36C25518Q9575-002.pdf

PDF 3 MB Posted

Attached to
WI WASHER DISINFECTOR UNIT Federal contract opportunity
Solicitation number
36C25518Q9575
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15

About this file

36C25518Q9575 Attachment A.pdf

View the file

Other files for this federal contract opportunity

Other files attached to WI WASHER DISINFECTOR UNIT, newest first.
File Type Posted
36C25518Q9575-0001002.docx DOCX document
36C25518Q9575-0001000.docx DOCX document
36C25518Q9575-0001001.pdf PDF
36C25518Q9575-001.docx DOCX document
36C25518Q9575-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FE

FE

FE

FE

SPS DIRTY

ELEVATOR

156-34

RECEIVING

STORAGE/

DISPATCH

115-34

EXIST.

DUMB

WAITER

115-34

SPS

SERVICE

113A-34

HAC

115A-34

SPS

CLEAN

ELEVATOR

172-34

LOCKERS

MALE

LR002

159-34

LOCKERS

FEMALE

LR002

157-34

ANTE

SOILED/DROP

OFF

CSCR1

154-34

SCOPE

STAGING

CSST1

165-34

STERILE

PROCESSING

SUPPLIES

SRSP1

175-34

CLEAN

STEAM

GENERATOR

CSCG1

174-34

HALL

161-34

TOILET

160-34

ANTE RM

168-34

24010E

24010E24010E

24011E

24012E

24013E

24015E 24015E

24017E

24018E

24019E

24020E 24020E

24020E

24021E

24021E

24023E

24024E

24025E

24026E 24026E 24026E

24027E

24027E

24029F

24040E

24040E

24030F

24060E 24060E

24060E

24060E24060E 24060E

24060E

24060E 24060E24060E

24060E 24060E 24060E

24060E24060E

24060E 24060E 24060E

24060E

24060E

24029E24029E

24014N

24014N

24020E

24020E

24028F24028E24028E

24003F

24013E

PPE

CABINET

HAC

176-34

SPS

SERVICE

PREP/

ASSEMBLY

AREA

173-34SPS

SERVICE

114-34

SCOPE

PROCESS

CSSP1

166-34

SPS

DECONTAMINATION

FA1

164-34

CORRIDOR

153-34

STAIRS

151-34

CORRIDOR

152-34

SPS

113-34

ELEC.

CLOSET

178-34

FILE 3

DESK 6

DESK 1

FILE 1

DESK 5

DESK 2

DISPOSAL

A104

A102

A107

A107

24035E

24035F

24026E

TOILET

158-34

LOUNGE &

TRAINING

169-34

SPS CHIEF

171-34

ASSIST

CHIEF

163-34

ANTE RM

170-34

ANTE RM

150-34

MANUAL

CART

WASH

CWSH3

155-34

HAC

162-34

SERVICE

RM

167-34

24033F

24047E

24033E

24047E

24033E

24033F

24038E

24034E

24042E

24049E

24039E

24002E 24036E

24037E

24048F

24016E

24046E

24046N

24032E24032E 24032E

A102

A104

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

SPS REVISIONS

589-754

Robert J. Dole VA Medical Center

STERILE PROCESSING SERVICE (SPS)

SURGICAL SUITE EXPANSION, B34

AI-202R

ENLRGD EQUIP PLAN - FIRST FLOOR (#)

5500 E Kellogg, Wichita, KS

SS CK10/31/2016

1/4" = 1'-0"

ENLARGED EQUIP PLAN - FIRST FLOOR

N

4' 8' 16'

1/8" = 1'-0"

0'

EQUIPMENT SCHEDULE - FIRST FLOOR

Equipment Number Equipment Description

Equipment Manufacturer Qty.

Provided by

Installed by

REQUIREMENTS

NotesElectrical Plumbing Data

24002E EYE INSTRUMENT ULTRASONIC MEDISAFE 1 VA VA Yes No No

24003F AUTO CART WASH STERIS 1 VA CC Yes Yes Yes

24010E CARTS - MISC SUPPLY 3 VA VA No No No

24011E CARTS - BED PADS HANGING 1 VA VA No No No

24012E CART WITH PHONE 1 VA VA No No No

24013E CARTS - SMALL 2 VA VA No No No

24014N CLAMP / INSTRUMENT RACK 2 VA No No No

24015E INSTRUMENT TOOL BOXES 2 VA VA No No No

24016E THRU-WALL VENTED CABINET HARLOFF 1 VA CC Yes No No

24017E CART WITH CORDS 1 VA VA No No No

24018E LASER PRINTER HP 1 VA VA Yes No Yes

24019E CHARGER UNIT COVIDIEN 1 VA VA No No No

24020E DESK ON WHEELS CASPA SOLUTIONS 5 VA VA Yes No Yes

24021E RACKS WITH INSTRUMENTS 2 VA VA No No No

24023E RACK WITH CASE LIDS 1 VA VA No No No

24024E CARTS BETWEEN DESK 1 VA VA No No No

24025E CHEMICAL STERILIZER ASP 1 VA CC Yes No No

24026E CART CARRIERS STERIS 4 VA VA No No No

24027E AUTO READERS 3M 2 VA VA Yes No No

24028E STERILIZER STERIS 2 VA VA No No No

24028F STERILIZER STERIS 1 VA VA No No No

24029E WASHER /DISENFECTOR - THRU

WALL

STERIS 2 VA CC No No No

24029F WASHER /DISENFECTOR - THRU

WALL

STERIS 1 VA CC No No No

24030F LOW V PRO MAX STERILIZER 1 VA CC No No No

24032E CAVIWAVE STERIS 2 VA CC Yes No No

24033E DOSING SYSTEM 2 VA VA Yes No Yes TWO ARE FUTURE

EQUIPMENT

24033F DOSING SYSTEM 2 VA VA Yes No Yes TWO ARE FUTURE

EQUIPMENT

24034E METAL TABLE - LARGE 1 VA VA No No No

24035E MONITOR - WALL MOUNTED 2 VA VA Yes No Yes TWO ARE FUTURE

EQUIPMENT

24035F MONITOR - WALL MOUNTED 2 VA VA Yes No Yes TWO ARE FUTURE

EQUIPMENT

24036E MONITOR - WALL MOUNTED 1 VA VA Yes No Yes TWO ARE FUTURE

EQUIPMENT

24037E RACK FOR CASES 1 VA VA No No No

24038E TABLE ON WHEELS - SMALL 1 VA VA No No No

24039E RACK WITH TOWELS AND

CHEMICALS

1 VA VA No No No

24040E CARTS FOR WASHER - SMALL 2 VA VA No No No

24042E METAL WORK TABLE 1 VA VA No No No

24046E STERILE DRYER OLYMPIC 1 VA VA Yes No No

24046F SCOPE DRYING 1 VA VA No No No

24047E THERMAL PRINTER UNKNOWN 2 VA VA Yes No Yes

24048N MEDIVATOR 1 VA CC Yes Yes No

24049E RACK 1 VA VA No No No

24060E CASE CARTS 20 VA VA No No No

24061N SINKS 2 VA CC Yes No No 11'-0" x 2'-6"

24062N SINKS 1 VA CC Yes No No 7'-8" x 2'-1"

24063N SINKS 1 VA CC Yes No No 9'-1" x 2'-1"

DESK1 CHIEF DESK 1 VA VA No No No

DESK2 CHIEF DESK - RETURN 1 VA VA No No No

DESK5 EDUCATOR DESK 1 VA VA No No No

DESK6 EDUCATOR DESK 1 VA VA No No No

FILE1 CHIEF FILE 1 VA VA No No No

FILE3 EDUCATOR FILE 1 VA VA No No No

ACCESSORIES SCHEDULE

ACCESSORY

KEY QTY DESCRIPTION

PROVIDED

BY

INSTALLED

BY NOTES

A101 3 GM - Toilet Paper Dispenser (Bobrick): GM - Toilet Paper Dispenser (Bobrick)

VA CC

A102 5 GM - Paper Towel Dispenser (GP Centerpull): GM - Paper Towel Dispenser (GP Centerpull)

A103 1 GM - Paper Towel Dispenser (GP Large): GM - Paper Towel Dispenser (GP Large)

VA CC

A104 7 GM - Soap Dispenser: GM - Soap Dispenser

A105 14 GM - Coat Hook: GM - Coat Hook CC CC

A106 3 GM - Mirror (Rectangular): 24 x 36 CC CC

A107 2 GM - Coat Hook: GM - Mop Rack CC CC

A108 3 ADA Grab Bar: 42"x36"x36" CC CC

A109 2 GM - METAIL SCRUB SINK Shelf: GM - METAIL SCRUB SINK Shelf

CC CC

A110 2 GM - Coat Hook: GM - Shower Caddy VA CC

A111 1 GM - Sanitary Napkin Disposal: GM - Sanitary Napkin Disposal

VA CC

A112 2 GM - SS Shelf Bobrick B295 16 X 18: GM - SS Shelf Bobrick B295 16 X 18

CC CC

A113 2 GM - ADA Grab Bar (Patient Showers): Grab Bar (Patient Showers)

CC CC

ACCESSORIES SCHEDULE

EQUIPMENT SCHEDULE - FIRST FLOOR

No. Description Date

1 SPS REVISION 4-28-2017

Architectural floor plan showing the physical location

Red Circle shows location of washer

34-1 34-2 34-3 34-4 34-5 34-6

34-7

34-7

34-8

34-8

34-9

34-9

34-11

34-11 34-12 34-13

34-A34-A

34-B34-B

34-C34-C

34-D34-D

SPS DIRTY ELEVATOR

156-34

LABORATORY

106-34

STORAGE

106H-34

HSKPG

108-34

GLASS WASH

109-34

STORAGE

107-34

OFFICE

110D-34

STERILIZERS

109B-34

CATH LAB PRIMARY

INVENTORY

109A-34

LOGISTICS SERVICE

115-34

MEDIA PREPARATION

110E-34

MICROBIOLOGY

IMMUNOLOGY

110-34

FLUORESCENT

MICROSCOPY

110A-34

TRANSFER ROOM

110B-34

ELECTRICAL

112-34

IMMUNOLOGY

110C-34

OFFICE

106J-34

COMM

111-34

CREDIT/ BILLING OFFICE

106K-34

BALANCE AND SOLUTION

106I-34

EXIST. DUMB WAITER

115-34

SPD SERVICE

114-34

SPD

113-34

SPD SERVICE

117-34

SPD SERVICE

113A-34

HAC

115A-34

HAC

113B-34

CORRIDOR

1-CORR-C

VEST.

113C-34

SPD CHIEF

171-34

LOUNGE & MEETING

169-34

LOCKERS FEMALE LR002

157-34

LOCKERS MALE LR002

159-34

ANTE SOILED/DROP OFF

CSCR1

154-34

MANUAL CART WASH

CWSH3

155-34

ASSIST CHIEF

163-34

SCOPE STAGING CSST1

165-34

SPS CLEAN ELEVATOR

172-34

STERILE PROCESSING

SUPPLIES SRSP1

175-34

CLEAN STEAM GENERATOR

CSCG1

174-34

HAC

162-34

ANTE

168-34

HALL

161-34

HAC

176-34

TOILET

160-34

TOILET

158-34

SPD DECONTAMINATION

FA1

164-34

SCOPE PROCESS CSSP1

166-34

SPD SERVICE PREP/

ASSEMBLY AREA

173-34

TRAINING OFFICE

170-34

SERVICE RM

167-34

(EX) FD

(EX)3" W

(EX)2"

(EX)3" V

(EX)4" W

(EX)6" RL

(EX)2" V

(E X

)2

(E X

)1

/2

"(EX)3/4" RO

(EX)1/2" RO

STAIRS

151-34

CORRIDOR

153-34

13.3

13.3

14.5

14.5

PL200

VALVE AND CONNECT 1 1/2"HW &

2"CW TO (EX)2"CW & (EX)1 1/2"HW

2"VTR

P-604

6"RL & 4"W UP INTO

CHASE ABOVE

RO

CONNECT 3/4"RO & 1/2"RO

TO (EX) 3/4"RO & 1/2"RO

1/

2"

RO

(EX)4" W

(EX)1 1/2" W

(EX)4" W

(EX)1"

(EX)2"

(EX)2"

(EX)1/2"

(E X

)2

(E X

)3

(E X

)1

(EX)1 1/2"

(EX)3/4"

(EX) 3" CW, 2" HW & 1" HWC UP

(EX) 4" CW, 2 1/2" & 1 1/4" HWC DOWN

(E X

)1

(E X

)2

RO

RO

(EX)1"RO &

1/2"ROR UP

INSTALL NEW 3"CW &

2"HW VALVES

2" 2"

1/2"

3/4"CD FROM

FCU-2

NEW CONSTRUCTION (ADDITION)

REMODEL AREA

EXISTING

GENERAL NOTES

1. PLANS ARE SCHEMATIC IN NATURE. LAYOUT IS BASED ON BEST AVAILABLE

INFORMATION. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND

DIMENSIONS.

2. ALL CUTTING, PATCHING AND DEMOLITION WORK SHALL BE CLOSELY COORDINATED

WITH THE EXISTING CONDITIONS AND THE REQUIRED NEW WORK. G.C. SHALL

PATCH AND FINISH PENETRATIONS OF EXISTING SURFACES TO MATCH ADJACENT

SURFACES.

3. FIELD VERIFY BEST ROUTING FOR NEW PIPING AND DUCTWORK. COORDINATE

WITH EXISTING EQUIPMENT, PIPING AND DUCTWORK. NEW PIPING SHALL RISE AND

DROP, JOG OR OFFSET AS REQUIRED TO AVOID CONFLICTS. DUCTWORK SHALL

TAKE PRECEDENCE OVER ALL PIPING, EXCEPT WHERE GRADE MUST BE

MAINTAINED FOR DRAINAGE. ANY EXPENSES RISING FROM LACK OF COORDINATION

SHALL BE MADE AT THE CONTRACTOR’S EXPENSE.

4. REFER TO ARCHITECTURAL SPECIFICATIONS AND PLANS FOR PHASING OF

DEMOLITION AND NEW WORK. ADJACENT AREAS ARE 100% OCCUPIED AND

CONTRACTOR SHALL WORK CLOSELY WITH OWNER TO SCHEDULE DEMOLITION

AND CONSTRUCTION TO BE AS LEAST DISRUPTIVE AS POSSIBLE.

5. ALL WORK SHALL BE DONE AT NIGHT AND/OR WEEKENDS, OR AS DIRECTED BY THE

COR.

6. PIPE LENGTH FROM RECIRCULATED HOT WATER MAIN TO LAVATORY HOT WATER

STOP SHALL BE NO MORE THAN 18'-0".

7. PIPE LENGTH FROM COLD WATER MAIN TO WATER CLOSET FLUSH VALVE SHALL BE

NO MORE THAN 19'-6".

8. COMPLETE COORDINATION OF DRAWINGS SHALL BE REQUIRED BY PARAGRAPH

"SUBMITTAL" IN SPECIFICATION SECTION 220511. CONSTRUCTION SHALL NOT

START ON ANY SYSTEM UNTIL THE COORDINATION DRAWINGS HAVE BEEN

APPROVED BY VA.

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA WICHITA, KS 67202

316-262-2691 www.pec1.com

Drawing Title Project Title

Date

Location

Checked

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Contract No.: --

589-754

Robert J. Dole VA Medical Center

STERILE PROCESSING SERVICE (SPS)

SURGICAL SUITE EXPANSION, B34

BID SET

C

U s e rs

\j g a \D o c u m e n ts

\1 -0

-M

A S

T E

R M

E C

H -R jg a .r v t

/2

/2

:2 :1

P

M

PL102

PLUMBING PLAN - FIRST FLOOR

5500 E Kellogg, Wichita, KS

JAC JML10/31/2016

1/8" = 1'-0"

PLUMBING PLAN - FIRST FLOOR 4' 8' 16'

1/8" = 1'-0"

0'

N

1/32" = 1'-0"

KEY PLAN FIRST FLOOR

Plumbing Piping that will be needed to be installed for the washer

Red Circle shows location of washer

Electrical drawing that shows what type of power needs to be installed to make the unit operate

Red Circle shows location of washer

File details come from the government source that posted it.