RFI Responses.docx

DOCX document 12 KB Posted

Attached to
Upgrade Clean Rooms Phase 4 Federal contract opportunity
Solicitation number
36C25022B0066
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade Clean Rooms Phase 4, newest first.
File Type Posted
36C25022B0066 0002.pdf PDF
36C25022B0066 0001.docx DOCX document
Site Visit Sign-in Sheet.pdf PDF
583-22-528 Storage System Options And Technical Considerations.pdf PDF
583-22-528 Approximate Room Dimensions and Construction Requirements.pdf PDF
Contractor Certification Regarding Safety and Environmental.docx DOCX document
36C25022B0066 Solicitation Document.pdf PDF
583-22-528 PCRA.pdf PDF
RFI Form.doc DOC document
Wage Determination.txt TXT text file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Responses – Upgrade Clean Rooms Phase 4

Question #1: Will the contractor be required to hard pipe new electrical wiring into the stud walls where applicable? If so, what size and type of pipe would be required?

Response #1: Flexible metal conduit is acceptable for the stud cavities, but it cannot be horizontally extended more than six (6) feet above the ceiling tiles. If exposed conduits are needed, Electrical Metal Tubing (EMT) will be required, with a minimum diameter of 3/4".

Question #2: Will the data runs need to be hard piped into the stud cavities? If so, what size and type of pipe would be required?

Response #2: Data cables do not need to be hard piped into the stud cavities. If data cables need to be installed on a concrete or brick wall, EMT will be required.