Three Year Electrical Test - Schedule.xlsx
XLSX spreadsheet 29 KB Posted
- Attached to
- H259--3-Year Electrical Test (Cincinnati/Ft. Thomas) | Need Start: Prior to EOFY Federal contract opportunity
- Solicitation number
- 36C25020Q1053
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25020Q1053 0001.docx | DOCX document | |
| 36C25020Q1053.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Day #1 (Columbus Day)
| Date: | 12-Oct-20 | Monday (Columbus Day Holiday) | |||||
| Building Number | Room Number | Time Period | Equipment to be tested | Breakers | Xfmrs | ATS | MCC |
| 3 | 13 | 8 am to 4:30 pm | Unit Substation US-3 & Dist. Panelboard | 5 | 1 | 0 | |
| 8 | - | Transformers & Gen Breaker, ATS's | 1 | 3 | 2 | ||
| 13 | - | All normal power equipment | 13 | 3 | 0 | ||
| 2 | - | Unit Substation US-2, DP1, DP2, MDP | 13 | 3 | |||
| 14 | - | Unit Substation US-14, | 1 | 1 | |||
| PG | - | MDP (5 CB's), 2-ATS's, GPEM (1 MB), Elevator transformers (2), Gen Breaker | 7 | 2 | 2 | ||
| - | PPSU - High Voltage Switch for Bldg. 2/3/8/13/PG |
40 13 4 0
3 Year Electrical Testing and Maintenance
Day #2
| Date: | 17-Oct-20 | Saturday | |||||
| Building Number | Room Number | Time Period | Equipment to be tested | Breakers | Xfmrs | ATS | MCC |
| 1 | B013a | 8 am to 4:30 pm | US-1A (10 CB's) | 10 | 1 | ||
| 1 | B16A | - | DPB and associated branch panelboards (15 CB's) | 16 | |||
| 15 | B02 | - | 15MDP (Fischer House), Elevator transformer, Panel WH, Panel 15E1 | 10 | 1 | ||
| 1 | B013a | - | US-1B (11 CB's) | 11 | 1 | ||
| 1 | A019 | - | DPP | 2 | |||
| 1 | A022A | - | DPE | 18 | |||
| 1 | A023 | - | Unit Substation US-1X, MCC-2 | 11 | 1 | ||
| 1 | C008 | - | DS-1A, MCC-N, MCC-E | 7 | 1 | 2 | |
| 1 | A456E | - | 4P1 (Transformer) | 1 | |||
| 1 | C008 | - | DS-1X | 3 | |||
| 1 | A0001 | - | DPF (3FT1 Transformer) | 5 | 1 | ||
| 1 | A025 | - | Unit Substation US-1P | 10 | 1 | ||
| 1 | - | MCP2, MCCB, MCCD (A023), MCC-D/G, MCC-C (5th Flr.) | 6 | ||||
| 1 | A023 | - | PP1, TLPB | 1 | 1 | ||
| 1 | C008 | - | DS-1P | 3 | |||
| 107 | 9 | 0 | 8 |
3 Year Electrical Testing and Maintenance
Day #3 (Mid-Week - Load Bank)
| Date: | 20-Oct-20 | Tuesday | |||||
| Building Number | Room Number | Time Period | Equipment to be tested | Breakers | Xfmrs | ATS | MCC |
| 8 | 7am to 5:30pm | 225KW Cummins Generator - Load Bank Test | |||||
| 13 | 7am to 5:30pm | 2.8MW Kohler Generator - Load Bank Test | |||||
| PG | 7am to 5:30pm | 100KW Kohler Generator - Load Bank Test | |||||
| FTD | 7am to 5:30pm | 400KW Generator - Load Bank Test | |||||
| 0 | 0 | 0 | 0 |
Day #4 (EM Power)
| Date: | 24-Oct-20 | Saturday | |||||
| Building Number | Room Number | Time Period | Equipment to be tested | Breakers | Xfmrs | ATS | MCC |
| 15 | B02 | 8am - 6:30pm | 15 ATS-1, 15 ATS-2, 15 ATS-3, 16 ATS FISHER HOUSE, ATS Disconnect CB's (4) | 4 | 4 | ||
| 1 | B013a | - | ATS 3 "1E3" Medical Air | 6 | 1 | ||
| 1 | B013a | - | ATS 7 "1E7" IRM | 5 | 1 | ||
| 1 | A023 | - | GDE (6 CB's + TRANS), | 6 | 1 | ||
| 1 | A023 | - | ATS-27 LSDP, 13 Associated Distribution Panelboards | 16 | 1 | ||
| 1 | A023 | - | ATS-28 CDP (8 CB's), 18 Associated Distribution Panelboards | 26 | 1 | ||
| 1 | - | ATS-29 Liebert and Disconnect CB | 1 | 1 | |||
| 1 | C003A | - | ESWB (11 CB's), 8 Associated branch panelboards | 22 | 1 | ||
| 1 | C003A | - | ATS-9 (LS3C), ATS-10, ATS-11, ATS-12, ATS-21, ATS-26 | 1 | 6 | ||
| 1 | C008 | - | ATS-30, ATS-1, ESWB-20 (Transformer x3), ESWB-40A/B, | 10 | 3 | 2 | |
| 1 | A023 | - | ATS-24 | 1 | |||
| 1 | A001 | - | EDPEQ | 4 | |||
| 1 | 3RD FLR.MECH | - | EDPEQ3 | 2 | |||
| 1 | A436B | - | 4CCU | ||||
| 1 | 4th Flr. Mech | - | MCC-E/F | 1 | |||
| 2 | 5 | - | EDP (2) (ATS-18, ATS-19 (ECDP1, Trans), ATS-20 (EQDP1, TRANS), ATS-15 (ECDP2, Trans), (LSDP1 Trans)) | 8 | 4 | 4 | |
| 2 | 5 | - | ECDP1 (2), EQDP1 (1), EDP (2) | 5 | |||
| 2 | 35 | - | ECDP2 (3) | 3 | 2 | ||
| 119 | 11 | 22 | 1 |
&14&U&KFF0000ALL EMERGENCY POWER
Day #5 (Mid-Week)
| Date: | 27-Oct-20 | Tuesday | |||||
| Building Number | Room Number | Time Period | Equipment to be tested | Breakers | Xfmrs | ATS | MCC |
| 1 | B013 | 7am - 12pm | Generator #1 (1500 KW) - Load Bank Test | ||||
| 1 | B013 | 12:30 pm - 5:30 pm | Generator #2 (1500 KW) - Load Bank Test | ||||
| 1 | B013 | 7am - 5:30pm | Emergency Switchboard "ESB" | 8 | |||
| 1 | B013 | 7am - 5:30pm | ATS 4 "1E4" P1 and P2 | 1 | |||
| 1 | B013 | 7am - 5:30pm | ATS 5 "1E5" P3 and P4 | 1 | |||
| 1 | B013 | 7am - 5:30pm | ATS 6 "1E6" S5 and S6 | 1 | |||
| 1 | SB06 | 7am - 5:30pm | ATS 8 "1E8" Fire Pump | 1 | |||
| 1 | B013 | 7am - 5:30pm | Parallel Switch Gear Breakers | 6 | |||
| 14 | 0 | 4 | 0 |
3 Year Electrical Testing and Maintenance
Day #6
| Date: | 31-Oct-20 | Saturday | |||||
| Building Number | Room Number | Time Period | Equipment to be tested | Breakers | Xfmrs | ATS | MCC |
| Disconnect Electric Service by Duke Energy- 8 am | |||||||
| 1 | B013a | 8am to 4:30pm | Primary Switchgear, Preferred and Alternate(Air Breakers) | 8 | |||
| 1 | A023 | 8am to 4:30pm | Primary Switchgear, "PS1" (6 - Switches) | 6 | |||
| 14 | 204 / 205 | 8am to 4:30pm | 14 MDP (9 CB's), 14TDP1, 14 DP1 (7 CB's), 14ESWB (4 CB's), 14OSPDP1 (1 CB), 14OSDP1 (8 CB's), 14TEM, 14TOS1, ATS LR, ATS EM, ATS OS1, ATS OS2 | 28 | 2 | 4 | |
| 42 | 2 | 4 | 0 |
3 Year Electrical Testing and Maintenance
Day #7
| Date: | 7-Nov-20 | Saturday | |||||
| Building Number | Room Number | Time Period | Equipment to be tested | Breakers | Xfmrs | ATS | MCC |
| 1 | A023 | 8am to 4:30pm | US-1C (CB's & Transformer) | 10 | 1 | ||
| 1 | A019 | 8am to 4:30pm | DPA (8 CB's), 13 Associated Distribution Panelboards | 20 | |||
| 1 | A001D | 8am to 4:30pm | DPC (8 CB's), 9 Associated Distribution Panelboards | 17 | |||
| 1 | A10001 | 8am to 4:30pm | MCP (Penthouse) | 1 | |||
| 1 | A023 | 8am to 4:30pm | US-1D (CB's & Transformer) | 9 | 1 | ||
| 1 | A032F | 8am to 4:30pm | DPD (7 CB's), 9 Associated Distribution panelboards | 17 | |||
| 1 | C008 | 8am to 4:30pm | DS-1B (9 CB's), DP2 (1 CB + TRANS), DPF (1) | 11 | 1 | ||
| 1 | A0001 | 8am to 4:30pm | DP-LF (7 CB's), DP-LF3 (1 CB), BF1 (1 CB), BF2 (1 CB) | 10 |
94 3 0 1
3 Year Electrical Testing and Maintenance
Day #8 (Veteran's Day)
| Date: | 11-Nov-20 | Wednesday (Veteran's Day Holiday) | |||||
| Building Number | Room Number | Time Period | Equipment to be tested | Breakers | Xfmrs | ATS | MCC |
| Disconnect Electric Service by Duke Energy- 8 am | |||||||
| FTD | Gen Room | 8am - 12pm | MEDP | 3 | |||
| FTD | Gen Room | 8am - 12pm | MD1 | 24 | |||
| Restore Electric Service by Duke Energy- 12 pm | |||||||
| FTD | Gen Room | 12:30pm - 4:30pm | EDPE | 6 | |||
| FTD | Gen Room | 12:30pm - 4:30pm | ATS | 4 | |||
| FTD | Gen Room | 12:30pm - 4:30pm | TRANSFORMER | 1 | |||
| 33 | 1 | 4 | 0 |
| Breakers | Xfmrs | ATS | MCC | |
| Total Equipment Counts→ | 449 | 52 | 38 | 10 |