36C25518Q9575-002.pdf
PDF 3 MB Posted
- Attached to
- WI WASHER DISINFECTOR UNIT Federal contract opportunity
- Solicitation number
- 36C25518Q9575
About this file
36C25518Q9575 Attachment A.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25518Q9575-0001002.docx | DOCX document | |
| 36C25518Q9575-0001000.docx | DOCX document | |
| 36C25518Q9575-0001001.pdf | ||
| 36C25518Q9575-001.docx | DOCX document | |
| 36C25518Q9575-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FE
FE
FE
FE
SPS DIRTY
ELEVATOR
156-34
RECEIVING
STORAGE/
DISPATCH
115-34
EXIST.
DUMB
WAITER
115-34
SPS
SERVICE
113A-34
HAC
115A-34
SPS
CLEAN
ELEVATOR
172-34
LOCKERS
MALE
LR002
159-34
LOCKERS
FEMALE
LR002
157-34
ANTE
SOILED/DROP
OFF
CSCR1
154-34
SCOPE
STAGING
CSST1
165-34
STERILE
PROCESSING
SUPPLIES
SRSP1
175-34
CLEAN
STEAM
GENERATOR
CSCG1
174-34
HALL
161-34
TOILET
160-34
ANTE RM
168-34
24010E
24010E24010E
24011E
24012E
24013E
24015E 24015E
24017E
24018E
24019E
24020E 24020E
24020E
24021E
24021E
24023E
24024E
24025E
24026E 24026E 24026E
24027E
24027E
24029F
24040E
24040E
24030F
24060E 24060E
24060E
24060E24060E 24060E
24060E
24060E 24060E24060E
24060E 24060E 24060E
24060E24060E
24060E 24060E 24060E
24060E
24060E
24029E24029E
24014N
24014N
24020E
24020E
24028F24028E24028E
24003F
24013E
PPE
CABINET
HAC
176-34
SPS
SERVICE
PREP/
ASSEMBLY
AREA
173-34SPS
SERVICE
114-34
SCOPE
PROCESS
CSSP1
166-34
SPS
DECONTAMINATION
FA1
164-34
CORRIDOR
153-34
STAIRS
151-34
CORRIDOR
152-34
SPS
113-34
ELEC.
CLOSET
178-34
FILE 3
DESK 6
DESK 1
FILE 1
DESK 5
DESK 2
DISPOSAL
A104
A102
A107
A107
24035E
24035F
24026E
TOILET
158-34
LOUNGE &
TRAINING
169-34
SPS CHIEF
171-34
ASSIST
CHIEF
163-34
ANTE RM
170-34
ANTE RM
150-34
MANUAL
CART
WASH
CWSH3
155-34
HAC
162-34
SERVICE
RM
167-34
24033F
24047E
24033E
24047E
24033E
24033F
24038E
24034E
24042E
24049E
24039E
24002E 24036E
24037E
24048F
24016E
24046E
24046N
24032E24032E 24032E
A102
A104
Drawing Title Project Title
Date
Location
Checked
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
SPS REVISIONS
589-754
Robert J. Dole VA Medical Center
STERILE PROCESSING SERVICE (SPS)
SURGICAL SUITE EXPANSION, B34
AI-202R
ENLRGD EQUIP PLAN - FIRST FLOOR (#)
5500 E Kellogg, Wichita, KS
SS CK10/31/2016
1/4" = 1'-0"
ENLARGED EQUIP PLAN - FIRST FLOOR
N
4' 8' 16'
1/8" = 1'-0"
0'
EQUIPMENT SCHEDULE - FIRST FLOOR
Equipment Number Equipment Description
Equipment Manufacturer Qty.
Provided by
Installed by
REQUIREMENTS
NotesElectrical Plumbing Data
24002E EYE INSTRUMENT ULTRASONIC MEDISAFE 1 VA VA Yes No No
24003F AUTO CART WASH STERIS 1 VA CC Yes Yes Yes
24010E CARTS - MISC SUPPLY 3 VA VA No No No
24011E CARTS - BED PADS HANGING 1 VA VA No No No
24012E CART WITH PHONE 1 VA VA No No No
24013E CARTS - SMALL 2 VA VA No No No
24014N CLAMP / INSTRUMENT RACK 2 VA No No No
24015E INSTRUMENT TOOL BOXES 2 VA VA No No No
24016E THRU-WALL VENTED CABINET HARLOFF 1 VA CC Yes No No
24017E CART WITH CORDS 1 VA VA No No No
24018E LASER PRINTER HP 1 VA VA Yes No Yes
24019E CHARGER UNIT COVIDIEN 1 VA VA No No No
24020E DESK ON WHEELS CASPA SOLUTIONS 5 VA VA Yes No Yes
24021E RACKS WITH INSTRUMENTS 2 VA VA No No No
24023E RACK WITH CASE LIDS 1 VA VA No No No
24024E CARTS BETWEEN DESK 1 VA VA No No No
24025E CHEMICAL STERILIZER ASP 1 VA CC Yes No No
24026E CART CARRIERS STERIS 4 VA VA No No No
24027E AUTO READERS 3M 2 VA VA Yes No No
24028E STERILIZER STERIS 2 VA VA No No No
24028F STERILIZER STERIS 1 VA VA No No No
24029E WASHER /DISENFECTOR - THRU
WALL
STERIS 2 VA CC No No No
24029F WASHER /DISENFECTOR - THRU
WALL
STERIS 1 VA CC No No No
24030F LOW V PRO MAX STERILIZER 1 VA CC No No No
24032E CAVIWAVE STERIS 2 VA CC Yes No No
24033E DOSING SYSTEM 2 VA VA Yes No Yes TWO ARE FUTURE
EQUIPMENT
24033F DOSING SYSTEM 2 VA VA Yes No Yes TWO ARE FUTURE
EQUIPMENT
24034E METAL TABLE - LARGE 1 VA VA No No No
24035E MONITOR - WALL MOUNTED 2 VA VA Yes No Yes TWO ARE FUTURE
EQUIPMENT
24035F MONITOR - WALL MOUNTED 2 VA VA Yes No Yes TWO ARE FUTURE
EQUIPMENT
24036E MONITOR - WALL MOUNTED 1 VA VA Yes No Yes TWO ARE FUTURE
EQUIPMENT
24037E RACK FOR CASES 1 VA VA No No No
24038E TABLE ON WHEELS - SMALL 1 VA VA No No No
24039E RACK WITH TOWELS AND
CHEMICALS
1 VA VA No No No
24040E CARTS FOR WASHER - SMALL 2 VA VA No No No
24042E METAL WORK TABLE 1 VA VA No No No
24046E STERILE DRYER OLYMPIC 1 VA VA Yes No No
24046F SCOPE DRYING 1 VA VA No No No
24047E THERMAL PRINTER UNKNOWN 2 VA VA Yes No Yes
24048N MEDIVATOR 1 VA CC Yes Yes No
24049E RACK 1 VA VA No No No
24060E CASE CARTS 20 VA VA No No No
24061N SINKS 2 VA CC Yes No No 11'-0" x 2'-6"
24062N SINKS 1 VA CC Yes No No 7'-8" x 2'-1"
24063N SINKS 1 VA CC Yes No No 9'-1" x 2'-1"
DESK1 CHIEF DESK 1 VA VA No No No
DESK2 CHIEF DESK - RETURN 1 VA VA No No No
DESK5 EDUCATOR DESK 1 VA VA No No No
DESK6 EDUCATOR DESK 1 VA VA No No No
FILE1 CHIEF FILE 1 VA VA No No No
FILE3 EDUCATOR FILE 1 VA VA No No No
ACCESSORIES SCHEDULE
ACCESSORY
KEY QTY DESCRIPTION
PROVIDED
BY
INSTALLED
BY NOTES
A101 3 GM - Toilet Paper Dispenser (Bobrick): GM - Toilet Paper Dispenser (Bobrick)
VA CC
A102 5 GM - Paper Towel Dispenser (GP Centerpull): GM - Paper Towel Dispenser (GP Centerpull)
A103 1 GM - Paper Towel Dispenser (GP Large): GM - Paper Towel Dispenser (GP Large)
VA CC
A104 7 GM - Soap Dispenser: GM - Soap Dispenser
A105 14 GM - Coat Hook: GM - Coat Hook CC CC
A106 3 GM - Mirror (Rectangular): 24 x 36 CC CC
A107 2 GM - Coat Hook: GM - Mop Rack CC CC
A108 3 ADA Grab Bar: 42"x36"x36" CC CC
A109 2 GM - METAIL SCRUB SINK Shelf: GM - METAIL SCRUB SINK Shelf
CC CC
A110 2 GM - Coat Hook: GM - Shower Caddy VA CC
A111 1 GM - Sanitary Napkin Disposal: GM - Sanitary Napkin Disposal
VA CC
A112 2 GM - SS Shelf Bobrick B295 16 X 18: GM - SS Shelf Bobrick B295 16 X 18
CC CC
A113 2 GM - ADA Grab Bar (Patient Showers): Grab Bar (Patient Showers)
CC CC
ACCESSORIES SCHEDULE
EQUIPMENT SCHEDULE - FIRST FLOOR
No. Description Date
1 SPS REVISION 4-28-2017
Architectural floor plan showing the physical location
Red Circle shows location of washer
34-1 34-2 34-3 34-4 34-5 34-6
34-7
34-7
34-8
34-8
34-9
34-9
34-11
34-11 34-12 34-13
34-A34-A
34-B34-B
34-C34-C
34-D34-D
SPS DIRTY ELEVATOR
156-34
LABORATORY
106-34
STORAGE
106H-34
HSKPG
108-34
GLASS WASH
109-34
STORAGE
107-34
OFFICE
110D-34
STERILIZERS
109B-34
CATH LAB PRIMARY
INVENTORY
109A-34
LOGISTICS SERVICE
115-34
MEDIA PREPARATION
110E-34
MICROBIOLOGY
IMMUNOLOGY
110-34
FLUORESCENT
MICROSCOPY
110A-34
TRANSFER ROOM
110B-34
ELECTRICAL
112-34
IMMUNOLOGY
110C-34
OFFICE
106J-34
COMM
111-34
CREDIT/ BILLING OFFICE
106K-34
BALANCE AND SOLUTION
106I-34
EXIST. DUMB WAITER
115-34
SPD SERVICE
114-34
SPD
113-34
SPD SERVICE
117-34
SPD SERVICE
113A-34
HAC
115A-34
HAC
113B-34
CORRIDOR
1-CORR-C
VEST.
113C-34
SPD CHIEF
171-34
LOUNGE & MEETING
169-34
LOCKERS FEMALE LR002
157-34
LOCKERS MALE LR002
159-34
ANTE SOILED/DROP OFF
CSCR1
154-34
MANUAL CART WASH
CWSH3
155-34
ASSIST CHIEF
163-34
SCOPE STAGING CSST1
165-34
SPS CLEAN ELEVATOR
172-34
STERILE PROCESSING
SUPPLIES SRSP1
175-34
CLEAN STEAM GENERATOR
CSCG1
174-34
HAC
162-34
ANTE
168-34
HALL
161-34
HAC
176-34
TOILET
160-34
TOILET
158-34
SPD DECONTAMINATION
FA1
164-34
SCOPE PROCESS CSSP1
166-34
SPD SERVICE PREP/
ASSEMBLY AREA
173-34
TRAINING OFFICE
170-34
SERVICE RM
167-34
(EX) FD
(EX)3" W
(EX)2"
(EX)3" V
(EX)4" W
(EX)6" RL
(EX)2" V
(E X
)2
(E X
)1
/2
"(EX)3/4" RO
(EX)1/2" RO
STAIRS
151-34
CORRIDOR
153-34
13.3
13.3
14.5
14.5
PL200
VALVE AND CONNECT 1 1/2"HW &
2"CW TO (EX)2"CW & (EX)1 1/2"HW
2"VTR
P-604
6"RL & 4"W UP INTO
CHASE ABOVE
RO
CONNECT 3/4"RO & 1/2"RO
TO (EX) 3/4"RO & 1/2"RO
1/
2"
RO
(EX)4" W
(EX)1 1/2" W
(EX)4" W
(EX)1"
(EX)2"
(EX)2"
(EX)1/2"
(E X
)2
(E X
)3
(E X
)1
(EX)1 1/2"
(EX)3/4"
(EX) 3" CW, 2" HW & 1" HWC UP
(EX) 4" CW, 2 1/2" & 1 1/4" HWC DOWN
(E X
)1
(E X
)2
RO
RO
(EX)1"RO &
1/2"ROR UP
INSTALL NEW 3"CW &
2"HW VALVES
2" 2"
1/2"
3/4"CD FROM
FCU-2
NEW CONSTRUCTION (ADDITION)
REMODEL AREA
EXISTING
GENERAL NOTES
1. PLANS ARE SCHEMATIC IN NATURE. LAYOUT IS BASED ON BEST AVAILABLE
INFORMATION. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND
DIMENSIONS.
2. ALL CUTTING, PATCHING AND DEMOLITION WORK SHALL BE CLOSELY COORDINATED
WITH THE EXISTING CONDITIONS AND THE REQUIRED NEW WORK. G.C. SHALL
PATCH AND FINISH PENETRATIONS OF EXISTING SURFACES TO MATCH ADJACENT
SURFACES.
3. FIELD VERIFY BEST ROUTING FOR NEW PIPING AND DUCTWORK. COORDINATE
WITH EXISTING EQUIPMENT, PIPING AND DUCTWORK. NEW PIPING SHALL RISE AND
DROP, JOG OR OFFSET AS REQUIRED TO AVOID CONFLICTS. DUCTWORK SHALL
TAKE PRECEDENCE OVER ALL PIPING, EXCEPT WHERE GRADE MUST BE
MAINTAINED FOR DRAINAGE. ANY EXPENSES RISING FROM LACK OF COORDINATION
SHALL BE MADE AT THE CONTRACTOR’S EXPENSE.
4. REFER TO ARCHITECTURAL SPECIFICATIONS AND PLANS FOR PHASING OF
DEMOLITION AND NEW WORK. ADJACENT AREAS ARE 100% OCCUPIED AND
CONTRACTOR SHALL WORK CLOSELY WITH OWNER TO SCHEDULE DEMOLITION
AND CONSTRUCTION TO BE AS LEAST DISRUPTIVE AS POSSIBLE.
5. ALL WORK SHALL BE DONE AT NIGHT AND/OR WEEKENDS, OR AS DIRECTED BY THE
COR.
6. PIPE LENGTH FROM RECIRCULATED HOT WATER MAIN TO LAVATORY HOT WATER
STOP SHALL BE NO MORE THAN 18'-0".
7. PIPE LENGTH FROM COLD WATER MAIN TO WATER CLOSET FLUSH VALVE SHALL BE
NO MORE THAN 19'-6".
8. COMPLETE COORDINATION OF DRAWINGS SHALL BE REQUIRED BY PARAGRAPH
"SUBMITTAL" IN SPECIFICATION SECTION 220511. CONSTRUCTION SHALL NOT
START ON ANY SYSTEM UNTIL THE COORDINATION DRAWINGS HAVE BEEN
APPROVED BY VA.
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA WICHITA, KS 67202
316-262-2691 www.pec1.com
Drawing Title Project Title
Date
Location
Checked
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Contract No.: --
589-754
Robert J. Dole VA Medical Center
STERILE PROCESSING SERVICE (SPS)
SURGICAL SUITE EXPANSION, B34
BID SET
C
U s e rs
\j g a \D o c u m e n ts
\1 -0
-M
A S
T E
R M
E C
H -R jg a .r v t
/2
/2
:2 :1
P
M
PL102
PLUMBING PLAN - FIRST FLOOR
5500 E Kellogg, Wichita, KS
JAC JML10/31/2016
1/8" = 1'-0"
PLUMBING PLAN - FIRST FLOOR 4' 8' 16'
1/8" = 1'-0"
0'
N
1/32" = 1'-0"
KEY PLAN FIRST FLOOR
Plumbing Piping that will be needed to be installed for the washer
Red Circle shows location of washer
Electrical drawing that shows what type of power needs to be installed to make the unit operate
Red Circle shows location of washer
File details come from the government source that posted it.