Attachment_E-Likorall_Service_Manual_All_Sizes.pdf

PDF 2 MB Posted

Attached to
PATIENT LIFT PREVENTATIVE MAINTENANCE BASE PLUS 4 OYS Federal contract opportunity
Solicitation number
36C25219Q0200
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

36C25219Q0200 Attachment E-Likorall Service Manual All Sizes.pdf

View the file

Other files for this federal contract opportunity

Other files attached to PATIENT LIFT PREVENTATIVE MAINTENANCE BASE PLUS 4 OYS, newest first.
File Type Posted
ATTACHMENT_F_TOMAH_15-4929(REV-7)7-10-18.pdf PDF
Attachment_C-Checklist_for_Corrective_and_Preventative_Maintenance.pdf PDF
Attachment_B-_Patient_Safety_Alert_AL14-07.pdf PDF
Attachment_A-Patient_Lift_Inventory_Schedule.docx DOCX document
Attachment_D-Installation_or_Relocation_Checklist_for_Patient_Lifts.pdf PDF
36C25219Q0200.docx DOCX document
36C25219Q0200_1.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Periodic Inspection Likorall 106 www.liko.com

6.1Likorall™

Lift type:

Prod No:

Serial No:

Prod. Year:

Customer Reference:

Contract No:

Name:

Address:

(Zip Code)

Likorall 200, 240, 242, 243, 250

Periodic inspection 2014-06-26

The patient lift must be thoroughly inspected at least once per year. Inspection and service must be carried out by Hill-Rom/Liko authorized personnel.

If the system is installed in a corrosive environment such as indoor pool or bathroom, please see section 15 before starting inspection. Make a color print of this instruction.

Inspection performed in accordance with ISO 10535:2006 Annex B- Periodic inspection

Approval to use the patient lift � Approved � Not approved � To be actioned

If the patient lift has one or more inspection point with result “Not approved” the system must not be used. If the system has one or more inspection point with result “To be actioned” these actions should be performed immediatley.

After performed actions sign below. If anything is unclear or if you have questions, please contact Hill-Rom/Liko or your local Hill-Rom/Liko representative. Contact information is to be found at www.liko.com.

Inspection performed by: ____________________________________ Date: ____________________

Final approval by: _____________________________________ Approval date: ____________

Next inspection: _____________________________________

Version:

INSPECTION POINTS

Approved Not To be actioned:

approved 1 General inspection � � 2 Carriages � � 3 Emergency Stop � � 4 Hand control � � 5 Electrical emergency lowering device � � 6 SSP Limit Switch � � 7 Lift Strap � � 8a Mechanical emergency lowering (242) � � 8b Fixed strap-stop (242) � � 9 TDM & R2R Hook (200 & 242 R2R) � � 10 Slingbar � � 11 Charger function � �

LOAD TESTING

12 Mechanical lowering load test (242) � � 13 Maximum load rail system � �

DOCUMENTATION

14 Instructions / Instruction guide � �

ENVIRONMENTAL IMPACT

15 Corrosive environments � � www.liko.com© Copyright Liko AB

Periodic Inspection Likorall 107 www.liko.com

6.1Likorall™Instructions for the inspection points

Periodic Inspection Likorall www.liko.com

Inspection points

Periodic Inspection Likorall www.liko.com

Likorall 200

Likorall 242

8a

8b

Likorall 243 & 250

R2R

Periodic Inspection Likorall 108 www.liko.com

Instructions for the inspection points

Periodic Inspection Likorall www.liko.com

1 General inspection

- Verify presence of decal with model type and serial number.

- Check the front plastic cover for cracks.

- Check rear plastic cover for cracks and that the end-cover screws are in place.

- Check aluminium body for dents or scratches.

2 Carriages

- Verify that carriages are secured to motor with bolts and nyloc nuts.

- Roll the carriage within the rail. Verify that each wheel turns freely and the plastic wheel bearing covers not are cracked or missing.

R2R Turnable Hanger:

- Verify that the centre pin is held secure with a split pin.

Carriage with brake:

- If applicable, check that the carriage brake assembly tightens and holds.

- Check the brake function of the carriage.

3 Emergency Stop

- Press in the emergency stop button. Verify that it holds and locks in the closed position. If the emergency stop cord is attached, check that it is secured properly.

- With the Emergency Stop button pressed in, check that the motor does not operate when the hand control buttons are pressed.

- Turn the red emergency button in the direction of the arrows. Verify that the button releases from the locked position into the raised, open position.

4 Hand control

- Check cord for exposed wear or tear in the insulation sleeve.

- Inspect casing for damage, verify dust & water seal is intact.

- With the emergency-stop out, press each button and check for corresponding lift operation.

5 Electrical emergency lowering device

- Test the electrical emergency lowering device by pulling down the handle (Likorall 200) or pressing the up and down arrows on the electronic card cover. Check for corresponding lift operation.

6 SSP Limit Switch

- Check that the (2) mounting screws secure the micro switch e-card to the motor casing.

- Check function of twist protection.

- With the emergency stop out, move the lifts trap all the way up against the SSP Limit switch. Check that the motor does not operate when touching the SSP Limit switch.

7 Lift Strap

- Using the hand control, lower the strap to its maximum extension. Inspect the belt for frayed edges, heavy wrinkles or wear-through areas.

- Verify that the Q-link is secure on strap. Slide plastic cover off the Q-link and visually inspect that the lifts trap safety pin is seated securely in the middle recess of the Q-link.

8a Mechanical emergency lowering (Likorall 242)

- Make sure the hole at the emergency lowering not exceeds 12 mm / 0,47 inch.

- Attach the sling bar to the lift strap. Make sure the sling bar is correctly mounted.

- Verify the position of the red plastic adjustable stop at the top of the Spring magazine.

Ensure that the snap-fit is interlocked and secure.

- Apply slight manual downward pressure on the sling bar. Simultaneously pump the red handle on the mechanical emergency-lowering. Verify that the spring action handle lowers and recoils upward and that the strap is let out of the Spring magazine.

- Manually elevate the sling bar so there is no weight on the mechanical lowering assembly. Simultaneously pump the red handle until the strap rewinds up to the red plastic adjustable stop.

- Ensure that the red plastic handle cover is in place.

8b Fixed strap-stop (Likorall 242)

- Verify that screws (2) are tight in two-piece assembly

- If requested and/or necessary, reset the strap-stop height according to service manual instructions.

EMERGENCY

LOWERING

Periodic Inspection Likorall 109 www.liko.com

Instructions for the inspection points

Periodic Inspection Likorall www.liko.com

Max.load

50cm

Start

Stop

9 TDM & R2R Hook (Likorall 242 R2R and Likorall 200)

- Manually press and lower the plastic covers and spring assembly away from the aluminium hook. Release the spring assembly and verify that the spring snaps back against the hook, providing a secure snap-fit lock.

- Verify that the screw joints are tight.

10 Sling bar

- Visually inspect the sling bar to detect any scratches, sharp edges or deformities.

- Check that the unit rotates freely on its bearings.

- Make sure both safety latch clips are mounted and fall back against the body of the sling bar.

- Verify that the sling bar fasteners are tight.

- On old model of sling bar, made of steel; Verify that the o-ring is present and positioned in the center bolt groove.

11 Charger function

- With the emergency stop out, insert the hand control into the wall-mounted charger outlet (110 - 240V). Visually inspect that diode lights on the charger unit and hand control light up according to the User Manual or the Quick reference guide.

Load testing

12 Mechanical lowering load test (50 kg / 110 lbs) (Likorall 242)

- With the emergency stop out, and the strap with the sling bar lowered, secure the weights.

- Using the hand control, raise the weights approximately 10-15 cm (4-6 inch).

- Firmly apply increasing downward pressure on the red emergency-lowering handle until the strap begins to slowly lower the weight to the floor. Remove the weights and rewind the strap to its original position, as described in inspection point 8a.

13 Maximum-load test

Likorall 200: 200 kg / 440 lbs Likorall 240: 180 kg / 400 lbs Likorall 242: 200 kg / 440 lbs Likorall 243: 230 kg / 507 lbs Likorall 250: 250 kg / 550 lbs

- With the emergency stop out, and the strap with the sling bar lowered, secure the weights.

- Using the hand control, raise the maximum load 50 cm

- Make sure the lift strap does not drift more than 15 cm (6 inch)/ 30 sec.

- Lower the maximum load to the start position.

- Listen for peculiar noises and vibrations.

Note:

Never go below start position with the maximum load!

Make sure the batteries are fully charged before maximum load test!

If the low-battery alarm sounds during the lift, the battery must be recharged prior to load testing.

If the low-battery alarm sounds during the lift with fully recharged batteries, the batteries must be replaced.

Documentation

14 Instructions / Instruction guide.

- Make sure Instruction guide or Quick reference guide, to the lift unit, are available.

Periodic Inspection Likorall 110 www.liko.com

Instructions for the inspection points

Periodic Inspection Likorall www.liko.com

Due to the environment an overhead system is installed in, components may be subject to corrosion.

High temperature, high relative humidity, poor ventilation, presence of chlorine and different combinations of these factors, will affect the corrosion rate.

Depending on material type a corrosion attack can occur suddenly or in other cases form gradually.

The corrosion rate and type of corrosion attack might be different in one area of the installation compared to another. Fixing points classified as safety critical, installed in a corrosive environment such as indoor pool or bathroom, must be inspected. When a component has reached a certain stage of corrosion it might need to be replaced.

Note! Print out in color.

Check for visible severe corrosion and material loss and identify if components need to be replaced.

Galvanized steel These pictures describes the evaluation method for all galvanized steel components.

1. New bolt 2. Acceptable 3. Replace 4. NOT acceptable

1. A galvanized steel component.

2. White rust on a component appears when the surface treatment corrodes.

3. Red rust appears when the actual steel has started to corrode. Corroding steel will result in material loss and should therefore be replaced.

4. A component covered in red rust is unfit for use.

Powder coated steel These pictures describes the evaluation method for all powder coated steel components.

1. New 2. Acceptable 3. Replace 4. NOT acceptable

1. A powder coated steel component.

2. Local discoloration may occur in close proximity to corroding non-painted components. Stains on the painted surface is acceptable.

3. Cracks in the paint and red corrosion under the paint is a sign of corroding steel. Corroding steel will result in material loss and should therefore be replaced.

4. A component with peeling coating, bubbles in the paint and red corrosion under the paint is unfit to use.

15 Environmental Impact – corrosive environments

Periodic Inspection Likorall 111 www.liko.com

Safety critical fixing points: Example of load bearing parts:

• Carrier bolts and pins

• Load bearing components below lift motor.

Instructions for the inspection points

3EN200405 Rev. 9 112 www.liko.com

Likorall™

Periodic Inspection Rail System 113 www.liko.com

6.2Likorall™

System information

Type of Rail system:

S/N:

Approved Max Load:

Year of Installation:

Customer references

Agreement No:

Name:

Address:

Post code:

Rail system

Periodic Inspection 3EN111001 Rev 10 www.liko.com© Copyright Liko AB, 2014 June

Inspection performed in accordance with ISO 10535:2006 Annex B- Periodic inspection

Approval to use the overhead system �Approved �Not approved �To be actioned

Not approved: If the system has one or more inspection points with result “Not approved” the system must not be used.

To be actioned: Actions according to the “Instructions for the inspection points” should be performed immediatley. After performed actions sign below. If anything is unclear or if you have questions, please contact Hill-Rom/Liko or your local Hill-Rom/Liko representative. Contact information is to be found at www.liko.com.

Inspection performed by: ____________________________________ Date: ____________________

Final approval by: _____________________________________ Approval date: ____________

Next inspection: _____________________________________

The Rail System must be thoroughly inspected at least once per year. Inspection and service must be carried out by Hill-Rom/Liko authorized personnel.

See Installation condition checklist on next page to determine how to perform inspection points 1 and 3.

Make a color print of this instruction.

INSPECTION POINTS

Approved Not To be actioned:

approved

INSTALLATION

1Generalinspection��.............................................................................
2Labels/Signs��.............................................................................
3Ceiling/Pendant/CeilingFixture��.............................................................................
4Wall/WallBracket��.............................................................................

LOAD-BEARING PARTS / RAIL SYSTEM

5UprightSupport��.............................................................................
6Primaryrail��.............................................................................
7SecondaryRail��.............................................................................
8TraverseCarriage��.............................................................................
9Endstop��.............................................................................
10RailJoint��.............................................................................

POWER UNIT

11 Lift motor � �

LOAD TESTING

12Maximumloadrailsystem��.............................................................................
13Extendedmaximumloadtest��.............................................................................

DOCUMENTATION

14 Instructions / Instruction guide � �

ENVIRONMENTAL IMPACT

15 Corrosive environments � �

Periodic Inspection Rail System 114 www.liko.com

Instructions for inspection points

Periodic Inspection Rail System, 3EN111001 Rev. 10 www.liko.com

This checklist helps to determine ways to perform inspection points 1 and 3, depending on what environment the system is installed in.

All other inspection points has to be performed according to the instructions.

Environment: Accessible fixing points:

All attachments are visible

Partly accessible fixing points:

E.g. false ceiling with inspection hatches

Non accessible fixing points:

E.g. false ceiling

Non corrosive environment •Inspectaminimumof
20%(atleasttwo)of
thefixingpoints.
•Inspectaminimumof
20%(atleasttwo)of
thefixingpoints.
•Iflessthan20%can
beinspected,extended
maximumloadtest
mustbeperformed
onnonvisiblefixing
points,accordingto
section13
•Extendedmaximum
loadtestaccordingto
section13.

Corrosive environment e.g. bathroom or other high humidity environment.

•Inspectallfixingpoints.
•Performcorrosion
inspectionaccordingto
section15.
•Inspectaminimumof
20%(atleasttwo)of
thefixingpoints.
•Iflessthan20%can
beinspected,extended
maximumloadtest
mustbeperformed
onnonvisiblefixing
points,accordingto
section13
•Performcorrosion
inspectionaccordingto
section15.
•Extendedmaximum
loadtestaccordingto
section13.

Chlorinated corrosive environment e.g. indoor pool

•Inspectallfixingpoints.
•Performcorrosion
inspectionaccordingto
section15.
•Inspectallfixingpoints.
•Performcorrosion
inspectionaccordingto
section15.

NOTE!

Make inspection with inspection hatches or similar.

• Inspect all fixing points.

•Performcorrosion
inspectionaccordingto
section15.

NOTE!

Make inspection with inspection hatches or similar.

Installation condition checklist

Periodic Inspection Rail System 115 www.liko.com

Instructions for inspection points

Periodic Inspection Rail System, 3EN111001 Rev. 10 www.liko.com

1 General inspection

• Verify that there is a valid Installation Certificate for the overhead lift system.

• Inspect that the distance between the installation points and the overhang match the instructions for the rail and the max load for installed lift unit.

Se Tables in Overhead System Installation Hand Book.

• Inspect that the overhead lift system has no visible damage or deformation.

• Inspect a minimum of 20% of the fixing points to make sure that bolts and nuts are not loose, or see “Installation condition checklist” on previous page if fixing points are unaccessible.

• Use the appropriate inspection method for the bolts.

(This is given by the supplier of the bolt.)

2 Decal / Labels

•Inspect the S/N on the label, if available
•Make sure the maximum load at the decal on the rail, is

equal to, or larger than the maximum load for the lift unit installed in the system. TESTED

Serie No / Serial No xxxxxx Märklast / Max load www.liko.com kg

3 Ceiling / Pendant / Ceiling Fixture

• Inspect a minimum of 20% (at least two) of the fixing points to make sure that bolts and nuts are not loose, or see “Installation condition checklist” on previous page if fixing points are unaccessible.

• (See 1 General inspection)

Periodic Inspection Rail System 116 www.liko.com

Instructions for inspection points

Periodic Inspection Rail System, 3EN111001 Rev. 10 www.liko.com

4 Wall / Wall Bracket

• Inspect that there is no play between the wall and the bracket.

• Inspect the fixing between the rail and the wall bracket.

5 Upright Support

• Make sure that there is no play between the fixing points in the wall and the upright support.

• Inspect the fixing between the wall and the upright support.

• Inspect the floor for damage/deflection around the bottom of the upright support.

6 Primary rail, ( straight rail, traverse )

•Makesurethereareatleasttwofixingsperrail.
•Inspect that joint gap is max 2 mm / 0,08 inch. (A)
•Makesurethattherailjointissupportedbyafixingora

proper joint section.

(A)

7 Secondary Rail

• Inspect that the drawing affect in the system is acceptable, by placing a force (F) on one side.

The secondary rail (B) should then run freely.

F

8 Traverse Carriage

• Inspect that the carriers are functioning correctly with-out exercise. Listen for abnormal sounds from movable parts.

(B)

Periodic Inspection Rail System 117 www.liko.com

Instructions for inspection points

Periodic Inspection Rail System, 3EN111001 Rev. 10 www.liko.com

9 End stop

• Inspect that safetythrough bolts with locking nuts are mounted.

• Inspect that the end stop is correctly mounted.

10 Rail Joint (in rail, pendant and ceiling bracket)

• Inspect the Rail Joint to make sure that bolts and nuts are tightened and there is no play between the parts.

• Make sure the Rail Joint is assembled with the joints in the middle.

11 Lift motor

• See Periodic inspection for the particular lift /product in the rail system.

(Available at www.partner.liko.net)

12 Maximum load rail system

• Carry out load test with lift motor carriages and rail system, using maximum load for the rail system, across the whole lifting area, by manoeuvre the load along each primary rail, and then in a Z pattern.

•Listen for unusual noises and vibrations. Check for any
abnormalitiessuchasdeflection,abnormalmovement

or resistance.

Instructions for inspection points

Periodic Inspection Rail System, 3EN111001 Rev. 10 www.liko.com

9 End stop

• Inspect that safetythrough bolts with locking nuts are mounted.

• Inspect that the end stop is correctly mounted.

10 Rail Joint (in rail, pendant and ceiling bracket)

• Inspect the Rail Joint to make sure that bolts and nuts are tightened and there is no play between the parts.

• Make sure the Rail Joint is assembled with the joints in the middle.

11 Lift motor

• See Periodic inspection for the particular lift /product in the rail system.

(Available at www.partner.liko.net)

12 Maximum load rail system

• Carry out load test with lift motor carriages and rail system, using maximum load for the rail system, across the whole lifting area, by manoeuvre the load along each primary rail, and then in a Z pattern.

•Listen for unusual noises and vibrations. Check for any
abnormalitiessuchasdeflection,abnormalmovement

or resistance.

Periodic Inspection Rail System 118 www.liko.com

Instructions for inspection points

Periodic Inspection Rail System, 3EN111001 Rev. 10 www.liko.com

13A Extended maximum load test

STRAIGHT RAIL SYSTEM

• Apply the maximum load for the overhead rail system. Travel the applied load along the rail from one end

stoptotheotherendstop,withapauseundereachfixingpoint.Travelasthedashedlineshows.
•Listenforunusualnoisesandvibrations.Checkforanyabnormalitiessuchasdeflection,movementor

resistance.

End stop End stop

Pause Attachment 1 etc.

Carriage

Rail

CarriageEnd Stop

Pendant

Primary rail

Pendant

Periodic Inspection Rail System 119 www.liko.com

Instructions for inspection points

Periodic Inspection Rail System, 3EN111001 Rev. 10 www.liko.com

13B Extended maximum load test

TRAVERSE SYSTEM

•Apply the maximum load for the overhead rail system.
•Place the carriage with the applied load at the end stop of the secondary rail (1). Move the secondary rail,
withapauseundereachfixingpoint,fromoneendstoptotheotherendstopofthefirstprimaryrail.
•Continue by moving the applied load diagonally through the centre of the system over to the other side, as

the dashed line shows.

• Now continue by moving the secondary rail with the applied load, from (2), with a pause under each fixing point, from one end stop to the other end stop of the second primary rail.

• Listen for unusual noises and vibrations. Check for any abnormalities such as deflection, movement or resistance.

CarriageEnd Stop

Primary rail

Secondary rail

Primary rail

Pause Attachment 1 etc.

End stop End stop

End stop End stop

Periodic Inspection Rail System 120 www.liko.com

Instructions for inspection points

Periodic Inspection Rail System, 3EN111001 Rev. 10 www.liko.com

14 Instructions / Instruction guide

• Make sure Instruction guide or Quick reference guide, to the lift unit, are available.

15 Environmental Impact – corrosive environments Due to the environment an overhead system is installed in, components may be subject to corrosion.

High temperature, high relative humidity, poor ventilation, presence of chlorine and different combinations of these factors, will affect the corrosion rate.

Depending on material type a corrosion attack can occur suddenly or in other cases form gradually.

The corrosion rate and type of corrosion attack might be different in one area of the installation compared to another. Fixing points classified as safety critical, installed in a corrosive environment such as indoor pool or bathroom, must be inspected. When a component has reached a certain stage of corrosion it might need to be replaced.

Note! Print out in color.

Check for visible severe corrosion and material loss and identify if components need to be replaced.

Galvanized steel These pictures describes the evaluation method for all galvanized steel components.

1. New bolt 2. Acceptable 3. Replace 4. NOT acceptable

1. A galvanized steel component.

2. White rust on a component appears when the surface treatment corrodes.

3. Red rust appears when the actual steel has started to corrode. Corroding steel will result in material loss and should therefore be replaced.

4. A component covered in red rust is unfit for use.

Powder coated steel These pictures describes the evaluation method for all powder coated steel components.

1. New 2. Acceptable 3. Replace 4. NOT acceptable

1. A powder coated steel component.

2. Local discoloration may occur in close proximity to corroding non-painted components. Stains on the painted surface is acceptable.

3. Cracks in the paint and red corrosion under the paint is a sign of corroding steel. Corroding steel will result in material loss and should therefore be replaced.

4. A component with peeling coating, bubbles in the paint and red corrosion under the paint is unfit to use.

Periodic Inspection Rail System 121 www.liko.com

Instructions for inspection points

Periodic Inspection Rail System, 3EN111001 Rev. 10 www.liko.com

Safetycriticalfixingpoints:
•Ceiling and wall attachments

• Load bearing bolts and nuts in

- Pendants

- Ceiling and wall brackets

- Traverse carriers

- Switches and turntables

Example of load bearing bolts and nuts:

• End stop

3EN200405 Rev. 9 122 www.liko.com

3EN200405 Rev. 9 123 www.liko.com

Lift type:

Product No:

Serial No:

Prod. Year:

Customer Reference:

Contract No:

Name:

Address:

(Zip Code)

Interval/Month: Date:

Serviced by:

Likorall 200/240/242/243/250

Preventative Maintenance 2013-11-05

To ensure maximum life cycle should Preventative Maintenance be carried out according to the table below.

Inspection and service must be carried by HillRom/Liko authorized personnel. Instructions for the check points, from the next page.

Version:

Check points:

Carriage Month 12 24 36 48 60 72 84 96 108 120

1 Carriage cleaning 2 Bearing inspection Bearing replacement

Motor

3 Lift strap replacement 4 Battery inspection Battery replacement 5 Sling bar

7.1

3EN200405 Rev. 9 124 www.liko.com

Check points

4A&B

Instructions regarding the check points for Likorall 200/240/242/243/250

Tools required

Adjustable brake

1. Carriage cleaning

13 mm

B. Place carriage in rail, mount motor. Tighten carriage screws. Adjust the brake on the carriage (friction brake).

A. Remove the carriage from the rail and clean the wheels and the inside surface of rails with a moist cloth.

3EN200405 Rev. 9 125 www.liko.com

Likorall™Likorall 200/240/242/243/250

Tools required

3. Lift strap replacement

Spare part No. according to spare part list.

Lift strap replacement recommended every 5th year

Tools required

3 mm

Battery replacement recommended every 3rd year

��200�

4 Battery inspection and replacement

- Remove the cover by unfasten the 4 screws and than pull out the batteries.

- Check the battery with Battery tester Prod. No. 2101100, signal should be audible for more than 5 sec.

If not, replace battery with Spare part No. 31290007.

- Replace battery according to assembly instruction for Spare part 31290007.

Battery tester Prod. No. 2101100

2. Bearing inspection and replacement Spare part No:

31290060 Plastic wheel with bearing.

Not for IRC-carriage 3126114 and IRC Traverse Adapter 3102540

Bearing replacement recommended every 5th year

3EN200405 Rev. 9 126 www.liko.com

Likorall 200/240/242/243/250

Tools required

5. Sling bar cleaning Only on SlingBar Standard:

Cleaning of sling bar and center bolt recommended every year

A. Unfasten sling bar from Likorall. B. Clean sling bar and center bolt on old type of slingbar.

17 mm

6 mm

Likorall 243 ES, NA Likorall 250 ES, NA

Likorall 242 S Likorall 242 ES

Likorall 242 S R2R Likorall 242 ES R2R

Likorall 243 ES Likorall 250 ES Likorall 250 S IRC

Likorall 200

8.0

Likorall 200 Prod. No. 3121001

Likorall 242 ES Prod. No. 3122005-3122006 / NA Likorall 242 ES R2R Prod. No. 3122007-3122008 / NA Likorall 242 S Prod. No. 3122009-3122010 / NA Likorall 242 S R2R Prod. No. 3122011-3122012 / NA

Likorall 243 ES, natural Prod. No. 3123001 / NA Likorall 243 ES, white Prod. No. 3123002 / NA Likorall 250 ES, natural Prod. No. 3122501 / NA Likorall 250 ES, white Prod. No. 3122502 / NA Likorall 250 S, IRC Prod. No. 3124050

Likorall 240 natural / white Prod. No. 3120001-3121617 - Discontinued 2004 Likorall 242 natural / white Prod. No. 3122001-3122004 - Discontinued 2004

3EN200405 Rev. 9 127 www.liko.com

Likorall 200 / 240 / 242 / 243 / 250

Product changes

Changes Type Prod. No. Rev. From S/N Proj.

Spareparts to old versions of Likorall has been discontinued.

Likorall 240 31290052 31290053 31290005

- The liftstraps has been modified. New type of seam and new 145 mm long treaded bolt.

All Lift Strap Spare Parts has got new spare part numbers. (see Spare Parts List)

Likorall 200

Likorall 242 S

Likorall 242 ES

Likorall 243 ES

Likorall 250 ES

Likorall 250 S IRC

3121001

3122009 3122010 3122011 3122012

3122009NA

3122010NA

3122011NA

3122012NA

3122005 3122006 3122007 3122008

3122005NA

3122006NA

3122007NA

3122008NA

3123001 3123002

3123001NA

3123002NA

3122501 3122502

3122501NA

3122502NA

3124050

8 411 000

8 024 000 8 024 000 8 024 000 8 024 000 286 200 286 200 286 200 286 200

8 103 700 8 103 700 8 103 700 8 103 700 429 200 429 200 429 200 429 200

8 205 400 8 205 400 368 200 368 200

8 306 300 8 306 300 6 604 200 6 604 200

5 500

8.0 Likorall™ 200 / 240 / 242 / 243 / 250

Product changes

Changes Type Prod. No. Rev. From S/N: Proj.

- New longer and grey lift straps.

- The motor has been modified.

- New version of PCBA

- Revision numbers (Rev.) are implemented.

It is visible on the product label at the lift and on the packaging label.

- Clearifying instructions regarding maximum load testing has been inserted in our documentation.

(never go below start position with max load)

Likorall 200

Likorall 242 S

Likorall 242 ES

Likorall 243 ES

Likorall 250 ES

Likorall 250 S IRC

3121001

3122009 3122010 3122011 3122012

3122009NA

3122010NA

3122011NA

3122012NA

3122005 3122006 3122007 3122008

3122005NA

3122006NA

3122007NA

3122008NA

3123001 3123002

3123001NA

3123002NA

3122501 3122502

3122501NA

3122502NA

3124050

8 406 676

8 000 001 8 000 001 8 000 001 8 000 001 260 001 260 001 260 001 260 001

8 100 001 8 100 001 8 100 001 8 100 001 420 001 420 001 420 001 420 001

8 200 001 8 200 001 362 301 362 301

8 300 001 8 300 001 6 600 001 6 600 001

Changes Type Prod. No. S/N: Proj.

Due to production problems some Likorall was produced according to proj 754, with shorter black lift strap, old version of motor, and PCBA.

Temporary solution until project 1748 was released.

Likorall 200

Likorall 242 S

3121001

3122011

7 900 001 - 8 405 800 8 405 969 - 8 406 299

7 920 001 - 8 016 112 8 016 169 - 8 016 399

Likorall • 3EN200405 Rev. 9 128 www.liko.com

Product changes

Changes Type From S/N Project New layout on decal and product labels. Likorall 200 1690/1694 New layout on decal and product labels.

Spare part 31290078 Emergency guard activator, reintroduces.

Likorall 242 S

Likorall 242 ES Likorall 243 ES Likorall 250 ES Likorall 250 S IRC

Likorall 242 S (NA) Likorall 242 ES (NA) Likorall 243 ES (NA) Likorall 250 ES (NA)

285 300 427 700 366 306 6 603 100

1690/1694

Changes Type From S/N Project

- The Hand Control Cable is 15 cm longer and more flexible.

- The lifting range has been modified to 205 cm.

- New longer lift strap.

- The motor has been modified.

Likorall 200 8 405 801 1211/1051

- The lifting range has been modified to 205 cm.

- New longer and grey lift straps.

- The motor has been modified.

- New fuse (12A) and fuse holder

Proj 1211/1051 was never inplemented on Likorall NA.

Likorall 242 S

Likorall 242 ES Likorall 243 ES Likorall 250 ES Likorall 250 S IRC

Likorall 242 S (NA) Likorall 242 ES (NA) Likorall 243 ES (NA) Likorall 250 ES (NA)

8 016 001

8 102 001 8 203 501 8 303 501

1211/1051

Changes Type From S/N Project New type of ceiling lift, prepared for continuous charging through the rail system by In-Rail charging system (IRC)

Likorall 250 S IRC 2001-2500 (pre serial)

New cover with integrated emergency stop collar and emergency stop cord. Lift strap equipped with Q-link is now standard on Likorall 243 ES and Likorall 250 ES.

New cover with integrated emergency stop collar and emergency stop cord.

Likorall 242 S Likorall 242 ES Likorall 243 ES Likorall 250 ES

Likorall 200 Likorall 242 S (NA) Likorall 242 ES (NA) Likorall 243 ES (NA) Likorall 250 ES (NA)

8 007 961 8 100 714 8 201 237 8 301 629

8 401 443 284 580 426 991 365 346 6 601 769

Likorall • 3EN200405 Rev. 9 129 www.liko.com

Product changes

Changes Type From S/N Project New version of electronic card; version F Likorall 200 8 401 051 1030

Changes Type From S/N Project New version of Electronic card.

New version of Electronic card.

Likorall 242 S Likorall 242 ES Likorall 243 ES Likorall 250 ES

Likorall 242 S (NA) Likorall 242 ES (NA) Likorall 243 ES (NA) Likorall 250 ES (NA)

8 000 001 8 100 001 8 200 001 8 300 001

278 548 425 687 363 741 6 600 301

Changes Type From S/N Project Current limit changed from 10.5A to 11.5A.

Safety Squeeze Protection upgraded with Twist Protection.

Hang-Up for Hand control

Likorall 242 ES

Likorall 242 S Likorall 243 ES Likorall 242 ES

Likorall 242 S Likorall 242 ES Likorall 243 ES

424689

267210 362586 424379

266387 424229 362487

Likorall • 3EN200405 Rev. 9 130 www.liko.com

3EN200405 Rev. 9 131 www.liko.com

2.0Likorall™

Manufacturer:

Liko AB SE-975 92 Luleå Sweden www.l iko.com

C op yr ig ht

L ik o A

B , 2

Ju ne

File details come from the government source that posted it.