36C25218B0808-00005000.docx

DOCX document 28 KB Posted

Attached to
Roofing System Replacement Federal contract opportunity
Solicitation number
36C25218B0808
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

36C25218B0808 00005 36C25218B0808 00005.docx

View the file

Other files for this federal contract opportunity

Other files attached to Roofing System Replacement, newest first.
File Type Posted
36C25218C0201-000.docx DOCX document
36C25218B0808-00005001.pdf PDF
36C25218B0808-00005002.docx DOCX document
36C25218B0808-00004003.docx DOCX document
36C25218B0808-00003000.docx DOCX document
36C25218B0808-00002000.docx DOCX document
36C25218B0808-00001000.docx DOCX document
36C25218B0808-005.docx DOCX document
36C25218B0808-006.docx DOCX document
36C25218B0808-004.docx DOCX document
36C25218B0808-000.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25218B0808 A00005

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2.

AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF

CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV.

11/2016) is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR

43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS

ENTERED INTO

PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14.

DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME

AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS

OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 00005 05-18-2018 578-18-2-6098-0231 A578-18-1022 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 3001 Green Bay Rd Bldg 1, Rm 329 North Chicago IL 60064-3048 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 3001 Green Bay Rd Bldg 1, Rm 329 North Chicago IL 60064-3048 To all Offerors/Bidders

36C25218B0808 04-16-2018

X x x x The purpose of this amendment is to as follows:

1. Provide Government responses to RFIs received from industry.

2. Attach Google Map aerial view of roof.

3. Attach Flashing Coping specification 0 77100.

END OF AMENDMENT.

COTRACTOR RFI QUESTIONS AND GOVERNMENT RESPONSES

Roofing System Replacement – Project #: A578-18-1022

1-Q: Work Hours: Can the Prime modify the hours of operation as long as it does not disturb the occupants? Please state the earliest and the latest hour we can work during a standard work week.

1-A: Hours of operation would be acceptable from sunrise until sunset; (6:00a.m.-7:00p.m. M-F)

2-Q: Please provide as built drawings that show the existing roof system construction.

2-A: As built drawings are unavailable at this time.

3-Q: Please provide project drawings and details.

3-A: Drawings are not available at this time. Please see attached Google Map aerial view of roof for reference.

4-Q: Please provide laydown space for project materials. Temporary construction fencing will need to be placed to secure the laydown space.

4-A: Limited fenced area is available for stocking material; no laydown space will require fencing.

5-Q: Please confirm that this project is NOT tax exempt.

5-A: This project IS tax exempt. The following verbiage is hereby incorporated into the solicitation:

The Illinois Administrative Code, 130.2075 allows construction contractors to be exempt from Retailers Occupation Tax and Use Tax within the State of Illinois when the materials are for Incorporation into real estate owned by Governmental bodies. For purposes of this authority, a Construction Contractor is defined as a General Contractor or a Subcontractor 86 Ill.Adm.Code 130.1940(a)(1). Materials, are defined as all of the tangible personal property, including fixtures, which enter into a structure or otherwise become incorporated into real estate 86 Ill.Adm.Code 130.1940(a)(5), but do not include tools, fuel, lumber for forms and other end use or consumption items which are not incorporated into the real property 86 Ill.Adm.Code 130.2075(d)(3).

‘Prospective offerors are notified that under 86 Ill.Adm.Code 130.2075, purchase within the State of Illinois to be incorporated into the real property of Jesse Brown VA Medical Center, Chicago, Illinois may be exempt from Illinois Retailers’ Occupation Tax and Use Tax. VA will furnish a Certificate to the successful awardee of this solicitation with all required information to be used within the State of Illinois. Prime contractors may furnish the certificate to its subcontractors for use on this project. All bids received in response to this solicitation are presumed to reflect any tax benefit that may be realized upon receipt of this certificate.

6-Q: What is the current thickness and composition of the roof at building 30. Current roof is sitting right below counter flashing. Does the VA want the new roof to be installed to match the thickness of the existing roof? Installing new roof to meet current energy code requirements may require the new roofing to go up and over the parapet wall and installation new metal coping. If we are installing new coping what are the specifications for the coping.

6-A: Hines Staff cored the roof over Bldg.30 and our findings are it is a bituminous gravel roof coating

7-Q: A portion of outer corridor E has a sloped area from a higher elevation roof attached to it. We will not be able to tie the new roof in to the bottom of the sloped section. Does the VA want us to include roofing this sloped section and installing a new expansion joint at the top in our lump sum pricing?

7-A: 2) Yes The VA would like to include sloped roof and any other associated tie in to existing roofs. SOW is hereby modified to include additional area over corridor at/or near E176 and to include incorporating additional roofing for the modified Manfred Section at the Northern most point of the Scope length for D&E Sections. Additional square footage would be increased by < 500 sq. ft.

8-Q: The solicitation states that we will be mechanically attaching the insulation. Are the decks under the various roofs in this solicitation wood or concrete? If they are concrete mechanically attaching will require hammer drilling in to concrete and using concrete pins. Can the insulation be installed using low rise foam adhesive instead of mechanically attaching the insulation?

8-A: Insulation may be adhered to concrete roofs using adhesives as recommended by the insulation manufactures.

9-Q: The solicitation states on page 1 that the job magnitude is between $100,000 - $150,000. On page 12 in the description of work it states cost range is $100,000 to $250,000. Which is the government estimate for this job?

9-A: Job magnitude is $100,000-$150,000.

10-Q: The specifications mention walk pads (Page 07 54 23-7 section 2.6) and Roof pavers (Page 07 54 23-7 section 2.7). What is the quantity and location of the pavers and walk pads?

10-A: Roof pavers will not be required, walk mat(s) will be necessary on building 220, 75’ in length

See attached document: Google Map - Aerial Roof.

See attached document: 077100-FLASHING COPING.