stogsdill1@va.gov
Tel: 314-289-6450
Cell: 314-858-0269
5.2 The Pipe Shop Foreman (COR) will be the contractor’s contact at the John Cochran VA Medical Center. The POC will assist and direct the contractor when scheduling inspections. All questions concerning coordination of installation activities while at medical center shall be directed to the Pipe Shop Foreman.
END OF STATEMENT OF WORK