This document contains a federal contract opportunity notice and related asbestos survey report. The notice announces a planned solicitation for a project to replace steam heating systems at the Cincinnati VA Medical Center. The project is estimated between $1-5 million and has a performance period of 574 calendar days from notice to proceed. The solicitation will be a 100% set-aside for small businesses with a preference for service-disabled veteran-owned small businesses. Offerors must be registered in relevant databases and websites. The notice also provides submission requirements for safety and violation histories.
The attached asbestos survey report details inspections and sampling conducted to identify asbestos-containing materials in areas that may be impacted by the steam system replacement project. Small quantities of asbestos were detected in pipe fitting insulation and caulking. The report provides locations, descriptions, conditions and estimated quantities of identified asbestos-containing materials and recommends proper handling and disposal according to regulations if impacted by the renovation work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25020B0027-001.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
Terracon Consul tants, Inc., 611 Lunken Park Dr ive, Cincinnat i , OH 45226 P (513) 321-5816 terracon.com
April 4, 2019
Levin Porter Associates Inc.
3011 Newmark Drive Miamisburg, Ohio 45342
Attn: Mr. J. William Williams, AIA President T: (937) 224-1931 E: bwilliams@levin-portar.com
Re: Limited Paint Sampling for Lead-Content Analysis VA Project: Replace Hospital Steam Heating Systems Phase 2 VA Project No. 539-18-102 Cincinnati VA Medical Center 3200 Vine Street Cincinnati, Ohio 45220 Terracon Project No. N1187304
Dear Mr. Williams:
Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this letter report to Levin Porter Associates Inc. (Client) regarding the lead analytical results for limited paint sampling conducted for the above-referenced project at the Cincinnati VA Medical Center (CVAMC). We understand that this survey was requested for the purpose of a planned renovation regarding to impacts to various hospital steam systems at various locations throughout the hospital.
Terracon representatives Mr. Joshua Vogel and Mr. Lemuel Weyer conducted the limited paint sampling. Sample collection was performed using a clean straight-edge razor to remove paint from designated surfaces. Collected paint samples were placed in sealable containers, labeled with unique sample numbers, and submitted under chain of custody to International Asbestos Testing Laboratories (IATL) of Mount Laurel, New Jersey. Paint chip samples were submitted for analysis by Atomic Absorption Spectroscopy (AAS) per EPA Method SW846/3050B/7420M. IATL is accredited for lead in paint analysis by the American Industrial Hygiene Association’s (AIHA®) Environmental Lead Laboratory Accreditation Program (ELLAP), accreditation number 100188.
Lead Paint Analytical Results Summary Terracon collected a total of one (1) paint sample for lead-content analysis from within the renovation project area. A sample summary which includes the sample description and analytical result is attached; the result is presented in parts per million (ppm) lead. The sample collected was identified by laboratory analysis to contain lead above the detection limit. The laboratory analytical report and sample chain of custody are also attached.
Lead-Containing Paint Sampling Replace Hospital Steam Heating Systems Phase 2 ■ CVAMC April 4, 2019 ■ Terracon Project No. N1187304
Occupational Safety and Health Administration (OSHA) standard, 29 Code of Federal Regulations (CFR) 1926.62 (Lead in Construction), does not reference a specific concentration of lead in a surface coating for applicability of the aforementioned regulation. The requirements under OSHA 29 CFR 1926.62 are applicable to any concentration of lead found above analytical limit of detection (LOD). When disturbed, paints containing lead in any concentration represent an airborne exposure hazard that could exceed the OSHA legally enforceable action level (AL) or permissible exposure limit (PEL). Contractors that bid or conduct work activities that will disturb surfaces with analytically-confirmed LCP should be made aware of those so that they can plan for proper compliance with applicable federal and state regulations, and any applicable Client specifications. Additionally, contractors should be aware that any untested paint surfaces should be assumed to also contain lead unless sampling and analysis refute lead-content.
This sampling event was conducted as per the direction and request of the Client. The sampling was of a limited nature specific to prominent and readily accessible painted surfaces and may not have included every painted surface. The sampling was conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing under similar conditions in the same locale. The results, findings and recommendations expressed in this letter report are based on conditions observed during the sampling event. This letter report has been prepared on behalf of and exclusively for use and reliance by the Client and is not a bidding document. Contractors or consultants reviewing this limited sampling report must draw their own conclusions regarding whether further investigation or remediation is deemed necessary. Terracon does not warrant the work of regulatory agencies, laboratories, or other third-parties supplying information, which may have been used in the preparation of this report. No warranty, express or implied, is made.
Terracon appreciates the opportunity to provide this service to Levin Porter Associates Inc. If you have questions regarding this letter report or if we can be of further service, please contact the undersigned at (513) 321-5816.
Sincerely, Terracon Consultants, Inc.
Joshua Vogel Joseph Tussey. CHMM Project Manager Senior Associate/Group Manager
Attachments: Sample Summary Table Laboratory Analytical Report
Attachment 1: Sample Summary Table
Terracon Sample # Component Paint
Color (surface) Substrate Sample Location Results (ppm lead)
L-01 Pipeline Yellow Fiberglass North End of C003B 60,000
< = less than limit of detection (LOD)
Attachment 2: Laboratory Analytical Report
Lab No.: 6742650 Client No.: L-01
Description: Yellow Paint Location: North End Of C003B-Fiberglass Pipe Line
Result (% by Weight): 6.0 Result (ppm): 60000 Comments:
Laboratory Director
Approved By:
Date Analyzed:
3/18/2019Date Received:
Analyst:
Please refer to the Appendix of this report for further information regarding your analysis.
Signature:
Arnesha Brewer
03/25/2019 Frank E. Ehrenfeld, III
9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054
Telephone: 856-231-9449 Email: customerservice@iatl.com
CERTIFICATE OF ANALYSIS
Client: Terracon
611 Lunken Park Drive Cincinnati OH 45226
3/25/2019Report Date:
Report No.: 585789 - Lead Paint Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304
LEAD PAINT SAMPLE ANALYSIS SUMMARY
Client: TER940
Dated : 3/25/2019 1:53:54 Page 1 of 2
Appendix to Analytical Report:
Customer Contact:
Method: ASTM D3335-85a, US EPA SW846 3050B:7000B
This appendix seeks to promote greater understanding of any observations, exceptions, special instructions, or circumstances that the laboratory needs to communicate to the client concerning the above samples. The information below is used to help promote your ability to make the most informed decisions for you and your customers.
Please note the following points of contact for any questions you may have.
iATL Customer Service: customerservice@iatl.com iATL Office Manager:wchampion@iatl.com iATL Account Representative: Cassie Doherty Sample Login Notes: See Batch Sheet Attached Sample Matrix: Paint Exceptions Noted: See Following Pages
General Terms, Warrants, Limits, Qualifiers:
General information about iATL capabilities and client/laboratory relationships and responsibilities are spelled out in iATL policies that are listed at www.iATL.com and in our Quality Assurance Manual per ISO 17025 standard requirements. The information therein is a representation of iATL definitions and policies for turnaround times, sample submittal, collection media, blank definitions, quantification issues and limit of detection, analytical methods and procedures, sub-contracting policies, results reporting options, fees, terms, and discounts, confidentiality, sample archival and disposal, and data interpretation.
iATL warrants the test results to be of a precision normal for the type and methodology employed for each sample submitted. iATL disclaims any other warrants, expressed or implied, including warranty of fitness for a particular purpose and warranty of merchantability. iATL accepts no legal responsibility for the purpose for which the client uses test results. Any analytical work performed must be governed by our Standard Terms and Conditions. Prices, methods and detection limits may be changed without notification. Please contact your Customer Service Representative for the most current information.
This confidential report relates only to those item(s) tested and does not represent an endorsement by NIST-NVLAP, AIHA LAP LLC, or any agency of local, state or province governments nor of any agency of the U.S. government.
This report shall not be reproduced except in full, without written approval of the laboratory.
Information Pertinent to this Report:
Analysis by ASTM D3335-85a by AAS
Certification:
- National Lead Laboratory Program (NLLAP): AIHA-LAP, LLC No. 100188
- NYSDOH-ELAP No. 11021
Regulatory limit is 0.5% lead by weight (EPA/HUD guidelines). Recommend multiple sampling for all samples less than regulatory limit for confirmation.
All results are based on the samples as received at the lab. iATL assumes that appropriate sampling methods have been used and that the data upon which these results are based have been accurately supplied by the client.
Method Detection Limit (MDL) per EPA Method 40CFR Part 136 Apendix B.
Reporting Limit (RL) based upon Lowest Standard Determined (LSD) in accordance with AIHA-ELLAP policies.
LSD=0.2 ppm MDL=0.005% by weight. RL= 0.010% by weight (based upon 100 mg sampled).
Disclaimers / Qualifiers:
There may be some samples in this project that have a "NOTE:" associated with a sample result. We use added disclaimers or qualifiers to inform the client about something that requires further explanation. Here is a complete list with highlighted disclaimers pertinent to this project. For a full explanation of these and other disclaimers, please inquire at customerservice@iatl.com.
* Insufficient sample provided to perform QC reanalysis (<200 mg) ** Not enough sample provided to analyze (<50 mg) *** Matrix / substrate interference possible.
3/25/2019Report Date:
Report No.: 585789 - Lead Paint
Page 2 of 2Dated : 3/25/2019 1:53:54
COA_585789.pdf
DAILY LEAD QC 3-25-19.pdf
585789.pdf
2019-04-04T10:08:16-0400
Vogel, Joshua
2019-04-04T10:11:06-0400
Tussey, Joe A
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2 36C25020B0027
0002 07-06-2020
539-20-1-6913-0004
539-18-102
Department of Veterans Affairs Network Contracting Office 10 3140 Governor's Place Blvd, Suite 210
Kettering OH 45409
Department of Veterans Affairs Network Contracting Office 10 3140 Governor's Place Blvd, Suite 210
Kettering OH 45409
To all Offerors/Bidders
36C25020B0027
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 16 July 2020, 2:00 PM EST
539-368/90162-6913-854200-3220-23NR8KA18
The purpose of this amendment is to post answers to questions and to change the bid opening date.
The bid opening is changed to 16 July 2020, 2:00 PM EST.
SEE FOLLOWING PAGES FOR ANSWERS TO QUESTIONS.
Q1. Can the VA confirm the amount of asbestos and provide the asbestos report if available?
A1. Asbestos reports attached
Q2. What was done for Phase I of this project?
A2. Phase II is not a continuation of Phase I. Both Phase I and Phase II are steam projects, however the work completed in Phase I is not related to the work in Phase II.
Q3. Is there elevator access to the sub-basement?
A3. Answer = No, only stair access
Q4. Can a follow-up site visit be conducted with the pipe shop staff at a later date?
A4. No, no follow-up site visit will be scheduled.
Q5. Can the VA clarify when work can start? Drawing package and specs currently say work can start at 8:00pm, can work start earlier? Maybe 5:00pm or 6:00pm?
A5. No, the start time cannot be earlier than indicated in the bid documents.
Q6. Do all steam pipe risers have door access to the riser?
A6. It appears ~ 90% of steam pipe risers have access via standard door opening. The basement riser behind the bio-med storage Room B010 may be enclosed in a chase.
ATTACHMENTS
N1187304 Cinci VA Replace Hosiptal Steam Systems Phase 2 Asbestos Survey Report Final.
N1187304 Cinci VA Replace Hospital Steam Heating Systems Phase 2 Ltd LP Sampling Analysis Report 040419.
Asbestos Survey
VA Project Number: 539-18-102 Cincinnati VA Medical Center
3200 Vine Street
Prepared for:
Prepared by:
Cincinnati, Ohio 45226
3011 Newmark Drive
Attn: Mr. J. William Williams, AIA President T: (937) 224-1931 E: bwilliams@levin-portar.com
Re: Asbestos Survey
VA Project No. 539-18-102 Cincinnati VA Medical Center 3200 Vine Street
Dear Mr. Williams:
Terracon Consultants, Inc. (Terracon) is pleased to submit the attached report for the above-referenced renovation project to Levin Porter Associates Inc. (Client). The purpose of this report is to present the results of an asbestos survey which was performed on March 13 and 14, 2019, and in general accordance with our proposal number PN1187304, dated August 13, 2018. We understand that this survey was requested for the purpose of a planned renovation pertaining to various hospital steam systems at various locations throughout the Cincinnati VA Medical Center (CVAMC) (as shown on Client-provided drawings).
Asbestos-containing materials (ACM) were identified as a result of the survey. Please refer to the attached report for detail.
Terracon appreciates the opportunity to provide this service to John Poe Architects. If you have any questions regarding this report, please contact the undersigned at 513-321-5816.
Sincerely, Joshua Vogel Joseph A. Tussey, CHMM Project Manager Sr. Associate / Group Manager
OH AHES #35291 OH AHES #32388
TABLE OF CONTENTS
EXECUTIVE SUMMARY .......................................................................................................................... i
1.0 INTRODUCTION
1.1 Project Objective
1.2 Reliance
2.0 BUILDING DESCRIPTION
3.0 FIELD ACTIVITIES
3.1 Visual Assessment
3.2 Physical Assessment
3.3 Sample Collection
3.4 Sample Analysis
4.0 REGULATORY OVERVIEW
5.0 FINDINGS AND RECOMMENDATIONS
6.0 LIMITATIONS/GENERAL COMMENTS
APPENDIX A IDENTIFIED ASBESTOS-CONTAINING MATERIALS BY HOMOGENEOUS AREA (HA)
APPENDIX B ASBESTOS SURVEY SAMPLE & RESULTS SUMMARY
APPENDIX C ASBESTOS ANALYTICAL LABORATORY DATA
APPENDIX D LICENSES AND CERTIFICATIONS
APPENDIX E SAMPLE LOCATION DRAWINGS
Responsive ■ Resourceful ■ Reliable i
EXECUTIVE SUMMARY
Terracon Consultants, Inc. (Terracon) conducted an asbestos survey which was specifically limited to within the boundaries and intent of the planned renovation project entitled “Replace Hospital Steam Heating Systems Phase 2” at the Cincinnati VA Medical Center (CVAMC). We understand that this survey was requested prior to renovation for the purpose of compliance with the EPA National Emission Standards for Hazardous Air Pollutants (NESHAP) regulation (40 CFR Part 61, Subpart M). The survey included identifying and sampling suspect asbestos-containing materials (ACM), and providing information regarding the identity, location, condition, and approximate quantities of ACM (if any) pertaining to specific building components which are intended to be impacted by planned renovation as indicated on Client-provided drawings. The survey was performed on March 13 and 14, 2018 by two (2) United States Environmental Protection Agency (USEPA)-accredited asbestos inspectors and Ohio Environmental Protection Agency (OEPA) certified Asbestos Hazard Evaluation Specialists (AHES). The survey was conducted in general accordance with our proposal number PN1187304, dated August 13, 2018, and the sampling protocols established in USEPA 40 Code of Federal Regulations (CFR) Part 763, Subpart E, known as the Asbestos Hazard Emergency Response Act (AHERA).
Specific to the subject renovation project areas and building systems indicated on Client-provided drawings and based on the analytical results of the collected samples, the materials listed below were identified to contain asbestos.
ACM Description Material Location % and Type Asbestos Condition Estimated
Quantity* Hard White Pipe Fitting Insulation with Fiberglass
Undercoat
Basement- B010 5” and 3” Condensate/Steam Lines
2.6% Amosite by Point Count (PC) Good ~5 Fittings or 5
Square Feet (SF)
Brown Caulking 1st Floor- B128- Base of 2” and 5” Steam Lines 4.8% Chrysotile PC Good ~1 SF Total
Brown Caulking 2nd Floor- B226- Base of 2” and 5” Steam Lines 3.2% Chrysotile PC Good ~1 SF Total
*Estimated quantities listed above are based on a cursory field evaluation, and actual quantities may vary significantly, especially if ACMs are present outside of the renovation areas, and in hidden and/or inaccessible areas not evaluated as part of this survey. This is not a bidding document and contractors would be responsible for drawing their own conclusions on quantities present
A sample summary is included in Appendix B; laboratory analytical reports are included as Appendix C.
If the identified ACMs will be impacted by the renovation, such materials would need to be properly removed, handled, and disposed in accordance with applicable federal and state EPA regulations, Occupational Safety and Health Administration (OSHA) regulations, and per VA project specifications.
Responsive ■ Resourceful ■ Reliable 1
ASBESTOS SURVEY
VA Project No.: 539-18-102
Terracon Project No. N1187302
1.0 INTRODUCTION
Terracon Consultants, Inc. (Terracon) conducted an asbestos survey specifically limited to within the boundaries and intent of the planned renovation project entitled “Replace Hospital Steam Heating Systems Phase 2” at the Cincinnati VA Medical Center (CVAMC). The survey was performed on March 13 and 14, 2019 by two (2) United States Environmental Protection Agency (USEPA)-accredited asbestos inspectors and Ohio Environmental Protection Agency (OEPA) certified Asbestos Hazard Evaluation Specialists (AHES). Accessible building components and areas intended to be impacted by the renovation project were surveyed based upon Client-provided renovation plans. Homogeneous areas of suspect asbestos-containing materials (ACM) were visually identified and documented. Although reasonable effort was made to survey accessible suspect materials, additional suspect but un-sampled materials could be located in walls, in voids, or in other concealed areas. Suspect ACM samples were collected in general accordance with the sampling protocols outlined in USEPA 40 Code of Federal Regulations (CFR) Part 763, Subpart E, known as the Asbestos Hazard Emergency Response Act (AHERA).
Samples were delivered to an accredited laboratory for analysis by Polarized Light Microscopy
(PLM).
1.1 Project Objective
We understand that this survey was requested for the purposes of a future planned renovation project pertaining to replacement of various steam heating components at various locations. Please note that asbestos surveys are required prior to renovation or demolition to satisfy requirements of the USEPA 40 CFR Part 61, Subpart M, the National Emission Standards for Hazardous Air Pollutants (NESHAP) regulation (as well as the state NESHAP equivalent).
1.2 Reliance
This report is for the exclusive use of Levin Porter Associates Inc. (Client) for the project being discussed. Reliance by any other party on this report is prohibited without written authorization of Terracon and Levin Porter Associates Inc. Reliance on this report by Levin Porter Associates Inc.
Responsive ■ Resourceful ■ Reliable 2 and all authorized parties will be subject to the terms, conditions, and limitations stated in the proposal and the agreement between Terracon and Levin Porter Associates Inc.
2.0 BUILDING DESCRIPTION
The renovation project includes impacts to various hospital steam systems at various locations throughout the hospital. Client-provided drawings which indicate the areas and systems being impacted are are shown on the sample location drawings included in Appendix E.
3.0 FIELD ACTIVITIES
The survey was conducted by Mr. Joshua Vogel and Mr. Lemuel Weyer, USEPA-accredited asbestos inspectors and OEPA certified AHES. A copy of their Ohio AHES credential is attached as Appendix D. The survey was conducted in general accordance with the sample collection protocols established in USEPA 40 CFR Part 763, Subpart E, Section 763.86, AHERA. A summary of survey activities is provided below.
3.1 Visual Assessment
Survey activities were initiated with visual observation of accessible areas and accessible building components to identify homogeneous areas of suspect ACM. A homogeneous area (HA) consists of building materials that appear similar throughout in terms of color and texture with consideration given to the date of application.
3.2 Physical Assessment
A physical assessment of each HA of suspect ACM was conducted to assess the friability and condition of the materials. A friable material is defined by the USEPA as a material which can be crumbled, pulverized, or reduced to powder by hand pressure when dry. Friability was assessed by physically touching suspect materials.
3.3 Sample Collection
Based on results of the visual observation, bulk samples of suspect ACM were collected in general accordance with USEPA AHERA sampling protocols. Samples of suspect materials were collected from randomly selected locations in each homogeneous area. Bulk samples were collected using wet methods as applicable to reduce the potential for fiber release. Samples were placed in sealable containers and labeled with unique sample numbers using an indelible marker.
The selection of sample locations and frequency of sampling were based on Terracon’s observations and the assumption that like materials in the same area are homogeneous in content.
Responsive ■ Resourceful ■ Reliable 3
Terracon collected a total of 144 bulk samples from 48 homogeneous areas of suspect ACM. A summary of suspect ACM samples collected during the survey is included as Appendix B.
3.4 Sample Analysis
Bulk samples were submitted under chain of custody to International Asbestos Testing Laboratories (IATL) of Mount Laurel, New Jersey for analysis PLM with dispersion staining techniques per USEPA methodology 600/R-93/116. The percentage of asbestos, where applicable, was determined by microscopic visual estimation. When applicable for samples determined by PLM to have a low asbestos content (<10%), the additional point count (PC) method was utilized. IATL is accredited under the National Voluntary Laboratory Accreditation Program (NVLAP), accreditation number 101165-0.
4.0 REGULATORY OVERVIEW
The asbestos NESHAP (40 CFR Part 61, Subpart M) regulates asbestos fiber emissions and asbestos waste disposal practices. The asbestos NESHAP regulation also requires the identification and classification of existing ACM according to friability prior to demolition or renovation activity. Friable ACM is a material containing more than 1% asbestos that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure. All friable ACM is considered regulated asbestos containing material (RACM).
The asbestos NESHAP regulation classifies material subject to demolition or renovation as either RACM, Category I non-friable ACM, or Category II non-friable ACM. RACM includes all friable ACM (pre-disturbance), along with Category I non-friable ACM that becomes friable (during disturbance), and Category I non-friable ACM subject to sanding, grinding, cutting, or abrading, or Category II non-friable ACM with a high probability of becoming crumbled, pulverized, or reduced to powder by forces expected to act on the material during disturbance. Category I non-friable ACM are exclusively asbestos-containing packings, gaskets, resilient floor coverings, and asphalt roofing products that contain more than 1% asbestos. Category II non-friable ACM are all other non-friable materials (other than Category I non-friable ACM) that contain more than 1% asbestos. Category II non-friable ACM generally includes (but is not limited to) cementitious material such as: cement pipes, cement siding (Transite™), cement panels, glazing, mortar, and grouts.
The Ohio Environmental Protection Agency (OEPA) adopted Chapter 3745-20 of the Ohio Administrative Code and implements the Asbestos NESHAP. The owner or operator must provide the OEPA district office or local air agency with written notification at least 10 business days prior to the commencement demolition projects and prior to removal of friable ACMs in quantities greater than 50 linear or 50 square feet. The OEPA also regulates friable asbestos abatement activities, asbestos personnel training, and issuance of asbestos professional certifications under OAC 3745-22. OEPA audits asbestos abatement projects and responds to public health
Responsive ■ Resourceful ■ Reliable 4 emergencies where friable ACMs has been released. Please note that per OEPA regulations, non-friable floor tile if broken into pieces four (4) square inches or smaller are considered friable, and thus as a RACM.
The United States Occupational Safety and Health Administration (USOSHA) asbestos standard for construction (29 CFR 1926.1101) regulates workplace exposure to asbestos. The USOSHA standard requires that employee exposure to airborne asbestos must not exceed 0.1 fibers per cubic centimeter of air (0.1 f/cc) as an eight-hour time weighted average (TWA) and not exceed
1.0 fibers per cubic centimeter of air (1.0 f/cc) over a 30-minute time period known as an excursion limit (EL). The TWA and EL are known as USOSHA’s asbestos permissible exposure limits (PELs). The USOSHA standard classifies construction and maintenance activities which could disturb ACM, and specifies work practices and precautions which employers must follow when engaging in each class of regulated work.
5.0 FINDINGS AND RECOMMENDATIONS
Specific to the subject renovation project areas and building systems indicated on Client-provided drawings and based on the analytical results of the collected samples, the materials listed below were identified to contain asbestos.
ACM Description Material Location % and Type Asbestos Condition Estimated
Quantity* Hard White Pipe Fitting Insulation
Basement- B010 5” and 3” Condensate/Steam Lines
2.6% Amosite by Point Count (PC) Good ~5 Fittings or 5
Square Feet (SF)
Brown Caulking 1st Floor- B128- Base of 2” and 5” Steam Lines 4.8% Chrysotile PC Good ~1 SF Total
Brown Caulking 2nd Floor- B226- Base of 2” and 5” Steam Lines 3.2% Chrysotile PC Good ~1 SF Total
*Estimated quantities listed above are based on a cursory field evaluation, and actual quantities may vary significantly, especially if ACMs are present outside of the renovation areas, and in hidden and/or inaccessible areas not evaluated as part of this survey. This is not a bidding document and contractors would be responsible for drawing their own conclusions on quantities present
A sample summary is included in Appendix B; laboratory analytical reports are included as Appendix C.
If the identified ACMs will be impacted by the renovation, such materials would need to be properly removed, handled, and disposed in accordance with applicable federal and state EPA regulations, Occupational Safety and Health Administration (OSHA) regulations, and per VA project specifications.
Responsive ■ Resourceful ■ Reliable 5
6.0 LIMITATIONS/GENERAL COMMENTS
The survey was project specific and limited to our understanding of the Client’s intended renovation project scope; this survey is not meant to be a comprehensive survey of the entire building/facility. In addition, Terracon did not perform sampling which required demolition or destructive activities such as knocking large holes in walls, dismantling of equipment or removal of protective coverings. Reasonable efforts to access suspect materials within known areas of restricted access (e.g., crawl spaces) were made; however, confined spaces or areas which may pose a health or safety risk to Terracon personnel were not sampled. Sampling did not include suspect materials which could not be safely reached with available ladders/man-lifts.
This asbestos survey was conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing under similar conditions in the same locale. The results, findings, conclusions, and recommendations expressed in this report are based on conditions observed during our survey of the building. The information contained in this report is relevant to the date on which this survey was performed and should not be relied upon to represent conditions at a later date. This report has been prepared on behalf of and exclusively for use by Levin Porter Associates Inc. for specific application to their project as discussed. This report is not a bidding document. Contractors or consultants reviewing this report must draw their own conclusions regarding quantities, further investigation or remediation deemed necessary. Terracon does not warrant the work of regulatory agencies, laboratories, or other third-parties supplying information which may have been used in the preparation of this report. No warranty, express or implied is made.
R es po ns iv e ou rc ef ul
Re lia bl
AP
PE
N D
IX
A
VA
P ro je ct : R ep la ce H os pi ta l S te am ea tin g
Sy st em s
Ph as
VA
ro je o.
: 5
-1
8-
C in ci nn at i V
M ed ic al en r
V
St re et nn i, O hi o
Te rra co n
Pr oj ec t N o.
ID
EN
TI
FI
ED
SB
ES
TO
S-
CO
NT
AI
IN
G
AT
ER
IA
LS
B
Y
HO
EN
EO
US
EA
(H
A) HA No
’s
AC
D cr ip tio er ia l L oc io a nd
T yp
As be
EP
NE
SH
AP
Cl si fic
Co iti on Es tim
Q ua nt ity ar d
W
F itt
In su w ith ib gl
U
Ba se m t-
B0
” a
” C de e/
St
Li ne
2.
6% ite by oi
(P eg sb to l (R oo
~5 itt gs r 5 Sq ee t (
SF
Br ow au lk
1s t F lo or
- B
8-of
” S
L
4.
8% hr ys ot ile
PC
y
II
-F ria
~1
SF
T
Br ow au lk
2n
Fl r-
B2
- B
” S
L
3.
2% hr ile
PC
II
-F ria
~1
S
To l
Se
Ap pe ix fo r a um pl c ol le
, A pp di x r d ai an yt ica l r ts
, a x E lo ca dr aw gs
*E im q li bo ve b cu rs fie ld va lu n, l q ay v gn ific tly
, e sp lly if pr t o ut f t he ne no s, h id d/ ac ss pa rt th is rv ey
. T t a ng oc um t a tra ra ei r o nc ga rd qu tit ie t.
It sh ss
/c us ls , o tif du rin ur y, ay xi
. S ho ad na l s un r t ur tiv
, t ho t b s-ai ni ng u il sa lic fir ei t.
If tif ill im pa n, uc h ee op ly ov
, h dl po cc da nc ith lic ab fe ra l a
E
PA
gu
, O cc up na l S af lth dm tra
(O
SH
A) gu p
V oj t s fic
Responsive ■ Resourceful ■ Reliable
APPENDIX B
VA Project No.: 539-18-102
ASBESTOS SURVEY SAMPLE SUMMARY
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)
HA # SEQ. #
White Mastic over Fiberglass Pipe
Insulation
West Side of Machinery- 2” Pipe
Sub-Basement-
None Detected (ND)
002 West Side of Machinery- 4” Pipe ND
003 East Side of Machinery- 2” Pipe ND
2” Condensate Pipe Sub- Basement- 2” Condensate and 4” Steam Lines- East
Crawl Space
ND
005 4” Steam Pipe ND
006 4” Steam Pipe ND
South Side of West Tank
Sub-Basement- Pipes Associated with Condensation Tanks
008 North Side of West Tank ND
009 North Side of East Tank ND
Center of Room – 4” Condensation Line Sub-Basement-
Condensate and Steam Line- Main
Room
Northwest Corner of Room – 4” High Pressure Steam
Line
Northeast Corner of
Room- 1” Condensation Line
4” Pipe
Basement- A-013 Closet
014 4” Pipe ND
015 4” Pipe ND
4” Condensate Line
Basement- C003B Condensate Line
017 4” Condensate Line ND
018 4” Condensate Line ND
1” Pipe
Basement- C003B Pipe Around Flow
Meter
020 1” Pipe ND
021 1” Pipe ND
Hard White Fittings
5” Pipe Basement- B010 5” and 3” Condensate/Steam
Lines
2.6% Amosite by Point Count
(PC)
023 5” Pipe 2.2% Amosite PC
024 3” 1.9% Amosite PC
Plaster Wall: Base Coat and Finished
Coat
Near Hatch
Basement- B010
Base Coat: ND, Finished Coat:
026 Near Hatch Base Coat: ND, Finished Coat:
027 Near Hatch Base Coat: ND, Finished Coat:
1st Floor- A123 – 4” Steam Lines
029 4” Pipe ND
030 4” Pipe ND
Brown Caulking
2” Pipe
1st Floor- B128- Base of 2” and 5”
4.3% Chrysotile PC
032 5” Pipe 4.1% Chrysotile PC
033 5” Pipe 4.8% Chrysotile PC
2nd Floor- A221- 4”
035 4” Pipe ND
036 4” Pipe ND
2nd Floor- A221- Base of 4”Steam
038 4” Pipe ND
039 4” Pipe ND
2” Pipe
2nd Floor- B226-
2.4% Chrysotile PC
041 5” Pipe 1.8% Chrysotile PC
042 5” Pipe 3.2% Chrysotile PC
15 043 4” Pipe 3rd Floor- A336- 4” Steam Lines ND
044 White Mastic over
4” Pipe ND
045 4” Pipe ND
Red Fire-Stop Caulking
3rd Floor- A336- 4”
047 4” Pipe ND
048 4” Pipe ND
3rd Floor- B317- Base of 5” and 3”
050 5” Pipe ND
051 3” Pipe ND
3rd Floor- B317- 5” and 3” Steam Lines
053 5” Pipe ND
054 3” Pipe ND
5th Floor- A525- 4”
056 4” Pipe ND
057 4” Pipe ND
5” Pipe 5th Floor- B508-
059 5” Pipe ND
060 3” Pipe ND
7th Floor- B711-
062 5” Pipe ND
063 3” Pipe ND
7th Floor- B711- 5”
065 5” Pipe ND
066 3” Pipe ND
7th Floor- A725-
068 5” Pipe ND
069 3” Pipe ND
7th Floor- A725- 5”
071 5” Pipe ND
072 3” Pipe ND
White 2’ x 2’ Fine Textured Ceiling Tile
South End of Hallway
Building 2- Throughout Basement
074 Outside Room 0007 ND
075 Outside Room 0007 ND
South End of Hallway Building 2
Basement - Steam and Condensate Lines Throughout
077 Outside Room 0007 ND
078 North End of Crawl Space ND
Outside Room 0007
Building 2 Basement- All Wall
Penetrations
080 Outside Room 0007 ND
081 Outside Room 0007 ND
Northwest Corner of Mechanical Room
Building 8- Steam and Condensate
Lines in Northwest Corner
083 Northwest Corner of Mechanical Room ND
084 Northwest Corner of Mechanical Room ND
Northwest of Entry to Ground’s Crew
Office- 1” Pipe Building 1- Steam Line in Ground’s Crew Basement
Area
1” Pipe 3rd Floor- Operating Room- Steam Line
Near Northeast Corner of Clean
089 1” Pipe ND
090 1” Pipe ND
31 091 Red Fire-Stop Caulking Center West ND
092 Northwest Building 15 Roof- West Wall of AHU
093 Southwest ND
Northwest Corner
Building 15 Roof- AHU 1 Steam
095 Middle West ND
096 Southwest Corner ND
Tan Putty
Southwest Corner
Building 15 Roof- AHU 1 Southwest
Corner
098 Southwest Corner ND
099 Southwest Corner ND
Transparent Mastic
Outside Room B412 4th Floor-
Throughout New Pharmacy on Duct
Work
101 Outside Room B412 ND
102 Outside Room B412 ND
2’ x 2’ Small Fissure Ceiling Tiles
Outside Room B412 4th Floor-
Throughout New Pharmacy Hallways
104 Outside Room B412 ND
105 Outside Room B433a ND
Brown Duct Mastic
Outside Room B412a 4th Floor- New
Pharmacy Duct
107 Outside Room B412a ND
108 Outside Room B412a ND
2’ x 2’ White Bird Track Ceiling Tile
Doorway of Northwest Room (Electrophoresis
Core) 4th Floor- New
Pharmacy Rooms
110 Doorway of Lac Produce ND
111 Doorway to West Lab ND
Large Area- East of South Column
4th Floor- South New Pharmacy
Area- Steam Lines
Large Area
Northeast of South Column
114 North Center of Large Room ND
Gray Duct Mastic
Center of Large
4th Floor- South New Pharmacy-
Duct Work
116 Center of Large Room ND
117 Center of Large
2” Pipe- Middle East Wall
5th Floor Penthouse (B505E)- Steam
Lines on East Side of Room
119 2” Pipe- Middle of
120 2” Pipe- Middle of
White Duct Tape
Southwest Corner of Room 5th Floor Penthouse
(B505E)- Duct
122 Southwest Corner of
123 Southwest Corner of
4” Pipe- Southwest Corner of Room
(B505E)- Steam
Lines in Southwest
125 4” Pipe- Southwest Corner of Room ND
126 4” Pipe- Southwest Corner of Room ND
White Duct Mastic
Room on
Uninsulated Duct
(B505E)- Duct
Work in southwest
East Side of Area
AHU1- 4” Steam
131 Middle of Area ND
132 West Side of Area ND
Gray Caulking
Southwest Corner
AHU1 Roof
134 Southwest Corner ND
135 Southwest Corner ND
136 White Mastic over
Middle of North Wall 4th Floor- Throughout
Mechanical Room - 456A- Steam Lines
137 Northeast Corner of
138 Middle of East Wall ND
South End
AHU 3 Steam
140 Middle ND
141 North End ND
Gray Caulking
Southeast Corner
AHU 3 Roof
143 Southeast Corner ND
144 Southeast Corner ND
APPENDIX C
ASBESTOS ANALYTICAL LABORATORY DATA
Lab No.: 6743046 Client No.: 1-001
Analyst Observation: White Mastic Client Description: White Mastic Over Fiberglass Pipe
Location: West Side Of Machinery - 2" Pipe; Sub-Basement-South Facility:
Percent Asbestos:
None Detected
Percent Non-Asbestos Fibrous Material:
5 Wollastonite
Percent Non-Fibrous Material:
Lab No.: 6743047 Client No.: 1-002
Location: West Side Of Machinery - 4"
Lab No.: 6743048 Client No.: 1-003
Location: East Side Of Machinery - 2"
Lab No.: 6743049 Client No.: 2-004
Location: 2" Condensate Pipe; East Crawl Space
Lab No.: 6743050 Client No.: 2-005
Location: 4" Steam Pipe; East Crawl Space
Lab No.: 6743051 Client No.: 2-006
Location: 4" Steam Pipe; East Crawl Space
Erik Swanson
03/28/2019
3/29/2019Report Date:
Report No.: 585819 - PLM
PLM BULK SAMPLE ANALYSIS SUMMARY
Dated : 3/29/2019 7:02:58 Page 1 of 33
Lab No.: 6743052 Client No.: 3-007
Location: South Side Of West Tank; Sub-
Lab No.: 6743053 Client No.: 3-008
Location: North Side Of West Tank; Sub-
Lab No.: 6743054 Client No.: 3-009
Location: North Side Of East Tank; Sub-
Lab No.: 6743055 Client No.: 4-010
Location: Center Of Room-4" Condensation Line; Sub-Basement
Lab No.: 6743056 Client No.: 4-011
Location: Northwest Corner Of Room-4" High Pressure Steam Line; Sub-Basement
Lab No.: 6743057 Client No.: 4-012
Location: Northeast Corner Of Room-1" Condensatiion Line; Sub-Basement
Dated : 3/29/2019 7:02:58 Page 2 of 33
Lab No.: 6743058 Client No.: 5-013
Location: 4" Pipe; Basement - A-013 Closet
Lab No.: 6743059 Client No.: 5-014
Lab No.: 6743060 Client No.: 5-015
Lab No.: 6743061 Client No.: 6-016
Location: 4" Condensate Line; Basement - C003B
Lab No.: 6743062 Client No.: 6-017
Lab No.: 6743063 Client No.: 6-018
Dated : 3/29/2019 7:02:58 Page 3 of 33
Lab No.: 6743064 Client No.: 7-019
Location: 1" Pipe; Basement - C003B Around Flow Meter
Lab No.: 6743065 Client No.: 7-020
Lab No.: 6743066 Client No.: 7-021
Lab No.: 6743067 Client No.: 8-022
Analyst Observation: White Fitting Client Description: Hard White Fittings With Fiberglass Pipe
Location: 5" Pipe; Basement - B010 Condensate/Steam Line
PC 2.6 Amosite
10 Fibrous Glass
87.4
Lab No.: 6743068 Client No.: 8-023
Location: 5" Pipe; Basement - B010
PC 2.2 Amosite
87.8
Lab No.: 6743069 Client No.: 8-024
Location: 3" Pipe; Basement - B010
PC 1.9 Amosite
88.1
Dated : 3/29/2019 7:02:58 Page 4 of 33
Lab No.: 6743070 Client No.: 9-025
Analyst Observation: White Plaster Client Description: Plaster Wall
Location: Near Hatch; Basement - B010
Lab No.: 6743070(L2) Client No.: 9-025
Analyst Observation: Beige Plaster
Lab No.: 6743071 Client No.: 9-026
Lab No.: 6743071(L2) Client No.: 9-026
Lab No.: 6743072 Client No.: 9-027
Lab No.: 6743072(L2) Client No.: 9-027
Dated : 3/29/2019 7:02:58 Page 5 of 33
Lab No.: 6743073 Client No.: 10-028
Location: 4" Pipe; 1st Floor-A123 Steam
Lab No.: 6743074 Client No.: 10-029
Lab No.: 6743075 Client No.: 10-030
Lab No.: 6743076 Client No.: 11-031
Analyst Observation: Brown Mastic Client Description: Brown Caulking
Location: 2" Pipe; 1st Floor-B128-Steam
PC 4.3 Chrysotile
95.7
Lab No.: 6743077 Client No.: 11-032
Location: 5" Pipe; 1st Floor-B128-Steam
PC 4.1 Chrysotile
95.9
Lab No.: 6743078 Client No.: 11-033
Location: 5" Pipe; 1st Floor-B128-Steam
PC 4.8 Chrysotile
95.2
Dated : 3/29/2019 7:02:58 Page 6 of 33
Lab No.: 6743079 Client No.: 12-034
Analyst Observation: White Coating
Location: 4" Pipe; 2nd Floor-A221-Steam
3 Cellulose
Lab No.: 6743080 Client No.: 12-035
1 Cellulose
Lab No.: 6743080(L2) Client No.: 12-035
Analyst Observation: Grey Insulation
95 Fibrous Glass
Lab No.: 6743081 Client No.: 12-036
Lab No.: 6743082 Client No.: 13-037
Analyst Observation: Brown Non-Fibrous
1 Fibrous Glass
Lab No.: 6743083 Client No.: 13-038
Zach Schwartz
Dated : 3/29/2019 7:02:58 Page 7 of 33
Lab No.: 6743083(L2) Client No.: 13-038
Analyst Observation: Grey Fibrous
95 Fibrous Glass
Lab No.: 6743084 Client No.: 13-039
5 Fibrous Glass
Lab No.: 6743085 Client No.: 14-040
Analyst Observation: Brown Caulk
Location: 2" Pipe; 2nd Floor-B226-Steam
PC 2.4 Chrysotile
3 Fibrous Glass
94.6
Lab No.: 6743086 Client No.: 14-041
Analyst Observation: Tan Caulk
Location: 5" Pipe; 2nd Floor-B226-Steam
PC 1.8 Chrysotile
2 Fibrous Glass
96.2
Lab No.: 6743087 Client No.: 14-042
Location: 5" Pipe; 2nd Floor-B226-Steam
PC 3.2 Chrysotile
96.8
Lab No.: 6743088 Client No.: 15-043
Analyst Observation: Off-White Wrap
Location: 4" Pipe; 3rd Floor-A336-Steam
15 Cellulose
Dated : 3/29/2019 7:02:58 Page 8 of 33
Lab No.: 6743088(L2) Client No.: 15-043
Analyst Observation: Yellow Insulation
99 Fibrous Glass
Lab No.: 6743089 Client No.: 15-044
Analyst Observation: Off-White Coating
20 Cellulose
Lab No.: 6743089(L2) Client No.: 15-044
Lab No.: 6743090 Client No.: 15-045
Analyst Observation: Grey Coating
Lab No.: 6743090(L2) Client No.: 15-045
Lab No.: 6743091 Client No.: 16-046
Analyst Observation: Red Caulk Client Description: Red Fire-Stop Caulking
Dated : 3/29/2019 7:02:58 Page 9 of 33
Lab No.: 6743092 Client No.: 16-047
Lab No.: 6743093 Client No.: 16-048
Lab No.: 6743094 Client No.: 17-049
Analyst Observation: Red Firestop
Location: 5" Pipe; 3rd Floor-A317-Steam
Lab No.: 6743095 Client No.: 17-050
Location: 5" Pipe; 3rd Floor-A317-Steam
Lab No.: 6743096 Client No.: 17-051
Location: 3" Pipe; 3rd Floor-A317-Steam
Lab No.: 6743097 Client No.: 18-052
Location: 5" Pipe; 3rd Floor-B317-Steam
50 Cellulose
Dated : 3/29/2019 7:02:58 Page 10 of 33
Lab No.: 6743098 Client No.: 18-053
Location: 5" Pipe; 3rd Floor-B317-Steam
30 Cellulose
Lab No.: 6743099 Client No.: 18-054
Location: 3" Pipe; 3rd Floor-B317-Steam
Lab No.: 6743099(L2) Client No.: 18-054
Analyst Observation: Brown Insulation
Location: 3" Pipe; 3rd Floor-B317-Steam
Lab No.: 6743100 Client No.: 19-055
Location: 4" Pipe; 5th Floor-A525-Steam
Lab No.: 6743101 Client No.: 19-056
Dated : 3/29/2019 7:02:58 Page 11 of 33
Lab No.: 6743102 Client No.: 19-057
Analyst Observation: Off-White Coating
Lab No.: 6743102(L2) Client No.: 19-057
Lab No.: 6743103 Client No.: 20-058
Client Description: Red Firestop Caulking
Location: 5" Pipe; 5th Floor-B508-Steam
Lab No.: 6743104 Client No.: 20-059
Location: 5" Pipe; 5th Floor-B508-Steam
Lab No.: 6743105 Client No.: 20-060
Location: 3" Pipe; 5th Floor-B508-Steam
Lab No.: 6743106 Client No.: 21-061
Location: 5" Pipe; 7th Floor-B711-Steam
Dated : 3/29/2019 7:02:59 Page 12 of 33
Lab No.: 6743107 Client No.: 21-062
Lab No.: 6743108 Client No.: 21-063
Location: 3" Pipe; 7th Floor-B711-Steam
Lab No.: 6743108(L2) Client No.: 21-063
Analyst Observation: Brown Foam
Lab No.: 6743109 Client No.: 22-064
Lab No.: 6743110 Client No.: 22-065
Analyst Observation: White Wrap
Dated : 3/29/2019 7:02:59 Page 13 of 33
Lab No.: 6743111 Client No.: 22-066
Lab No.: 6743112 Client No.: 23-067
Location: 5" Pipe; 7th Floor-A725-Steam
Lab No.: 6743113 Client No.: 23-068
Lab No.: 6743114 Client No.: 23-069
Location: 3" Pipe; 7th Floor-A725-Steam
Dated : 3/29/2019 7:02:59 Page 14 of 33
Lab No.: 6743115 Client No.: 24-070
Lab No.: 6743116 Client No.: 24-071
Lab No.: 6743117 Client No.: 24-072
Location: 3" Pipe; 7th Floor-A725-Steam
Lab No.: 6743118 Client No.: 25-073
Analyst Observation: White/Grey Ceiling Tile Client Description: White 2'x2' Fine Textured Ceiling Tile
Location: South End Of Hallway; Bldg 2- Throughout Basement
55 Mineral Wool
Lab No.: 6743119 Client No.: 25-074
Location: Outside Room 0007; Bldg 2-
Lab No.: 6743120 Client No.: 25-075
Terrence Mulhern
Dated : 3/29/2019 7:02:59 Page 15 of 33
Lab No.: 6743121 Client No.: 26-076
Location: South End Of Hallway; Bldg 2-
Lab No.: 6743122 Client No.: 26-077
Lab No.: 6743123 Client No.: 26-078
Location: North End Of Crawl Space; Bldg 2-Basement
Lab No.: 6743124 Client No.: 27-079
Basement All Wall Penetrations
5 Mineral Wool
Lab No.: 6743125 Client No.: 27-080
Lab No.: 6743126 Client No.: 27-081
Dated : 3/29/2019 7:02:59 Page 16 of 33
Lab No.: 6743127 Client No.: 28-082
Location: Northwest Corner Of Mechanical Room; Bldg 8
Lab No.: 6743128 Client No.: 28-083
Lab No.: 6743129 Client No.: 28-084
Lab No.: 6743130 Client No.: 29-085
Location: Northwest Of Entry To Ground's Crew Office-1" Pipe; Bldg 1
Lab No.: 6743131 Client No.: 29-086
Lab No.: 6743132 Client No.: 29-087
Dated : 3/29/2019 7:02:59 Page 17 of 33
Lab No.: 6743133 Client No.: 30-088
Location: 1" Pipe; 3rd Fl Operating Rm- Steam Line Near NE Corner Of Clean Rm
Lab No.: 6743134 Client No.: 30-089
Lab No.: 6743135 Client No.: 30-090
Lab No.: 6743136 Client No.: 31-091
Location: Center West; Bldg 15 Roof-West Wall Of AHU 30
Lab No.: 6743137 Client No.: 31-092
Analy