36C25218B0307-002.pdf

PDF 10 MB Posted

Attached to
Replace Heat Exchangers 3 & 4 Construction 585-16-107 Federal contract opportunity
Solicitation number
36C25218B0307
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

36C25218B0307 P01 - Drawings 120117.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Replace Heat Exchangers 3 & 4 Construction 585-16-107, newest first.
File Type Posted
36C25218C0072-000.docx DOCX document
36C25218B0307-00002003.pdf PDF
36C25218B0307-00002001.pdf PDF
36C25218B0307-00002002.pdf PDF
36C25218B0307-00002000.docx DOCX document
36C25218B0307-00001001.pdf PDF
36C25218B0307-00001002.pdf PDF
36C25218B0307-00001000.docx DOCX document
36C25218B0307-003.pdf PDF
36C25218B0307-001.docx DOCX document
36C25218B0307-000.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Director

Associate Director

Chief of Staff

Associate Director for N&PCS

Infection Control Nurse

Industrial Hygienist

Chief of Engineering

Chief of Police

Patient Safety

A.F.G.E.

Safety

M&R

CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

Office of Construction and Facilities Management

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

1-GI-1

COVER SHEET REPLACE HEAT

EXCHANGERS 3 & 4

BJT APS10/13/2017

585-16-107

Iron Mountain , MI.

NORTH

VA PROJECT NUMBER 585-16-107

OSCAR G. JOHNSON VA MEDICAL CENTER

325 E. "H" STREET, IRON MOUNTAIN, MICHIGAN 49801

REPLACE HEAT EXCHANGERS 3 & 4

SITE MAP

PROJECT LOCATION

AREA MAP

NORTH

PROJECT VICINITY

SHEET INDEX

NUMBER NAME

1-GI-1 COVER SHEET

M-001 SYMBOLS & ABBREVIATIONS

MD-100 MECHANICAL STEAM PIPING DEMOLITION PLAN -

SUB-BASEMENT

MD-101 MECHANICAL PIPING DEMOLITION PLAN -

SUB-BASEMENT

MD-102 MECHANICAL PIPING DEMOLITION PLAN - BASEMENT

MD-103 MECHANICAL PIPING DEMOLITION PLAN - FIRST

FLOOR

MD-104 MECHANICAL PIPING DEMOLITION PLAN - SECOND

FLOOR

MP-100 MECHANICAL STEAM PIPING PLAN - SUB-BASEMENT

MP-101 MECHANICAL PIPING PLAN - SUB-BASEMENT

MP-102 MECHANICAL PIPING PLAN - BASEMENT

MP-103 MECHANICAL PIPING PLAN - FIRST FLOOR

MP-301 MECHANICAL SECTIONS

M-401 MECHANICAL FLOW DIAGRAM

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

M-602 MECHANICAL SCHEDULES

M-701 MECHANICAL CONTROLS DIAGRAMS

E-001 ELECTRICAL GENERAL NOTES, SYMBOLS, AND

ABBREVIATIONS

ED-100 ELECTRICAL DEMOLITION PLAN

E-100 ELECTRICAL PLAN

No. Revisions Date

1 100% CONSTRUCTION

DOCUMENTS

10/13/2017

PLUG VALVE

PRESSURE REDUCING VALVE (PRV)

HOSE CONNECTOR

STRAINER WITH VALVED DRAIN AND QUICK-COUPLE

COLD WATER (CITY WATER)

HOT WATER

TEMPORARY PIPING

THERMOSTAT

THERMOSTATIC STEAM TRAP (T)

CLOSED-FLOAT-THERMOSTATIC STEAM TRAP ASSEMBLY (T)

INVERTED BUCKET STEAM TRAP ASSEMBLY (T)

QUICK-COUPLE HOSE CONNECTOR

PRESSURE GAGE (WITH SIPHON ON STEAM SERVICE)

T

H4

H7

A

ABBREVIATIONSVALVE SYMBOLS

BALL VALVE

GATE VALVE WITH 3/4" HOSE ADAPTER

CHECK VALVE

ANGLE GLOBE VALVE

BUTTERFLY VALVE

MODULATING CONTROL VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

AUTOMATIC BALANCING CONTROL VALVE

PRESSURE SAFETY VALVE

GATE VALVE - THREADED/FLANGED

GLOBE VALVE - THREADED/FLANGED

PRESSURE REGULATING VALVE

THREE-WAY TWO POSITION CONTROL VALVE

WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)

FLEXIBLE CONNECTION

WATER BALANCE DEVICE

MODULATING CONTROL BUTTERFLY VALVE

DRAWING SYMBOLS

26-SF 3

26-TU-I-I

DETAIL NUMBER

DRAWING NUMBER WHERE SHOWN

SECTION LETTER

TYPICAL UNIT NO.

BUILDING NO. WHERE EQUIPMENT IS LOCATED.

SUPPLY FAN NO. 3 IN BUILDING NO. 26

EQUIPMENT ABBREVIATION (SUPPLY FAN)

ITEM NUMBER (TERMINAL UNIT NO. 1)

ITEM (TERMINAL UNIT SHOWN)

SERVED BY AIR HANDLER UNIT NO. 1

DRAWING NUMBER WHERE DRAWN

BUILDING NO. WHERE EQUIPMENT IS LOCATED

PIPING SYMBOLS

HIGH PRESSURE STEAM CONDENSATE RETURN

HIGH PRESSURE STEAM (60 PSIG AND ABOVE)

HOT WATER HEATING SUPPLY

CONDENSATE PUMP DISCHARGE

LOW PRESSURE STEAM CONDENSATE RETURN

LOW PRESSURE STEAM (15 PSIG AND BELOW)

MEDIUM PRESSURE STEAM CONDENSATE RETURN

MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)

GLYCOL-WATER RETURN

GLYCOL-WATER SUPPLY

CHILLED WATER SUPPLY

CHILLED WATER RETURN

DRAIN LINE

MAKE-UP WATER

HOT WATER HEATING RETURN

HPS HPS HPS

HPR HPR HPR

MPS MPS MPS

MPR MPR MPR

LPS LPS LPS

LPR LPR LPR

PC PC PC

HWS HWS HWS

HWR HWR HWR

GWS GWS GWS

GWR GWR GWR

CHR CHR CHR

CHS CHS CHS

MW MW MW

D D D

X X X EXISTING PIPE TO BE REMOVED

LOW PRESSURE GRAVITY CONDENSATE RETURN

MEDIUM PRESSURE GRAVITY CONDENSATE RETURN

HIGH PRESSURE GRAVITY CONDENSATE RETURN

LPR

MPR

HPR

LPR

MPR

HPR

LPR

MPR

HPR

HW

CW CWCW

HWHW

GENERAL SYMBOLS

AV

MV

TT TEMPERATURE TRANSMITTER

MT MOISTURE (HUMIDITY) TRANSMITTER

PT PRESSURE TRANSMITTER

TT TEMPERATURE TRANSMITTER, AVERAGING ELEMENT

dPT DIFFERENTIAL PRESSURE TRANSMITTER

TSL TEMPERATURE SWITCH, LOW (FREEZESTAT)

HS HAND SWITCH (HAND-OFF-AUTO SWITCH)

M ELECTRIC OPERATED CONTROL DAMPER/OR VALVE

ZC VALVE OR DAMPER POSITION CONTROLLER

LTCP LOCAL TEMPERATURE CONTROL PANEL

HVAC HVAC CONTROL PANEL

ECC

INTEGRATE CONTROL POINT ON REMOTE GRAPHICS

WORKSTATION AT ENERGY CONTROL CENTER

TC TEMPERATURE CONTROLLER. SEE SEQUENCE OF OPERATION

ASD ADJUSTABLE SPEED DRIVE

PC PRESSURE CONTROLLER. SEE SEQUENCE OF OPERATION

SC SPEED CONTROLLER. SEE SEQUENCE OF OPERATION

FC FLOW CONTROLLER. SEE SEQUENCE OF OPERATION

PSH PRESSURE SWITCH HIGH

MOTOR STARTER

FS FLOW SWITCH

LENGTH IN DUCT WHEN SPACE PERMITS.)

A

TEMPERATURE SENSING ELEMENT FOR

TRANSMITTING TEMPERATURE TO EMCS

(PROVIDE 12 INCHES [200mm] MINIMUM

SENSOR WITH AVERAGING ELEMENT TO TRANSMIT

TEMPERATURE TO EMCS

CONTROL SYMBOLS

LIMIT OF DEMOLITION

ANCHOR

REDUCER OR INCREASER

DIRECTION OF FLOW

SIDE CONNECTION

ECCENTRIC REDUCER

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

DIRECTION OF PIPE PITCH (DOWN)

UNION

RISE OR DROP IN PIPE

CAPPED OUTLET

AND EXISTING WORK

POINT OF CONNECTION BETWEEN NEW

PRESSURE GAGE

THERMOMETER

FLOAT & THERMOSTATIC TRAP SET INCLUDING

PIPING ACCESSORIES

PIPING ACCESSORIES

INVERTED BUCKET TRAP SET INCLUDING

PIPE UP

PIPE DOWN

TEST PLUG (PRESSURE/TEMPERATURE)

AUTOMATIC AIR VENT

MANUAL AIR VENT

THERMOSTATIC TRAP SET INCLUDING

PIPING ACCESSORIES

GENERAL NOTES

1. ALL WORK SHALL BE IN COMPLIANCE WITH THE MOST STRINGENT OF FEDERAL, STATE AND LOCAL CODES, HOSPITAL

POLICY, AND THE MARCH 2011 HVAC DESIGN MANUAL FOR NEW, REPLACEMENT, ADDITION, AND RENOVATION OF

EXISTING VA FACILITIES.

2. INSTALL ALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.

3. CONTRACTOR SHALL REMOVE ALL ABANDONED PIPES AND DUCTWORK BACK TO MAIN OR SOURCE. REMOVE ALL

HANGERS AND SUPPORTS ASSOCIATED WITH ABANDONED SYSTEM.

4. EXISTING UTILITIES TO BE ABANDONED SHALL BE PROPERLY DISCONNECTED AND CAPPED AS REQUIRED BACK TO

SOURCE.

5. THESE DRAWINGS ARE DIAGRAMMATIC AND SHALL NOT BE SCALED. ADDITIONAL DATA SHALL BE FROM THE

ENGINEER THROUGH WRITTEN CLARIFICATION ONLY. VERIFY ALL EXISTING CONDITIONS, ELEVATIONS, AND

DIMENSIONS PRIOR TO PROCEEDING WITH ANY PORTION OF WORK. THE CONTRACTOR SHALL PROVIDE ALL OFFSETS

AND TRANSITIONS REQUIRED TO MEET DESIGN INTENT PER EXISTING CONDITIONS. A PRE-BID SITE SURVEY IS

RECOMMENDED. NO ADDITIONAL CHARGES, AT OWNERS EXPENSE, FOR REVISIONS DUE TO EXISTING SITE

CONDITIONS.

6. THE CONTRACTOR SHALL PERFORM WORK IN A SKILLED AND PROFESSIONAL MANNER.

7. ALL CONTRACTORS ARE RESPONSIBLE TO FIELD COORDINATE WORK SCHEDULE AND VERIFY AREA SHUTDOWN WITH

THE OWNER REPRESENTATIVE (COR) PRIOR TO CONSTRUCTION. PROVIDE A MINIMUM OF 2 WEEKS ADVANCED

NOTIFICATION. REFER TO GENERAL CONDITIONS 10 00 00 FOR SPECIFIC CONSTRUCTION PHASING REQUIREMENTS.

8. THE CONTRACTOR SHALL WORK AND COORDINATE WITH THE OTHER TRADES.

9. ALL EQUIPMENT SHALL BE NEW AND IN UNDAMAGED CONDITION. ANY EQUIPMENT FOUND DEFECTIVE SHALL BE

IMMEDIATELY REMOVED FROM THE PROJECT.

10. ALL EQUIPMENT SHALL BE INSTALLED IN A MANOR TO ALLOW SERVICE. SEE SPECIFICATIONS.

11. MECHANICAL CONTRACTOR TO REPAIR ANY DAMAGE DONE TO THE FIRE PROOFING WHILE INSTALLING THE

MECHANICAL TRADES. SEAL ALL PENETRATIONS THROUGH RATED STRUCTURES WITH UL LISTED FIRE SEAL

DESIGNED FOR THE SPECIFIED APPLICATION.

12. CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES TO PROTECT THE PUBLIC AND ADJACENT PROPERTIES

FROM DAMAGE THROUGHOUT CONSTRUCTION.

13. CONTRACTOR SHALL GUARANTEE ALL WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE (1) YEAR FROM THE

DATE OF SUBSTANTIAL COMPLETION OR AS OTHERWISE REQUIRED IN THE SPECIFICATIONS.

14. CONTRACTOR RESPONSIBLE FOR REMOVAL OF ALL WALL AND CEILING MATERIAL NECESSARY TO COMPLETE PIPING

DEMOLITION AND INSTALLATION. WALL AND CEILING MATERIALS SHALL BE REPLACED TO LIKE NEW CONDITIONS WITH

MATERIALS AND COLORS MATCHING SURROUNDING CONSTRUCTION.

CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

Office of Construction and Facilities Management

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

M-001

SYMBOLS & ABBREVIATIONS REPLACE HEAT

EXCHANGERS 3 & 4

BJT APS10/13/2017

585-16-107

Iron Mountain , MI.

AAV AUTOMATIC AIR VENT

AFF ABOVE FINISHED FLOOR

AS AIR SEPARATOR

BFP BACKFLOW PREVENTER

BHP BRAKE HORSEPOWER

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER

HOUR

C CENTIGRADE (CELSIUS)

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

COMP COMPRESSOR UNIT

CP CONDENSATE PUMP

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

Db DRY-BULB TEMPERATURE

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DIA DIAMETER

DP DEW POINT TEMPERATURE

DPS DIFFERENTIAL PRESSURE

SENSOR

ECC ENGINEERING CONTROL

CENTER

EMD END OF MAIN DRIP (STEAM)

ET EXPANSION TANK

EWT ENTERING WATER

TEMPERATURE

EX. EXISTING

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT

FPS FEET PER SECOND

FS FLOW SWITCH

FT FEET

FT-LB FOOT-POUND

GA GAUGE

GPD GALLONS PER DAY

GPM GALLONS PER MINUTE

HC HEATING COIL

HD HEAD

HOA HAND/OFF/AUTOMATIC

HP HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN

(STEAM CONDENSATE)

HPS HIGH PRESSURE SUPPLY

(STEAM)

HRP HYDRONIC RADIANT (CEILING)

PANEL

HSTAT HUMIDISTAT

HW HOT WATER

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HX HEAT EXCHANGER

HZ HERTZ

I/O INPUT/OUTPUT

IBT INVERTED BUCKET TRAP

ID INSIDE DIAMETER

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

KG KILOGRAM

KPA KILOPASCAL

KW KILOWATT

KWH KILOWATT HOUR

L/s LITERS PER SECOND

LAT LEAVING AIR TEMPERATURE

LB/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LPR LOW PRESSURE RETURN

(STEAM CONDENSATE)

LPS LOW PRESSURE STEAM

LWT LEAVING WATER

TEMPERATURE

M METER

MAV MANUAL AIR VENT

MAX MAXIMUM

MBH 1000 BTUH

MER MECHANICAL EQUIPMENT

ROOM

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NO NORMALLY OPEN

NOM NOMINAL

NTS NOT TO SCALE

OD OUTSIDE DIAMETER

P PUMP

PA PASCAL

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT

(FEET)

PD PRESSURE DROP

PG PRESSURE GAGE

PGW PROPYLENE GLYCOL-WATER

(SOLUTION)

PPM PARTS PER MILLION

PRS PRESSURE REGULATING

(VALVE) STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH –

ABSOLUTE

PSIG POUNDS PER SQUARE INCH –

GAGE

PSV PRESSURE SAFETY VALVE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RPM REVOLUTIONS PER MINUTE

SI SQUARE INCHES

SP STATIC PRESSURE

SQF SQUARE FOOT (FEET)

SV STEAM PRESSURE REDUCING

VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TP TRAP

TSTAT THERMOSTAT

V VALVE

VAV VARIABLE AIR VOLUME

VFD VARIABLE FREQUENCY DRIVE

Wb WET-BULB (TEMPERATURE)

WF WATER FILTER

WFMD WATER FLOW MEASURING

DEVICE

WG WATER GAGE

WM WATER METER

WPD WATER PRESSURE DROP

YR YEAR

No. Revisions Date

1 100% CONSTRUCTION

DOCUMENTS

FD

VAULT

TRANSFORMER

S002

ROOM

MECHANICAL

S001

UP

FD

REMOVE HEAT EXCHANGER (HX-10) AND ALL ASSOCIATED STEAM

AND CONDENSATE PIPING BACK TO MAIN.

REMOVE STEAM PIPING AS INDICATED.

REMOVE CONDENSATE PIPING AS INDICATED.

REMOVE 2" LPS FROM HX-3 AND HX-4 AND CAP.

REMOVE 1 1/4" CONDENSATE FROM HX-3 AND HX-4 AND CAP AT

MAIN.

REMOVE CONDENSATE PIPING AND VALVE. CAP AT MAIN.

KEYED NOTES

1. COORDINATE THE INSTALLATION OF HX-3 AND HX-4 WITH DEMOLITION OF

HX-10. HX-10 TO REMAIN IN OPERATION UNTIL CROSSOVER IS COMPLETE.

UPON COMPLETION OF CROSSOVER ALL DEMOLITION OF HX-10 WILL BE

COMPLETED. REFER TO GENERAL CONDITIONS 01 00 00 FOR SPECIFIC

CONSTRUCTION PHASING REQUIREMENTS.

GENERAL NOTES

EXISTING

CHWP-6

CAP

2" LPS

EXISTING HX-10

L P

C LPS

PUMPED

CONDENSATE

8" HPS HEADER12" LPS HEADER

8" MPS HEADER

ZONE CONTROL

VALVES

L P

S

L P

S

L P

S

L P

S

L P

S

L P

S

MPS

HPS HPS

HPS

4" VACUUM PUMP DISCHARGE

4" CONDENSATE

LPS

LPS

LPS

LPS

LPC

EXISTING STEAM

GENERATOR

L P

C

L P

S L P

S

HPS

H P

S

LPS

LPS

LPC

LPC

H P

S

1 1/2" LPS

L P

C

LPC

3 2

MD-100

MD-100

MD-100

6" LPC

1 3

LPC

LPC

EXISTING

HX-10 PUMPS

EXISTING HX-10

AIR SEPARATOR

EXISTING HX-10

EXPANSION TANK

L P

S

H P

S

H P

S

EXISTING PUMPED

CONDENSATE

LPS

EXISTING

STEAM

TRAP

EXISTING

STEAM TRAP

MD-100

EXISTING HX-10

AIR SEPARATOR

EXISTING

HX-10 PUMP

EXISTING

HX-10 PUMP

EXISTING HX-10

EXPANSION TANK

EXISTING

STEAM TRAP

EXISTING 6"

LPC HEADER

LPC

LPC

LPC

LPC

CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

Office of Construction and Facilities Management

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

MD-100

MECHANICAL STEAM PIPING

DEMOLITION PLAN - SUB-BASEMENT

REPLACE HEAT

EXCHANGERS 3 & 4

BJT APS10/13/2017

585-16-107

Iron Mountain , MI.

1/4" = 1'-0"

MECHANICAL STEAM PIPING DEMOLITION PLAN - SUB-BASEMENT1

NORTH

NOT TO SCALE

EXISTING LPS VALVE - HX-102

1/2" = 1'-0"

MECHANICAL STEAM PIPING DEMOLITION SECTION 13 1/2" = 1'-0"

MECHANICAL STEAM PIPING DEMOLITION SECTION 24

No. Revisions Date

1 100% CONSTRUCTION

DOCUMENTS

FD FD

REMOVE HEAT EXCHANGER (HX-10) AND ALL ASSOCIATED HOT

WATER PIPING.

REMOVE EXISTING HWS/R MAINS AND RISER AS INDICATED ON

PLAN.

REMOVE BOTH INLINE PUMPS AND ALL ASSOCIATED CONTROLS

AS INDICATED.

REMOVE EXISTING AIR SEPARATOR AND EXPANSION TANK AS

INDICATED.

REMOVE EXISTING GWS/R PIPING AS INDICATED.

REMOVE EXISTING PRESSURE REDUCING VALVE (PRV) AS

INDICATED.

REMOVE NON-POTABLE SOFT WATER PIPING AS INDICATED.

REMOVE EXISTING BACKFLOW PREVENTER (BFP) AS INDICATED.

KEYED NOTES

MD-101

EXISTING

EXPANSION

TANK

EXISTING

AIR SEPARATOR

6" CHWR

6" CHWS

6" C

H W

R

6" C

H W

S

6" C

H W

S

4" C

H W

R

6" C

H W

R

6" C

H W

S

6" C

H W

R

4" CHWS

4" C

H W

S

6" C

H W

R

6" C

H W

S

6" C

H W

R

6" C

H W

S

6" C

H W

R

6" C

H W

R

6" C

H W

R

C H

W S

6" CHWS

6" CHWS

6" CHWS

10" CHWR

6" C

H W

R

C H

W S

C H

W R

10" CHWR

C H

W S

6" CHWS

6" CHWS

6" CHWS

6" CHWS

8" CHWS

6" CHWS

6" CHWS

6" CHWS

6" CHWS

6" CHWS

6" CHWS

6" C

H W

S

6" C

H W

S

6" C

H W

S

6" C

H W

S

6" CHWS

6" CHWS

EXISTING

FILTER

2" CHWS

2" CHWS

8" CHWS

EXISTING

CHWP-3

EXISTING

CHWP-5

EXISTING

CHWP-6

EXISTING

PHW-2

EXISTING

PHW-1

EXISTING

PCHW-2

EXISTING

PCHW-1

C H

W R

10" CHWR

8" CHWS

8" C

H W

S

3" EXISTING

HWS/R PIPING UP

TO BASEMENT

EXISTING

CHWP-4

3 3

3" HWS/R

MD-101

EXISTING

SNOWMELT

PIPING

1" GWS/R

EXISTING SNOWMELT

CONTROL PANEL

BFP

PRV CAP AT MAIN

MD-101

1 3

3 3

67 7

1. COORDINATE THE INSTALLATION OF HX-3 AND HX-4 WITH DEMOLITION OF

HX-10. HX-10 TO REMAIN IN OPERATION UNTIL CROSSOVER IS COMPLETE.

UPON COMPLETION OF CROSSOVER ALL DEMOLITION OF HX-10 WILL BE

COMPLETED.

2. MECHANICAL CONTRACTOR TO REMOVE ALL HX-10 FRAMING AND

SUPPORTS.

3. REMOVE EXISTING PIPE HANGERS AND SUPPORTS FOR INSTALLATION OF

NEW HWS/R PIPING.

GENERAL NOTES

CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

Office of Construction and Facilities Management

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

MD-101

MECHANICAL PIPING DEMOLITION PLAN

- SUB-BASEMENT

REPLACE HEAT

EXCHANGERS 3 & 4

BJT APS10/13/2017

585-16-107

Iron Mountain , MI.

1/4" = 1'-0"

MECHANICAL PIPING DEMOLITION PLAN - SUB-BASEMENT1

NOT TO SCALE

HX-102

NORTH

1/2" = 1'-0"

MECHANICAL PIPING DEMOLITION SECTION 13

1/2" = 1'-0"

MECHANICAL PIPING DEMOLITION SECTION 24

No. Revisions Date

1 100% CONSTRUCTION

DOCUMENTS

CR CR

PP

KP

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

MAPES PANELS

IN WINDOWS

STCK BRKOUT

& RECEIVING

B287

SPD

OFFICE

B291A

PROGRAM

ASSISTANTS

B107B

WAN

ROOM

B105

TELEPHONE

EQUIPMENT

B103

HOLMAN

ROOM

B201

MECH. RM.

B202

CHIEF

LOGISTICS

B203

WOMENS

TOILET

B204

MENS

TOILET

B205

UTILITY

B186C

VESTIBULE

B107 CORRIDOR

B299A-1

PIPE SHAFT

B284

EMERGENCY

ELECT. RM.

B267

ELECTRICAL

ROOM

B269

OXYGEN

STORAGE

B268

FOOD BANK

COOLER 2

B186Q

RETHERM

COOLER 1

B186R

NESS

COOLER 3

B186P

CANTEEN

COOLER 4

B186N

CANTEEN

FREEZER 2

B186M

NESS

FREEZER 1

B186L

MEDICAL

WASTE

B186E

VESTIBULE

B276

RECYCLING &

SHREDDER RM.

B278

ELECTRICAL

EQUIP. RM.

B278A

CORRIDOR

B299D-1

PRI. SUPPLY/

SURGERY CASE CART

B291

WAREHOUSE

STORAGE

B274

ASST CHIEF

LOGISTICS

B298B

NON-EXP

EQUIP.

B298A

CORRIDOR

B299B-1

DECONTAMINATION

B295

MECH.

ACCESS

B295A

BULK MEDICAL

STORAGE

B231D

MECH.

ROOM

B231A

STORAGE

LOGISTICS

B231

MECH.

ROOM

B231B

ETO

B291C

PREPARATION

PACKAGING

B291B

MECH.

ACCESS

B227

LOCKER

B297

DATA &

PHONE

B296

WAREHOUSE

STORAGE

B298

ELEVATOR

EQUIPMENT

B224B

ELECT

ROOM

B224C

ELEVATOR

LOBBY

B224

LAUNDRY

CHUTE

B230

CORRIDOR

B299C-1

MECHANICAL

ROOM

B224A

LOUNGE

B226

TOILET

B226B

LOCKER

B226A

SHOWER

B226C

SHAFT MECH SHAFT

4" R

A

IS

E D

C O

N C

S

LA

B

E

LE

C T

R

IC

T R

A N

S F

O R

M E

R S

O N

E Q

U

IP

M E

N T

E

LE

C T

R

IC

A L

ACCESS

C H

A S

E

P

IP

E

BLAST CHILLER

IN-FILLED WINDOWS

88" TALL WALL

TA

TA

TA

IN

-F

IL

L

E D

W

IN

D O

W S

ELEVATOR

PASSENGER

STAIR 3

UP

UP

DN

STAIR 2ELEVATOR

SERVICE

ELEVATOR

PASSENGER

ELEVATOR

PASSENGER

FABRIC DOOR

COILING OH

CEILING

SLOPED

LIFT

COILING OH DOORCOILING OH DOORCOILING OH DOOR

FD

AHU

HYDRAULIC POWER UNITS

FD

R A

M P

TA

LOCKERS REMOVED

" HIGH GLAZED CURB,2

TA

EQUIP

FIRE

COILING OH DOOR

EQUIP

FIRE

EQUIP

FIRE

SCALE

FLOOR

PIPE CHASE

B107D

AMBIENT DISPOSABLE

& NOURISHMENT STORAGE

B186G

STAFF

WORK ROOM

B186D

DIETETICS

OFFICE

B186F

FOOD SERVICE

MANAGER'S OFFICE

B186E

ROUGH

PREPARATION

B186H

CART WASH

1"

TO FIRST FLOOR

2" HWS/R UP

SUB-BASEMENT

HWS/R DOWN TO

UP (OLD HX-5)

1 1/2" HWS/R

1"

1"

T

T

T

T

T

T

T

T

T

T

H

T

H

S

SSS

T TT T

T

DP-3

DP-3

T

T

T

HTT

H

T

DP-2

T

T

T

HTT

H

H

T

T

T

T

T

T

1 1/2" VENT

EF-RB226C

SAV-RB297

F C

-R B

SAV-RB291

SAV-RB291A

SAV-RB287

AHU-21

HX-13A

HX-13B

AS-1

P-15

P-16ET-1

2"

VAV-B185

VAV-B186A

VAV-B186E

VAV-B186G

FC-9

SAV-RB291B

AHU-9

ROOF(TYP.)

CONDENSORS ON

1/8" SUCTION UP TO

1/2" DISCHARGE & 1

HX-4

HX-3

SAV-RB291S

1 1/2" CHWS/R

3"CHWS/R

3" CHWS/R UP

TO SURGERY

1 1/2" HWS/R

1 1/2" COND.

1" COND.

1" COND.

1" COND.

3/4"

2 1/2"

CHWS/R DN

THRU FLOOR

1" HWS/R UP THRU FLOOR, SEE

MP101 FOR CONTINUATION

4" HWS/R UP &

DN THRU FLOORS (BID

ALTERNATE #1)

2 1/2" CHWS/R

1" HWS/R

DP-4

2 1/2" CHWS/R UP

THRU FLOOR TO

AHU-1, SEE MP101

FOR CONSTRUCTION

1 1/2" CHWS/R

3"

1/2" PURGE

PORTS

1/2" PURGE PORTS

1 1/4"

1 1/2"

3/4"

3/4"

3/4"

1 1/2"

1 1/2"

3/4"

3" CHWS/R

UP TO

AHU-30

1 1/4"

3/4"

3/4"

1"

3/4"

1 1/2" VENT

1 1/2" VENT

1 1/2" VENT

3"VTR

VENT AG

4" SAN UP

2 1/2"

3/4"

3/4"

3/4"

3/4"

1 1/4"

3/4"

3/4" 3/4"

1" HWS/HWR

DN TO TUNNEL

1"

3/4"

UP TO FIRST FLOOR

2 1/2" HWS/R

MED. PRESS.

STEAM RISER

10" CHWS/R

REFRIGERATION PIPING

DOWN TO BASEMENT

4"

H

3/4"

2"HWS&R

1"

SAV-7

1 1/2"

3"HWR/S

3"HWR/S

2"HWR/S

3/4"

4" CHWS&R

H

2"

1"

1 1/4"

1 1/8"1/2"

1 1/8" 1/2"

3/8"

7/8" 3/8" 7/8"

7/8"

3/8"

7/8"

3/8"

2"

3"

4" CHWS/R

2"

2 1/2" CHWS/R

4"

2"1 1/2"

3/4"

3/4"

1 1/2"

2 1/2"

1" 1"

VAV-RB296

VAV-RB299B

VAV-RB226A

VAV-RB226B

VAV-RB226C

VAV-RB226

VAV-RB231

VAV-RB231A

VAV-RB274

AHU-2

AC-1

AC-2

AC-3

VAV-B186G

VAV-B186H

VAV-B186E

VAV-KH3

EF-RB298

CRAC-RB105

H-RB105

CRAC-RB103

H-RB103

FCU-RB107B

ERV-RB103

UH-B107D

VAV-RB201A VAV-RB201B

VAV-RB201C

VAV-RB299A

VAV-RB202

AHU-28

SAV-RB291C

VAV-RB186E

P

P

P

P

P

EXISTING SNOWMELT PIPING

CONTINUTED IN SUB-BASEMENT

REMOVE HEAT EXCHANGERS (HX-3 & HX-4) AS INDICATED ON PLAN.

REMOVE ALL HWS/R PIPING AS INDICATED ON PLAN.

REMOVE 2" LPS PIPING AND CONDENSATE DOWN TO STEAM

TUNNEL. SEE 1/MD-100 FOR CONTINUATION.

REMOVE HWS/R PIPING UP TO TERMINAL UNIT VALVES AND

ACCESSORIES. RECONFIGURE PIPING CONNECTIONS TO TERMINAL

BASED ON NEW HWS/R CONNECTIONS SHOWN ON SHEET MP-102.

REMOVE HWS/R PIPING IN RISER FROM MECHANICAL ROOM 2180 TO

BASEMENT.

REMOVE INLINE PUMPS AND ASSOCIATED CONTROLS AS INDICATED

ON PLAN.

KEYED NOTES

1. COORDINATE THE INSTALLATION OF HX-3 AND HX-4 WITH DEMOLITION OF

HX-10. HX-10 TO REMAIN IN OPERATION UNTIL CROSSOVER IS COMPLETE.

UPON COMPLETION OF CROSSOVER ALL DEMOLITION OF HX-10 WILL BE

COMPLETED.

2. MECHANICAL CONTRACTOR TO REMOVE ALL HX-10 FRAMING AND

SUPPORTS.

3. REMOVE EXISTING PIPE HANGERS AND SUPPORTS FOR INSTALLATION OF

NEW HWS/R PIPING.

GENERAL NOTES

CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

Office of Construction and Facilities Management

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

MD-102

MECHANICAL PIPING DEMOLITION PLAN

- BASEMENT

REPLACE HEAT

EXCHANGERS 3 & 4

BJT APS10/13/2017

585-16-107

Iron Mountain , MI.

1/8" = 1'-0"

MECHANICAL PIPING DEMOLITION PLAN - BASEMENT1

NOT TO SCALE

HX-3 AND HX-42

NORTH

HX-4

HX-3

No. Revisions Date

1 100% CONSTRUCTION

DOCUMENTS

D-4 D-5

SERVICE

ELEVATOR PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

30 31

A

C

G

H

J

K

L

M

N

O

P

R

S

T

16 19 20 30 31

Q

B

D

RS

8 7 4 3 2 1

12356

UP

DN

DNUP

UP

DN

HALFWALL

VOLUNTEER

AREA

UP

CARPET

CARPET

CARPET

TILE

TILE

TILE

MECH SHAFT

FD

FE FE

6" RAISED

ALTAR

FIRE

EQUIP

T

S

S

SS

S

S

T

S

T

S

S

CO2

S S

S

S

S

S

S

S

S

S

S

S

T

CDW - HEATING

CDW - COOLING

4" HWS/R UP & DN

TREATMENT

SOILED

MEDICATION

DECONTAMINATION

AOD OFFICE

MRI VESTIBULE

TRIAGE

CHANGING

ROOM

1304C

EXAM

SECURE

TREATMENT

TREATMENT

WAITING

CORRIDOR

C1-6

P. TLT.

TREATMENT

MRI

VESTIBULE

1304A

STAIR

1300C

VESTIBULE

1300A

VESTIBULE

1300B

CHANGING

ROOM

1304B

PYXIS

ALCOVE

CORRIDOR

C1-6

NURSE

WORKROOM

STAFF

TOILET

DIABETES

DIABETES

HOUSEKEEPING

EXAM

WOMEN'S TLT.

MEN'S TLT.

FIRE ALARM

& SECURITY

EXAM

DIETICIAN

DIETICIAN

MEDICATION

EXAM

BLOOD DRAW/

EKG

P. TLT.

1267B

SOILED UTILITY

1267A

EXAM

NURSE

WORKROOM

EXAM

ALCOVE

WOUND CARE

TREATMENT

P. TLT.

EXAM

EXAM

EXAM

EXAM

EXAM

OFFICE

NURSE

WORKROOM

ANTE

1312A

TREATMENT/

ISOLATION

ELEVATOR

EQUIPMENT

TLT.

1312B

WAITING

WC STORAGE

BREAK/

LOCKERS

STAFF TLT.

1340A

EXAM

EXAM

CLEAN SUPPLY

EXAM

EXAM

EXAM

EXAM

EXAM

P. TLT.

STERILE

SUPPLY

OFFICE

EXAM

NURSE

WORKROOM

1333 DICTATION

NURSE STATION

EQUIPMENT

1315CLERK

SCALE ALCOVE

OFFICE

SCALE ALCOVE

WAITING

ELECTRICAL

ELEVATOR

LOBBY

CLERK

COMPUTER

ALCOVE

1300A

CORRIDOR

C1-8

CORRIDOR

C1-7

CORRIDOR

C1-10

CORRIDOR

C1-1

CORRIDOR

C1-2

CORRIDOR

C1-3

CORRIDOR

C1-5

CORRIDOR

C1-4

1" HWS/R DN

THRU FLOOR,

SEE MP002 FOR

CONTINUATION

SEE MP103 FOR

CONTINUATION

2 1/2" CHWR

2 1/2" CHWS

2 1/2" CHWR

T

T

T

T T TT

T

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T TTTTT

T

T

T

T

T

T

T

T

T

T

T T

T

T

T

12.8

GPM

2" HWR/S DN

1" HWS/R UP

TO FLOOR ABOVE

2" HWS/R UP &

1 1/2" DN (OLD HX-5)

1 1/4" 1 1/4"

2"

3/4"

1 1/4"

1"

3/4"

3/4"

2"

1 1/2"

3/4" HWS & HWR

2 1/2" HWS & HWR

DN TO BASEMENT

3/4" HWS/HWR

1 1/4"

2"

1 1/2"

1 1/2"

1 1/4"

2"

2"

1 1/4"

2 1/2"

1" HWS/R

1/2" HWS/R

1/2" HWS/R

1/2" HWS/R

1" HWS/R

3/4" HWS/R

1/2" HWS/R

1" HWS/R

3/4" HWS/R

1" HWS/R

3/4" HWS/R

1/2" HWS/R

1" HWS/R

3/4" HWS/R

1/2" HWS/R

2 1/2" CWR/S

10" CHWS/R UP &

DOWN

3/4"HS & HR

DOWN TO

FT-1 & FT-2.

3"GHS/GHR

3"CHS/R

UP FROM

BELOW

3" GHS/GHR

UP & DOWN

2 1/2"GHS/GHR

1"

3/4" COND

3" CHWS/R DN

3" CHWS/R

VAV-R1303A

VAV-R1303

REFRIGERATION

LINES UP TO

ROOF

CRE-2

GEV-R1313

2"

1 1/2" 2"

VAV-R1300C

VAV-R1300B

VAV-R1300D

VAV-R1300A

VAV-R1392

VAV-R1390

VAV-R1379

VAV-R1333

VAV-R1378

VAV-R1399

VAV-R1359

VAV-R1385

VAV-R1355

VAV-R1398

VAV-R1382

VAV-R1384

VAV-R1332

VAV-R1345

VAV-R1330

VAV-R1347

1 1/4"

2" VAV-R1324

RCP-3

DH-1

1 1/4"

1" 2"

2"

2 1/2"1"3/4"2 1/2"3/4"2 1/2"

2 1/2"

2 1/2"

1 1/4"

2"

1 1/4"

VAV-R1308A

VAV-R1308B

VAV-R1302

VAV-R1301

FT-1

FT-2

VAV-R1310

VAV-R1312

VAV-R1317

VAV-R1314

VAV-R1316

VAV-R1318

RCP-4

VAV-R1319

VAV-R1325H-1

VAV-R1340

RCP-1RCP-2

VAV-R1344VAV-R1346

VAV-R1348

VAV-R1352VAV-R1354VAV-R1356

VAV-R1358

VAV-R1360

VAV-R1362

VAV-R1363

VAV-R1268

VAV-R1266

VAV-R1267

VAV-R1262

VAV-R1288A

VAV-R1288

VAV-R1286A

VAV-R1284

VAV-R1220

VAV-R1229B

VAV-R1217VAV-R1215

VAV-R1213

3" CHWS & CHWR

DN TO FIRST

FLOOR CEILING

AC-1

AC-2

AC-3AHU-3

AHU-20 VAV-C1-2

VAV-R1269

VAV-R1271

VAV-R1272

VAV-R1278

VAV-R1275

1 1/2"

VAV-R1218

FC-R1218A

3/4"

1"

VAV-R1226

VAV-R1228

VAV-R1234

VAV-R1236

VAV-R1238

VAV-R1237A

VAV-R1237B

VAV-R1233

VAV-R1233A

VAV-R1233B

VAV-R1229A

1"

1 1/4"

VAV-R1374

1/2" BOILER

DRAIN

VAV-R1103

VAV-R1107

2"

CUH

AHU

CAP

CAP

REMOVE 1" HWS/R PIPING AS SHOWN UP TO MECHANICAL ROOM

2180. CAP AT MAIN PIPING AS SHOWN.

REMOVE ALL EXISTING 3-WAY VALVES ASSOCIATED WITH

TERMINAL UNITS SERVED BY HX-3 & HX-4.

REMOVE HWS/R PIPING IN RISER FROM MECHANICAL ROOM 2180

TO BASEMENT INCLUDING FLOOR LEVEL STUB OUTS. REFER TO

1/MD-102 AND 1/MD-105 FOR PIPING CONTINUATIONS.

KEYED NOTES

CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

Office of Construction and Facilities Management

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

MD-103

MECHANICAL PIPING DEMOLITION PLAN

- FIRST FLOOR

REPLACE HEAT

EXCHANGERS 3 & 4

BJT APS10/13/2017

585-16-107

Iron Mountain , MI.

1/8" = 1'-0"

MECHANICAL PIPING DEMOLITION PLAN - FIRST FLOOR1

NORTH

No. Revisions Date

1 100% CONSTRUCTION

DOCUMENTS

CWS

CORRIDOR

1-TU-11-2215

1-TU-11-2217

1-TU-11-C2-1

1-TU-11-2219

1-TU-11-C2-2

1-TU-11-2221

1-TU-11-2218

1-TU-11-2252

1-TU-11-2240P

1-TU-11-2231

1-FTR30

1-FTR29

3/4" HWS

3/4" HWR

2" HWR

2" HWS

3/4" HWR

3/4" HWS

1" HWS

1" HWR

3/4" HWS

3/4" HWR

1" HWS

1" HWR

3/4" HWS

3/4" HWR

2" HWR

2" HWS

3/4" HWS

3/4" HWS

6" CHWR

6" CHWS

2 1/2" HWS

2 1/2" HWR 3/4" HWR

3/4" HWS

3/4" HWR3/4" HWS 3/4" HWS 3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3" HWR

3" HWS

4" HWS

4" HWR

3" HWR

3" HWS

3" HWS

3" HWR

3" HWS

3" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

1" HWS

1" HWR

3" HWR

3" HWS

3/4" HWS

3/4" HWR

EQUIP ALCOVE

2230B

TECH WORK ROOM

FEMALE TOILET

MALE TOILET

WAITING AREA

PHONE/DATA

HOUSEKEEPING

STAFF TOILET

EQUIP ALCOVE

2230A

CORRIDOR

C2-2

CORRIDOR

C2-1

PACS VIEWING

PACS WORKSTATION

PACS COMPUTER

2215A

RECEPTION

BONE DENSITY

MECHANICAL

PNEUMATIC

TUBE COMP

SOILED

UTILITY

2110B

SEMI-RESTRICTED

HALLWAY

PASSENGER

ELEVATOR

P-2

PASSENGER

ELEVATOR

P-3

STAIR 2

CORRIDOR

2299H

D-4 D-5

T T T

T

T

T

T

T

DPM

DPM DPM DPM

T

T

T

T

4" HWS/R UP

6"

6"

4" HPS UP & DN

3" HPC UP & DN

1" HWS

1" HWR

3/4" HWS

3/4" HWR

1-TU-2207

PHONE/DATA

SEMI-RESTRICTED HALLWAY

HOUSEKEEPING

2299H

CORRIDOR

STAIR 2

P-3

PASSENGER ELEVATOR

P-2

PASSENGER ELEVATOR

S-1

SERVICE ELEVATOR

SOILED UTILITY

EQUIPMENT STORAGE

MALE LOCKER SHOWER ROOM

2111A

MALE TOILET

FEMALE LOCKER SHOWER

1 1/2" HWR

1 1/2" HWS

3/4" HWR

3" HWS

3" HWR

4" HWR

3" HWS

3" HWR

3" HWR

3" HWS

2" HWR

2" HWS

2" HWR

2" HWS

3/4" HWR

3/4" HWS

2" HWR

2" HWS

3/4" HWR

3/4" HWS

1 1/4" HWS

1" HWR

1" HWS

1 1/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

1" HWS

1" HWR

1-HC-2299H

1-HC-2108

1-HC-2110E 1-HC-2202

1-HC-22051-HC-2203

1-HC-2204

1 1/4" HWR

1 1/4" HWS

1-FTR-29

2 1/2"

2"

AHU-15

AHU-5

ET-1

HWP-24

HWP-25

CRAC-3

HX-23

HX-22

AHU-4

FC-2180

2 1/2"

8"

6"

4"

2"

1 1/2"

3"

4" HWR

AS-1

CAP

CAP

REMOVE EXISTING 1 1/2" HWS/R PIPING AS INDICATED ON PLAN.

FIELD VERIFY EXACT LOCATION PRIOR TO SHUTDOWN. CAP

PIPING AT EXISTING MAIN SHUT-OFF VALVES.

REMOVE 1" HWS/R PIPING DOWN TO FIRST FLOOR. SEE SHEET

MD-103 FOR CONTINUATION.

REMOVE HWS/R PIPING IN RISER DOWN TO BASEMENT.

KEYED NOTES

CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

Office of Construction and Facilities Management

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

MD-104

MECHANICAL PIPING DEMOLITION PLAN

- SECOND FLOOR

REPLACE HEAT

EXCHANGERS 3 & 4

BJT APS10/13/2017

585-16-107

Iron Mountain , MI.

1/4" = 1'-0"

MECHANICAL PIPING DEMOLITION PLAN - SECOND FLOOR1

NORTH

No. Revisions Date

1 100% CONSTRUCTION

DOCUMENTS

VAULT

TRANSFORMER

S002

ROOM

MECHANICAL

S001

STAIR 2

UP

UP

FD

MP-301

MP-301

MP-301

EXISTING

EXPANSION

TANK

EXISTING

CHWP-1

EXISTING

CHWP-2

EXISTING

CHWP-3

EXISTING

CHWP-4

EXISTING

CHWP-5

EXISTING

CHWP-6

PUMPED

CONDENSATE

8" HPS HEADER12" LPS HEADER

8" MPS HEADER

ZONE CONTROL

VALVES

L P

S

L P

S

L P

S

L P

S

L P

S

L P

S

MPS

HPS HPS

HPS

4" VACUUM PUMP DISCHARGE

4" CONDENSATE

LPS

LPS

LPS

LPS

LPC

EXISTING STEAM

GENERATOR

L P

S L P

S

MPS

HPS

H P

S

LPS

LPS

LPC

H P

S

HX-4

HX-3

CAP

2" LPS

1" LPC

L P

C

4" LPS

4" LPS

LPC

2 1/2" LPS

4" LPS BY PASS

4" LPS

2 1/2" LPS

REQUIRED SERVICE

CLEARANCE

2" LPC

6" LPC

4" LPS

4" LPS 4" LPS

1 1/2"

LPC

HPS

LPS

EXISTING

STEAM

TRAP

PROVIDE NEW HEAT EXCHANGERS. INSTALL PER

MANUFACTURERS REQUIREMENTS AND MAINTAIN ALL SERVICE

CLEARANCES.

PROVIDE NEW PRESSURE REDUCING VALVE (PRV).

KEYED NOTES

1. CONTRACTOR TO PROVIDE ALL PIPING MATERIALS AND OFFSETS AS

REQUIRED FOR PROPER STEAM AND CONDENSATE INSTALLATION.

2. INSTALL ALL STEAM AND CONDESNATE LINES WITH PROPER SLOPE PER

SPECIFICATIONS.

3. INSTALL NEW LPS AND CONDENSATE PIPING AS INDICATED ON PLAN.

CONTRACTOR TO FIELD VERIFY EXACT LOCATION OF STEAM AND

CONDENSATE PIPING PRIOR TO INSTALLATION.

4. INSULATE ALL PIPING PER SPECIFICATIONS. REPAIR ANY INSULATION

DAMAGED DURING CONSTRUCTION.

GENERAL NOTES

CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

Office of Construction and Facilities Management

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

MP-100

MECHANICAL STEAM PIPING PLAN -

SUB-BASEMENT

REPLACE HEAT

EXCHANGERS 3 & 4

BJT APS10/13/2017

585-16-107

Iron Mountain , MI.

1/4" = 1'-0"

MECHANICAL STEAM PIPING PLAN - SUB-BASEMENT1

NORTH

No. Revisions Date

1 100% CONSTRUCTION

DOCUMENTS

CHWP-2A

EXISTING

EXPANSION

TANK

EXISTING

AIR SEPARATOR

6" CHWR

6" CHWS

6" C

H W

R

6" C

H W

S

6" C

H W

S

4" C

H W

R

6" C

H W

R

6" C

H W

S

6" C

H W

R

4" CHWS

4" C

H W

S

6" C

H W

R

6" C

H W

S

6" C

H W

R

6" C

H W

S

6" C

H W

R

6" C

H W

R

6" CHWS

10" CHWR

6" C

H W

R

C H

W S

C H

W R

10" CHWR

C H

W S

6" CHWS

6" CHWS

6" CHWS

6" CHWS1

MP-301

MP-301

8" CHWS

6" CHWS

6" CHWS

6" CHWS

6" CHWS

6" CHWS

6" CHWS

6" C

H W

S

6" C

H W

S

6" C

H W

S

6" C

H W

S

6" CHWS

6" CHWS

EXISTING

FILTER

2" CHWS

2" CHWS

MP-301

8" CHWS

EXISTING

CHWP-3

EXISTING

CHWP-5

EXISTING

CHWP-6

EXISTING

PHW-2

EXISTING

PHW-1

EXISTING

PCHW-2

EXISTING

PCHW-1

C H

W R

10" CHWR

8" CHWS

8" C

H W

S

ET-1

HX-3

HX-4

HWP-4

HWP-3

(STACKED)

4" HWS

4" HWR

4" HWS

4" HWR

4" HWS/R

PIPING UP TO

BASEMENT

4" H

W S

4" H

W R

EXISTING

CHWP-4

1" HWR

1" HWS

EX. SNOW MELT

CONTROL PANEL

MP-101

EX. DISCONNECT SWITCH

P-21

HX-21A

AS-1

SERVICE

CLEARANCE

4" HWS

4" HWR

ET-2

1" GWR

RPZ-1

1. VERIFY DIRECTION OF FLOW BEFORE CONNECTING NEW SUPPLY

AND RETURN CHILLED WATER PIPES TO EXISTING SUPPLY AND

RETURN CHILLED WATER PIPES.

2. ADD SUPPORTS AS REQUIRED TO SUPPORT EXISTING PIPING.

3. COORDINATE ALL SHUT-DOWNS WITH OWNER BEFORE CLOSING

ANY VALVES.

4. INSTALL ALL NEW PIPING AS HIGH AS POSSIBLE. PROVIDE

TRANSITIONS AS REQUIRED.

5. MECHANICAL C0NTRACTOR TO PROVIDE ALL WELLS AND

SOCKETS ON THE PIPING SYSTEM FOR THE CONTROLS

CONTRACTOR TO INSTALL SENSORS.

GENERAL NOTES

PROVIDE NEW HEAT EXCHANGERS. INSTALL PER

MANUFACTURERS REQUIREMENTS AND MAINTAIN ALL SERVICE

CLEARANCES.

PROVIDE NEW INLINE PUMPS FOR SNOWMELT SYSTEM. PUMPS

TO BE STACKED ON WALL.

PROVIDE NEW BRAZED PLATE HEAT EXCHANGERS FOR

SNOWMELT SYSTEM. HEAT EXCHANGERS TO BE STACKED

ALONG WALL.

PROVIDE NEW 1" GWS/R PIPING FROM SNOW MELT HOT WATER

CIRCULATION PUMPS TO EXISTING CAPPED GWS/R PIPING.

PROVIDE NEW 1" PRESSURE REDUCING VALVE (PRV) AND SET

PRESSURE TO SYSTEM REQUIREMENTS.

PROVIDE NEW 1" BACKFLOW PREVENTER (RPZ-1) TO SUPPLY

NON-POTABLE WATER PIPING TO NEW HEAT EXCHANGER

SYSTEM. SEE REDUCED PRESSURE BACKFLOW PREVENTER

SCHEDULE ON SHEET M-601 FOR MORE INFORMATION.

KEYED NOTES

P-21

HX-21A

1" GWS

1" HWR

1" HWS

L P

S

LPS-RETURN

HPS

EXISTING 1" GWS/R

1" GWR

1" G

W R

1/2" GWS

ET-2

AIR SEPARATOR

CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

Office of Construction and Facilities Management

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

MP-101

MECHANICAL PIPING PLAN -

SUB-BASEMENT

REPLACE HEAT

EXCHANGERS 3 & 4

BJT APS10/13/2017

585-16-107

Iron Mountain , MI.

1/4" = 1'-0"

MECHANICAL PIPING PLAN - SUB-BASEMENT1

NORTH

1/2" = 1'-0"

MECHANICAL SNOW MELT SYSTEM SECTION2

NOT TO SCALE

EXISTING SNOW MELT CONTROL PANEL3

No. Revisions Date

1 100% CONSTRUCTION

DOCUMENTS

CR CR

PP

KP

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

MAPES PANELS

IN WINDOWS

FLOOR

SCALE

FIRE

EQUIP

FIRE

EQUIP

COILING OH DOOR

FIRE

EQUIP

TA

2 " HIGH GLAZED CURB,

LOCKERS REMOVED

TA

R A

M P

FD

HYDRAULIC POWER UNITS

AHU

FD

COILING OH DOOR COILING OH DOOR COILING OH DOOR

LIFT

SLOPED

CEILING

COILING OH

FABRIC DOOR

PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

SERVICE

ELEVATOR STAIR 2

DN

UP

UP

STAIR 3

PASSENGER

ELEVATOR

IN

-F

IL

L

E D

W

IN

D O

W S

TA

TA

TA

88" TALL WALL

IN-FILLED WINDOWS

BLAST CHILLER

P

IP

E

C H

A S

E

ACCESS

E

LE

C T

R

IC

A L

E Q

U

IP

M E

N T

E

LE

C T

R

IC

T R

A N

S F

O R

M E

R S

O N

4" R

A

IS

E D

C O

N C

S

LA

B

MECH SHAFTSHAFT

SHOWER

B226C

LOCKER

B226A

TOILET

B226B

LOUNGE

B226

MECHANICAL

ROOM

B224A

CORRIDOR

B299C-1

LAUNDRY

CHUTE

B230

ELEVATOR

LOBBY

B224

ELECT

ROOM

B224C

ELEVATOR

EQUIPMENT

B224B

WAREHOUSE

STORAGE

B298

DATA &

PHONE

B296

LOCKER

B297

MECH.

ACCESS

B227

PREPARATION

PACKAGING

B291B

ETO

B291C

MECH.

ROOM

B231B

STORAGE

LOGISTICS

B231

MECH.

ROOM

B231A

BULK MEDICAL

STORAGE

B231D

MECH.

ACCESS

B295A

DECONTAMINATION

B295

CORRIDOR

B299B-1

NON-EXP

EQUIP.

B298A

ASST CHIEF

LOGISTICS

B298B

WAREHOUSE

STORAGE

B274

PRI. SUPPLY/

SURGERY CASE CART

B291

CORRIDOR

B299D-1

ELECTRICAL

EQUIP. RM.

B278A

RECYCLING &

SHREDDER RM.

B278

VESTIBULE

B276

MEDICAL

WASTE

B186E

NESS

FREEZER 1

B186L

CANTEEN

FREEZER 2

B186M

CANTEEN

COOLER 4

B186N

NESS

COOLER 3

B186P

RETHERM

COOLER 1

B186R

FOOD BANK

COOLER 2

B186Q

OXYGEN

STORAGE

B268

ELECTRICAL

ROOM

B269

EMERGENCY

ELECT. RM.

B267

PIPE SHAFT

B284

CORRIDOR

B299A-1

VESTIBULE

B107

UTILITY

B186C

MENS

TOILET

B205

WOMENS

TOILET

B204

CHIEF

LOGISTICS

B203

MECH. RM.

B202

HOLMAN

ROOM

B201

TELEPHONE

EQUIPMENT

B103

WAN

ROOM

B105

PROGRAM

ASSISTANTS

B107B

SPD

OFFICE

B291A

STCK BRKOUT

& RECEIVING

B287

CHASE

B107D

PIPE CHASE

B107D

AMBIENT DISPOSABLE

& NOURISHMENT STORAGE

B186G

STAFF

WORK ROOM

B186D

DIETETICS

OFFICE

B186F

FOOD SERVICE

MANAGER'S OFFICE

B186E

ROUGH

PREPARATION

B186H

CART WASH

B186B

T

T

T

T

T

T

H

H

T T H

T

T

T

DP-2

T

H

T T H

T

T

T

DP-3

DP-3

T

TT TT

S S S

S

H

T

H

T

T

T

T

T

T

T

T

T

T

1"1"

2 1/2"

1 1/2"

3/4"

3/4"

1 1/2" 2"

4"

2 1/2" CHWS/R

2"

4" CHWS/R

3"

2"

3/8"

7/8"

3/8"

7/8"

7/8" 3/8"

7/8"

3/8"

1/2" 1 1/8"

1/2" 1 1/8"

1 1/4"

1"

2"

H

4" CHWS&R

3/4"

2"HWR/S

3"HWR/S

3"HWR/S

1 1/2"

SAV-7

1"

2"HWS&R

3/4"

H

4"

REFRIGERATION PIPING

DOWN TO BASEMENT

10" CHWS/R

MED. PRESS.

STEAM RISER

3/4"

1"

1" HWS/HWR

DN TO TUNNEL

3/4" 3/4"

3/4"

1 1/4"

3/4"

3/4"

3/4"

3/4"

2 1/2"

4" SAN UP

VENT AG

3"VTR

1 1/2" VENT

1 1/2" VENT

1 1/2" VENT

3/4"

1"

3/4"

3/4"

1 1/4"

3" CHWS/R

UP TO

AHU-30

3/4"

1 1/2"

1 1/2"

3/4"

3/4"

3/4"

1 1/2"

1 1/4"

1/2" PURGE PORTS

1/2" PURGE

PORTS

3"

1 1/2" CHWS/R

DP-4

1" HWS/R

2 1/2" CHWS/R

4" HWS/R UP &

DN THRU FLOORS (BID

ALTERNATE #1)

2 1/2"

CHWS/R DN

THRU FLOOR

3/4"

1" COND.

1" COND.

1" COND.

1 1/2" COND.

1 1/2" HWS/R

3" CHWS/R UP

TO SURGERY

3"CHWS/R

1 1/2" CHWS/R

SAV-RB291S

1/2" DISCHARGE & 1

1/8" SUCTION UP TO

CONDENSORS ON

ROOF(TYP.)

AHU-2

VAV-RB296

VAV-RB299B

AHU-9

VAV-RB226A

VAV-RB226B

VAV-RB226C

VAV-RB226

SAV-RB291B

FC-9

VAV-RB231

VAV-RB231A

VAV-RB274

AC-1

AC-2

AC-3

VAV-B186G

VAV-B186H

VAV-B186E

VAV-B186A

VAV-B185

VAV-KH3

2"

ET-1 P-16

P-15

AS-1

HX-13B

HX-13A

AHU-21

SAV-RB287

SAV-RB291A

SAV-RB291

F C

-R B

SAV-RB297

EF-RB226C

1 1/2" VENT

EF-RB298

CRAC-RB105

H-RB105

2 1/2" CHWS/R UP

THRU FLOOR TO

AHU-1, SEE MP101

FOR CONSTRUCTION

CRAC-RB103

H-RB103

1" HWS/R UP THRU FLOOR, SEE

MP101 FOR CONTINUATION

ERV-RB103

VAV-RB299A

VAV-RB202

AHU-28

VAV-RB201A VAV-RB201B

VAV-RB201C

UH-B107D

VAV-RB201A VAV-RB201B

VAV-RB201C

FCU-RB107B

VAV-RB186E

4" HWS/R

4" H

W S

/R

P

P

P

P

P

2 1/2" HWS/R

1" HWS/R

1" HWS/R

H W

S /R

H W

S /R

4" HWS/R

H W

S /R

EXISTING SNOWMELT PIPING

CONTINUTED IN SUB-BASEMENT

VERIFY DIRECTION OF FLOW BEFORE CONNECTING NEW SUPPLY AND

RETURN HOT WATER PIPES TO EXISTING SUPPLY AND RETURN HOT

WATER PIPES.

PROVIDE PIPING SUPPORTS AS REQUIRED FOR EXISTING PIPING.

COORDINATE EQUIPMENT AND SYSTEM SHUT-DOWNS WITH OWNER

PRIOR TO CONSTRUCTION.

INSTALL NEW PIPING AS HIGH AS POSSIBLE. PROVIDE TRANSITIONS AS

REQUIRED FOR COMPLETION OF DESIGN INTENT.

MECHANICAL CONTRACTOR TO COORDINATE WITH CONTROLS

CONTRACTOR FOR ALL SENSOR REQUIREMENTS.

GENERAL NOTES

1.

2.

3.

4.

5.

CONNECT NEW HWS/R PIPING TO EXISTING TERMINAL UNIT.

EXISTING 2 1/2" HWS/R PIPING UP TO FIRST FLOOR OPC. SEE

SHEET 1/MP-103 FOR CONTINUATION.

3" HWS/R PIPING UP TO EXAM AREA. SEE SHEET 1/MP-103 FOR

CONTINUATION.

4" HWS/R PIPING DOWN TO SUB-BASEMENT. SEE SHEET

1/MP-101 FOR CONTINUATION.

KEYED NOTES

CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

Office of Construction and Facilities Management

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

MP-102

MECHANICAL PIPING PLAN - BASEMENT REPLACE HEAT

EXCHANGERS 3 & 4

BJT APS10/13/2017

585-16-107

Iron Mountain , MI.

1/8" = 1'-0"

MECHANICAL PIPING PLAN - BASEMENT1

NORTH

10No. Revisions Date

1 100% CONSTRUCTION

DOCUMENTS

D-4 D-5

SERVICE

ELEVATOR PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

30 31

A

C

G

H

J

K

L

M

N

O

P

R

S

T

16 19 20 30 31

Q

B

D

RS

8 7 4 3 2 1

UP

DN

DNUP

UP

DN

HALFWALL

VOLUNTEER

AREA

UP

CARPET

CARPET

CARPET

TILE

TILE

TILE

MECH SHAFT

FD

FE FE

6" RAISED

ALTAR

FIRE

EQUIP

4" HWS/R UP & DN

CDW - COOLING

CDW - HEATING

T

S

S

S

S

S

S

S

S

S

S

S S

CO2

S

S

T

S

T

S

S

S S

S

S

T

TREATMENT

SOILED

MEDICATION

DECONTAMINATION

AOD OFFICE

MRI VESTIBULE

TRIAGE

CHANGING

ROOM

1304C

EXAM

SECURE

TREATMENT

TREATMENT

WAITING

CORRIDOR

C1-6

P. TLT.

TREATMENT

MRI

VESTIBULE

1304A

STAIR

1300C

VESTIBULE

1300A

VESTIBULE

1300B

CHANGING

ROOM

1304B

PYXIS

ALCOVE

CORRIDOR

C1-6

NURSE

WORKROOM

STAFF

TOILET

DIABETES

DIABETES

HOUSEKEEPING

EXAM

WOMEN'S TLT.

MEN'S TLT.

FIRE ALARM

& SECURITY

EXAM

DIETICIAN

DIETICIAN

MEDICATION

EXAM

BLOOD DRAW/

EKG

P. TLT.

1267B

SOILED UTILITY

1267A

EXAM

NURSE

WORKROOM

EXAM

ALCOVE

WOUND CARE

TREATMENT

P. TLT.

EXAM

EXAM

EXAM

EXAM

EXAM

OFFICE

NURSE

WORKROOM

ANTE

1312A

TREATMENT/

ISOLATION

ELEVATOR

EQUIPMENT

TLT.

1312B

WAITING

WC STORAGE

BREAK/

LOCKERS

STAFF TLT.

1340A

EXAM

EXAM

CLEAN SUPPLY

EXAM

1384 EXAM

EXAM

EXAM

EXAM

P. TLT.

STERILE

SUPPLY

OFFICE

EXAM

NURSE

WORKROOM

DICTATION

NURSE STATION

EQUIPMENT

1315CLERK

SCALE ALCOVE

OFFICE

SCALE ALCOVE

WAITING

ELECTRICAL

ELEVATOR

LOBBY

CLERK

COMPUTER

ALCOVE

1300A

CORRIDOR

C1-8

CORRIDOR

C1-7

CORRIDOR

C1-10

CORRIDOR

C1-1

CORRIDOR

C1-2

CORRIDOR

C1-3

CORRIDOR

C1-5

CORRIDOR

C1-4

SEE MP103 FOR

CONTINUATION

1" HWS/R DN

THRU FLOOR,

SEE MP002 FOR

CONTINUATION

2 1/2" CHWS/R

DN THRU FLOOR

SEE MP002 FOR

CONTINUATION

2 1/2" CHWR

2 1/2" CHWS

2 1/2" CHWS

2 1/2" CHWR

T

T

TT

T

T

T

T

T

T

T

T

T

T

T

T T T T TT

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T

T

T TTT

T

T

T

VAV-R1107

VAV-R1103

VAV-R1374

1 1/4"

1"

VAV-R1229A

VAV-R1233B

VAV-R1233A

VAV-R1233

VAV-R1237B

VAV-R1237A

VAV-R1238

VAV-R1236

VAV-R1234

VAV-R1228

VAV-R1226

FC-R1218A

VAV-R1218

1 1/2"

VAV-R1275

VAV-R1278

VAV-R1272

VAV-R1271

VAV-R1269

VAV-C1-2AHU-20

AHU-3 AC-3

AC-2

AC-1

VAV-R1213

VAV-R1215 VAV-R1217

VAV-R1229B

VAV-R1220

VAV-R1262

VAV-R1266

VAV-R1268

VAV-R1363

VAV-R1362

VAV-R1360

VAV-R1358

VAV-R1356 VAV-R1354 VAV-R1352

VAV-R1348

VAV-R1346 VAV-R1344

RCP-2 RCP-1

VAV-R1340

H-1 VAV-R1325

VAV-R1319

RCP-4

VAV-R1318

VAV-R1316

VAV-R1314

VAV-R1317

VAV-R1312

VAV-R1310

FT-2

FT-1

VAV-R1301

VAV-R1302

VAV-R1308B

VAV-R1308A

1 1/4"

2"

1 1/4"

2 1/2"

2 1/2"

2 1/2" 3/4" 2 1/2" 3/4" 1" 2 1/2"

2"

2" 1"

1 1/4"

DH-1

RCP-3

VAV-R13242"

1 1/4"

VAV-R1347

VAV-R1330

VAV-R1345

VAV-R1332

VAV-R1384

VAV-R1382

VAV-R1398

VAV-R1355

VAV-R1385

VAV-R1359

VAV-R1399

VAV-R1378

VAV-R1333

VAV-R1379

VAV-R1390

VAV-R1392

VAV-R1300A

VAV-R1300D

VAV-R1300B

VAV-R1300C

2" 1 1/2"

2"

GEV-R1313

CRE-2

ROOF

LINES UP TO

REFRIGERATION

VAV-R1303

VAV-R1303A

3" CHWS/R

3" CHWS/R DN

FLOOR CEILING

DN TO FIRST

3" CHWS & CHWR

3/4" COND

1"

3" GHS/GHR

FT-1 & FT-2.

DOWN TO

3/4"HS & HR

2 1/2" CWR/S

1/2" HWS/R

3/4" HWS/R

1" HWS/R

1/2" HWS/R

3/4" HWS/R

1" HWS/R

3/4" HWS/R

1" HWS/R

1/2" HWS/R

3/4" HWS/R

1" HWS/R

1/2" HWS/R

1/2" HWS/R

DRAIN

1/2" BOILER

1/2" HWS/R

1" HWS/R

2 1/2"

1 1/4"

2"

2"

1 1/4"

1 1/2"

1 1/2"

2"

1 1/4"

3/4" HWS/HWR

DN TO BASEMENT

EXISTING 2 1/2" HWS/R

3/4" HWS & HWR

1 1/2"

2"

3/4"

3/4"

1"

3/4"

1"

1 1/4"

3/4"

2"

1 1/4"1 1/4"

2 1/2" GHS/GHR

3"CHS/R UP

FROM BELOW

VAV-R1267

VAV-R1288A

VAV-R1288

VAV-R1286A

VAV-R1284

AHU-30

3" GHS/GHR UP

& DOWN

10" CHWS/R UP &

DOWN

2"

CUH

1 1

1 1111

3" HWS/R DN

VALVE AND

CAP FOR

FUTURE

CAP

VERIFY DIRECTION OF FLOW BEFORE CONNECTING NEW SUPPLY AND

RETURN HOT WATER PIPES TO EXISTING SUPPLY AND RETURN HOT

WATER PIPES.

PROVIDE PIPING SUPPORTS AS REQUIRED FOR EXISTING PIPING.

COORDINATE EQUIPMENT AND SYSTEM SHUT-DOWNS WITH OWNER

PRIOR TO CONSTRUCTION.

INSTALL NEW PIPING AS HIGH AS POSSIBLE. PROVIDE TRANSITIONS AS

REQUIRED FOR COMPLETION OF DESIGN INTENT.

MECHANICAL CONTRACTOR TO COORDINATE WITH CONTROLS

CONTRACTOR FOR ALL SENSOR REQUIREMENTS.

GENERAL NOTES

1.

2.

3.

4.

5.

PROVIDE NEW 2-WAY VALVE AT ASSOCIATED TERMINAL UNITS

SERVED AND MODIFY PIPING ACCORDINGLY.

KEYED NOTES

CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

Office of Construction and Facilities Management

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

MP-103

MECHANICAL PIPING PLAN - FIRST

FLOOR

REPLACE HEAT

EXCHANGERS 3 & 4

BJT APS10/13/2017

585-16-107

Iron Mountain , MI.

1/8" = 1'-0"

MECHANICAL PIPING PLAN - FIRST FLOOR1 NORTH

No. Revisions Date

1 100% CONSTRUCTION

DOCUMENTS

6" C

H W

S

6" CHWS

HWP-3

HWP-4

HX-3

HX-4

4" HWS

4" HWR

4" H

W R

4" LPS

2" LPC

4" L

P S

(BEYOND)

4" H

W S

4" H

W R

LPC

AS-1

HX-3

4" H

W R

4" H

W S

EXISTING

HOT WATER

GENERATOR

EXISTING

6" LPC

HEADER

4" L

P S

HX-4

HWP-4

HWP-3

4" HWS

4" HWS

4" H

W S

4" H

W S

4" HWS

4" HWR

4" HWR

STEAM TRAP

ROUTE 1" LINE TO

EXPANSION TANK

EXISTING

6" LPS MAIN

LPC

AS-1

4" HWS 4" HWS

STEAM TRAP

4" HWS

HX-4

STEAM TRAP

4" HWS

4" L

P S

4" H

W S

4" H

W R

2" STEAM - LPC

4" HWR

4" LPS

AS-1

2 1/2" LPS

4" LPS

ET-1

4" EQUIPMENT PAD

VENT

EXISTING 6"

LPC HEADER

4" LPS

2 1/2" LPS

4" LPS

2 1/2" LPS

4" LPS

4" L

P S

LPC

LPC

HPS

LPS

2" LPC

L P

C

CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

Office of Construction and Facilities Management

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

MP-301

MECHANICAL SECTIONS REPLACE HEAT

EXCHANGERS 3 & 4

BJT APS10/13/2017

585-16-107

Iron Mountain , MI.

1/2" = 1'-0"

HX-3 & 4 SECTION 11

1/2" = 1'-0"

HX-3 & 4 SECTION 22

1/2" = 1'-0"

HX-3 & 4 SECTION 33

1/2" = 1'-0"

HX-3 & 4 SECTION 44

MECHANICAL SUB-BASEMENT ISOMETRIC5

No. Revisions Date

1 100% CONSTRUCTION

DOCUMENTS

VSMC

VSMC

4"

P-3

P-4 2 1/2"

EXISTING AIR

SEPARATOR

EXPANSION

TANK

VSMC

VSMC

4"

P-6

P-8 4"

EXISTING AIR

SEPARATOR

EXPANSION

TANK

2 1/2"

T

T

BASEMENT

SUB-BASEMENT

BASEMENT

FIRST FLOOR

SUB-BASEMENT

HX-3

HX-4

HX-10

BASEMENT HX-3 AND HX-4 PIPING DEMOLITION DIAGRAM

HOT WATER PIPING RISER DIAGRAM

SUB-BASEMENT HX-10 PIPING DEMOLITION DIAGRAM

LPS

COND.

COND.

T

LPS

COND.

6" LPS

2 1/2" HWR

2 1/2" HWS

2 1/2" HWR

2 1/2" HWS

T

T

HX-3

HX-4

VSMC

VSMC

P

P

SUB-BASEMENT (HX-3 & HX-4) SERVES EMERGENCY & PHARMACY

• FIRST FLOOR: OPC / ED (25) VAVs: 359.7 MBH TOTAL @ 36.0 GPM

• FIRST FLOOR: PHARMACY / EXAM (31) VAVs: 235.2 MBH @ 25.0 GPM

• BASEMENT LEVEL: EAST LOCKER: (9) VAV's: 110.0 MBH @ 11.0 GPM

• LOADING DOCK: SNOWMELT: 63 MBH @ 6.3 GPM

• (FUTURE) FIRST FLOOR: EAST CONVECTORS (46): 400 MBH TOTAL @ 40 GPM

• (FUTURE) BASEMENT LEVEL: EAST CONVECTOR (12): 81 MBH TOTAL @ 8.1 GPM

TOTAL CONNECTED LOAD = 767.9 MBH

FUTURE CONNECTED LOAD = 1,247.4 MBH

BASEMENT

VAV'S (9)

PHARMACY /

EXAM AREA

OPC / ED

AREA

4" LPS

EXPANSION

TANK

4" HWS

4" HWS

4" HWR

4" HWS

4" HWS

4" HWS

NEW 1" RPZ

4" LPS

4" LPS

AS

HX

HX

1" HWR

1" HWS

VSMCHX

21A

LOADING DOCK

SNOWMELT

2 1/2" HWR

2 1/2" HWS

3" HWR

3" HWS

1" HWR

MANUAL AIR

VENT

1" HWS

1" HWS

1" HWR

1" HWS

4" HWS

4" HWR

AS

ET

ET

1" HWR

1/2"

1" HWS

P

21A

MANUAL FLUSH

AND FILL (TYP.)

1" SCW

CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

Office of Construction and Facilities Management

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

M-401

MECHANICAL FLOW DIAGRAM REPLACE HEAT

EXCHANGERS 3 & 4

BJT APS10/13/2017

585-16-107

Iron Mountain , MI.

No. Revisions Date

1 100% CONSTRUCTION

DOCUMENTS

SECURING HANGER RODS IN CONCRETEPROPER PIPING INSULATION ILLUSTRATIONIMPROPER PIPING INSULATION ILLUSTRATION

5 FT

THRU [20]

6 8 10

[32][25] [40]

[65]

[50]

[75]

-1312 14 -16 -

[125][100]

[150]

[250]

[200]

[300]

[400]

[350]

[450]

[600]

[500]

20 241814 16128 1064 532 2 1/21 1/21 1 1/4

[9100] [9600][8500][7600] [8200][7000][5800] [6700][5200][4100] [4900][3700][3000] [3400][2700][2100]

--- --[4900] -[4100][3700] [4000] -[3000][2400][1800][1500]

THRU 3/4

[2100] [2100]

[2100]

[2700]

[2400]

NTS

SIDE VIEW TRAPEZE HANGER FOR UP

TO 1000 LB. [453KG] UNIFORM LOAD

ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE SPECIFICATIONSADJUSTABLE CLEVIS HANGER TYPE 43 - SEE SPECIFICATIONS

PROVIDE INSULATION SHIELD

& INSERT FOR ALL PIPING

(8" [200mm] MIN.)

1-5/8" [43mm] 12 GAUGE CHANNEL OR 2"x2"x1/4" [50x50x6.4mm] ANGLE

1/2" [15mm] DIA.

HANGER RODS WITH

36" [900mm] MAX.

SPACING ON EACH

CHANNEL

INSULATION SHIELD

AT HANGER

PROVIDE HIGH

COMPRESSIVE

STRENGTH INSULATION

(9 PSF MIN. DENSITY)

UNDER INSULATION

SHIELD

INSULATION (VAPOR

BARRIER TYPE IS

REQUIRED FOR LOW

TEMPERATURE PIPE)

HANGER ROD

MAXIMUM PIPE/TUBING SUPPORT SPACING

NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.

NOM. SIZE

PIPE

TUBING

IN.

[mm]

FT.

[mm]

FT.

[mm]

PIPE HANGERS

[2 m m

M A X

NOTES:

SEE SPECIFER FOR DETAILED

HANGER REQUIREMENTS

SUPPORT/ANCHOR FOR PIPE RISERS

NTS

NOTES:

1.

2.

PROVIDE ANCHORS ONLY

WHERE SHOWN ON

DRAWINGS.

EXTEND SLEEVE ABOVE

FLOOR WHERE SPECIFIED.

INSULATION BOLT

(TYPICAL)

FLOOR

SLAB

FIRE-STOPPING

MATERIAL

BOLT

PIPEPIPE SLEEVE

WHERE SPECIFIED

RISER

CLAMP

RISER

PIPE SLEEVE

WHERE

SPECIFIED RISER CLAMP.

BOTTOM CLAMP

REQUIRED AT

ANCHOR POINTS

ONLY.ELEVATION

PLAN

RISER

CLAMP

PRESSURE TRANSMITTER INSTALLATION

NTS

NOTES:

1. INSTALLATION OF SENSORS AND TRANSMITTERS SHALL CONFORM TO

RECOMMENDATIONS OF MANUFACTURERS OF TRANSMITTERS.

1/2" [15mm] STEEL PIPE OR

STEEL TUBING TO SENSORS

DIFFERENTIAL PRESSURE

TRANSMITTER (FLOW, LEVEL)

BLOWDOWN

PT

ELEVATION

NTS

ABOVE 2" [50mm] DIA. PIPE 2" [50mm] DIA. & SMALLER

VERTICAL

2 1/2" [65mm] DIA.

ABOVE 2" [50mm] DIA. PIPE 2" [50mm] DIA. & SMALLER

HORIZONTAL

2 1/2" [65mm] DIA.

INSTALLATION OF THERMOMETER WELLS

NTS

PIPE HANGERS - PROVIDE DOUBLE

DEFLECTION NEOPRENE (TYPE HN)

FOR FIRST TWO ON EACH SIDE OF

PUMP (SEE NOTE NO. 1)

PRESSURE GAGE

1/2" [15mm]

STRAINER

BALL OR

BUTTERFLY TYP.

NOTES:

1. SUPPORT PUMP FROM PIPING ONLY. DO NOT SUPPORT PUMP FROM MOTOR.

2. PROVIDE A MINIMUM 24" STRAIGHT LENGTH AT INLET AND OUTLET OF PUMP.

IN-LINE PUMPS - CONNECTIONS

BALANCING

DEVICE

NTS

STEEL EXPANSION SHIELD FOR

EXISTING CONSTRUCTION AND

INSERTS FOR NEW CONSTRICTION THIS

TYPE SHALL BE USED ONLY IN SLABS

OR BEAMS OF 4" [100mm] MIN DEPTH

3/8" [10mm] MIN DIA EXPANSION BOLTS FOR

EXISTING CONSTRUCTION AND INSERTS

FOR NEW CONSTRUCTION

CONCRETE

FLOOR SLAB

CLIP

ANGLE

NUTS & WASHERS

3/8" [10mm] MIN DIA

HANGER RODS

FOR PIPES UNDER 2" [50mm] IN SIZE

USE 1 1/2"x1 1/2"x1/4" [40x40x6.4mm]

ANGLE. ALL PIPES 2" [50mm] & LARGER

USE 3"x3"x1/4" [75x75x6.4mm] ANGLE

TURNBUCKLE

3/8" [10mm] MIN DIA

HANGER RODS

3/8" [10mm] MIN DIA

INSERTS NEW

CONSTRUCTION ONLY.

NTS

NTS

BAND

WELD

SADDLE

CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

Office of Construction and Facilities Management

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

M-501

MECHANICAL DETAILS REPLACE HEAT

EXCHANGERS 3 & 4

BJT APS10/13/2017

585-16-107

Iron Mountain , MI.

No. Revisions Date

1 100% CONSTRUCTION

DOCUMENTS

ASSEMBLY

INVERTED BUCKET STEAM TRAP

END OF STEAM LINE DRIP TRAP

D

D

PIPING CONNECTIONS

NTS

FLOOR MOUNTED EXPANSION TANK -

NOTE:

1.

2.

3.

SEE EXPANSION TANK SYSTEM

SCHEDULE FOR COMPONENT

SIZES.

FOR HOT WATER SYSTEMS 2"

[50mm] AND SMALLER AND

CHILLED WATER SYSTEMS USE

IN-LINE AIR PURGER IN LIEU OF

AIR SEPARATOR.

SET PRESSURE REDUCING VALVE

SO PRESSURE AT HIGHEST POINT

IN SYSTEM HAS A MINIMUM OF 4

PSIG [28kPa].

D

FLOOR MOUNTING BASE RING WITH

DRAIN ACCESS OPENING SHOWN. ANGLE

IRON LEGS MAY BE USED AS AN OPTION.

6"

[150mm]

HOUSEKEEPING

PAD

COLD WATER FILL LINE.

SEE EXPANSION TANK

SCHEDULE FOR SIZE

DRAIN

FROM SYSTEM

RUN DRAIN LINE TO

NEAREST FD UNLESS

INDICATED OTHERWISE

DRAIN

TO PUMP

SUCTION

AIR

SEPARATOR

SEE NOTES 3

HANGER

RODS (TYP)

CONNECTOR PIPE.

BLADDER

EXPANSION

TANK

REDUCED PRESSURE BACKFLOW

PREVENTER

NC

BUTTERFLY

OR BALL

ISOLATION

VALVE

D

RUN DRAIN

LINE TO

NEAREST FD

AIR CHARGING

SHRAEDER VALVE

MV

AUTO. AIR VENT TO DRAIN

PI

NTS

TYPICAL MANUAL AIR VENT

TYPICAL HOT WATER PIPING

DRAIN VALVE CONNECTIONS

ELEVATION

THREADED PIPING

ELEVATION

WELDED PIPING

TYPICAL WATER PIPING

REDUCER, IF REQUIRED

3/4" [20mm] BALL VALVE

ADAPTER TO 3/4" [20mm] HOSE

THREAD-PROVIDE HOSE CAP NUT

NOTES:

1. DRAIN ALL LOW POINTS AS INDICATED ABOVE.

2. WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS AND/OR

PLANS LOCATE DRAIN AT BOTTOM OF SCALE POCKET.

AIR VENT

1/2" [15mm]

BALL VALVE

1/4" [8mm]

COPPER TUBING

1/2" [15mm] x 4" [100mm]

NIPPLE

CIRCULATING WATER PIPING

ELEVATION

NOTES:

1. VENT ALL HIGH POINTS INDICATED ABOVE.

2. IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO DRAIN.

DRAIN VALVE AND AIR VENT CONNECTIONS

(HYDRONIC SYSTEMS)

MV

OR

AV

HEAT EXCHANGER - STEAM TO HOT WATER

NTS

NOTE:

1.

2.

3.

4.

THE ABOVE DETAIL SHOWS REQUIRED PIPING FOR TWO HEAT EXCHANGERS IN PARALLEL.

PROVIDE SADDLE SUPPORTS AND LEGS OR HANGERS FOR HEAT EXCHANGER. MOUNTING HEIGHT SHALL BE

ADJUSTED TO FACILITATE GRAVITY RETURN OF STEAM CONDENSATE.

MAKE THE BYPASS THE SAME SIZE AS THE…