36C25019B0018-009.pdf
PDF 5 MB Posted
- Attached to
- 1B229 Mechanical Room (VA-19-00027342) Federal contract opportunity
- Solicitation number
- 36C25019B0018
About this file
36C25019B0018 S02 - Combined Drawings - PDFs.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25019B0018-011.docx | DOCX document | |
| 36C25019B0018-008.pdf | ||
| 36C25019B0018-010.pdf | ||
| 36C25019B0018-007.docx | DOCX document | |
| 36C25019B0018-012.docx | DOCX document | |
| 36C25019B0018-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEDIUM PRESSURE STEAM CONDENSATE
HEATING HOT WATER SUPPLY
HEATING HOT WATER RETURN
MPR
MPS
CHWS
HHWS
HHWR
CHWR CHILLED WATER RETURN
CHILLED WATER SUPPLY
MEDIUM PRESSURE STEAM
PRESSURE GAUGE
FLEXIBLE METAL EXPANSION LOOP ASSEMBLY
HPR HIGH PRESSURE STEAM CONDENSATE
F FIRE SUPPRESSION PIPE
STRAINER
PIPE EXPANSION ANCHOR
PIPE GUIDE
FLEXIBLE PIPE CONNECTOR
THERMOMETER IN PIPE WELL
BALANCING VALVE
X
E.L.
HEIGHT OF BOTTOM OF PIPE ABOVE FLOOR9'-2"
HVAC PIPING:
SHUTOFF VALVE
REDUCER OR INCREASER
UNION
(SHUTOFF, BALANCE, CHECK)
TRIPLE DUTY VALVE
CHECK VALVE
3-WAY CONTROL VALVE
GAUGE PORT (PETE'S PLUG)
DRAIN VALVE WITH HOSE FITTING
HIGH PRESSURE STEAMHPS
2-WAY CONTROL VALVE
A. CONTRACTOR SHALL FIELD VERIFY CONDITIONS SHOWN ON DESIGN DOCUMENTS PRIOR TO
COMMENCEMENT OF CONSTRUCTION. NOTIFY ENGINEER OF ANY CONDITIONS WHICH WILL NOT PERMIT
THE WORK TO BE PERFORMED AS INDICATED ON THESE DRAWINGS.
B. COORDINATE ALL SHUT-DOWNS OF EXISTING MECHANICAL SYSTEMS WITH OWNER A MINIMUM OF TEN
WORKING DAYS IN ADVANCE.
C. PROVIDE SERVICE CLEARANCE FOR ALL MECHANICAL EQUIPMENT. REFER TO INSTRUCTIONS FROM THE
EQUIPMENT MANUFACTURER.
D. NEW PIPING SHALL NOT BE ROUTED ABOVE ELECTRICAL PANELS. REFER TO ELECTRICAL DRAWINGS
FOR LOCATION OF PANELS.
E. NO TEMPERATURE SENSING CONTROL DEVICES SHALL BE LOCATED OVER HEAT PRODUCING DEVICES.
F. MECHANICAL DRAWINGS ARE DIAGRAMMATIC. WHERE DUCT SIZE SHOWN IS IN CONFLICT WITH
STRUCTURE OR OTHER BUILDING SYSTEM, CONTRACTOR MAY MODIFY DUCT SIZE AND PROVIDE
EQUIVALENT FREE AREA DUCT.
G. WHERE EQUIPMENT IS TO BE REMOVED, REMOVE ALL ASSOCIATED PIPING, DUCTWORK, CONTROLS, CONCRETE PADS, SUPPORTS, ETC. PATCH WALL AND FLOOR OPENINGS TO MATCH ADJACENT
SURFACES.
H. CONTRACTOR SHALL REMOVE AND REPLACE CEILING TILES AND GRID AS REQUIRED TO COMPLETE
DEMOLITION AND NEW WORK IN AREAS OF WORK. CONTRACTOR SHALL BE RESPONSIBLE FOR
REPLACING ANY TILES OR GRID DAMAGED DUE TO THIS WORK.
L. ALL VARIABLE SPEED MOTORS SHALL BE PROVIDED SHAFT GROUNDING RINGS.
M. ALL VAV CONTROLLERS SHALL BE MOUNTED TO ALLOW FULL ACCESSIBILITY.
N. ALL VALVES SHALL BE INSTALLED IN ACCESSIBLE LOCATIONS.
NORMALLY OPENNO
NORMALLY CLOSEDNC
LOCAL DRAIN, VALVED WITH 3/4" THREADED
CONNECTOR
MANUAL AIR VENTMAV
PRESSURE RELIEF VALVE
CD CONDENSATE PIPING
HVAC GENERAL NOTES:
PRESSURE REDUCING VALVE
CALL OUTS:
ROUND DUCT SIZE12"Ø
RECTANGULAR DUCT SIZE24x18
REFERENCE TO CODED NOTE#
SUPPLY AIR DUCT
DUCTWORK SYMBOLS:
RETURN AIR DUCT
EXHAUST AIR DUCT
EXISTING TO REMAIN
EXISTING TO BE REMOVED
EQUIPMENT OR FIXTURE MARK
UNIT NUMBER
EQUIPMENT
TYPE
AC
AD
AFF
AHU
AP
CF
CD
CO
CW
Db dB Dp
DX
AIR CONDITIONING UNIT
ACCESS DOOR
ABOVE FINISHED FLOOR
AIR HANDLING UNIT
ACCESS PANEL
CENTRIFUGAL FAN
COOLING COIL CONDENSATE
CLEAN OUT
COLD WATER
DRY BULB TEMPERATURE
DECIBELS
DEW POINT TEMPERATURE
DIRECT EXPANSION
EA
EF
EX.
FC
FLR.
FD
FSD
HC
HP
EXHAUST AIR
EXHAUST FAN
EXISTING
FORWARD CURVED FAN
FLOOR
FIRE DAMPER
COMBINATION FIRE/SMOKE DAMPER
HEATING COIL
HORSEPOWER
MAX.
MIN.
NOM.
OA
PD
PF
PH
REA
RF
RH
Rh
SA
Sp. Gr.
SP
SPS
MAXIMUM
MINIMUM
NOMINAL
OUTDOOR AIR
PRESSURE DROP
PRE-FILTER
PREHEAT
RELIEF AIR
RETURN FAN
REHEAT COIL
RELATIVE HUMIDITY
SUPPLY AIR
SPECIFIC GRAVITY
STATIC PRESSURE
STATIC PRESSURE SENSOR
VD
VSMC
Wb
VOLUME DAMPER
VARIABLE SPEED MOTOR CONTROLLER
WET BULB TEMPERATURE
ABBREVIATIONS:
MECHANICAL SYMBOLS:
LIMIT OF DEMOLITION
AND EXISTING WORK
POINT OF CONNECTION BETWEEN NEW
GENERAL SYMBOLS:
EXISTING TO BE RELOCATED
SS STAINLESS STEEL
N.T.S. NOT TO SCALE
TCP TEMPERATURE CONTROL PANEL
SIDE CONNECTION
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
RA RETURN AIR
FLOAT & THERMOSTATIC STEAM TRAP SET
INCLUDING PIPING ACCESSORIES
INVERTED BUCKET STEAM TRAP SET INCLUDING
PIPING ACCESSORIES
ECCENTRIC REDUCER
DIRECTION OF FLOW
D DRAIN
V VENT LINE
SHUTOFF VALVE IN VERTICAL PIPE
PROCESS CHILLED WATER SUPPLY
PROCESS CHILLED WATER RETURN
PCWS
PCWR
GV GRAVITY VENTILATOR
LOW PRESSURE STEAM CONDENSATELPR
LPS LOW PRESSURE STEAM
CFM
CUH
CUBIC FEET PER MINUTE
CABINET UNIT HEATER
DDC DIRECT DIGITAL CONTROL
GPM GALLONS PER MINUTE
PIPE TRANSITION
HZ ZONE HUMIDIFIER
RTU ROOFTOP UNIT
X
XR
XRL
EXISTING
EXISTING TO BE REMOVED
EXISTING TO BE RELOCATED
GH
GHR
HOT GLYCOL WATER HEATING SUPPLY
HOT GLYCOL WATER HEATING RETURN
GRR GLYCOL WATER RUN-AROUND RETURN
GR GLYCOL WATER RUN-AROUND SUPPLY
VAV- #
CONVERTOR
NO.
HX-1
LOCATION
MECH RM
AB402
FLUID
WATER
GPM
TEMP. IN
°F
TEMP.
OUT
°F
MAX. LOSS
PSI
FLUID
1.0
CIRCULATING FLUID STEAM PSIG
ENT.
CONTROL
VALVE
ENT.
CONVERTOR
10 5
CONTROL
VALVE
LBS/HR
TRAP
LBS/HR
HX-2
STEAM-TO-HOT WATER CONVERTOR SCHEDULE
MARK
SERVICE
TYPE
EXPANSION TANK
CAPACITY
TANK VOLUME (GAL.)
PHYSICAL SIZE
ET-1
HOT WATER
VERT. BLADDER
20"Ø X 41"T
NOTES:
1. MOUNT ON 4" THICK CONCRETE HOUSEKEEPING PAD.
2. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
MARK
SERVICE
AIR SEPARATOR
CAPACITY
INLET/OUTLET SIZE
ASME RATED
AS-1
HOT WATER
3"
YES
NOTES:
1. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
WATER FLOW (GPM)
MARK
SERVICE
TYPE
TEMPERATURE (°F)
PUMPS
MEDIA
PERFORMANCE
FLOW (GPM)
TOTAL HEAD (FEET)
SPEED (RPM)
MOTOR
SIZE (HP)
VOLT-PHASE-HERTZ
HWP-1, 2
HOT WATER
100% WATER
3.0
460-3-60
EFFICIENCY (%) 57.0
NOTES:
1. INSTALL WITH MANUFACTURER'S REQUIRED NET POSITIVE SUCTION HEAD
(NPSH).
2. MOUNT PUMP ON CONCRETE INERTIA PAD.
3. PUMP CAPACITY SHOWN IN SCHEDULE INDICATES TOTAL FUTURE LOAD OF
SYSTEM.
4. AT CONCLUSION OF THIS PROJECT, PUMPS SHALL BE SET TO 60 GPM,
CONSTANT VOLUME.
4. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
5. VSMC BY EC.
6. MOTORS SHALL BE PROVIDED WITH SHAFT GROUNDING RINGS.
NOTES 1,2,3,4,5,6
VARIABLE SPEED MOTOR CONTROLLER YES
NOTES:
1. CONVERTORS SHALL BE INSULATED PER MECHANICAL SPECIFICATIONS.
2. CAPACITY SHOWN IN SCHEDULE INDICATES TOTAL FUTURE LOAD OF SYSTEM.
3. 2-PASS, L=60", 8-5/8" DIA., WEIGHT = 425 LBS.
BASE MTD,
END SUCTION
0.5HEAD LOSS (FT)
PRECHARGE (PSI) 12
SYSTEM EXPANSION (GALLONS) 23.1
MAX. DESIGN TEMPERATURE (°F) 180
ACCEPTANCE VOLUME (GALLONS) 37
ET-#HX-#
HWP-#
AS-#
YES
STRAINER
ASME RATED YES
MECH RM
AB402
WATER 84 150 180 1.0 10 5 1281 2562
RECONFIGURE 1B-229
MECHANICAL ROOM
541-18-510CONSULTANTS: ARCHITECT:
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
10/02/18
10/02/2018
FULLY SPRINKLERED
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2004.
CONSULTANTS:
Final Construction Documents
S
74490
L.D. HENDRIX, JR
R E
S
O F
I
R
GE
NOIS
P
E
N E
D
ERT
L EA
E I N
G
R
T
S
TE
A HF OO
IO
MECHANICAL SYMBOLS,
SCHEDULES, AND NOTES
1-M1
LDHLDH
STEEL EXPANSION SHIELD FOR
THIS TYPE SHALL BE USED ONLY
INSERTS FOR NEW CONSTRUCTION
FOR EXISTING CONSTRUCTION AND
3/8" (10 MM) MIN DIA EXPANSION BOLTS
NUTS & WASHERS
HANGER RODS
3/8" (10 MM) MIN DIA
FLOOR SLAB
CLIP
ANGLE
HANGER RODS
3/8" (10 MM) MIN DIA
TURNBUCKLE
IN SLABS OR BEAMS OF
INSERTS FOR NEW CONSTRICTION
EXISTING CONSTRUCTION AND
4" (100 MM) MIN DEPTH
CONCRETE
3/8" (10 MM) MIN DIA
INSERTS NEW
CONSTRUCTION ONLY.
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
MAXIMUM PIPE/TUBING SUPPORT SPACING
TUBING 5 FT
NOM. SIZE
PIPE
THRU (20)
6 8 10
(32)(25) (40)
(65)
(50)
(75)
ADJUSTABLE CLEVIS HANGER
TYPE 43 - SEE SPECIFICATIONS
SADDLE
WELD
1312 14 16
(125)(100)
(150)
(200)
TO 1000 LB. (453 KG) UNIFORM LOAD
TRAPEZE HANGER FOR UP
PROVIDE INSULATION SHIELD
SIDE VIEW
1 5/8" (43 MM) 12 GAGE1" (25 MM) MAX.
STRENGTH INSULATION
PROVIDE HIGH COMPRESSIVE
TYPE 1 - SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER
HANGER ROD
UNDER INSULATION SHIELD
AT HANGER
INSULATION SHIELD
TEMPERATURE PIPE)
REQUIRED FOR LOW
BARRIER TYPE IS
INSULATION (VAPOR
SPACING ON
36" (900 MM) MAX.
BAND
(9 PCF MIN. DENSITY)
HANGER RODS WITH
(8" (200 MM) MIN.)
CHANNEL OR 2"x2"x1/4"
(50x50x8 MM) ANGLE
864 532 2 1/21 1/21 1 1/4IN.
(MM)
(M)
FT.
FT.
(M)
(5.8)(5.2)(4.1) (4.9)(3.7)(3.0) (3.4)(2.7)(2.1)
(4.9)(4.1)(3.7) (4.0)(3.0)(2.4)(1.8)5 FT
THRU 3/4
(2.1) (2.1)
(2.1)
(2.7)
(2.4)
1/2" (15 MM) DIA.
EACH CHANNEL
AND INSERT FOR ALL PIPING
NOTE:
1. APPLICABLE TO PENETRATIONS OF ALL
FIRE RATED MEMBRANES, IN
ACCORDANCE WITH NFPA 101. REFER
TO SPECIFICATIONS SECTION FOR FIRE
STOPPING SYSTEMS.
INSULATED PIPE
OR DUCT
FLOOR
FIRESTOP MATERIAL
3/4" [19mm] APPROVED
FIRESTOP INSULATION
WITH VAPOR BARRIER
PIPE SLEEVE
1/4" [6mm]Ø ANCHOR
ROD FOR NEW
CONSTRUCTION
WELD
FLOOR OR DECK PENETRATION
PARTITION OR CHASE PENETRATION
6" [152mm]
6" [152mm]
MASONRY
PARTITION
PARTITION SUPPORT
FIRESTOP
MATERIAL
6"
[152mm]
6" [152mm]
3/4" [19mm] APPROVED
FIRESTOP INSULATION WITH
VAPOR BARRIER
DRYWALL PARTITION
INSULATED
PIPE OR
DUCT
VENT ALL HIGH POINTS INDICATED ABOVE.
IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO DRAIN
NOTES:
1.
2.
PLANS LOCATE DRAIN AT BOTTOM OF SCALE POCKET.
TYPICAL WATER PIPING
REDUCER, IF REQUIRED
3/4" (20 MM) GATE VALVE
ADAPTER TO 20 MM (3/4") HOSE THREAD.
PROVIDE HOSE CAP NUT
NOTES:
ELEVATION
THREADED PIPING WELDED PIPING
ELEVATION
1/4" (8 MM)
COPPER TUBING
1/2" (15 MM)
GATE VALVE
1/2" (15 MM) x 4" (100 MM)
REDUCER
CIRCULATING WATER PIPING
WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS AND/OR
DRAIN ALL LOW POINTS AS INDICATED ABOVE.
1.
2.
NIPPLE
ELEVATION
NOTES:
1.
2.
3.
4.
CONNECT TO SIDE OF MAIN TO PREVENT AIR OR DEBRIS FROM ENTERING PIPE TO TANK, TOP OR BOTTOM
CONNECTION NOT PERMITTED.
PROVIDE 12" MINIMUM DROP ANTI-THERMOSYPHON LOOP TO PREVENT GRAVITY HEATING OF TANK.
MOUNT EXPANSION TANK ON 4" CONCRETE HOUSEKEEPING PAD.
FOR HEATING HOT WATER SYSTEM, FILL LINE SHALL BE PIPED FROM DOMESTIC COLD WATER.
HANGER ROD
SUPPORTS
HIGH
CAPACITY
FLOAT TYPE
AIR VENT
FILL LINE. REFER TO
FILL LINE DETAIL. SEE
NOTE 4.
AIR SEPARATOR. SEE
SCHEDULE
VERTICAL
EXPANSION TANK
SEE NOTE 1 AIR VENT
1-1/2"
GLOBE VALVE
PIPE TO LPR MAIN
F&T TRAP ASSEMBLY
REFER TO DETAIL
UNION (TYP)
DIRT LEG. FULL SIZE OF
HEAT EXCHANGER RETURN
OPENING.
BYPASS LINE
PIPE TO LOCAL FLOOR DRAIN
PROVIDE STEEL SADDLE SUPPORTS AND LEGS
SUPPORTED FROM FLOOR FOR EACH HEAT
EXCHANGER. SUPPORT HEIGHT SHALL ALLOW
FOR GRAVITY FLOW OF CONDENSATE TO
CONDENSATE PUMP
THREADED CAP
3/4" DRAIN VALVE
TEST PLUG (TYP)
FLANGE
NOTE: ARRANGE PIPING
TO ALLOW FOR TUBE
REMOVAL
ASME PRESSURE
RELIEF VALVE
PRESSURE
GAUGE (TYP)
THERMOMETER
(TYP)
STEAM CONTROL
VALVES SIZED AT 1/3
AND 2/3 CAPACITY
THERMOSTATIC
AIR VENT
GLOBE VALVE
3/4" BYPASS LINE
STRAINER (TYP)
GLOBE VALVE
BYPASS LINE, SIZE
SAME AS 2/3
CONTROL VALVE
3"
SHUT OFF VALVE
(TYP)
DIRT LEG
PIPE TO
LPR MAIN
2'-0" MIN.
NOTES:
1. INSTALL ALL THERMOMETERS, PRESSURE GAUGES, AND MEASURING DEVICES AT
ELEVATION AND DIRECTION WITH CLEAR VIEW.
FLANGE
DRAIN VALVE
2-POSITION
SOLENOID VALVE,
FULL LINE SIZE.
FROM SYSTEM
TO SYSTEM
3/4"
FLANGE (TYP)
CONCRETE
(TYPICAL)
VIBRATION ISOLATOR
1" (25 MM) MIN. DIA.
DRAIN
1/2" (15 MM)
1/2" (15 MM)
FLEXIBLE CONNECTOR (TYPICAL)
HANGER
RIGID PIPE
HANGER
RIGID PIPE
PIPE & SMALLER. TYPE "H-P" FOR 5"
TYPE. TYPE "H" FOR 4" (100 MM) DIA.
BRANCH SHALL BE SPRING & NEOPRENE
FIRST 3 HANGERS FOR EACH PIPE AND
TO PIPE ELBOW AS POSSIBLE (TYPICAL)
INSTALL HANGER AS CLOSE
FLOOR
PUMP WITH BUILT-IN
SUCTION DIFFUSER
PRESSURE GAGE
(125 MM) DIA. PIPE & LARGER.
STRAINER
PIPE STAND
INERTIA BASE
BALANCE VALVE
NOTES:
1. UNLESS SPECIFICALLY NOTED, SHUT-OFF VALVES INDICATED SHALL BE
GATE, BUTTERFLY, OR BALL VALVES. REFER TO MECHANICAL
SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
CHECK VALVE
ISOLATION VALVE, TYP.
BY HCBY PC
DOMESTIC
COLD WATER.
ISOLATION VALVE. TYPICAL.
UNION. TYPICAL.
PRESSURE REDUCING VALVE.
REDUCED
PRESSURE
BACKFLOW
PREVENTER.
MAKE UP WATER
TO EQUIPMENT
BY HC.
PRESSURE GAUGE.
BYPASS.
EXTEND DRAIN LINE TO
NEAREST FLOOR DRAIN.
TERMINATE WITH AN AIR GAP.
NOTE:
A. SET PRESSURE REDUCING VALVE TO SYSTEM STATIC PRESSURE + 4 PSIG FOR FILL
LINE TO HEATING HOT WATER SYSTEM.
F&T TRAP
GLOBE VALVE BYPASS
(NORMALLY CLOSED)
STRAINER
UNION (TYP.)
SHUTOFF VALVE (TYP.)
LPR
L P
S
12"
MIN.
DIRT LEG FULL
MAIN SIZE
NOT TO SCALE 10
HANGER RODS IN CONCRETE SLABS
AND BEAMS DETAILS
NOT TO SCALE 2
PIPING DRAIN VALVE CONNECTIONS DETAIL
NOT TO SCALE 6
AIR CONTROL, EXPANSION TANK, AND PIPING
CONNECTIONS FOR HYDRONIC SYSTEMS
NOT TO SCALE 1
AIR VENT DETAIL
NOT TO SCALE 4
PIPE/DUCT PENETRATION OF
FIRE/SMOKE DETAILS
NOT TO SCALE 7
TYPICAL PIPE HANGERS DETAILS
NOT TO SCALE 8
FILL LINE DETAIL
NOT TO SCALE 9
FLOAT AND THERMOSTATIC STEAM
TRAP ASSEMBLY DETAIL
NOT TO SCALE 5
END SUCTION BASE MOUNTED PUMP DETAIL
NOT TO SCALE 3
TYPICAL STEAM TO HOT WATER CONVERTOR DETAIL
RECONFIGURE 1B-229
MECHANICAL ROOM
541-18-510CONSULTANTS: ARCHITECT:
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
10/02/18
10/02/2018
FULLY SPRINKLERED
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2004.
CONSULTANTS:
Final Construction Documents
S
74490
L.D. HENDRIX, JR
R E
S
O F
I
R
GE
NOIS
P
E
N E
D
ERT
L EA
E I N
G
R
T
S
TE
A HF OO
IO
MECHANICAL DETAILS
1-M2A
SUB-BASEMENT (FULL HEIGHT)
BASEMENT
A
R E
A W
A Y
ROOF
P
P
GLOBE
H
L
PILOT
PILOT
VENT TO EXTERIOR.
1300#/HR
430#/HR
870#/HR
HIGH PRESSURE
TRAP
ECCENTRIC
INCREASER/
DECREASER, TYP.
4 PIPE DIAMETERS
EXISTING CONDENSATE PUMP
3"
1-1/2"
2-1/2"
2"
3"3"
3"
2"
3"
3/4"3/4"
4"
V E
N T
LPS
LPR
A
IR
S E
P A
R A
T O
R
AUTOMATIC AIR VENT, TYP.
REFER TO DETAIL PIPING
ARRANGEMENT AND
SPECIALTIES AT AIR
SEPARATOR AND EXPANSION
TANK.
REFER TO PUMP DETAIL FOR
DETAILED PIPING ARRANGEMENT AND
SPECIALTIES.
3"
3"
3"
1-1/2"
DOMESTIC
COLD WATER.3/4" FILL LINE TO
EQUIPMENT BY MC.
FILL LINE WATER PRESSURE
REDUCING STATION - REFER TO
DETAIL.
3" 3"
E X
P A
N S
IO
N
T A
N K
HHWS
HHWR
HEATING WATER
HEAT EXCHANGER
HEATING WATER
HEAT EXCHANGER
1,281
LBS/HR
1,281
LBS/HR
REFER TO HEAT EXCHANGER DETAIL
FOR DETAILED PIPING ARRANGEMENT
AND SPECIALTIES.
3"
2"
3"
2/3
1/3
4"
3"
3"
2/3
1/3
3"
2"
2"
3"
2"
3"
3"
1-1/4"
1-1/4"
1-1/2"
MECH ROOM
AB402
3"
3"
3/4" VALVES FOR
POT FEEDER CONNECTION
3"
3"
HPS
HPR
SUB-BASEMENT (CRAWLSPACE)
BASEMENT
SCALE: NONE
STEAM AND HEATING HOT
WATER PIPING SCHEMATIC
2-1/2" 3/4"
RECONFIGURE 1B-229
MECHANICAL ROOM
541-18-510CONSULTANTS: ARCHITECT:
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
10/02/18
10/02/2018
FULLY SPRINKLERED
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2004.
CONSULTANTS:
Final Construction Documents
S
74490
L.D. HENDRIX, JR
R E
S
O F
I
R
GE
NOIS
P
E
N E
D
ERT
L EA
E I N
G
R
T
S
TE
A HF OO
IO
STEAM AND HEATING HOT
WATER PIPING SCHEMATIC
1-M2B
GENERAL CONTROLS NOTES:
A. IN DIAGRAMS, 'I' INDICATES AN INPUT, 'O' INDICATES AN OUTPUT.
B. TEMPERATURE CONTROL TEST SHALL INCLUDE, BUT NOT BE LIMITED TO:
• VALVE ACTUATION RESPONSE AND VALIDATION OF CORRECT OPERATION
• VERIFIED ENTIRE CONTROL SEQUENCE OPERATES PER DESIGN
• ACCOUNT FOR ALL CONTROL POINTS LISTED
I - HOT WATER PUMP 2 STATUS
I - HOT WATER SUPPLY TEMP
M
M
I - HOT WATER PUMP 1 VFD FAULT
O - HOT WATER PUMP 1 VFD SPEED
I - HOT WATER PUMP 2 VFD FAULT
O - HOT WATER PUMP 2 VFD SPEED
O - HOT WATER PUMP 2 START/STOP
I - HOT WATER PUMP 1 STATUS
O - HOT WATER PUMP 1 START/STOP
VFD
VFD
CT
CT
M
HWP-2
HWP-1
HHWS
I - HOT WATER RETURN TEMP
T
O - STEAM VALVE 2/3
O - STEAM VALVE 1/3
M
HHWS
T
T
HHWR HHWR
1. STEAM TO HOT WATER CONVERTERS
HEAT EXCHANGER SYSTEM RUN CONDITIONS:
THE HEAT EXCHANGER SYSTEM SHALL BE ENABLED AT ALL TIMES.
HOT WATER PUMP OPERATION:
THE HOT WATER PUMPS SHALL OPERATE IN A LEAD/STANDBY FASHION.
• THE PUMPS SHALL RUN IN CONSTANT VOLUME WATER FLOW. THE CONTROLLER SHALL MAINTAIN
CONSTANT VOLUME WATER FLOW OF 60 GPM (ADJ.) FOR THE LEAD PUMP.
• ON FAILURE OF THE LEAD PUMP, THE STANDBY PUMP SHALL RUN AND THE LEAD PUMP SHALL
TURN OFF. THE STANDBY PUMP SHALL BECOME THE LEAD PUMP AND SHALL MAINTAIN
CONSTANT VOLUME WATER FLOW OF 60 GPM (ADJ.).
• BUILDING MANAGEMENT SYSTEM SHALL CONTROL LEAD/STANDBY PUMPS TO SHARE RUNTIME
HOURS EQUALLY.
• EACH PUMP IS SIZED FOR FUTURE WATER FLOW OF 84 GPM.
M
O - STEAM VALVE 1/3
O - STEAM VALVE 2/3
M
M
M
O - HOT WATER ISOLATION VALVE
O - HOT WATER ISOLATION VALVE
SEQUENCE OF HEAT EXCHANGER SYSTEM
HEAT EXCHANGER OPERATION:
THE HEAT EXCHANGERS SHALL OPERATE IN A LEAD/STANDBY FASHION.
• THE LEAD HEAT EXCHANGER SHALL RUN FIRST. THE HOT WATER ISOLATION CONTROL
VALVE SHALL OPEN.
• THE HOT WATER ISOLATION CONTROL VALVE SHALL BE INTERLOCKED WITH THE
RESPECTIVE STEAM CONTROL VALVES.
• THE CONTROLLER SHALL MODULATE THE STEAM CONTROL VALVES TO MAINTAIN A FIXED
HOT WATER SUPPLY TEMPERATURE SETPOINT OF 180°F (ADJ.).
• THE STEAM VALVES SHALL BE INTERLOCKED WITH THE HOT WATER FLOW SWITCH.
• THE STANDBY HEAT EXCHANGER'S VALVES SHALL REMAIN CLOSED UNTIL THE HEAT
EXCHANGER IS PLACED INTO THE LEAD OPERATION. BUILDING MANAGEMENT SYSTEM
SHALL CONTROL LEAD/STANDBY HEAT EXCHANGERS TO SHARE RUNTIME HOURS
EQUALLY.
BTU INDICATION:
MONITOR HEATING WATER SUPPLY AND RETURN TEMPERATURES AND SYSTEM FLOWS AND
CALCULATE AND DISPLAY BTUs DELIVERED BY THE SYSTEM. SET UP PROGRAM FOR TRENDING
DELIVERED BTUs FOR ENERGY MONITORING PURPOSES.
ALARMS:
• PUMP FAILURE.
• PUMP RUNNING IN HAND.
• PUMP RUNTIME EXCEEDED: STATUS RUNTIME EXCEEDS A USER DEFINABLE LIMIT.
• VFD FAULT.
• HIGH HOT WATER SUPPLY TEMPERATURE
• LOW HOT WATER SUPPLY TEMPERATURE
F
I - HOT WATER FLOW SWITCH
I - HOT WATER SUPPLY
TEMP
HX-1
HX-2
10 PSI
10 PSI
RECONFIGURE 1B-229
MECHANICAL ROOM
541-18-510CONSULTANTS: ARCHITECT:
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
10/02/18
10/02/2018
FULLY SPRINKLERED
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2004.
CONSULTANTS:
Final Construction Documents
S
74490
L.D. HENDRIX, JR
R E
S
O F
I
R
GE
NOIS
P
E
N E
D
ERT
L EA
E I N
G
R
T
S
TE
A HF OO
IO
TEMPERATURE CONTROLS
1-M3
AB400A
AB401
AB401AAB401B
AB401C
AB402
AB403
AB404
AB405
XR-40x20 RA
1"
1 /2
X-MPS
XR-MPS
X -L
P R
X -L
P R
X-LPR
X-LPS
X -L
P S
X-PD
X-V
X -C
H W
SX
-C
H W
R
3"
X -C
H W
S
X -C
H W
R
4"
X -H
P S
X -H
P R
X -L
P S
S L
O P
E
2"
X-EF
XR-AC-23
XR-UH
XR-AC-24
XR
-O
A
XR
-SA
XR-SA
XR-SA
XR-SA
XR-SA 1
CAP
CAP
X R
-C H
W S
X R
-C H
W R
XR-OA
7 TYP.
CODED NOTES:
1 REMOVE EXISTING AC-24 AND ALL ASSOCIATED DUCTWORK, PIPING, CONTROLS, POWER, CONCRETE
PADS, SUPPORTS, ETC. CAP UTILITIES BACK AT ACTIVE MAIN.
REMOVE EXISTING AC-23 AND ALL ASSOCIATED DUCTWORK, PIPING, CONTROLS, POWER, CONCRETE
PADS, SUPPORTS, ETC. CAP UTILITIES BACK AT ACTIVE MAIN.
REMOVE EXISTING OA DUCTWORK UP THROUGH AREA WAY. PATCH WALL AT PENETRATION. PATCH
GRATING AT TOP OF AREA WAY AS NECESSARY.
REMOVE EXISTING UNIT HEATER COMPLETELY. REMOVE PIPING BACK TO ACTIVE MAIN. REMOVE POWER
AND CONTROLS COMPLETELY.
REMOVE EXISTING LIEBERT CHILLER UNIT COMPLETELY. REMOVE PIPING BACK TO ACTIVE MAIN.
REMOVE CONCRETE PAD, POWER, AND CONTROLS COMPLETELY.
REMOVE EXISTING CHILLER (BUDZER) UNIT COMPLETELY. REMOVE PIPING BACK TO ACTIVE MAIN.
REMOVE CONCRETE PAD, POWER, AND CONTROLS COMPLETELY.
REMOVE EXISTING DUCT TO BOTTOM OF SHAFT. CAP DUCT.
A. REMOVE ALL EQUIPMENT AS INDICATED. REMOVE ALL ASSOCIATED PIPING, DUCTWORK, CONTROLS, ETC. BACK TO ACTIVE SOURCE AND CAP/TERMINATE. NOT ALL PIPING, DUCTWORK, ETC. IS SHOWN, HOWEVER, THE CONTRACTOR SHALL REMOVE THESE ASSOCIATED ITEMS COMPLETELY. FIELD
VERIFY EXISTING CONDITIONS.
B. REMOVE ALL CONCRETE PADS BENEATH DEMOLISHED EQUIPMENT COMPLETELY.
C. PATCH WALL AND FLOOR OPENINGS UPON REMOVAL OF EQUIPMENT, PIPING, DUCTWORK,
CONDUITS, ETC. PATCH WITH LIKE MATERIAL. PROVIDE FIRESTOPPING WHERE NECESSARY.
DEMOLITION GENERAL NOTES:
D
C
B
A
Q
R
N3
2 3 4 539 42 46 4737A37B
RECONFIGURE 1B-229
MECHANICAL ROOM
541-18-510CONSULTANTS: ARCHITECT:
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
10/02/18
10/02/2018
FULLY SPRINKLERED
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2004.
CONSULTANTS:
Final Construction Documents
S
74490
L.D. HENDRIX, JR
R E
S
O F
I
R
GE
NOIS
P
E
N E
D
ERT
L EA
E I N
G
R
T
S
TE
A HF OO
IO
SUB-BASEMENT MECHANICAL
ROOM DEMOLITION PLAN
1-M4
LDHLDH
0'
SCALE: 1/4" = 1'0"
2' 4' 8' 16'
SUB-BASEMENT MECHANICAL
ROOM DEMOLITION PLAN
STAIR 2
1B228
1B229
X-HPR
X-PD
X-HPS
XR-LPR
XR-LPS
XR-HWR
XR-HWS
3"
CAP
CODED NOTES:
1 EXISTING ELECTRICAL PANEL TO REMAIN.
REMOVE EXISTING WATER FILTER COMPLETELY. REMOVE ALL ASSOCIATED PIPING, SUPPORTS, ETC.
EXISTING TEMPERATURE CONTROL PANEL TO REMAIN.
EXISTING CONDENSATE PUMP TO REMAIN.
EXISTING STEAM PRESSURE REDUCING STATION TO REMAIN.
REMOVE EXISTING DOMESTIC WATER FILL LINE. CAP BACK AT ACTIVE MAIN.
REMOVE EXISTING EXPANSION TANK COMPLETELY. REMOVE ALL ASSOCIATED PIPING, SUPPORTS, ETC.
EXISTING TEMPERATURE CONTROLS AIR COMPRESSOR TO REMAIN.
REMOVE EXISTING AIR SEPARATOR COMPLETELY. REMOVE ALL ASSOCIATED PIPING, SUPPORTS, ETC.
REMOVE EXISTING HOT WATER PUMP COMPLETELY. REMOVE ALL ASSOCIATED PIPING, POWER,
CONTROLS, SUPPORTS, ETC.
REMOVE EXISTING HEAT EXCHANGER COMPLETELY. REMOVE ALL ASSOCIATED PIPING, CONTROLS, SUPPORTS, ETC.
EXISTING SPOT COOLER TO REMAIN.
A. REMOVE ALL EQUIPMENT AS INDICATED. REMOVE ALL ASSOCIATED PIPING, DUCTWORK, CONTROLS, ETC. BACK TO ACTIVE SOURCE AND CAP/TERMINATE. NOT ALL PIPING, DUCTWORK, ETC. IS SHOWN, HOWEVER, THE CONTRACTOR SHALL REMOVE THESE ASSOCIATED ITEMS COMPLETELY. FIELD
VERIFY EXISTING CONDITIONS.
B. REMOVE ALL CONCRETE PADS AND SUPPORTS ASSOCIATED WITH DEMOLISHED EQUIPMENT.
C. PATCH WALL AND FLOOR OPENINGS UPON REMOVAL OF EQUIPMENT, PIPING, DUCTWORK,
CONDUITS, ETC. PATCH WITH LIKE MATERIAL. PROVIDE FIRESTOPPING WHERE NECESSARY.
DEMOLITION GENERAL NOTES:
C
C1
36.5 38
RECONFIGURE 1B-229
MECHANICAL ROOM
541-18-510CONSULTANTS: ARCHITECT:
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
10/02/18
10/02/2018
FULLY SPRINKLERED
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2004.
CONSULTANTS:
Final Construction Documents
S
74490
L.D. HENDRIX, JR
R E
S
O F
I
R
GE
NOIS
P
E
N E
D
ERT
L EA
E I N
G
R
T
S
TE
A HF OO
IO
FIRST FLOOR MECHANICAL
ROOM 1B-229 DEMOLITION PLAN
1-M5
LDHLDH
SCALE: 1/2" = 1'0"
0' 1' 2' 4' 8'
FIRST FLOOR MECHANICAL ROOM 1B-229
DEMOLITION PLAN
N
N2
AB400A
AB401
AB401AAB401B
AB401C
AB402
AB403
AB404
AB405
X-MPS
X -L
P R
X -L
P R
X-LPR
X-LPS
X -L
P S
X-PD
X-V
X -C
H W
SX
-C
H W
R
X -C
H W
S
X -C
H W
R
X -H
P S
X -H
P R
X -L
P S
S L
O P
E
X-EF
H P
S
H P
R
H P
S
H P
R
H H
W S
H H
W R
H H
W S
H H
W R
VENT
L P
S
LPR
3"
HWP-1
HX-2HX-1
AS-1
ET-1
2-1/2"
3/4"
3/4"
2-1/2"
3"
3" 1-1/2"
4"
6HWP-2 6
CODED NOTES:
1 NEW PRESSURE REDUCING STATION. REFER TO PIPING SCHEMATIC AND DETAILS.
REFER TO SUB-BASEMENT MECHANICAL PIPING PLAN (DWG 1-M7) FOR CONTINUATION.
ROUTE 4" VENT UP THROUGH AREA WAY. OFFSET AS NECESSARY IN ORDER TO ROUTE TO OUTSIDE.
RACK PIPE TO AREA WAY WALL. CUT AND RE-SUPPORT GRATING AS NECESSARY.
MOUNT EXPANSION TANK ON 4" CONCRETE HOUSEKEEPING PAD.
MOUNT AIR SEPARATOR FROM STRUCTURE ABOVE.
MOUNT PUMP ON NEW CONCRETE INERTIA PAD.
MOUNT HEAT EXCHANGER ABOVE FLOOR WITH STEEL SUPPORT.
A. FIELD VERIFY EXACT ROUTING OF ALL PIPING WITHIN MECHANICAL ROOM. FIELD VERIFY EXACT
LOCATIONS OF ALL NEW EQUIPMENT.
B. SLEEVE ALL CONCRETE WALL PENETRATIONS. PROVIDE FIRESTOPPING IN RATED CONSTRUCTION.
C. REFER TO MECHANICAL DETAILS (DWG 1-M2A) AND STEAM AND HEATING HOT WATER PIPING
SCHEMATIC (DWG 1-M2B) FOR DETAILED PIPING ARRANGEMENT, CONFIGURATION, AND SIZES.
GENERAL NOTES:
D
C
B
A
Q
R
N3
1 2 3 4 539 42 46 4737A37B
RECONFIGURE 1B-229
MECHANICAL ROOM
541-18-510CONSULTANTS: ARCHITECT:
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
10/02/18
10/02/2018
FULLY SPRINKLERED
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2004.
CONSULTANTS:
Final Construction Documents
S
74490
L.D. HENDRIX, JR
R E
S
O F
I
R
GE
NOIS
P
E
N E
D
ERT
L EA
E I N
G
R
T
S
TE
A HF OO
IO
SUB-BASEMENT MECHANICAL
ROOM PLAN
1-M6
LDHLDH
N 0'
SCALE: 1/4" = 1'0"
2' 4' 8' 16'
SUB-BASEMENT MECHANICAL
ROOM PLAN
CODED NOTES:
1 3" HHWS/R UP TO BASEMENT. ROUTE PIPING IN BETWEEN CONCRETE JOIST SPACE. FIELD VERIFY
EXISTING CONDITIONS. REFER TO DWG 1-M8 FOR CONTINUATION.
REFER TO DRAWING 1-M6 FOR CONTINUATION.
PROVIDE 3"Ø FLEXIBLE EXPANSION LOOP FOR HHWS AND HHWR PIPE. FLEXIBLE LOOPS SHALL BE RATED
FOR ±4" OF MOVEMENT AND 288 PSI. FLEXIBLE LOOPS SHALL CONSIST OF TWO FLEXIBLE SECTIONS OF
HOSE AND BRAID, TWO 90° ELBOWS, AND ON 180° RETURN ASSEMBLED IN SUCH A WAY THAT THE PIPING DOES NOT CHANGE DIRECTION, BUT MAINTAINS ITS COURSE ALONG A SINGLE AXIS. LOOPS SHALL BE
INSTALLED IN A NEUTRAL, PRE-COMPRESSED OR PRE-EXTENDED CONDITION AS REQUIRED FOR THE
APPLICATION. MATERIAL OF CONSTRUCTION AND END FITTINGS TYPE SHALL BE CONSISTENT WITH PIPE
MATERIAL AND EQUIPMENT/PIPE CONNECTION FITTINGS. SUPPORT PER MANUFACTURER'S
REQUIREMENTS.
A. SUB-BASEMENT CRAWL SPACE IS APPROXIMATELY 4 FEET HIGH WITH LIMITED CLEARANCE AND
LIGHTING. ACCESS TO SUB-BASEMENT CAN BE ACHIEVED THROUGH SUB-BASEMENT PLUMBING
STORAGE, RADIOLOGY SOILED UTILITY FLOOR ACCESS HATCH, STAIR #8, AS WELL AS OTHER STAIR
ACCESS POINTS.
B. THE LARGE QUANTITY OF EXISTING PIPE AND CONDUIT WILL REQUIRE MULTIPLE OFFSETS AND
CHANGES IN ELEVATION AND DIRECTION.
C. SLEEVE ALL PENETRATIONS OF CONCRETE/MASONRY CONSTRUCTION. PROVIDE FIRESTOPPING AT
PENETRATIONS OF RATED CONSTRUCTION.
GENERAL NOTES:
AB200
AB201
AB202
AB203
AB204
AB205AB206
AB401C
X -H
P S
X -P
D X
-H P
R X
-C H
W S
X -C
H W
R
X -H
P S
X -C
P D
X -H
P R
X -C
H W
S
X -C
H W
R
X -P
D
S L O
P E
X -H
P S
X -H
P R
S L O
P E
1 /2
H P
S H
P R
H H
W S
H H
W R
2-1/2"
H H
W S
H H
W R
H H
W S
H H
W R
H H
W S
H H
W R
3/4"
3"
3"
3"
K
J
H
L
L2
G1
E
C
L3
P
N2
1 237 39 4237A37B
RECONFIGURE 1B-229
MECHANICAL ROOM
541-18-510CONSULTANTS: ARCHITECT:
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
10/02/18
10/02/2018
FULLY SPRINKLERED
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2004.
CONSULTANTS:
Final Construction Documents
S
74490
L.D. HENDRIX, JR
R E
S
O F
I
R
GE
NOIS
P
E
N E
D
ERT
L EA
E I N
G
R
T
S
TE
A HF OO
IO
SUB-BASEMENT MECHANICAL
PIPING PLAN
1-M7
LDHLDH
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
SUB-BASEMENT MECHANICAL PIPING PLAN
X-HPR
X-PD
X-HPS
3"
HHWS
HHWR
1B228
1B229
X-24x14 EA
6 6 77
8 9
HHWS
HHWR
10BB220
BB219
C15D
C21H1
C15C
BB218
CODED NOTES:
1 3" HHWS/R DOWN TO BASEMENT. REFER TO PARTIAL BASEMENT PLAN (THIS DRAWING) FOR
CONTINUATION. COORDINATE PENETRATIONS WITH EXISTING STRUCTURE.
2" HHWS/R VALVED AND CAPPED FOR FUTURE.
3" HHWS/R UP TO FIRST FLOOR MECHANICAL ROOM 1B-229. REFER TO PARTIAL FIRST FLOOR PLAN (THIS
DRAWING) FOR CONTINUATION.
REWORK EXISTING EXHAUST AIR DUCT ABOVE CEILING. PROVIDE (2) 45-DEG ELBOWS IN LIEU OF 90-DEG
ELBOW IN ORDER TO PERMIT INSTALLATION OF HHWS/R PIPING.
REWORK EXISTING MEDICAL AIR, MEDICAL VACUUM, AND OXYGEN PIPING AT WALL AS REQUIRED IN
ORDER TO PERMIT INSTALLATION OF NEW HHWS/R PIPING.
REMOVE AND REINSTALL CEILING GRID AND TILE AS REQUIRED IN ORDER TO COMPLETE ABOVE CEILING
WORK IN OUTLINED AREA.
REWORK SPRINKLER PIPING AS NECESSARY IN OUTLINED AREA.
CUT AND RE-SUPPORT EXISTING RAISED FLOOR SYSTEM IN ORDER TO INSTALL NEW HHWS/R PIPING
AND ASSOCIATED CHASE. REWORK UNDER FLOOR CABLING AS REQUIRED.
3" HHWS/R DOWN TO SUB-BASEMENT. REFER TO DRAWING 1-M7 FOR CONTINUATION. CONCEAL PIPING
IN NEW CHASE. CHASE SHALL EXTEND FROM FLOOR TO CEILING. PAINT TO MATCH EXISTING ROOM
FINISH. COORDINATE PENETRATION WITH EXISTING STRUCTURE. PENETRATION SHALL BE MADE
BETWEEN CONCRETE JOISTS.
REWORK EXISTING 1" PERIMETER HEAT S/R PIPING AS REQUIRED.
C
C1
36.5 38 36.5 38 38.5
C
C1
RECONFIGURE 1B-229
MECHANICAL ROOM
541-18-510CONSULTANTS: ARCHITECT:
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
10/02/18
10/02/2018
FULLY SPRINKLERED
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2004.
CONSULTANTS:
Final Construction Documents
S
74490
L.D. HENDRIX, JR
R E
S
O F
I
R
GE
NOIS
P
E
N E
D
ERT
L EA
E I N
G
R
T
S
TE
A HF OO
IO
SCALE: 1/2" = 1'0"
0' 1' 2' 4' 8'
PARTIAL FIRST FLOOR MECHANICAL PLAN
2 SCALE: 1/2" = 1'0"
0' 1' 2' 4' 8'
PARTIAL BASEMENT MECHANICAL PLAN
PARTIAL BASEMENT AND FIRST
FLOOR MECHANICAL PLANS
1-M8
PB
WIRING DEVICES
WIRING TERMINATIONS
GENERAL NOTES
WIRE SIZE
(MIN. #12AWG)
NO. OF CCTS
IN CONDUIT
PHASE
CONDUCTORS
NEUTRALS
GROUND
POWER DISTRIBUTION EQUIPMENT (FLOOR PLAN VIEW)
MOTOR AND MOTOR CONTROLLERS (FLOOR PLAN VIEW)
BRANCH CIRCUIT WIRING
VSD
GENERAL LEGEND
SF
RECONFIGURE 1B-229
MECHANICAL ROOM
541-18-510CONSULTANTS: ARCHITECT:
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
10/02/18
10/02/2018
FULLY SPRINKLERED
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2004.
CONSULTANTS:
Final Construction Documents
W.T. GIENGER
GN
SS
A
I ON EL
T
63889
F EGE
P
R O
R
SI NRE
I E
E R
D
E
AT
S
ET
O
OI
HOF
ELECTRICAL LEGEND
AND GENERAL NOTES
1-E1
JRDWTG
1B264A
1B226A
1B224A
1B217A
1B215A
1B215C
1B217
1B216
1B215
1B214
1B218
1B2321B233
1B229
1B228
1B227
1B225
1B223 1B222
1B2341B241
1B2311B242
1B2301B243
1B224
1B226
1A210
1B351
35.1 35.5 36 36.5 38 38.5 38.6 40 41 42 43
E
C
C1
RECONFIGURE 1B-229
MECHANICAL ROOM
541-18-510CONSULTANTS: ARCHITECT:
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
10/02/18
10/02/2018
FULLY SPRINKLERED
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2004.
CONSULTANTS:
Final Construction Documents
W.T. GIENGER
GN
SS
A
I ON EL
T
63889
F EGE
P
R O
R
SI NRE
I E
E R
D
E
AT
S
ET
O
OI
HOF
0'
SCALE: 1/4" = 1'0"
2' 4' 8' 16'
PARTIAL FIRST FLOOR ELECTRICAL DEMOLITION PLAN
D1. ALL EXISTING LIGHTING FIXTURES, RECEPTACLES, SPECIAL SYSTEMS OUTLETS, CONDUIT, WIRING ETC.
THAT WILL NOT BE REUSED IN THE REMODELED INSTALLATION SHALL BE REMOVED UNLESS OTHERWISE
NOTED. THIS DEMOLITION SHALL INCLUDE ALL ELECTRICAL ITEMS SHOWN ON THIS PLAN THAT ARE NOT
DESIGNATED BY "X", "XN" OR "XRR" AND ALL OTHER ADDITIONAL ITEMS THAT ARE NOT SHOWN BUT THAT
MUST BE REMOVED IN ORDER TO PRODUCE A NEAT, FINISHED, PROPERLY FUNCTIONING ELECTRICAL
INSTALLATION. MAINTAIN CIRCUIT CONTINUITY TO ALL EXISTING REUSED ELECTRICAL SYSTEMS
COMPONENTS - PROVIDE ALL CONDUIT AND WIRING NECESSARY TO ACHIEVE THE SAME. THE
CONTRACTOR SHALL FIELD VERIFY THE NATURE AND EXTENT OF ALL DEMOLITION WORK AND SHALL
INCLUDE COST FOR THE SAME IN THE BID SUBMITTAL.
D2. ALL EXISTING REMOVED ELECTRICAL EQUIPMENT, DEVICES, ETC. THAT ARE NOT RETAINED BY THE
OWNER SHALL BE DISPOSED OF BY THE ELECTRICAL CONTRACTOR.
D3. DASHED WALLS ON PLAN INDICATE EXISTING CONSTRUCTION TO BE REMOVED.
D4. REFER TO ELECTRICAL LEGEND FOR ALL SYMBOL DESIGNATIONS. NOTE SPECIAL ATTENTION TO
SELECTED EXISTING DEVICES, WIREWAYS, ETC. MARKED XB, XRR OR XN, AND REMOVE/BLANK OFF, RELOCATE OR REPLACE THESE COMPONENTS AS REQUIRED.
D5. MAINTAIN CIRCUIT CONTINUITY TO ALL EXISTING ELECTRICAL SYSTEM COMPONENTS IN AREAS NOT
BEING REMODELED UNLESS OTHERWISE NOTED. PROVIDE ALL CONDUIT AND WIRING EXTENSIONS
NECESSARY TO ACHIEVE SAME.
D6. THE ELECTRICAL CONTRACTOR SHALL CLOSELY COORDINATE ALL ELECTRICAL DEMOLITION WORK
WITH THE GENERAL AND MECHANICAL CONTRACTORS, AND SHALL DISCONNECT ALL REQUIRED
CIRCUITS IN A TIMELY MANNER.
D7. CONTACT THE ENGINEER IF A QUESTION SHOULD ARISE CONCERNING THE STATUS OF ANY OUTLET, DEVICE, LIGHTING FIXTURE, ETC.
ELECTRICAL DEMOLITION NOTES
CODED NOTES:
PARTIAL FIRST FLOOR
ELECTRICAL DEMOLITION PLAN
1-E2
JRDWTG
DISCONNECT POWER TO EXISTING HOT WATER PUMPS COMPLETE BACK TO SOURCE, REMOVE
ASSOCIATED CONDUIT, WIRING, CONTROLS, ETC.
X-EF
XR-AC-23
XR-UH
XR-AC-24
XR-CHILLER
XR-LIEBERT
UNIT
ASH2
X
ASH
X
ASL
X
LFS1EQ
XASL2
X
ASH-J
X
T-ASL2
X
T-DPL-FS1
X
DPL-FS1
X
AB405
AB403
AB402
AB401C
AB401B
AB401A
AB401
AB400A
1 2 3 4 537 39 42 46 4737A37B
D
C
B
A
Q
R
N3
RECONFIGURE 1B-229
MECHANICAL ROOM
541-18-510CONSULTANTS: ARCHITECT:
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
10/02/18
10/02/2018
FULLY SPRINKLERED
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2004.
CONSULTANTS:
Final Construction Documents
W.T. GIENGER
GN
SS
A
I ON EL
T
63889
F EGE
P
R O
R
SI NRE
I E
E R
D
E
AT
S
ET
O
OI
HOF
PARTIAL SUB-BASEMENT
ELECTRICAL DEMOLITION PLAN
1-E3
JRDWTG
0'
SCALE: 1/4" = 1'0"
2' 4' 8' 16'
PARTIAL SUB-BASEMENT
ELECTRICAL DEMOLITION PLAN
CODED NOTES:
D1. ALL EXISTING LIGHTING FIXTURES, RECEPTACLES, SPECIAL SYSTEMS OUTLETS, CONDUIT, WIRING ETC.
THAT WILL NOT BE REUSED IN THE REMODELED INSTALLATION SHALL BE REMOVED UNLESS OTHERWISE
NOTED. THIS DEMOLITION SHALL INCLUDE ALL ELECTRICAL ITEMS SHOWN ON THIS PLAN THAT ARE NOT
DESIGNATED BY "X", "XN" OR "XRR" AND ALL OTHER ADDITIONAL ITEMS THAT ARE NOT SHOWN BUT THAT
MUST BE REMOVED IN ORDER TO PRODUCE A NEAT, FINISHED, PROPERLY FUNCTIONING ELECTRICAL
INSTALLATION. MAINTAIN CIRCUIT CONTINUITY TO ALL EXISTING REUSED ELECTRICAL SYSTEMS
COMPONENTS - PROVIDE ALL CONDUIT AND WIRING NECESSARY TO ACHIEVE THE SAME. THE
CONTRACTOR SHALL FIELD VERIFY THE NATURE AND EXTENT OF ALL DEMOLITION WORK AND SHALL
INCLUDE COST FOR THE SAME IN THE BID SUBMITTAL.
D2. ALL EXISTING REMOVED ELECTRICAL EQUIPMENT, DEVICES, ETC. THAT ARE NOT RETAINED BY THE
OWNER SHALL BE DISPOSED OF BY THE ELECTRICAL CONTRACTOR.
D3. DASHED WALLS ON PLAN INDICATE EXISTING CONSTRUCTION TO BE REMOVED.
D4. REFER TO ELECTRICAL LEGEND FOR ALL SYMBOL DESIGNATIONS. NOTE SPECIAL ATTENTION TO
SELECTED EXISTING DEVICES, WIREWAYS, ETC. MARKED XB, XRR OR XN, AND REMOVE/BLANK OFF, RELOCATE OR REPLACE THESE COMPONENTS AS REQUIRED.
D5. MAINTAIN CIRCUIT CONTINUITY TO ALL EXISTING ELECTRICAL SYSTEM COMPONENTS IN AREAS NOT
BEING REMODELED UNLESS OTHERWISE NOTED. PROVIDE ALL CONDUIT AND WIRING EXTENSIONS
NECESSARY TO ACHIEVE SAME.
D6. THE ELECTRICAL CONTRACTOR SHALL CLOSELY COORDINATE ALL ELECTRICAL DEMOLITION WORK
WITH THE GENERAL AND MECHANICAL CONTRACTORS, AND SHALL DISCONNECT ALL REQUIRED
CIRCUITS IN A TIMELY MANNER.
D7. CONTACT THE ENGINEER IF A QUESTION SHOULD ARISE CONCERNING THE STATUS OF ANY OUTLET, DEVICE, LIGHTING FIXTURE, ETC.
ELECTRICAL DEMOLITION NOTES
1 DISCONNECT POWER TO AC-23 COMPLETE BACK TO SOURCE, REMOVE ALL ASSOCIATED CONDUIT, WIRING, CONTROLS, ETC.
DISCONNECT POWER TO AC-24 COMPLETE BACK TO SOURCE, REMOVE ALL ASSOCIATED CONDUIT, WIRING, CONTROLS, ETC.
DISCONNECT POWER TO UNIT HEATER COMPLETE BACK TO SOURCE, REMOVE ALL ASSOCIATED
CONDUIT, WIRING, CONTROLS, ETC.
DISCONNECT POWER TO LIEBERT UNIT COMPLETE BACK TO SOURCE, REMOVE ALL ASSOCIATED
CONDUIT, WIRING, CONTROLS, ETC.
DISCONNECT POWER TO CHILLER COMPLETE BACK TO SOURCE, REMOVE ALL ASSOCIATED CONDUIT, WIRING, CONTROLS, ETC.
X-EF
ASH2
X
ASH
X
ASL
X
LFS1EQ
XASL2
X
ASH-J
X
T-ASL2
X
T-DPL-FS1
X
DPL-FS1
X
AB405
AB403
AB402
AB401C
AB401B
AB401A
AB401
AB400A
ASH2-13,15,17
ASH2-7,9,11
1 2 3 4 537 39 42 46 4737A37B
D
C
B
A
Q
R
N3
RECONFIGURE 1B-229
MECHANICAL ROOM
541-18-510CONSULTANTS: ARCHITECT:
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
10/02/18
10/02/2018
FULLY SPRINKLERED
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2004.
CONSULTANTS:
Final Construction Documents
W.T. GIENGER
GN
SS
A
I ON EL
T
63889
F EGE
P
R O
R
SI NRE
I E
E R
D
E
AT
S
ET
O
OI
HOF
PARTIAL SUB-BASEMENT
ELECTRICAL PLAN
1-E4
JRDWTG
0'
SCALE: 1/4" = 1'0"
2' 4' 8' 16'
PARTIAL SUB-BASEMENT ELECTRICAL PLAN
CODED NOTES:
MECHANICAL EQUIPMENT GENERAL NOTES:
M1. MECHANICAL EQUIPMENT SHALL BE CONNECTED COMPLETE PER MANUFACTURER'S WIRING DIAGRAMS
AND DETAILS UNLESS OTHERWISE NOTED ON DRAWINGS.
M2. CONTRACTOR SHALL CONCEAL CONDUIT AND WIRING IN WALLS AND ABOVE CEILING AND PROVIDE
LIQUID-TIGHT FLEXIBLE METAL CONDUIT FOR FINAL CONNECTION TO MECHANICAL EQUIPMENT.
PROVIDE RIGID ALUMINUM CONDUITS AT EXTERIOR LOCATIONS. SEAL ALL ROOF PENETRATION
WATER-TIGHT AND ALL WALL PENETRATIONS TO MAINTAIN FIRE RATING.
M3. CONTRACTOR SHALL PROVIDE ALL LOCAL DISCONNECTING MEANS FOR ALL MECHANICAL EQUIPMENT, UNLESS EQUIPMENT IS NOTED TO BE FURNISHED WITH INTEGRAL DISCONNECTS. LABEL ALL
DISCONNECT SWITCHES TO INDICATE POWER SOURCE AND EQUIPMENT SERVED.
M4. COORDINATE EXACT INSTALLATION LOCATION OF ALL MECHANICAL EQUIPMENT WITH
MECHANICAL PLANS PRIOR TO ROUGH-IN.
M5. CONDUITS SHALL BE RIGID ALUMINUM AT ALL EXTERIOR LOCATIONS.
M6. SHARED NEUTRALS ARE NOT PERMITTED FOR BRANCH CIRCUITS.
M7. REFER TO GENERAL INFORMATION DRAWINGS (1-X*) FOR PHASING AND CONSTRUCTION SCHEDULING
NOTES.
M8. CONTRACTOR SHALL INSTALL CONCRETE HOUSEKEEPING PAD FOR ALL ELECTRICAL EQUIPMENT
MOUNTED ON FLOOR IN ELECTRICAL ROOMS (TRANSFORMERS, SWITCHBOARDS, TRANSFER SWITCHES, UPS EQUIPMENT, MOTOR CONTROL CENTERS, ETC.). REFER TO TYPICAL HOUSEKEEPING PAD DETAIL ON
SUBSEQUENT DRAWINGS FOR ADDITIONAL REQUIREMENTS.
M9. CONTRACTOR IS RESPONSIBLE FOR RIGGING METHOD TO RAISE/LOWER ALL EQUIPMENT PROVIDED.
COORDINATE EQUIPMENT ENTRY LOCATION WITH OWNER.
1 HWP-1 - 3HP, 480V-3ø-15A MOCP. EC SHALL PROVIDE VFD MOUNTED ON STRUT SUPPORT SYSTEM AT
UNIT LOCATION. PROVIDE 15A-3P CIRCUIT BREAKER IN PANEL 'ASH2' AND CONNECT PUMP COMPLETE
TO PANEL 'ASH2 THROUGH VFD AND VIA 3/4"C-3#12 AND 1#12EG PER MANUFACTURER'S WIRING
DIAGRAM.
HWP-2 - 3HP, 480V-3ø-15A MOCP. EC SHALL PROVIDE VFD MOUNTED ON STRUT SUPPORT SYSTEM AT
UNIT LOCATION. PROVIDE 15A-3P CIRCUIT BREAKER IN PANEL 'ASH2' AND CONNECT PUMP COMPLETE
TO PANEL 'ASH2' THROUGH VFD AND VIA 3/4"C-3#12 AND 1#12EG PER MANUFACTURER'S WIRING
DIAGRAM.
| 1-X.1 Cover |
| 1-M1 MECHANICAL SYMBOLS, SCHEDULES, AND NOTES |
| 1-M1 MECHANICAL SYMBOLS, SCHEDULES, AND NOTES |
| 30x42 |
| 1-M2A MECHANICAL DETAILS |
| 1-M2A, 1-M2B MECHANICAL DETAILS |
| 1-M2A |
| 1-M2B MECHANICAL DETAILS |
| 1-M2A, 1-M2B MECHANICAL DETAILS |
| 1-M2B |
| 1-M3 TEMPERATURE CONTROLS |
| 1-M3 TEMPERATURE CONTROLS |
| 30x42 |
| 1-M4 PARTIAL SUB-BASEMENT MECHANICAL ROOM DEMOLITION PLAN |
| 1-M4 PARTIAL SUB-BASEMENT MECHANICAL ROOM DEMOLITION PLAN |
| 30x42 |
| 1-M5 PARTIAL FIRST FLOOR MECHANICAL ROOM DEMOLITION PLAN |
| 1-M5 PARTIAL FIRST FLOOR MECHANICAL ROOM DEMOLITION PLAN |
| 30x42 |
| 1-M6 PARTIAL SUB-BASEMENT MECHANICAL ROOM PLAN |
| 1-M6 PARTIAL SUB-BASEMENT MECHANICAL ROOM PLAN |
| 30x42 |
| 1-M7 PARTIAL SUB-BASEMENT MECHANICAL PIPING PLAN |
| 1-M7 PARTIAL SUB-BASEMENT MECHANICAL PIPING PLAN |
| 30x42 |
| 1-M8 PARTIAL BASEMENT AND FIRST FLOOR MECHANICAL PLANS |
| 1-M8 PARTIAL BASEMENT AND FIRST FLOOR MECHANICAL PLANS |
| 30x42 |
| 1-E1 - ELECTRICAL LEGEND AND GENERAL NOTES |
| 1-E1 ELECTRICAL LEGEND AND GENERAL NOTES, SPECIFICATIONS |
| 1-E1 - ELECTRICAL LEGEND AND GENERAL NOTES |
| 1-E2 - PARTIAL FIRST FLOOR ELECTRICAL DEMOLITION PLAN |
| 1-E2 PARTIAL FIRST FLOOR ELECTRICAL PLANS |
| 1-E2 - PARTIAL FIRST FLOOR ELECTRICAL DEMOLITION PLAN |
| 1-E3 - PARTIAL SUB-BASEMENT ELECTRICAL DEMOLITION PLAN |
| 1-E3,E4 PARTIAL SUB-BASEMENT MECHANICAL ROOM ELECTRICAL PLANS |
| 1-E3 - PARTIAL SUB-BASEMENT ELECTRICAL DEMOLITION PLAN |
| 1-E4 - PARTIAL SUB-BASEMENT ELECTRICAL PLAN |
| 1-E3,E4 PARTIAL SUB-BASEMENT MECHANICAL ROOM ELECTRICAL PLANS |
| 1-E4 - PARTIAL SUB-BASEMENT ELECTRICAL PLAN |
File details come from the government source that posted it.