RFI Responses.docx
DOCX document 12 KB Posted
- Attached to
- Upgrade Clean Rooms Phase 4 Federal contract opportunity
- Solicitation number
- 36C25022B0066
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25022B0066 0002.pdf | ||
| 36C25022B0066 0001.docx | DOCX document | |
| Site Visit Sign-in Sheet.pdf | ||
| 583-22-528 Storage System Options And Technical Considerations.pdf | ||
| 583-22-528 Approximate Room Dimensions and Construction Requirements.pdf | ||
| Contractor Certification Regarding Safety and Environmental.docx | DOCX document | |
| 36C25022B0066 Solicitation Document.pdf | ||
| 583-22-528 PCRA.pdf | ||
| RFI Form.doc | DOC document | |
| Wage Determination.txt | TXT text file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI Responses – Upgrade Clean Rooms Phase 4
Question #1: Will the contractor be required to hard pipe new electrical wiring into the stud walls where applicable? If so, what size and type of pipe would be required?
Response #1: Flexible metal conduit is acceptable for the stud cavities, but it cannot be horizontally extended more than six (6) feet above the ceiling tiles. If exposed conduits are needed, Electrical Metal Tubing (EMT) will be required, with a minimum diameter of 3/4".
Question #2: Will the data runs need to be hard piped into the stud cavities? If so, what size and type of pipe would be required?
Response #2: Data cables do not need to be hard piped into the stud cavities. If data cables need to be installed on a concrete or brick wall, EMT will be required.