Three Year Electrical Test - Schedule.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
H259--3-Year Electrical Test (Cincinnati/Ft. Thomas) | Need Start: Prior to EOFY Federal contract opportunity
Solicitation number
36C25020Q1053
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

View the file

Other files for this federal contract opportunity

Other files attached to H259--3-Year Electrical Test (Cincinnati/Ft. Thomas) | Need Start: Prior to EOFY, newest first.
File Type Posted
36C25020Q1053 0001.docx DOCX document
36C25020Q1053.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Day #1 (Columbus Day)

Date:12-Oct-20Monday (Columbus Day Holiday)
Building NumberRoom NumberTime PeriodEquipment to be testedBreakersXfmrsATSMCC
3138 am to 4:30 pmUnit Substation US-3 & Dist. Panelboard510
8-Transformers & Gen Breaker, ATS's132
13-All normal power equipment1330
2-Unit Substation US-2, DP1, DP2, MDP133
14-Unit Substation US-14,11
PG-MDP (5 CB's), 2-ATS's, GPEM (1 MB), Elevator transformers (2), Gen Breaker722
-PPSU - High Voltage Switch for Bldg. 2/3/8/13/PG

40 13 4 0

3 Year Electrical Testing and Maintenance

Day #2

Date:17-Oct-20Saturday
Building NumberRoom NumberTime PeriodEquipment to be testedBreakersXfmrsATSMCC
1B013a8 am to 4:30 pmUS-1A (10 CB's)101
1B16A-DPB and associated branch panelboards (15 CB's)16
15B02-15MDP (Fischer House), Elevator transformer, Panel WH, Panel 15E1101
1B013a-US-1B (11 CB's)111
1A019-DPP2
1A022A-DPE18
1A023-Unit Substation US-1X, MCC-2111
1C008-DS-1A, MCC-N, MCC-E712
1A456E-4P1 (Transformer)1
1C008-DS-1X3
1A0001-DPF (3FT1 Transformer)51
1A025-Unit Substation US-1P101
1-MCP2, MCCB, MCCD (A023), MCC-D/G, MCC-C (5th Flr.)6
1A023-PP1, TLPB11
1C008-DS-1P3
107908

3 Year Electrical Testing and Maintenance

Day #3 (Mid-Week - Load Bank)

Date:20-Oct-20Tuesday
Building NumberRoom NumberTime PeriodEquipment to be testedBreakersXfmrsATSMCC
87am to 5:30pm225KW Cummins Generator - Load Bank Test
137am to 5:30pm2.8MW Kohler Generator - Load Bank Test
PG7am to 5:30pm100KW Kohler Generator - Load Bank Test
FTD7am to 5:30pm400KW Generator - Load Bank Test
0000

Day #4 (EM Power)

Date:24-Oct-20Saturday
Building NumberRoom NumberTime PeriodEquipment to be testedBreakersXfmrsATSMCC
15B028am - 6:30pm15 ATS-1, 15 ATS-2, 15 ATS-3, 16 ATS FISHER HOUSE, ATS Disconnect CB's (4)44
1B013a-ATS 3 "1E3" Medical Air61
1B013a-ATS 7 "1E7" IRM51
1A023-GDE (6 CB's + TRANS),61
1A023-ATS-27 LSDP, 13 Associated Distribution Panelboards161
1A023-ATS-28 CDP (8 CB's), 18 Associated Distribution Panelboards261
1-ATS-29 Liebert and Disconnect CB11
1C003A-ESWB (11 CB's), 8 Associated branch panelboards221
1C003A-ATS-9 (LS3C), ATS-10, ATS-11, ATS-12, ATS-21, ATS-2616
1C008-ATS-30, ATS-1, ESWB-20 (Transformer x3), ESWB-40A/B,1032
1A023-ATS-241
1A001-EDPEQ4
13RD FLR.MECH-EDPEQ32
1A436B-4CCU
14th Flr. Mech-MCC-E/F1
25-EDP (2) (ATS-18, ATS-19 (ECDP1, Trans), ATS-20 (EQDP1, TRANS), ATS-15 (ECDP2, Trans), (LSDP1 Trans))844
25-ECDP1 (2), EQDP1 (1), EDP (2)5
235-ECDP2 (3)32
11911221

&14&U&KFF0000ALL EMERGENCY POWER

Day #5 (Mid-Week)

Date:27-Oct-20Tuesday
Building NumberRoom NumberTime PeriodEquipment to be testedBreakersXfmrsATSMCC
1B0137am - 12pmGenerator #1 (1500 KW) - Load Bank Test
1B01312:30 pm - 5:30 pmGenerator #2 (1500 KW) - Load Bank Test
1B0137am - 5:30pmEmergency Switchboard "ESB"8
1B0137am - 5:30pmATS 4 "1E4" P1 and P21
1B0137am - 5:30pmATS 5 "1E5" P3 and P41
1B0137am - 5:30pmATS 6 "1E6" S5 and S61
1SB067am - 5:30pmATS 8 "1E8" Fire Pump1
1B0137am - 5:30pmParallel Switch Gear Breakers6
14040

3 Year Electrical Testing and Maintenance

Day #6

Date:31-Oct-20Saturday
Building NumberRoom NumberTime PeriodEquipment to be testedBreakersXfmrsATSMCC
Disconnect Electric Service by Duke Energy- 8 am
1B013a8am to 4:30pmPrimary Switchgear, Preferred and Alternate(Air Breakers)8
1A0238am to 4:30pmPrimary Switchgear, "PS1" (6 - Switches)6
14204 / 2058am to 4:30pm14 MDP (9 CB's), 14TDP1, 14 DP1 (7 CB's), 14ESWB (4 CB's), 14OSPDP1 (1 CB), 14OSDP1 (8 CB's), 14TEM, 14TOS1, ATS LR, ATS EM, ATS OS1, ATS OS22824
42240

3 Year Electrical Testing and Maintenance

Day #7

Date:7-Nov-20Saturday
Building NumberRoom NumberTime PeriodEquipment to be testedBreakersXfmrsATSMCC
1A0238am to 4:30pmUS-1C (CB's & Transformer)101
1A0198am to 4:30pmDPA (8 CB's), 13 Associated Distribution Panelboards20
1A001D8am to 4:30pmDPC (8 CB's), 9 Associated Distribution Panelboards17
1A100018am to 4:30pmMCP (Penthouse)1
1A0238am to 4:30pmUS-1D (CB's & Transformer)91
1A032F8am to 4:30pmDPD (7 CB's), 9 Associated Distribution panelboards17
1C0088am to 4:30pmDS-1B (9 CB's), DP2 (1 CB + TRANS), DPF (1)111
1A00018am to 4:30pmDP-LF (7 CB's), DP-LF3 (1 CB), BF1 (1 CB), BF2 (1 CB)10

94 3 0 1

3 Year Electrical Testing and Maintenance

Day #8 (Veteran's Day)

Date:11-Nov-20Wednesday (Veteran's Day Holiday)
Building NumberRoom NumberTime PeriodEquipment to be testedBreakersXfmrsATSMCC
Disconnect Electric Service by Duke Energy- 8 am
FTDGen Room8am - 12pmMEDP3
FTDGen Room8am - 12pmMD124
Restore Electric Service by Duke Energy- 12 pm
FTDGen Room12:30pm - 4:30pmEDPE6
FTDGen Room12:30pm - 4:30pmATS4
FTDGen Room12:30pm - 4:30pmTRANSFORMER1
33140
BreakersXfmrsATSMCC
Total Equipment Counts→449523810

3 Year Electrical Testing and Maintenance