36C25218B0307-002.pdf
PDF 10 MB Posted
- Attached to
- Replace Heat Exchangers 3 & 4 Construction 585-16-107 Federal contract opportunity
- Solicitation number
- 36C25218B0307
About this file
36C25218B0307 P01 - Drawings 120117.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25218C0072-000.docx | DOCX document | |
| 36C25218B0307-00002000.docx | DOCX document | |
| 36C25218B0307-00002003.pdf | ||
| 36C25218B0307-00002001.pdf | ||
| 36C25218B0307-00002002.pdf | ||
| 36C25218B0307-00001000.docx | DOCX document | |
| 36C25218B0307-00001001.pdf | ||
| 36C25218B0307-00001002.pdf | ||
| 36C25218B0307-003.pdf | ||
| 36C25218B0307-001.docx | DOCX document | |
| 36C25218B0307-000.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Director
Associate Director
Chief of Staff
Associate Director for N&PCS
Infection Control Nurse
Industrial Hygienist
Chief of Engineering
Chief of Police
Patient Safety
A.F.G.E.
Safety
M&R
CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
1-GI-1
COVER SHEET REPLACE HEAT
EXCHANGERS 3 & 4
BJT APS10/13/2017
585-16-107
Iron Mountain , MI.
NORTH
VA PROJECT NUMBER 585-16-107
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E. "H" STREET, IRON MOUNTAIN, MICHIGAN 49801
REPLACE HEAT EXCHANGERS 3 & 4
SITE MAP
PROJECT LOCATION
AREA MAP
NORTH
PROJECT VICINITY
SHEET INDEX
NUMBER NAME
1-GI-1 COVER SHEET
M-001 SYMBOLS & ABBREVIATIONS
MD-100 MECHANICAL STEAM PIPING DEMOLITION PLAN -
SUB-BASEMENT
MD-101 MECHANICAL PIPING DEMOLITION PLAN -
SUB-BASEMENT
MD-102 MECHANICAL PIPING DEMOLITION PLAN - BASEMENT
MD-103 MECHANICAL PIPING DEMOLITION PLAN - FIRST
FLOOR
MD-104 MECHANICAL PIPING DEMOLITION PLAN - SECOND
FLOOR
MP-100 MECHANICAL STEAM PIPING PLAN - SUB-BASEMENT
MP-101 MECHANICAL PIPING PLAN - SUB-BASEMENT
MP-102 MECHANICAL PIPING PLAN - BASEMENT
MP-103 MECHANICAL PIPING PLAN - FIRST FLOOR
MP-301 MECHANICAL SECTIONS
M-401 MECHANICAL FLOW DIAGRAM
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-602 MECHANICAL SCHEDULES
M-701 MECHANICAL CONTROLS DIAGRAMS
E-001 ELECTRICAL GENERAL NOTES, SYMBOLS, AND
ABBREVIATIONS
ED-100 ELECTRICAL DEMOLITION PLAN
E-100 ELECTRICAL PLAN
No. Revisions Date
1 100% CONSTRUCTION
DOCUMENTS
10/13/2017
PLUG VALVE
PRESSURE REDUCING VALVE (PRV)
HOSE CONNECTOR
STRAINER WITH VALVED DRAIN AND QUICK-COUPLE
COLD WATER (CITY WATER)
HOT WATER
TEMPORARY PIPING
THERMOSTAT
THERMOSTATIC STEAM TRAP (T)
CLOSED-FLOAT-THERMOSTATIC STEAM TRAP ASSEMBLY (T)
INVERTED BUCKET STEAM TRAP ASSEMBLY (T)
QUICK-COUPLE HOSE CONNECTOR
PRESSURE GAGE (WITH SIPHON ON STEAM SERVICE)
T
H4
H7
A
ABBREVIATIONSVALVE SYMBOLS
BALL VALVE
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC BALANCING CONTROL VALVE
PRESSURE SAFETY VALVE
GATE VALVE - THREADED/FLANGED
GLOBE VALVE - THREADED/FLANGED
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)
FLEXIBLE CONNECTION
WATER BALANCE DEVICE
MODULATING CONTROL BUTTERFLY VALVE
DRAWING SYMBOLS
26-SF 3
26-TU-I-I
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
SUPPLY FAN NO. 3 IN BUILDING NO. 26
EQUIPMENT ABBREVIATION (SUPPLY FAN)
ITEM NUMBER (TERMINAL UNIT NO. 1)
ITEM (TERMINAL UNIT SHOWN)
SERVED BY AIR HANDLER UNIT NO. 1
DRAWING NUMBER WHERE DRAWN
BUILDING NO. WHERE EQUIPMENT IS LOCATED
PIPING SYMBOLS
HIGH PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
HOT WATER HEATING SUPPLY
CONDENSATE PUMP DISCHARGE
LOW PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG AND BELOW)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
GLYCOL-WATER RETURN
GLYCOL-WATER SUPPLY
CHILLED WATER SUPPLY
CHILLED WATER RETURN
DRAIN LINE
MAKE-UP WATER
HOT WATER HEATING RETURN
HPS HPS HPS
HPR HPR HPR
MPS MPS MPS
MPR MPR MPR
LPS LPS LPS
LPR LPR LPR
PC PC PC
HWS HWS HWS
HWR HWR HWR
GWS GWS GWS
GWR GWR GWR
CHR CHR CHR
CHS CHS CHS
MW MW MW
D D D
X X X EXISTING PIPE TO BE REMOVED
LOW PRESSURE GRAVITY CONDENSATE RETURN
MEDIUM PRESSURE GRAVITY CONDENSATE RETURN
HIGH PRESSURE GRAVITY CONDENSATE RETURN
LPR
MPR
HPR
LPR
MPR
HPR
LPR
MPR
HPR
HW
CW CWCW
HWHW
GENERAL SYMBOLS
AV
MV
TT TEMPERATURE TRANSMITTER
MT MOISTURE (HUMIDITY) TRANSMITTER
PT PRESSURE TRANSMITTER
TT TEMPERATURE TRANSMITTER, AVERAGING ELEMENT
dPT DIFFERENTIAL PRESSURE TRANSMITTER
TSL TEMPERATURE SWITCH, LOW (FREEZESTAT)
HS HAND SWITCH (HAND-OFF-AUTO SWITCH)
M ELECTRIC OPERATED CONTROL DAMPER/OR VALVE
ZC VALVE OR DAMPER POSITION CONTROLLER
LTCP LOCAL TEMPERATURE CONTROL PANEL
HVAC HVAC CONTROL PANEL
ECC
INTEGRATE CONTROL POINT ON REMOTE GRAPHICS
WORKSTATION AT ENERGY CONTROL CENTER
TC TEMPERATURE CONTROLLER. SEE SEQUENCE OF OPERATION
ASD ADJUSTABLE SPEED DRIVE
PC PRESSURE CONTROLLER. SEE SEQUENCE OF OPERATION
SC SPEED CONTROLLER. SEE SEQUENCE OF OPERATION
FC FLOW CONTROLLER. SEE SEQUENCE OF OPERATION
PSH PRESSURE SWITCH HIGH
MOTOR STARTER
FS FLOW SWITCH
LENGTH IN DUCT WHEN SPACE PERMITS.)
A
TEMPERATURE SENSING ELEMENT FOR
TRANSMITTING TEMPERATURE TO EMCS
(PROVIDE 12 INCHES [200mm] MINIMUM
SENSOR WITH AVERAGING ELEMENT TO TRANSMIT
TEMPERATURE TO EMCS
CONTROL SYMBOLS
LIMIT OF DEMOLITION
ANCHOR
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
ECCENTRIC REDUCER
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
UNION
RISE OR DROP IN PIPE
CAPPED OUTLET
AND EXISTING WORK
POINT OF CONNECTION BETWEEN NEW
PRESSURE GAGE
THERMOMETER
FLOAT & THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES
PIPING ACCESSORIES
INVERTED BUCKET TRAP SET INCLUDING
PIPE UP
PIPE DOWN
TEST PLUG (PRESSURE/TEMPERATURE)
AUTOMATIC AIR VENT
MANUAL AIR VENT
THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES
GENERAL NOTES
1. ALL WORK SHALL BE IN COMPLIANCE WITH THE MOST STRINGENT OF FEDERAL, STATE AND LOCAL CODES, HOSPITAL
POLICY, AND THE MARCH 2011 HVAC DESIGN MANUAL FOR NEW, REPLACEMENT, ADDITION, AND RENOVATION OF
EXISTING VA FACILITIES.
2. INSTALL ALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
3. CONTRACTOR SHALL REMOVE ALL ABANDONED PIPES AND DUCTWORK BACK TO MAIN OR SOURCE. REMOVE ALL
HANGERS AND SUPPORTS ASSOCIATED WITH ABANDONED SYSTEM.
4. EXISTING UTILITIES TO BE ABANDONED SHALL BE PROPERLY DISCONNECTED AND CAPPED AS REQUIRED BACK TO
SOURCE.
5. THESE DRAWINGS ARE DIAGRAMMATIC AND SHALL NOT BE SCALED. ADDITIONAL DATA SHALL BE FROM THE
ENGINEER THROUGH WRITTEN CLARIFICATION ONLY. VERIFY ALL EXISTING CONDITIONS, ELEVATIONS, AND
DIMENSIONS PRIOR TO PROCEEDING WITH ANY PORTION OF WORK. THE CONTRACTOR SHALL PROVIDE ALL OFFSETS
AND TRANSITIONS REQUIRED TO MEET DESIGN INTENT PER EXISTING CONDITIONS. A PRE-BID SITE SURVEY IS
RECOMMENDED. NO ADDITIONAL CHARGES, AT OWNERS EXPENSE, FOR REVISIONS DUE TO EXISTING SITE
CONDITIONS.
6. THE CONTRACTOR SHALL PERFORM WORK IN A SKILLED AND PROFESSIONAL MANNER.
7. ALL CONTRACTORS ARE RESPONSIBLE TO FIELD COORDINATE WORK SCHEDULE AND VERIFY AREA SHUTDOWN WITH
THE OWNER REPRESENTATIVE (COR) PRIOR TO CONSTRUCTION. PROVIDE A MINIMUM OF 2 WEEKS ADVANCED
NOTIFICATION. REFER TO GENERAL CONDITIONS 10 00 00 FOR SPECIFIC CONSTRUCTION PHASING REQUIREMENTS.
8. THE CONTRACTOR SHALL WORK AND COORDINATE WITH THE OTHER TRADES.
9. ALL EQUIPMENT SHALL BE NEW AND IN UNDAMAGED CONDITION. ANY EQUIPMENT FOUND DEFECTIVE SHALL BE
IMMEDIATELY REMOVED FROM THE PROJECT.
10. ALL EQUIPMENT SHALL BE INSTALLED IN A MANOR TO ALLOW SERVICE. SEE SPECIFICATIONS.
11. MECHANICAL CONTRACTOR TO REPAIR ANY DAMAGE DONE TO THE FIRE PROOFING WHILE INSTALLING THE
MECHANICAL TRADES. SEAL ALL PENETRATIONS THROUGH RATED STRUCTURES WITH UL LISTED FIRE SEAL
DESIGNED FOR THE SPECIFIED APPLICATION.
12. CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES TO PROTECT THE PUBLIC AND ADJACENT PROPERTIES
FROM DAMAGE THROUGHOUT CONSTRUCTION.
13. CONTRACTOR SHALL GUARANTEE ALL WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE (1) YEAR FROM THE
DATE OF SUBSTANTIAL COMPLETION OR AS OTHERWISE REQUIRED IN THE SPECIFICATIONS.
14. CONTRACTOR RESPONSIBLE FOR REMOVAL OF ALL WALL AND CEILING MATERIAL NECESSARY TO COMPLETE PIPING
DEMOLITION AND INSTALLATION. WALL AND CEILING MATERIALS SHALL BE REPLACED TO LIKE NEW CONDITIONS WITH
MATERIALS AND COLORS MATCHING SURROUNDING CONSTRUCTION.
CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
M-001
SYMBOLS & ABBREVIATIONS REPLACE HEAT
EXCHANGERS 3 & 4
BJT APS10/13/2017
585-16-107
Iron Mountain , MI.
AAV AUTOMATIC AIR VENT
AFF ABOVE FINISHED FLOOR
AS AIR SEPARATOR
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER
HOUR
C CENTIGRADE (CELSIUS)
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
COMP COMPRESSOR UNIT
CP CONDENSATE PUMP
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DIA DIAMETER
DP DEW POINT TEMPERATURE
DPS DIFFERENTIAL PRESSURE
SENSOR
ECC ENGINEERING CONTROL
CENTER
EMD END OF MAIN DRIP (STEAM)
ET EXPANSION TANK
EWT ENTERING WATER
TEMPERATURE
EX. EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT
FPS FEET PER SECOND
FS FLOW SWITCH
FT FEET
FT-LB FOOT-POUND
GA GAUGE
GPD GALLONS PER DAY
GPM GALLONS PER MINUTE
HC HEATING COIL
HD HEAD
HOA HAND/OFF/AUTOMATIC
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN
(STEAM CONDENSATE)
HPS HIGH PRESSURE SUPPLY
(STEAM)
HRP HYDRONIC RADIANT (CEILING)
PANEL
HSTAT HUMIDISTAT
HW HOT WATER
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HX HEAT EXCHANGER
HZ HERTZ
I/O INPUT/OUTPUT
IBT INVERTED BUCKET TRAP
ID INSIDE DIAMETER
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
KG KILOGRAM
KPA KILOPASCAL
KW KILOWATT
KWH KILOWATT HOUR
L/s LITERS PER SECOND
LAT LEAVING AIR TEMPERATURE
LB/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LPR LOW PRESSURE RETURN
(STEAM CONDENSATE)
LPS LOW PRESSURE STEAM
LWT LEAVING WATER
TEMPERATURE
M METER
MAV MANUAL AIR VENT
MAX MAXIMUM
MBH 1000 BTUH
MER MECHANICAL EQUIPMENT
ROOM
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOM NOMINAL
NTS NOT TO SCALE
OD OUTSIDE DIAMETER
P PUMP
PA PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT
(FEET)
PD PRESSURE DROP
PG PRESSURE GAGE
PGW PROPYLENE GLYCOL-WATER
(SOLUTION)
PPM PARTS PER MILLION
PRS PRESSURE REGULATING
(VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH –
ABSOLUTE
PSIG POUNDS PER SQUARE INCH –
GAGE
PSV PRESSURE SAFETY VALVE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RPM REVOLUTIONS PER MINUTE
SI SQUARE INCHES
SP STATIC PRESSURE
SQF SQUARE FOOT (FEET)
SV STEAM PRESSURE REDUCING
VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TP TRAP
TSTAT THERMOSTAT
V VALVE
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
Wb WET-BULB (TEMPERATURE)
WF WATER FILTER
WFMD WATER FLOW MEASURING
DEVICE
WG WATER GAGE
WM WATER METER
WPD WATER PRESSURE DROP
YR YEAR
No. Revisions Date
1 100% CONSTRUCTION
DOCUMENTS
FD
VAULT
TRANSFORMER
S002
ROOM
MECHANICAL
S001
UP
FD
REMOVE HEAT EXCHANGER (HX-10) AND ALL ASSOCIATED STEAM
AND CONDENSATE PIPING BACK TO MAIN.
REMOVE STEAM PIPING AS INDICATED.
REMOVE CONDENSATE PIPING AS INDICATED.
REMOVE 2" LPS FROM HX-3 AND HX-4 AND CAP.
REMOVE 1 1/4" CONDENSATE FROM HX-3 AND HX-4 AND CAP AT
MAIN.
REMOVE CONDENSATE PIPING AND VALVE. CAP AT MAIN.
KEYED NOTES
1. COORDINATE THE INSTALLATION OF HX-3 AND HX-4 WITH DEMOLITION OF
HX-10. HX-10 TO REMAIN IN OPERATION UNTIL CROSSOVER IS COMPLETE.
UPON COMPLETION OF CROSSOVER ALL DEMOLITION OF HX-10 WILL BE
COMPLETED. REFER TO GENERAL CONDITIONS 01 00 00 FOR SPECIFIC
CONSTRUCTION PHASING REQUIREMENTS.
GENERAL NOTES
EXISTING
CHWP-6
CAP
2" LPS
EXISTING HX-10
L P
C LPS
PUMPED
CONDENSATE
8" HPS HEADER12" LPS HEADER
8" MPS HEADER
ZONE CONTROL
VALVES
L P
S
L P
S
L P
S
L P
S
L P
S
L P
S
MPS
HPS HPS
HPS
4" VACUUM PUMP DISCHARGE
4" CONDENSATE
LPS
LPS
LPS
LPS
LPC
EXISTING STEAM
GENERATOR
L P
C
L P
S L P
S
HPS
H P
S
LPS
LPS
LPC
LPC
H P
S
1 1/2" LPS
L P
C
LPC
3 2
MD-100
MD-100
MD-100
6" LPC
1 3
LPC
LPC
EXISTING
HX-10 PUMPS
EXISTING HX-10
AIR SEPARATOR
EXISTING HX-10
EXPANSION TANK
L P
S
H P
S
H P
S
EXISTING PUMPED
CONDENSATE
LPS
EXISTING
STEAM
TRAP
EXISTING
STEAM TRAP
MD-100
EXISTING HX-10
AIR SEPARATOR
EXISTING
HX-10 PUMP
EXISTING
HX-10 PUMP
EXISTING HX-10
EXPANSION TANK
EXISTING
STEAM TRAP
EXISTING 6"
LPC HEADER
LPC
LPC
LPC
LPC
CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
MD-100
MECHANICAL STEAM PIPING
DEMOLITION PLAN - SUB-BASEMENT
REPLACE HEAT
EXCHANGERS 3 & 4
BJT APS10/13/2017
585-16-107
Iron Mountain , MI.
1/4" = 1'-0"
MECHANICAL STEAM PIPING DEMOLITION PLAN - SUB-BASEMENT1
NORTH
NOT TO SCALE
EXISTING LPS VALVE - HX-102
1/2" = 1'-0"
MECHANICAL STEAM PIPING DEMOLITION SECTION 13 1/2" = 1'-0"
MECHANICAL STEAM PIPING DEMOLITION SECTION 24
No. Revisions Date
1 100% CONSTRUCTION
DOCUMENTS
FD FD
REMOVE HEAT EXCHANGER (HX-10) AND ALL ASSOCIATED HOT
WATER PIPING.
REMOVE EXISTING HWS/R MAINS AND RISER AS INDICATED ON
PLAN.
REMOVE BOTH INLINE PUMPS AND ALL ASSOCIATED CONTROLS
AS INDICATED.
REMOVE EXISTING AIR SEPARATOR AND EXPANSION TANK AS
INDICATED.
REMOVE EXISTING GWS/R PIPING AS INDICATED.
REMOVE EXISTING PRESSURE REDUCING VALVE (PRV) AS
INDICATED.
REMOVE NON-POTABLE SOFT WATER PIPING AS INDICATED.
REMOVE EXISTING BACKFLOW PREVENTER (BFP) AS INDICATED.
KEYED NOTES
MD-101
EXISTING
EXPANSION
TANK
EXISTING
AIR SEPARATOR
6" CHWR
6" CHWS
6" C
H W
R
6" C
H W
S
6" C
H W
S
4" C
H W
R
6" C
H W
R
6" C
H W
S
6" C
H W
R
4" CHWS
4" C
H W
S
6" C
H W
R
6" C
H W
S
6" C
H W
R
6" C
H W
S
6" C
H W
R
6" C
H W
R
6" C
H W
R
C H
W S
6" CHWS
6" CHWS
6" CHWS
10" CHWR
6" C
H W
R
C H
W S
C H
W R
10" CHWR
C H
W S
6" CHWS
6" CHWS
6" CHWS
6" CHWS
8" CHWS
6" CHWS
6" CHWS
6" CHWS
6" CHWS
6" CHWS
6" CHWS
6" C
H W
S
6" C
H W
S
6" C
H W
S
6" C
H W
S
6" CHWS
6" CHWS
EXISTING
FILTER
2" CHWS
2" CHWS
8" CHWS
EXISTING
CHWP-3
EXISTING
CHWP-5
EXISTING
CHWP-6
EXISTING
PHW-2
EXISTING
PHW-1
EXISTING
PCHW-2
EXISTING
PCHW-1
C H
W R
10" CHWR
8" CHWS
8" C
H W
S
3" EXISTING
HWS/R PIPING UP
TO BASEMENT
EXISTING
CHWP-4
3 3
3" HWS/R
MD-101
EXISTING
SNOWMELT
PIPING
1" GWS/R
EXISTING SNOWMELT
CONTROL PANEL
BFP
PRV CAP AT MAIN
MD-101
1 3
3 3
67 7
1. COORDINATE THE INSTALLATION OF HX-3 AND HX-4 WITH DEMOLITION OF
HX-10. HX-10 TO REMAIN IN OPERATION UNTIL CROSSOVER IS COMPLETE.
UPON COMPLETION OF CROSSOVER ALL DEMOLITION OF HX-10 WILL BE
COMPLETED.
2. MECHANICAL CONTRACTOR TO REMOVE ALL HX-10 FRAMING AND
SUPPORTS.
3. REMOVE EXISTING PIPE HANGERS AND SUPPORTS FOR INSTALLATION OF
NEW HWS/R PIPING.
GENERAL NOTES
CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
MD-101
MECHANICAL PIPING DEMOLITION PLAN
- SUB-BASEMENT
REPLACE HEAT
EXCHANGERS 3 & 4
BJT APS10/13/2017
585-16-107
Iron Mountain , MI.
1/4" = 1'-0"
MECHANICAL PIPING DEMOLITION PLAN - SUB-BASEMENT1
NOT TO SCALE
HX-102
NORTH
1/2" = 1'-0"
MECHANICAL PIPING DEMOLITION SECTION 13
1/2" = 1'-0"
MECHANICAL PIPING DEMOLITION SECTION 24
No. Revisions Date
1 100% CONSTRUCTION
DOCUMENTS
CR CR
PP
KP
FE
FE
FE
FE
FE
FE
FE
FE
FE
FE
FE
MAPES PANELS
IN WINDOWS
STCK BRKOUT
& RECEIVING
B287
SPD
OFFICE
B291A
PROGRAM
ASSISTANTS
B107B
WAN
ROOM
B105
TELEPHONE
EQUIPMENT
B103
HOLMAN
ROOM
B201
MECH. RM.
B202
CHIEF
LOGISTICS
B203
WOMENS
TOILET
B204
MENS
TOILET
B205
UTILITY
B186C
VESTIBULE
B107 CORRIDOR
B299A-1
PIPE SHAFT
B284
EMERGENCY
ELECT. RM.
B267
ELECTRICAL
ROOM
B269
OXYGEN
STORAGE
B268
FOOD BANK
COOLER 2
B186Q
RETHERM
COOLER 1
B186R
NESS
COOLER 3
B186P
CANTEEN
COOLER 4
B186N
CANTEEN
FREEZER 2
B186M
NESS
FREEZER 1
B186L
MEDICAL
WASTE
B186E
VESTIBULE
B276
RECYCLING &
SHREDDER RM.
B278
ELECTRICAL
EQUIP. RM.
B278A
CORRIDOR
B299D-1
PRI. SUPPLY/
SURGERY CASE CART
B291
WAREHOUSE
STORAGE
B274
ASST CHIEF
LOGISTICS
B298B
NON-EXP
EQUIP.
B298A
CORRIDOR
B299B-1
DECONTAMINATION
B295
MECH.
ACCESS
B295A
BULK MEDICAL
STORAGE
B231D
MECH.
ROOM
B231A
STORAGE
LOGISTICS
B231
MECH.
ROOM
B231B
ETO
B291C
PREPARATION
PACKAGING
B291B
MECH.
ACCESS
B227
LOCKER
B297
DATA &
PHONE
B296
WAREHOUSE
STORAGE
B298
ELEVATOR
EQUIPMENT
B224B
ELECT
ROOM
B224C
ELEVATOR
LOBBY
B224
LAUNDRY
CHUTE
B230
CORRIDOR
B299C-1
MECHANICAL
ROOM
B224A
LOUNGE
B226
TOILET
B226B
LOCKER
B226A
SHOWER
B226C
SHAFT MECH SHAFT
4" R
A
IS
E D
C O
N C
S
LA
B
E
LE
C T
R
IC
T R
A N
S F
O R
M E
R S
O N
E Q
U
IP
M E
N T
E
LE
C T
R
IC
A L
ACCESS
C H
A S
E
P
IP
E
BLAST CHILLER
IN-FILLED WINDOWS
88" TALL WALL
TA
TA
TA
IN
-F
IL
L
E D
W
IN
D O
W S
ELEVATOR
PASSENGER
STAIR 3
UP
UP
DN
STAIR 2ELEVATOR
SERVICE
ELEVATOR
PASSENGER
ELEVATOR
PASSENGER
FABRIC DOOR
COILING OH
CEILING
SLOPED
LIFT
COILING OH DOORCOILING OH DOORCOILING OH DOOR
FD
AHU
HYDRAULIC POWER UNITS
FD
R A
M P
TA
LOCKERS REMOVED
" HIGH GLAZED CURB,2
TA
EQUIP
FIRE
COILING OH DOOR
EQUIP
FIRE
EQUIP
FIRE
SCALE
FLOOR
PIPE CHASE
B107D
AMBIENT DISPOSABLE
& NOURISHMENT STORAGE
B186G
STAFF
WORK ROOM
B186D
DIETETICS
OFFICE
B186F
FOOD SERVICE
MANAGER'S OFFICE
B186E
ROUGH
PREPARATION
B186H
CART WASH
1"
TO FIRST FLOOR
2" HWS/R UP
SUB-BASEMENT
HWS/R DOWN TO
UP (OLD HX-5)
1 1/2" HWS/R
1"
1"
T
T
T
T
T
T
T
T
T
T
H
T
H
S
SSS
T TT T
T
DP-3
DP-3
T
T
T
HTT
H
T
DP-2
T
T
T
HTT
H
H
T
T
T
T
T
T
1 1/2" VENT
EF-RB226C
SAV-RB297
F C
-R B
SAV-RB291
SAV-RB291A
SAV-RB287
AHU-21
HX-13A
HX-13B
AS-1
P-15
P-16ET-1
2"
VAV-B185
VAV-B186A
VAV-B186E
VAV-B186G
FC-9
SAV-RB291B
AHU-9
ROOF(TYP.)
CONDENSORS ON
1/8" SUCTION UP TO
1/2" DISCHARGE & 1
HX-4
HX-3
SAV-RB291S
1 1/2" CHWS/R
3"CHWS/R
3" CHWS/R UP
TO SURGERY
1 1/2" HWS/R
1 1/2" COND.
1" COND.
1" COND.
1" COND.
3/4"
2 1/2"
CHWS/R DN
THRU FLOOR
1" HWS/R UP THRU FLOOR, SEE
MP101 FOR CONTINUATION
4" HWS/R UP &
DN THRU FLOORS (BID
ALTERNATE #1)
2 1/2" CHWS/R
1" HWS/R
DP-4
2 1/2" CHWS/R UP
THRU FLOOR TO
AHU-1, SEE MP101
FOR CONSTRUCTION
1 1/2" CHWS/R
3"
1/2" PURGE
PORTS
1/2" PURGE PORTS
1 1/4"
1 1/2"
3/4"
3/4"
3/4"
1 1/2"
1 1/2"
3/4"
3" CHWS/R
UP TO
AHU-30
1 1/4"
3/4"
3/4"
1"
3/4"
1 1/2" VENT
1 1/2" VENT
1 1/2" VENT
3"VTR
VENT AG
4" SAN UP
2 1/2"
3/4"
3/4"
3/4"
3/4"
1 1/4"
3/4"
3/4" 3/4"
1" HWS/HWR
DN TO TUNNEL
1"
3/4"
UP TO FIRST FLOOR
2 1/2" HWS/R
MED. PRESS.
STEAM RISER
10" CHWS/R
REFRIGERATION PIPING
DOWN TO BASEMENT
4"
H
3/4"
2"HWS&R
1"
SAV-7
1 1/2"
3"HWR/S
3"HWR/S
2"HWR/S
3/4"
4" CHWS&R
H
2"
1"
1 1/4"
1 1/8"1/2"
1 1/8" 1/2"
3/8"
7/8" 3/8" 7/8"
7/8"
3/8"
7/8"
3/8"
2"
3"
4" CHWS/R
2"
2 1/2" CHWS/R
4"
2"1 1/2"
3/4"
3/4"
1 1/2"
2 1/2"
1" 1"
VAV-RB296
VAV-RB299B
VAV-RB226A
VAV-RB226B
VAV-RB226C
VAV-RB226
VAV-RB231
VAV-RB231A
VAV-RB274
AHU-2
AC-1
AC-2
AC-3
VAV-B186G
VAV-B186H
VAV-B186E
VAV-KH3
EF-RB298
CRAC-RB105
H-RB105
CRAC-RB103
H-RB103
FCU-RB107B
ERV-RB103
UH-B107D
VAV-RB201A VAV-RB201B
VAV-RB201C
VAV-RB299A
VAV-RB202
AHU-28
SAV-RB291C
VAV-RB186E
P
P
P
P
P
EXISTING SNOWMELT PIPING
CONTINUTED IN SUB-BASEMENT
REMOVE HEAT EXCHANGERS (HX-3 & HX-4) AS INDICATED ON PLAN.
REMOVE ALL HWS/R PIPING AS INDICATED ON PLAN.
REMOVE 2" LPS PIPING AND CONDENSATE DOWN TO STEAM
TUNNEL. SEE 1/MD-100 FOR CONTINUATION.
REMOVE HWS/R PIPING UP TO TERMINAL UNIT VALVES AND
ACCESSORIES. RECONFIGURE PIPING CONNECTIONS TO TERMINAL
BASED ON NEW HWS/R CONNECTIONS SHOWN ON SHEET MP-102.
REMOVE HWS/R PIPING IN RISER FROM MECHANICAL ROOM 2180 TO
BASEMENT.
REMOVE INLINE PUMPS AND ASSOCIATED CONTROLS AS INDICATED
ON PLAN.
KEYED NOTES
1. COORDINATE THE INSTALLATION OF HX-3 AND HX-4 WITH DEMOLITION OF
HX-10. HX-10 TO REMAIN IN OPERATION UNTIL CROSSOVER IS COMPLETE.
UPON COMPLETION OF CROSSOVER ALL DEMOLITION OF HX-10 WILL BE
COMPLETED.
2. MECHANICAL CONTRACTOR TO REMOVE ALL HX-10 FRAMING AND
SUPPORTS.
3. REMOVE EXISTING PIPE HANGERS AND SUPPORTS FOR INSTALLATION OF
NEW HWS/R PIPING.
GENERAL NOTES
CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
MD-102
MECHANICAL PIPING DEMOLITION PLAN
- BASEMENT
REPLACE HEAT
EXCHANGERS 3 & 4
BJT APS10/13/2017
585-16-107
Iron Mountain , MI.
1/8" = 1'-0"
MECHANICAL PIPING DEMOLITION PLAN - BASEMENT1
NOT TO SCALE
HX-3 AND HX-42
NORTH
HX-4
HX-3
No. Revisions Date
1 100% CONSTRUCTION
DOCUMENTS
D-4 D-5
SERVICE
ELEVATOR PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
30 31
A
C
G
H
J
K
L
M
N
O
P
R
S
T
16 19 20 30 31
Q
B
D
RS
8 7 4 3 2 1
12356
UP
DN
DNUP
UP
DN
HALFWALL
VOLUNTEER
AREA
UP
CARPET
CARPET
CARPET
TILE
TILE
TILE
MECH SHAFT
FD
FE FE
6" RAISED
ALTAR
FIRE
EQUIP
T
S
S
SS
S
S
T
S
T
S
S
CO2
S S
S
S
S
S
S
S
S
S
S
S
T
CDW - HEATING
CDW - COOLING
4" HWS/R UP & DN
TREATMENT
SOILED
MEDICATION
DECONTAMINATION
AOD OFFICE
MRI VESTIBULE
TRIAGE
CHANGING
ROOM
1304C
EXAM
SECURE
TREATMENT
TREATMENT
WAITING
CORRIDOR
C1-6
P. TLT.
TREATMENT
MRI
VESTIBULE
1304A
STAIR
1300C
VESTIBULE
1300A
VESTIBULE
1300B
CHANGING
ROOM
1304B
PYXIS
ALCOVE
CORRIDOR
C1-6
NURSE
WORKROOM
STAFF
TOILET
DIABETES
DIABETES
HOUSEKEEPING
EXAM
WOMEN'S TLT.
MEN'S TLT.
FIRE ALARM
& SECURITY
EXAM
DIETICIAN
DIETICIAN
MEDICATION
EXAM
BLOOD DRAW/
EKG
P. TLT.
1267B
SOILED UTILITY
1267A
EXAM
NURSE
WORKROOM
EXAM
ALCOVE
WOUND CARE
TREATMENT
P. TLT.
EXAM
EXAM
EXAM
EXAM
EXAM
OFFICE
NURSE
WORKROOM
ANTE
1312A
TREATMENT/
ISOLATION
ELEVATOR
EQUIPMENT
TLT.
1312B
WAITING
WC STORAGE
BREAK/
LOCKERS
STAFF TLT.
1340A
EXAM
EXAM
CLEAN SUPPLY
EXAM
EXAM
EXAM
EXAM
EXAM
P. TLT.
STERILE
SUPPLY
OFFICE
EXAM
NURSE
WORKROOM
1333 DICTATION
NURSE STATION
EQUIPMENT
1315CLERK
SCALE ALCOVE
OFFICE
SCALE ALCOVE
WAITING
ELECTRICAL
ELEVATOR
LOBBY
CLERK
COMPUTER
ALCOVE
1300A
CORRIDOR
C1-8
CORRIDOR
C1-7
CORRIDOR
C1-10
CORRIDOR
C1-1
CORRIDOR
C1-2
CORRIDOR
C1-3
CORRIDOR
C1-5
CORRIDOR
C1-4
1" HWS/R DN
THRU FLOOR,
SEE MP002 FOR
CONTINUATION
SEE MP103 FOR
CONTINUATION
2 1/2" CHWR
2 1/2" CHWS
2 1/2" CHWR
T
T
T
T T TT
T
T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T TTTTT
T
T
T
T
T
T
T
T
T
T
T T
T
T
T
12.8
GPM
2" HWR/S DN
1" HWS/R UP
TO FLOOR ABOVE
2" HWS/R UP &
1 1/2" DN (OLD HX-5)
1 1/4" 1 1/4"
2"
3/4"
1 1/4"
1"
3/4"
3/4"
2"
1 1/2"
3/4" HWS & HWR
2 1/2" HWS & HWR
DN TO BASEMENT
3/4" HWS/HWR
1 1/4"
2"
1 1/2"
1 1/2"
1 1/4"
2"
2"
1 1/4"
2 1/2"
1" HWS/R
1/2" HWS/R
1/2" HWS/R
1/2" HWS/R
1" HWS/R
3/4" HWS/R
1/2" HWS/R
1" HWS/R
3/4" HWS/R
1" HWS/R
3/4" HWS/R
1/2" HWS/R
1" HWS/R
3/4" HWS/R
1/2" HWS/R
2 1/2" CWR/S
10" CHWS/R UP &
DOWN
3/4"HS & HR
DOWN TO
FT-1 & FT-2.
3"GHS/GHR
3"CHS/R
UP FROM
BELOW
3" GHS/GHR
UP & DOWN
2 1/2"GHS/GHR
1"
3/4" COND
3" CHWS/R DN
3" CHWS/R
VAV-R1303A
VAV-R1303
REFRIGERATION
LINES UP TO
ROOF
CRE-2
GEV-R1313
2"
1 1/2" 2"
VAV-R1300C
VAV-R1300B
VAV-R1300D
VAV-R1300A
VAV-R1392
VAV-R1390
VAV-R1379
VAV-R1333
VAV-R1378
VAV-R1399
VAV-R1359
VAV-R1385
VAV-R1355
VAV-R1398
VAV-R1382
VAV-R1384
VAV-R1332
VAV-R1345
VAV-R1330
VAV-R1347
1 1/4"
2" VAV-R1324
RCP-3
DH-1
1 1/4"
1" 2"
2"
2 1/2"1"3/4"2 1/2"3/4"2 1/2"
2 1/2"
2 1/2"
1 1/4"
2"
1 1/4"
VAV-R1308A
VAV-R1308B
VAV-R1302
VAV-R1301
FT-1
FT-2
VAV-R1310
VAV-R1312
VAV-R1317
VAV-R1314
VAV-R1316
VAV-R1318
RCP-4
VAV-R1319
VAV-R1325H-1
VAV-R1340
RCP-1RCP-2
VAV-R1344VAV-R1346
VAV-R1348
VAV-R1352VAV-R1354VAV-R1356
VAV-R1358
VAV-R1360
VAV-R1362
VAV-R1363
VAV-R1268
VAV-R1266
VAV-R1267
VAV-R1262
VAV-R1288A
VAV-R1288
VAV-R1286A
VAV-R1284
VAV-R1220
VAV-R1229B
VAV-R1217VAV-R1215
VAV-R1213
3" CHWS & CHWR
DN TO FIRST
FLOOR CEILING
AC-1
AC-2
AC-3AHU-3
AHU-20 VAV-C1-2
VAV-R1269
VAV-R1271
VAV-R1272
VAV-R1278
VAV-R1275
1 1/2"
VAV-R1218
FC-R1218A
3/4"
1"
VAV-R1226
VAV-R1228
VAV-R1234
VAV-R1236
VAV-R1238
VAV-R1237A
VAV-R1237B
VAV-R1233
VAV-R1233A
VAV-R1233B
VAV-R1229A
1"
1 1/4"
VAV-R1374
1/2" BOILER
DRAIN
VAV-R1103
VAV-R1107
2"
CUH
AHU
CAP
CAP
REMOVE 1" HWS/R PIPING AS SHOWN UP TO MECHANICAL ROOM
2180. CAP AT MAIN PIPING AS SHOWN.
REMOVE ALL EXISTING 3-WAY VALVES ASSOCIATED WITH
TERMINAL UNITS SERVED BY HX-3 & HX-4.
REMOVE HWS/R PIPING IN RISER FROM MECHANICAL ROOM 2180
TO BASEMENT INCLUDING FLOOR LEVEL STUB OUTS. REFER TO
1/MD-102 AND 1/MD-105 FOR PIPING CONTINUATIONS.
KEYED NOTES
CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
MD-103
MECHANICAL PIPING DEMOLITION PLAN
- FIRST FLOOR
REPLACE HEAT
EXCHANGERS 3 & 4
BJT APS10/13/2017
585-16-107
Iron Mountain , MI.
1/8" = 1'-0"
MECHANICAL PIPING DEMOLITION PLAN - FIRST FLOOR1
NORTH
No. Revisions Date
1 100% CONSTRUCTION
DOCUMENTS
CWS
CORRIDOR
1-TU-11-2215
1-TU-11-2217
1-TU-11-C2-1
1-TU-11-2219
1-TU-11-C2-2
1-TU-11-2221
1-TU-11-2218
1-TU-11-2252
1-TU-11-2240P
1-TU-11-2231
1-FTR30
1-FTR29
3/4" HWS
3/4" HWR
2" HWR
2" HWS
3/4" HWR
3/4" HWS
1" HWS
1" HWR
3/4" HWS
3/4" HWR
1" HWS
1" HWR
3/4" HWS
3/4" HWR
2" HWR
2" HWS
3/4" HWS
3/4" HWS
6" CHWR
6" CHWS
2 1/2" HWS
2 1/2" HWR 3/4" HWR
3/4" HWS
3/4" HWR3/4" HWS 3/4" HWS 3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3" HWR
3" HWS
4" HWS
4" HWR
3" HWR
3" HWS
3" HWS
3" HWR
3" HWS
3" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
1" HWS
1" HWR
3" HWR
3" HWS
3/4" HWS
3/4" HWR
EQUIP ALCOVE
2230B
TECH WORK ROOM
FEMALE TOILET
MALE TOILET
WAITING AREA
PHONE/DATA
HOUSEKEEPING
STAFF TOILET
EQUIP ALCOVE
2230A
CORRIDOR
C2-2
CORRIDOR
C2-1
PACS VIEWING
PACS WORKSTATION
PACS COMPUTER
2215A
RECEPTION
BONE DENSITY
MECHANICAL
PNEUMATIC
TUBE COMP
SOILED
UTILITY
2110B
SEMI-RESTRICTED
HALLWAY
PASSENGER
ELEVATOR
P-2
PASSENGER
ELEVATOR
P-3
STAIR 2
CORRIDOR
2299H
D-4 D-5
T T T
T
T
T
T
T
DPM
DPM DPM DPM
T
T
T
T
4" HWS/R UP
6"
6"
4" HPS UP & DN
3" HPC UP & DN
1" HWS
1" HWR
3/4" HWS
3/4" HWR
1-TU-2207
PHONE/DATA
SEMI-RESTRICTED HALLWAY
HOUSEKEEPING
2299H
CORRIDOR
STAIR 2
P-3
PASSENGER ELEVATOR
P-2
PASSENGER ELEVATOR
S-1
SERVICE ELEVATOR
SOILED UTILITY
EQUIPMENT STORAGE
MALE LOCKER SHOWER ROOM
2111A
MALE TOILET
FEMALE LOCKER SHOWER
1 1/2" HWR
1 1/2" HWS
3/4" HWR
3" HWS
3" HWR
4" HWR
3" HWS
3" HWR
3" HWR
3" HWS
2" HWR
2" HWS
2" HWR
2" HWS
3/4" HWR
3/4" HWS
2" HWR
2" HWS
3/4" HWR
3/4" HWS
1 1/4" HWS
1" HWR
1" HWS
1 1/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
1" HWS
1" HWR
1-HC-2299H
1-HC-2108
1-HC-2110E 1-HC-2202
1-HC-22051-HC-2203
1-HC-2204
1 1/4" HWR
1 1/4" HWS
1-FTR-29
2 1/2"
2"
AHU-15
AHU-5
ET-1
HWP-24
HWP-25
CRAC-3
HX-23
HX-22
AHU-4
FC-2180
2 1/2"
8"
6"
4"
2"
1 1/2"
3"
4" HWR
AS-1
CAP
CAP
REMOVE EXISTING 1 1/2" HWS/R PIPING AS INDICATED ON PLAN.
FIELD VERIFY EXACT LOCATION PRIOR TO SHUTDOWN. CAP
PIPING AT EXISTING MAIN SHUT-OFF VALVES.
REMOVE 1" HWS/R PIPING DOWN TO FIRST FLOOR. SEE SHEET
MD-103 FOR CONTINUATION.
REMOVE HWS/R PIPING IN RISER DOWN TO BASEMENT.
KEYED NOTES
CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
MD-104
MECHANICAL PIPING DEMOLITION PLAN
- SECOND FLOOR
REPLACE HEAT
EXCHANGERS 3 & 4
BJT APS10/13/2017
585-16-107
Iron Mountain , MI.
1/4" = 1'-0"
MECHANICAL PIPING DEMOLITION PLAN - SECOND FLOOR1
NORTH
No. Revisions Date
1 100% CONSTRUCTION
DOCUMENTS
VAULT
TRANSFORMER
S002
ROOM
MECHANICAL
S001
STAIR 2
UP
UP
FD
MP-301
MP-301
MP-301
EXISTING
EXPANSION
TANK
EXISTING
CHWP-1
EXISTING
CHWP-2
EXISTING
CHWP-3
EXISTING
CHWP-4
EXISTING
CHWP-5
EXISTING
CHWP-6
PUMPED
CONDENSATE
8" HPS HEADER12" LPS HEADER
8" MPS HEADER
ZONE CONTROL
VALVES
L P
S
L P
S
L P
S
L P
S
L P
S
L P
S
MPS
HPS HPS
HPS
4" VACUUM PUMP DISCHARGE
4" CONDENSATE
LPS
LPS
LPS
LPS
LPC
EXISTING STEAM
GENERATOR
L P
S L P
S
MPS
HPS
H P
S
LPS
LPS
LPC
H P
S
HX-4
HX-3
CAP
2" LPS
1" LPC
L P
C
4" LPS
4" LPS
LPC
2 1/2" LPS
4" LPS BY PASS
4" LPS
2 1/2" LPS
REQUIRED SERVICE
CLEARANCE
2" LPC
6" LPC
4" LPS
4" LPS 4" LPS
1 1/2"
LPC
HPS
LPS
EXISTING
STEAM
TRAP
PROVIDE NEW HEAT EXCHANGERS. INSTALL PER
MANUFACTURERS REQUIREMENTS AND MAINTAIN ALL SERVICE
CLEARANCES.
PROVIDE NEW PRESSURE REDUCING VALVE (PRV).
KEYED NOTES
1. CONTRACTOR TO PROVIDE ALL PIPING MATERIALS AND OFFSETS AS
REQUIRED FOR PROPER STEAM AND CONDENSATE INSTALLATION.
2. INSTALL ALL STEAM AND CONDESNATE LINES WITH PROPER SLOPE PER
SPECIFICATIONS.
3. INSTALL NEW LPS AND CONDENSATE PIPING AS INDICATED ON PLAN.
CONTRACTOR TO FIELD VERIFY EXACT LOCATION OF STEAM AND
CONDENSATE PIPING PRIOR TO INSTALLATION.
4. INSULATE ALL PIPING PER SPECIFICATIONS. REPAIR ANY INSULATION
DAMAGED DURING CONSTRUCTION.
GENERAL NOTES
CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
MP-100
MECHANICAL STEAM PIPING PLAN -
SUB-BASEMENT
REPLACE HEAT
EXCHANGERS 3 & 4
BJT APS10/13/2017
585-16-107
Iron Mountain , MI.
1/4" = 1'-0"
MECHANICAL STEAM PIPING PLAN - SUB-BASEMENT1
NORTH
No. Revisions Date
1 100% CONSTRUCTION
DOCUMENTS
CHWP-2A
EXISTING
EXPANSION
TANK
EXISTING
AIR SEPARATOR
6" CHWR
6" CHWS
6" C
H W
R
6" C
H W
S
6" C
H W
S
4" C
H W
R
6" C
H W
R
6" C
H W
S
6" C
H W
R
4" CHWS
4" C
H W
S
6" C
H W
R
6" C
H W
S
6" C
H W
R
6" C
H W
S
6" C
H W
R
6" C
H W
R
6" CHWS
10" CHWR
6" C
H W
R
C H
W S
C H
W R
10" CHWR
C H
W S
6" CHWS
6" CHWS
6" CHWS
6" CHWS1
MP-301
MP-301
8" CHWS
6" CHWS
6" CHWS
6" CHWS
6" CHWS
6" CHWS
6" CHWS
6" C
H W
S
6" C
H W
S
6" C
H W
S
6" C
H W
S
6" CHWS
6" CHWS
EXISTING
FILTER
2" CHWS
2" CHWS
MP-301
8" CHWS
EXISTING
CHWP-3
EXISTING
CHWP-5
EXISTING
CHWP-6
EXISTING
PHW-2
EXISTING
PHW-1
EXISTING
PCHW-2
EXISTING
PCHW-1
C H
W R
10" CHWR
8" CHWS
8" C
H W
S
ET-1
HX-3
HX-4
HWP-4
HWP-3
(STACKED)
4" HWS
4" HWR
4" HWS
4" HWR
4" HWS/R
PIPING UP TO
BASEMENT
4" H
W S
4" H
W R
EXISTING
CHWP-4
1" HWR
1" HWS
EX. SNOW MELT
CONTROL PANEL
MP-101
EX. DISCONNECT SWITCH
P-21
HX-21A
AS-1
SERVICE
CLEARANCE
4" HWS
4" HWR
ET-2
1" GWR
RPZ-1
1. VERIFY DIRECTION OF FLOW BEFORE CONNECTING NEW SUPPLY
AND RETURN CHILLED WATER PIPES TO EXISTING SUPPLY AND
RETURN CHILLED WATER PIPES.
2. ADD SUPPORTS AS REQUIRED TO SUPPORT EXISTING PIPING.
3. COORDINATE ALL SHUT-DOWNS WITH OWNER BEFORE CLOSING
ANY VALVES.
4. INSTALL ALL NEW PIPING AS HIGH AS POSSIBLE. PROVIDE
TRANSITIONS AS REQUIRED.
5. MECHANICAL C0NTRACTOR TO PROVIDE ALL WELLS AND
SOCKETS ON THE PIPING SYSTEM FOR THE CONTROLS
CONTRACTOR TO INSTALL SENSORS.
GENERAL NOTES
PROVIDE NEW HEAT EXCHANGERS. INSTALL PER
MANUFACTURERS REQUIREMENTS AND MAINTAIN ALL SERVICE
CLEARANCES.
PROVIDE NEW INLINE PUMPS FOR SNOWMELT SYSTEM. PUMPS
TO BE STACKED ON WALL.
PROVIDE NEW BRAZED PLATE HEAT EXCHANGERS FOR
SNOWMELT SYSTEM. HEAT EXCHANGERS TO BE STACKED
ALONG WALL.
PROVIDE NEW 1" GWS/R PIPING FROM SNOW MELT HOT WATER
CIRCULATION PUMPS TO EXISTING CAPPED GWS/R PIPING.
PROVIDE NEW 1" PRESSURE REDUCING VALVE (PRV) AND SET
PRESSURE TO SYSTEM REQUIREMENTS.
PROVIDE NEW 1" BACKFLOW PREVENTER (RPZ-1) TO SUPPLY
NON-POTABLE WATER PIPING TO NEW HEAT EXCHANGER
SYSTEM. SEE REDUCED PRESSURE BACKFLOW PREVENTER
SCHEDULE ON SHEET M-601 FOR MORE INFORMATION.
KEYED NOTES
P-21
HX-21A
1" GWS
1" HWR
1" HWS
L P
S
LPS-RETURN
HPS
EXISTING 1" GWS/R
1" GWR
1" G
W R
1/2" GWS
ET-2
AIR SEPARATOR
CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
MP-101
MECHANICAL PIPING PLAN -
SUB-BASEMENT
REPLACE HEAT
EXCHANGERS 3 & 4
BJT APS10/13/2017
585-16-107
Iron Mountain , MI.
1/4" = 1'-0"
MECHANICAL PIPING PLAN - SUB-BASEMENT1
NORTH
1/2" = 1'-0"
MECHANICAL SNOW MELT SYSTEM SECTION2
NOT TO SCALE
EXISTING SNOW MELT CONTROL PANEL3
No. Revisions Date
1 100% CONSTRUCTION
DOCUMENTS
CR CR
PP
KP
FE
FE
FE
FE
FE
FE
FE
FE
FE
FE
FE
MAPES PANELS
IN WINDOWS
FLOOR
SCALE
FIRE
EQUIP
FIRE
EQUIP
COILING OH DOOR
FIRE
EQUIP
TA
2 " HIGH GLAZED CURB,
LOCKERS REMOVED
TA
R A
M P
FD
HYDRAULIC POWER UNITS
AHU
FD
COILING OH DOOR COILING OH DOOR COILING OH DOOR
LIFT
SLOPED
CEILING
COILING OH
FABRIC DOOR
PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
SERVICE
ELEVATOR STAIR 2
DN
UP
UP
STAIR 3
PASSENGER
ELEVATOR
IN
-F
IL
L
E D
W
IN
D O
W S
TA
TA
TA
88" TALL WALL
IN-FILLED WINDOWS
BLAST CHILLER
P
IP
E
C H
A S
E
ACCESS
E
LE
C T
R
IC
A L
E Q
U
IP
M E
N T
E
LE
C T
R
IC
T R
A N
S F
O R
M E
R S
O N
4" R
A
IS
E D
C O
N C
S
LA
B
MECH SHAFTSHAFT
SHOWER
B226C
LOCKER
B226A
TOILET
B226B
LOUNGE
B226
MECHANICAL
ROOM
B224A
CORRIDOR
B299C-1
LAUNDRY
CHUTE
B230
ELEVATOR
LOBBY
B224
ELECT
ROOM
B224C
ELEVATOR
EQUIPMENT
B224B
WAREHOUSE
STORAGE
B298
DATA &
PHONE
B296
LOCKER
B297
MECH.
ACCESS
B227
PREPARATION
PACKAGING
B291B
ETO
B291C
MECH.
ROOM
B231B
STORAGE
LOGISTICS
B231
MECH.
ROOM
B231A
BULK MEDICAL
STORAGE
B231D
MECH.
ACCESS
B295A
DECONTAMINATION
B295
CORRIDOR
B299B-1
NON-EXP
EQUIP.
B298A
ASST CHIEF
LOGISTICS
B298B
WAREHOUSE
STORAGE
B274
PRI. SUPPLY/
SURGERY CASE CART
B291
CORRIDOR
B299D-1
ELECTRICAL
EQUIP. RM.
B278A
RECYCLING &
SHREDDER RM.
B278
VESTIBULE
B276
MEDICAL
WASTE
B186E
NESS
FREEZER 1
B186L
CANTEEN
FREEZER 2
B186M
CANTEEN
COOLER 4
B186N
NESS
COOLER 3
B186P
RETHERM
COOLER 1
B186R
FOOD BANK
COOLER 2
B186Q
OXYGEN
STORAGE
B268
ELECTRICAL
ROOM
B269
EMERGENCY
ELECT. RM.
B267
PIPE SHAFT
B284
CORRIDOR
B299A-1
VESTIBULE
B107
UTILITY
B186C
MENS
TOILET
B205
WOMENS
TOILET
B204
CHIEF
LOGISTICS
B203
MECH. RM.
B202
HOLMAN
ROOM
B201
TELEPHONE
EQUIPMENT
B103
WAN
ROOM
B105
PROGRAM
ASSISTANTS
B107B
SPD
OFFICE
B291A
STCK BRKOUT
& RECEIVING
B287
CHASE
B107D
PIPE CHASE
B107D
AMBIENT DISPOSABLE
& NOURISHMENT STORAGE
B186G
STAFF
WORK ROOM
B186D
DIETETICS
OFFICE
B186F
FOOD SERVICE
MANAGER'S OFFICE
B186E
ROUGH
PREPARATION
B186H
CART WASH
B186B
T
T
T
T
T
T
H
H
T T H
T
T
T
DP-2
T
H
T T H
T
T
T
DP-3
DP-3
T
TT TT
S S S
S
H
T
H
T
T
T
T
T
T
T
T
T
T
1"1"
2 1/2"
1 1/2"
3/4"
3/4"
1 1/2" 2"
4"
2 1/2" CHWS/R
2"
4" CHWS/R
3"
2"
3/8"
7/8"
3/8"
7/8"
7/8" 3/8"
7/8"
3/8"
1/2" 1 1/8"
1/2" 1 1/8"
1 1/4"
1"
2"
H
4" CHWS&R
3/4"
2"HWR/S
3"HWR/S
3"HWR/S
1 1/2"
SAV-7
1"
2"HWS&R
3/4"
H
4"
REFRIGERATION PIPING
DOWN TO BASEMENT
10" CHWS/R
MED. PRESS.
STEAM RISER
3/4"
1"
1" HWS/HWR
DN TO TUNNEL
3/4" 3/4"
3/4"
1 1/4"
3/4"
3/4"
3/4"
3/4"
2 1/2"
4" SAN UP
VENT AG
3"VTR
1 1/2" VENT
1 1/2" VENT
1 1/2" VENT
3/4"
1"
3/4"
3/4"
1 1/4"
3" CHWS/R
UP TO
AHU-30
3/4"
1 1/2"
1 1/2"
3/4"
3/4"
3/4"
1 1/2"
1 1/4"
1/2" PURGE PORTS
1/2" PURGE
PORTS
3"
1 1/2" CHWS/R
DP-4
1" HWS/R
2 1/2" CHWS/R
4" HWS/R UP &
DN THRU FLOORS (BID
ALTERNATE #1)
2 1/2"
CHWS/R DN
THRU FLOOR
3/4"
1" COND.
1" COND.
1" COND.
1 1/2" COND.
1 1/2" HWS/R
3" CHWS/R UP
TO SURGERY
3"CHWS/R
1 1/2" CHWS/R
SAV-RB291S
1/2" DISCHARGE & 1
1/8" SUCTION UP TO
CONDENSORS ON
ROOF(TYP.)
AHU-2
VAV-RB296
VAV-RB299B
AHU-9
VAV-RB226A
VAV-RB226B
VAV-RB226C
VAV-RB226
SAV-RB291B
FC-9
VAV-RB231
VAV-RB231A
VAV-RB274
AC-1
AC-2
AC-3
VAV-B186G
VAV-B186H
VAV-B186E
VAV-B186A
VAV-B185
VAV-KH3
2"
ET-1 P-16
P-15
AS-1
HX-13B
HX-13A
AHU-21
SAV-RB287
SAV-RB291A
SAV-RB291
F C
-R B
SAV-RB297
EF-RB226C
1 1/2" VENT
EF-RB298
CRAC-RB105
H-RB105
2 1/2" CHWS/R UP
THRU FLOOR TO
AHU-1, SEE MP101
FOR CONSTRUCTION
CRAC-RB103
H-RB103
1" HWS/R UP THRU FLOOR, SEE
MP101 FOR CONTINUATION
ERV-RB103
VAV-RB299A
VAV-RB202
AHU-28
VAV-RB201A VAV-RB201B
VAV-RB201C
UH-B107D
VAV-RB201A VAV-RB201B
VAV-RB201C
FCU-RB107B
VAV-RB186E
4" HWS/R
4" H
W S
/R
P
P
P
P
P
2 1/2" HWS/R
1" HWS/R
1" HWS/R
H W
S /R
H W
S /R
4" HWS/R
H W
S /R
EXISTING SNOWMELT PIPING
CONTINUTED IN SUB-BASEMENT
VERIFY DIRECTION OF FLOW BEFORE CONNECTING NEW SUPPLY AND
RETURN HOT WATER PIPES TO EXISTING SUPPLY AND RETURN HOT
WATER PIPES.
PROVIDE PIPING SUPPORTS AS REQUIRED FOR EXISTING PIPING.
COORDINATE EQUIPMENT AND SYSTEM SHUT-DOWNS WITH OWNER
PRIOR TO CONSTRUCTION.
INSTALL NEW PIPING AS HIGH AS POSSIBLE. PROVIDE TRANSITIONS AS
REQUIRED FOR COMPLETION OF DESIGN INTENT.
MECHANICAL CONTRACTOR TO COORDINATE WITH CONTROLS
CONTRACTOR FOR ALL SENSOR REQUIREMENTS.
GENERAL NOTES
1.
2.
3.
4.
5.
CONNECT NEW HWS/R PIPING TO EXISTING TERMINAL UNIT.
EXISTING 2 1/2" HWS/R PIPING UP TO FIRST FLOOR OPC. SEE
SHEET 1/MP-103 FOR CONTINUATION.
3" HWS/R PIPING UP TO EXAM AREA. SEE SHEET 1/MP-103 FOR
CONTINUATION.
4" HWS/R PIPING DOWN TO SUB-BASEMENT. SEE SHEET
1/MP-101 FOR CONTINUATION.
KEYED NOTES
CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
MP-102
MECHANICAL PIPING PLAN - BASEMENT REPLACE HEAT
EXCHANGERS 3 & 4
BJT APS10/13/2017
585-16-107
Iron Mountain , MI.
1/8" = 1'-0"
MECHANICAL PIPING PLAN - BASEMENT1
NORTH
10No. Revisions Date
1 100% CONSTRUCTION
DOCUMENTS
D-4 D-5
SERVICE
ELEVATOR PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
30 31
A
C
G
H
J
K
L
M
N
O
P
R
S
T
16 19 20 30 31
Q
B
D
RS
8 7 4 3 2 1
UP
DN
DNUP
UP
DN
HALFWALL
VOLUNTEER
AREA
UP
CARPET
CARPET
CARPET
TILE
TILE
TILE
MECH SHAFT
FD
FE FE
6" RAISED
ALTAR
FIRE
EQUIP
4" HWS/R UP & DN
CDW - COOLING
CDW - HEATING
T
S
S
S
S
S
S
S
S
S
S
S S
CO2
S
S
T
S
T
S
S
S S
S
S
T
TREATMENT
SOILED
MEDICATION
DECONTAMINATION
AOD OFFICE
MRI VESTIBULE
TRIAGE
CHANGING
ROOM
1304C
EXAM
SECURE
TREATMENT
TREATMENT
WAITING
CORRIDOR
C1-6
P. TLT.
TREATMENT
MRI
VESTIBULE
1304A
STAIR
1300C
VESTIBULE
1300A
VESTIBULE
1300B
CHANGING
ROOM
1304B
PYXIS
ALCOVE
CORRIDOR
C1-6
NURSE
WORKROOM
STAFF
TOILET
DIABETES
DIABETES
HOUSEKEEPING
EXAM
WOMEN'S TLT.
MEN'S TLT.
FIRE ALARM
& SECURITY
EXAM
DIETICIAN
DIETICIAN
MEDICATION
EXAM
BLOOD DRAW/
EKG
P. TLT.
1267B
SOILED UTILITY
1267A
EXAM
NURSE
WORKROOM
EXAM
ALCOVE
WOUND CARE
TREATMENT
P. TLT.
EXAM
EXAM
EXAM
EXAM
EXAM
OFFICE
NURSE
WORKROOM
ANTE
1312A
TREATMENT/
ISOLATION
ELEVATOR
EQUIPMENT
TLT.
1312B
WAITING
WC STORAGE
BREAK/
LOCKERS
STAFF TLT.
1340A
EXAM
EXAM
CLEAN SUPPLY
EXAM
1384 EXAM
EXAM
EXAM
EXAM
P. TLT.
STERILE
SUPPLY
OFFICE
EXAM
NURSE
WORKROOM
DICTATION
NURSE STATION
EQUIPMENT
1315CLERK
SCALE ALCOVE
OFFICE
SCALE ALCOVE
WAITING
ELECTRICAL
ELEVATOR
LOBBY
CLERK
COMPUTER
ALCOVE
1300A
CORRIDOR
C1-8
CORRIDOR
C1-7
CORRIDOR
C1-10
CORRIDOR
C1-1
CORRIDOR
C1-2
CORRIDOR
C1-3
CORRIDOR
C1-5
CORRIDOR
C1-4
SEE MP103 FOR
CONTINUATION
1" HWS/R DN
THRU FLOOR,
SEE MP002 FOR
CONTINUATION
2 1/2" CHWS/R
DN THRU FLOOR
SEE MP002 FOR
CONTINUATION
2 1/2" CHWR
2 1/2" CHWS
2 1/2" CHWS
2 1/2" CHWR
T
T
TT
T
T
T
T
T
T
T
T
T
T
T
T T T T TT
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T T
T
T TTT
T
T
T
VAV-R1107
VAV-R1103
VAV-R1374
1 1/4"
1"
VAV-R1229A
VAV-R1233B
VAV-R1233A
VAV-R1233
VAV-R1237B
VAV-R1237A
VAV-R1238
VAV-R1236
VAV-R1234
VAV-R1228
VAV-R1226
FC-R1218A
VAV-R1218
1 1/2"
VAV-R1275
VAV-R1278
VAV-R1272
VAV-R1271
VAV-R1269
VAV-C1-2AHU-20
AHU-3 AC-3
AC-2
AC-1
VAV-R1213
VAV-R1215 VAV-R1217
VAV-R1229B
VAV-R1220
VAV-R1262
VAV-R1266
VAV-R1268
VAV-R1363
VAV-R1362
VAV-R1360
VAV-R1358
VAV-R1356 VAV-R1354 VAV-R1352
VAV-R1348
VAV-R1346 VAV-R1344
RCP-2 RCP-1
VAV-R1340
H-1 VAV-R1325
VAV-R1319
RCP-4
VAV-R1318
VAV-R1316
VAV-R1314
VAV-R1317
VAV-R1312
VAV-R1310
FT-2
FT-1
VAV-R1301
VAV-R1302
VAV-R1308B
VAV-R1308A
1 1/4"
2"
1 1/4"
2 1/2"
2 1/2"
2 1/2" 3/4" 2 1/2" 3/4" 1" 2 1/2"
2"
2" 1"
1 1/4"
DH-1
RCP-3
VAV-R13242"
1 1/4"
VAV-R1347
VAV-R1330
VAV-R1345
VAV-R1332
VAV-R1384
VAV-R1382
VAV-R1398
VAV-R1355
VAV-R1385
VAV-R1359
VAV-R1399
VAV-R1378
VAV-R1333
VAV-R1379
VAV-R1390
VAV-R1392
VAV-R1300A
VAV-R1300D
VAV-R1300B
VAV-R1300C
2" 1 1/2"
2"
GEV-R1313
CRE-2
ROOF
LINES UP TO
REFRIGERATION
VAV-R1303
VAV-R1303A
3" CHWS/R
3" CHWS/R DN
FLOOR CEILING
DN TO FIRST
3" CHWS & CHWR
3/4" COND
1"
3" GHS/GHR
FT-1 & FT-2.
DOWN TO
3/4"HS & HR
2 1/2" CWR/S
1/2" HWS/R
3/4" HWS/R
1" HWS/R
1/2" HWS/R
3/4" HWS/R
1" HWS/R
3/4" HWS/R
1" HWS/R
1/2" HWS/R
3/4" HWS/R
1" HWS/R
1/2" HWS/R
1/2" HWS/R
DRAIN
1/2" BOILER
1/2" HWS/R
1" HWS/R
2 1/2"
1 1/4"
2"
2"
1 1/4"
1 1/2"
1 1/2"
2"
1 1/4"
3/4" HWS/HWR
DN TO BASEMENT
EXISTING 2 1/2" HWS/R
3/4" HWS & HWR
1 1/2"
2"
3/4"
3/4"
1"
3/4"
1"
1 1/4"
3/4"
2"
1 1/4"1 1/4"
2 1/2" GHS/GHR
3"CHS/R UP
FROM BELOW
VAV-R1267
VAV-R1288A
VAV-R1288
VAV-R1286A
VAV-R1284
AHU-30
3" GHS/GHR UP
& DOWN
10" CHWS/R UP &
DOWN
2"
CUH
1 1
1 1111
3" HWS/R DN
VALVE AND
CAP FOR
FUTURE
CAP
VERIFY DIRECTION OF FLOW BEFORE CONNECTING NEW SUPPLY AND
RETURN HOT WATER PIPES TO EXISTING SUPPLY AND RETURN HOT
WATER PIPES.
PROVIDE PIPING SUPPORTS AS REQUIRED FOR EXISTING PIPING.
COORDINATE EQUIPMENT AND SYSTEM SHUT-DOWNS WITH OWNER
PRIOR TO CONSTRUCTION.
INSTALL NEW PIPING AS HIGH AS POSSIBLE. PROVIDE TRANSITIONS AS
REQUIRED FOR COMPLETION OF DESIGN INTENT.
MECHANICAL CONTRACTOR TO COORDINATE WITH CONTROLS
CONTRACTOR FOR ALL SENSOR REQUIREMENTS.
GENERAL NOTES
1.
2.
3.
4.
5.
PROVIDE NEW 2-WAY VALVE AT ASSOCIATED TERMINAL UNITS
SERVED AND MODIFY PIPING ACCORDINGLY.
KEYED NOTES
CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
MP-103
MECHANICAL PIPING PLAN - FIRST
FLOOR
REPLACE HEAT
EXCHANGERS 3 & 4
BJT APS10/13/2017
585-16-107
Iron Mountain , MI.
1/8" = 1'-0"
MECHANICAL PIPING PLAN - FIRST FLOOR1 NORTH
No. Revisions Date
1 100% CONSTRUCTION
DOCUMENTS
6" C
H W
S
6" CHWS
HWP-3
HWP-4
HX-3
HX-4
4" HWS
4" HWR
4" H
W R
4" LPS
2" LPC
4" L
P S
(BEYOND)
4" H
W S
4" H
W R
LPC
AS-1
HX-3
4" H
W R
4" H
W S
EXISTING
HOT WATER
GENERATOR
EXISTING
6" LPC
HEADER
4" L
P S
HX-4
HWP-4
HWP-3
4" HWS
4" HWS
4" H
W S
4" H
W S
4" HWS
4" HWR
4" HWR
STEAM TRAP
ROUTE 1" LINE TO
EXPANSION TANK
EXISTING
6" LPS MAIN
LPC
AS-1
4" HWS 4" HWS
STEAM TRAP
4" HWS
HX-4
STEAM TRAP
4" HWS
4" L
P S
4" H
W S
4" H
W R
2" STEAM - LPC
4" HWR
4" LPS
AS-1
2 1/2" LPS
4" LPS
ET-1
4" EQUIPMENT PAD
VENT
EXISTING 6"
LPC HEADER
4" LPS
2 1/2" LPS
4" LPS
2 1/2" LPS
4" LPS
4" L
P S
LPC
LPC
HPS
LPS
2" LPC
L P
C
CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
MP-301
MECHANICAL SECTIONS REPLACE HEAT
EXCHANGERS 3 & 4
BJT APS10/13/2017
585-16-107
Iron Mountain , MI.
1/2" = 1'-0"
HX-3 & 4 SECTION 11
1/2" = 1'-0"
HX-3 & 4 SECTION 22
1/2" = 1'-0"
HX-3 & 4 SECTION 33
1/2" = 1'-0"
HX-3 & 4 SECTION 44
MECHANICAL SUB-BASEMENT ISOMETRIC5
No. Revisions Date
1 100% CONSTRUCTION
DOCUMENTS
VSMC
VSMC
4"
P-3
P-4 2 1/2"
EXISTING AIR
SEPARATOR
EXPANSION
TANK
VSMC
VSMC
4"
P-6
P-8 4"
EXISTING AIR
SEPARATOR
EXPANSION
TANK
2 1/2"
T
T
BASEMENT
SUB-BASEMENT
BASEMENT
FIRST FLOOR
SUB-BASEMENT
HX-3
HX-4
HX-10
BASEMENT HX-3 AND HX-4 PIPING DEMOLITION DIAGRAM
HOT WATER PIPING RISER DIAGRAM
SUB-BASEMENT HX-10 PIPING DEMOLITION DIAGRAM
LPS
COND.
COND.
T
LPS
COND.
6" LPS
2 1/2" HWR
2 1/2" HWS
2 1/2" HWR
2 1/2" HWS
T
T
HX-3
HX-4
VSMC
VSMC
P
P
SUB-BASEMENT (HX-3 & HX-4) SERVES EMERGENCY & PHARMACY
• FIRST FLOOR: OPC / ED (25) VAVs: 359.7 MBH TOTAL @ 36.0 GPM
• FIRST FLOOR: PHARMACY / EXAM (31) VAVs: 235.2 MBH @ 25.0 GPM
• BASEMENT LEVEL: EAST LOCKER: (9) VAV's: 110.0 MBH @ 11.0 GPM
• LOADING DOCK: SNOWMELT: 63 MBH @ 6.3 GPM
• (FUTURE) FIRST FLOOR: EAST CONVECTORS (46): 400 MBH TOTAL @ 40 GPM
• (FUTURE) BASEMENT LEVEL: EAST CONVECTOR (12): 81 MBH TOTAL @ 8.1 GPM
TOTAL CONNECTED LOAD = 767.9 MBH
FUTURE CONNECTED LOAD = 1,247.4 MBH
BASEMENT
VAV'S (9)
PHARMACY /
EXAM AREA
OPC / ED
AREA
4" LPS
EXPANSION
TANK
4" HWS
4" HWS
4" HWR
4" HWS
4" HWS
4" HWS
NEW 1" RPZ
4" LPS
4" LPS
AS
HX
HX
1" HWR
1" HWS
VSMCHX
21A
LOADING DOCK
SNOWMELT
2 1/2" HWR
2 1/2" HWS
3" HWR
3" HWS
1" HWR
MANUAL AIR
VENT
1" HWS
1" HWS
1" HWR
1" HWS
4" HWS
4" HWR
AS
ET
ET
1" HWR
1/2"
1" HWS
P
21A
MANUAL FLUSH
AND FILL (TYP.)
1" SCW
CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
M-401
MECHANICAL FLOW DIAGRAM REPLACE HEAT
EXCHANGERS 3 & 4
BJT APS10/13/2017
585-16-107
Iron Mountain , MI.
No. Revisions Date
1 100% CONSTRUCTION
DOCUMENTS
SECURING HANGER RODS IN CONCRETEPROPER PIPING INSULATION ILLUSTRATIONIMPROPER PIPING INSULATION ILLUSTRATION
5 FT
THRU [20]
6 8 10
[32][25] [40]
[65]
[50]
[75]
-1312 14 -16 -
[125][100]
[150]
[250]
[200]
[300]
[400]
[350]
[450]
[600]
[500]
20 241814 16128 1064 532 2 1/21 1/21 1 1/4
[9100] [9600][8500][7600] [8200][7000][5800] [6700][5200][4100] [4900][3700][3000] [3400][2700][2100]
--- --[4900] -[4100][3700] [4000] -[3000][2400][1800][1500]
THRU 3/4
[2100] [2100]
[2100]
[2700]
[2400]
NTS
SIDE VIEW TRAPEZE HANGER FOR UP
TO 1000 LB. [453KG] UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE SPECIFICATIONSADJUSTABLE CLEVIS HANGER TYPE 43 - SEE SPECIFICATIONS
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(8" [200mm] MIN.)
1-5/8" [43mm] 12 GAUGE CHANNEL OR 2"x2"x1/4" [50x50x6.4mm] ANGLE
1/2" [15mm] DIA.
HANGER RODS WITH
36" [900mm] MAX.
SPACING ON EACH
CHANNEL
INSULATION SHIELD
AT HANGER
PROVIDE HIGH
COMPRESSIVE
STRENGTH INSULATION
(9 PSF MIN. DENSITY)
UNDER INSULATION
SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
IN.
[mm]
FT.
[mm]
FT.
[mm]
PIPE HANGERS
[2 m m
M A X
NOTES:
SEE SPECIFER FOR DETAILED
HANGER REQUIREMENTS
SUPPORT/ANCHOR FOR PIPE RISERS
NTS
NOTES:
1.
2.
PROVIDE ANCHORS ONLY
WHERE SHOWN ON
DRAWINGS.
EXTEND SLEEVE ABOVE
FLOOR WHERE SPECIFIED.
INSULATION BOLT
(TYPICAL)
FLOOR
SLAB
FIRE-STOPPING
MATERIAL
BOLT
PIPEPIPE SLEEVE
WHERE SPECIFIED
RISER
CLAMP
RISER
PIPE SLEEVE
WHERE
SPECIFIED RISER CLAMP.
BOTTOM CLAMP
REQUIRED AT
ANCHOR POINTS
ONLY.ELEVATION
PLAN
RISER
CLAMP
PRESSURE TRANSMITTER INSTALLATION
NTS
NOTES:
1. INSTALLATION OF SENSORS AND TRANSMITTERS SHALL CONFORM TO
RECOMMENDATIONS OF MANUFACTURERS OF TRANSMITTERS.
1/2" [15mm] STEEL PIPE OR
STEEL TUBING TO SENSORS
DIFFERENTIAL PRESSURE
TRANSMITTER (FLOW, LEVEL)
BLOWDOWN
PT
ELEVATION
NTS
ABOVE 2" [50mm] DIA. PIPE 2" [50mm] DIA. & SMALLER
VERTICAL
2 1/2" [65mm] DIA.
ABOVE 2" [50mm] DIA. PIPE 2" [50mm] DIA. & SMALLER
HORIZONTAL
2 1/2" [65mm] DIA.
INSTALLATION OF THERMOMETER WELLS
NTS
PIPE HANGERS - PROVIDE DOUBLE
DEFLECTION NEOPRENE (TYPE HN)
FOR FIRST TWO ON EACH SIDE OF
PUMP (SEE NOTE NO. 1)
PRESSURE GAGE
1/2" [15mm]
STRAINER
BALL OR
BUTTERFLY TYP.
NOTES:
1. SUPPORT PUMP FROM PIPING ONLY. DO NOT SUPPORT PUMP FROM MOTOR.
2. PROVIDE A MINIMUM 24" STRAIGHT LENGTH AT INLET AND OUTLET OF PUMP.
IN-LINE PUMPS - CONNECTIONS
BALANCING
DEVICE
NTS
STEEL EXPANSION SHIELD FOR
EXISTING CONSTRUCTION AND
INSERTS FOR NEW CONSTRICTION THIS
TYPE SHALL BE USED ONLY IN SLABS
OR BEAMS OF 4" [100mm] MIN DEPTH
3/8" [10mm] MIN DIA EXPANSION BOLTS FOR
EXISTING CONSTRUCTION AND INSERTS
FOR NEW CONSTRUCTION
CONCRETE
FLOOR SLAB
CLIP
ANGLE
NUTS & WASHERS
3/8" [10mm] MIN DIA
HANGER RODS
FOR PIPES UNDER 2" [50mm] IN SIZE
USE 1 1/2"x1 1/2"x1/4" [40x40x6.4mm]
ANGLE. ALL PIPES 2" [50mm] & LARGER
USE 3"x3"x1/4" [75x75x6.4mm] ANGLE
TURNBUCKLE
3/8" [10mm] MIN DIA
HANGER RODS
3/8" [10mm] MIN DIA
INSERTS NEW
CONSTRUCTION ONLY.
NTS
NTS
BAND
WELD
SADDLE
CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
M-501
MECHANICAL DETAILS REPLACE HEAT
EXCHANGERS 3 & 4
BJT APS10/13/2017
585-16-107
Iron Mountain , MI.
No. Revisions Date
1 100% CONSTRUCTION
DOCUMENTS
ASSEMBLY
INVERTED BUCKET STEAM TRAP
END OF STEAM LINE DRIP TRAP
D
D
PIPING CONNECTIONS
NTS
FLOOR MOUNTED EXPANSION TANK -
NOTE:
1.
2.
3.
SEE EXPANSION TANK SYSTEM
SCHEDULE FOR COMPONENT
SIZES.
FOR HOT WATER SYSTEMS 2"
[50mm] AND SMALLER AND
CHILLED WATER SYSTEMS USE
IN-LINE AIR PURGER IN LIEU OF
AIR SEPARATOR.
SET PRESSURE REDUCING VALVE
SO PRESSURE AT HIGHEST POINT
IN SYSTEM HAS A MINIMUM OF 4
PSIG [28kPa].
D
FLOOR MOUNTING BASE RING WITH
DRAIN ACCESS OPENING SHOWN. ANGLE
IRON LEGS MAY BE USED AS AN OPTION.
6"
[150mm]
HOUSEKEEPING
PAD
COLD WATER FILL LINE.
SEE EXPANSION TANK
SCHEDULE FOR SIZE
DRAIN
FROM SYSTEM
RUN DRAIN LINE TO
NEAREST FD UNLESS
INDICATED OTHERWISE
DRAIN
TO PUMP
SUCTION
AIR
SEPARATOR
SEE NOTES 3
HANGER
RODS (TYP)
CONNECTOR PIPE.
BLADDER
EXPANSION
TANK
REDUCED PRESSURE BACKFLOW
PREVENTER
NC
BUTTERFLY
OR BALL
ISOLATION
VALVE
D
RUN DRAIN
LINE TO
NEAREST FD
AIR CHARGING
SHRAEDER VALVE
MV
AUTO. AIR VENT TO DRAIN
PI
NTS
TYPICAL MANUAL AIR VENT
TYPICAL HOT WATER PIPING
DRAIN VALVE CONNECTIONS
ELEVATION
THREADED PIPING
ELEVATION
WELDED PIPING
TYPICAL WATER PIPING
REDUCER, IF REQUIRED
3/4" [20mm] BALL VALVE
ADAPTER TO 3/4" [20mm] HOSE
THREAD-PROVIDE HOSE CAP NUT
NOTES:
1. DRAIN ALL LOW POINTS AS INDICATED ABOVE.
2. WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS AND/OR
PLANS LOCATE DRAIN AT BOTTOM OF SCALE POCKET.
AIR VENT
1/2" [15mm]
BALL VALVE
1/4" [8mm]
COPPER TUBING
1/2" [15mm] x 4" [100mm]
NIPPLE
CIRCULATING WATER PIPING
ELEVATION
NOTES:
1. VENT ALL HIGH POINTS INDICATED ABOVE.
2. IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO DRAIN.
DRAIN VALVE AND AIR VENT CONNECTIONS
(HYDRONIC SYSTEMS)
MV
OR
AV
HEAT EXCHANGER - STEAM TO HOT WATER
NTS
NOTE:
1.
2.
3.
4.
THE ABOVE DETAIL SHOWS REQUIRED PIPING FOR TWO HEAT EXCHANGERS IN PARALLEL.
PROVIDE SADDLE SUPPORTS AND LEGS OR HANGERS FOR HEAT EXCHANGER. MOUNTING HEIGHT SHALL BE
ADJUSTED TO FACILITATE GRAVITY RETURN OF STEAM CONDENSATE.
MAKE THE BYPASS THE SAME SIZE AS THE…