36C25018Q9272-002.docx

DOCX document 13 KB Posted

Attached to
552-18-506: Roof Replacement (Bldg. 126) Federal contract opportunity
Solicitation number
36C25018Q9272
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

36C25018Q9272 CONSTRUCTION SCOPE OF WORK.docx

View the file

Other files for this federal contract opportunity

Other files attached to 552-18-506: Roof Replacement (Bldg. 126), newest first.
File Type Posted
36C25018C0226-000.docx DOCX document
36C25018Q9272-003.pdf PDF
36C25018Q9272-005.docx DOCX document
36C25018Q9272-004.pdf PDF
36C25018Q9272-001.docx DOCX document
36C25018Q9272-006.pdf PDF
36C25018Q9272-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION SCOPE OF WORK

Project #552-18-506

TASK ONE

REPLACE ASPHALT SHINGLE ROOF SYSTEM

Provide complete construction services to remove and replace existing asphalt-shingle roof, drip-edge, rake edge, and valleys on Building (B) #126. The location of building is on the campus of the Dayton VA Medical Center, 4100 W. Third Street Dayton, Ohio.

Design work has been developed from the previous project. Pertinent drawing, technical specifications and documents are included with this solicitation. The Construction Contractor shall have 30 calendar days to complete this project.

The asphalt shingle roof at B-126 will be replaced with a product that has been previously approved by the State Historical Preservation Office (SHPO) CertainTeed, Highland Slate Designer Shingles, 30-year, Smokey Quartz. The Construction Contractor shall provide all edge, vent stack and valley metal in a color that corresponds naturally with the color of designated shingles. The Construction Contractor shall be directed to evaluate the condition of the roof deck, and repair as needed with material that matches current roof deck.

The Construction Contractor shall replace or repair equipment or finishes scheduled to remain if damaged during work.

The Construction Contractor shall provide overhead safety protection at all points of entry that are near work being performed. The Construction Contractor shall provide safety fencing to guide all personnel direct entry and exiting routes so work shall not be impeded.

The Contractor shall perform all necessary quality control and design review to identify and correct all design errors and omissions and shall not rely on Government review for such purposes. The Contractor shall provide a detailed description of its quality control plan for ensuring documents have been thoroughly reviewed for proper design coordination and errors and omission identification and corrections.

All necessary work shall be in accordance with all Federal, State, and Local building codes. All applicable SMACNA and NRCA standards shall be followed.