36C25018Q0384-001.docx
DOCX document 145 KB Posted
- Attached to
- Fire Suppression System Maintenance Saginaw VAMC Federal contract opportunity
- Solicitation number
- 36C25018Q0384
About this file
36C25018Q0384 36C25018Q0384.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25018Q0384-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25018Q0384
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
DUNS:
DUNS+4:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. 2/2012)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
655-18-1-6111-0011 36C25018Q0384 02-13-2018 Christopher Gundy 734-222-7168 02-14-2018
4:30 PM EST
36C250 Department of Veterans Affairs Veterans Health Administration Network Contracting Office 10 2215 Fuller Road Ann Arbor MI 48105 X X 561621 $20.5 Million X N/A X Department of Veterans Affair Aleda E Lutz VA Medical Center 1500 Weiss ST Saginaw MI 48602 Y Department of Veterans Affair Ann Arbor Healthcare System Network Contracting Office 10 2215 Fuller Road Ann Arbor MI 48105
Department of Veterans Affairs Financial Management System PO Box 149971 Austin TX 78714-9971 877-353-9791 512-460-5540 See CONTINUATION Page Contractor to provide fire alarm and suppression systems inspections, software updates, maintenance and repairs in accordance with the Statement of Work for the Aleda E Lutz VA medical Center, 1500 Weiss ST, Saginaw, MI 48602 All questions concerning this solicitation must be sent by email to the contracting officer at christopher.gundy@va.gov Subject line must read "Technical question - Saginaw Fire Suppression System". Questions must be submitted no later 9:00 AM EST, February 14, 2018.
See page 52 for Instructions for Proposal Submission.
Offer must comply with wage determination rates for Saginaw County, MI. See section D for wage determination.
Employee Class 23290 See CONTINUATION Page X X X
ONE
Christopher Gundy Contracting Officer Table of Contents
| SECTION A | 1 |
| A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS | 1 |
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 3 |
| B.1 CONTRACT ADMINISTRATION DATA | 3 |
| B.2 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND COMPLIANCE (JUN 2011) | 4 |
| B.3 SUBCONTRACTING COMMITMENTS--MONITORING AND COMPLIANCE (JUN 2011) | 4 |
| B.4 PRICE/COST SCHEDULE | 5 |
| ITEM INFORMATION | 5 |
| Statement of Work | 10 |
| SECTION C - CONTRACT CLAUSES | 20 |
| C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (JAN 2017) | 20 |
| C.2 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999) | 26 |
| C.3 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) | 26 |
| C.4 VAAR 852.203-70 COMMERCIAL ADVERTISING (JAN 2008) | 26 |
| C.5 VAAR 852.215-71 EVALUATION FACTOR COMMITMENTS (DEC 2009) | 27 |
| C.6 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2012) | 27 |
| C.7 VAAR 852.237-70 CONTRACTOR RESPONSIBILITIES (APR 1984) | 28 |
| C.8 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 28 |
| C.9 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (NOV 2017) | 29 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 36 |
| SECTION E - SOLICITATION PROVISIONS | 55 |
| E.1 52.216-1 TYPE OF CONTRACT (APR 1984) | 55 |
| E.2 52.233-2 SERVICE OF PROTEST (SEP 2006) | 55 |
| E.3 VAAR 852.215-70 SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESS EVALUATION FACTORS (JUL 2016)(DEVIATION) | 56 |
| E.4 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (JAN 2008) | 56 |
| E.5 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (JAN 1998) | 57 |
| E.6 52.212-2 EVALUATION—COMMERCIAL ITEMS (OCT 2014) | 57 |
| E.7 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL ITEMS (NOV 2017) | 58 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
(continuation from Standard Form 1449, block 18A.)
1. Contract Administration: All contract administration matters will be handled by the following individuals:
| a. CONTRACTOR: | Company Name:____________________________________ |
| Address:___________________________________________ | |
| City/State/Zip:_______________________________________ | |
| Point of contact/Position:_______________________________ | |
| POC Phone:_________________________________________ | |
| Email:______________________________________________ | |
| DUNS NO.:__________________________________________ | |
| Tax ID NO.:__________________________________________ |
b. GOVERNMENT: Contracting Officer 36C250 Christopher Gundy Department of Veterans Affairs Veterans Health Administration Network Contracting Office 10 2215 Fuller Road Ann Arbor MI 48105
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [] |
| c. Other | [] |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
Department of Veterans Affairs Financial Management System PO Box 149971 Austin TX 78714-9971 ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
B.2 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND COMPLIANCE (JUN 2011)
This solicitation includes FAR 52.219-14 Limitations on Subcontracting. Accordingly, any contract resulting from this solicitation will include this clause. The contractor is advised in performing contract administration functions, the CO may use the services of a support contractor(s) retained by VA to assist in assessing the contractor's compliance with the limitations on subcontracting or percentage of work performance requirements specified in the clause. To that end, the support contractor(s) may require access to contractor's offices where the contractor's business records or other proprietary data are retained and to review such business records regarding the contractor's compliance with this requirement. All support contractors conducting this review on behalf of VA will be required to sign an “Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement” to ensure the contractor's business records or other proprietary data reviewed or obtained in the course of assisting the CO in assessing the contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs. Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the contractor to protect proprietary information as required by FAR 9.505-4, obtaining access to proprietary information, paragraph (b). The contractor is required to cooperate fully and make available any records as may be required to enable the CO to assess the contractor's compliance with the limitations on subcontracting or percentage of work performance requirement.
B.3 SUBCONTRACTING COMMITMENTS--MONITORING AND COMPLIANCE (JUN 2011)
This solicitation includes VAAR 852.215-70, Service-Disabled Veteran-Owned and Veteran-Owned Small Business Evaluation Factors, and VAAR 852.215-71, Evaluation Factor Commitments. Accordingly, any contract resulting from this solicitation will include these clauses. The contractor is advised in performing contract administration functions, the CO may use the services of a support contractor(s) to assist in assessing contractor compliance with the subcontracting commitments incorporated into the contract. To that end, the support contractor(s) may require access to the contractor's business records or other proprietary data to review such business records regarding contract compliance with this requirement. All support contractors conducting this review on behalf of VA will be required to sign an “Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement” to ensure the contractor's business records or other proprietary data reviewed or obtained in the course of assisting the CO in assessing the contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs. Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the contractor to protect proprietary information as required by FAR 9.505-4, obtaining access to proprietary information, paragraph (b). The contractor is required to cooperate fully and make available any records as may be required to enable the CO to assess the contractor compliance with the subcontracting commitments.
B.4 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0001 |
| Vendor to provide Fire Alarm and Suppression System(s) inspections in accordance with the Statement of Work for the Aleda E Lutz VA Medical Center, 1500 Weiss St., Saginaw, MI 48602. 5 YR standpipe flow test inspection to be completed in base year. |
Contract Period: Base POP Begin: 02-19-2018 POP End: 02-18-2019
1.00
YR
| 0002 |
| Portal to portal software standard factory revisions for fire alarm and suppression system. 40 hours allocated for first visit; 8 hours per quarter thereafter. Contractor to contact CO and COR if additional time is needed in accordance with Statement of Work. |
Contract Period: Base
64.00
HR
| 0003 |
| Contractor to provide all labor, supervision, and material for Fire Alarm and Suppression System maintenance and repairs. Price shall not exceed $20,000.00 on annual basis. Contractor must notify the CO or COR when 90% has been expended for the year. Emergency call-back service must be available and limited to minor adjustments to affect the integrity of the system. |
Contract Period: Base
| 0004 |
| Vendor to provide Fire Alarm and Suppression System(s) inspections in accordance with the Statement of Work for the Aleda E Lutz VA Medical Center, 1500 Weiss St., Saginaw, MI 48602. |
Contract Period: Option 1 POP Begin: 02-19-2019 POP End: 02-18-2020
| 0005 |
| Portal to portal software standard factory revisions for fire alarm and suppression system. 8 hours per quarter. Contractor to contact CO and COR if additional time is needed in accordance with Statement of Work. |
Contract Period: Option 1
32.00
| 0006 |
| Contractor to provide all labor, supervision, and material for Fire Alarm and Suppression System maintenance and repairs. Price shall not exceed $20,000.00 on annual basis. Contractor must notify the CO or COR when 90% has been expended for the year. Emergency call-back service must be available and limited to minor adjustments to affect the integrity of the system. |
Contract Period: Option 1
| 0007 |
| Vendor to provide Fire Alarm and Suppression System(s) inspections in accordance with the Statement of Work for the Aleda E Lutz VA Medical Center, 1500 Weiss St., Saginaw, MI 48602. |
Contract Period: Option 2 POP Begin: 02-19-2020 POP End: 02-18-2021
| 0008 |
| Portal to portal software standard factory revisions for fire alarm and suppression system. 8 hours per quarter. Contractor to contact CO and COR if additional time is needed in accordance with Statement of Work. |
Contract Period: Option 2
| 0009 |
| Contractor to provide all labor, supervision, and material for Fire Alarm and Suppression System maintenance and repairs. Price shall not exceed $20,000.00 on annual basis. Contractor must notify the CO or COR when 90% has been expended for the year. Emergency call-back service must be available and limited to minor adjustments to affect the integrity of the system. |
Contract Period: Option 2
| 0010 |
| Vendor to provide Fire Alarm and Suppression System(s) inspections in accordance with the Statement of Work for the Aleda E Lutz VA Medical Center, 1500 Weiss St., Saginaw, MI 48602. |
Contract Period: Option 3 POP Begin: 02-19-2021 POP End: 02-18-2022
| 0011 |
| Portal to portal software standard factory revisions for fire alarm and suppression system. 8 hours per quarter. Contractor to contact CO and COR if additional time is needed in accordance with Statement of Work. |
Contract Period: Option 3
| 0012 |
| Contractor to provide all labor, supervision, and material for Fire Alarm and Suppression System maintenance and repairs. Price shall not exceed $20,000.00 on annual basis. Contractor must notify the CO or COR when 90% has been expended for the year. Emergency call-back service must be available and limited to minor adjustments to affect the integrity of the system. |
Contract Period: Option 3
| 0013 |
| Vendor to provide Fire Alarm and Suppression System(s) inspections in accordance with the Statement of Work for the Aleda E Lutz VA Medical Center, 1500 Weiss St., Saginaw, MI 48602. |
Contract Period: Option 4 POP Begin: 02-19-2022 POP End: 02-18-2023
| 0014 |
| Portal to portal software standard factory revisions for fire alarm and suppression system. 8 hours per quarter. Contractor to contact CO and COR if additional time is needed in accordance with Statement of Work. |
Contract Period: Option 4
| 0015 |
| Contractor to provide all labor, supervision, and material for Fire Alarm and Suppression System maintenance and repairs. Price shall not exceed $20,000.00 on annual basis. Contractor must notify the CO or COR when 90% has been expended for the year. Emergency call-back service must be available and limited to minor adjustments to affect the integrity of the system. |
Contract Period: Option 4
GRAND TOTAL
Page 1 of Page 1 of B.5 Statement of Work
1. Contractor shall provide all necessary labor, materials and expertise in order to perform quarterly, semiannual and annual inspection, testing services on the Fire Alarm System located at the Aleda E Lutz VA Medical Center, 1500 Weiss St., Saginaw, MI 48602
2. Contractor shall perform inspections in accordance with the most current editions of (OEM) maintenance manuals, NFPA 14, 25, 72 & 105, and additional regulatory requirements as prescribed by the Joint Commission on the Accreditation of Healthcare Organizations (TJC).
3. Contractor must provide an individual who is factory trained and certified and is an authorized representative of the major equipment manufacturer, United Technologies – Edwards, to perform Testing, Maintenance and Inspections, as well as any necessary repairs.
4. Services include the following.
a. Inspections:
(1) Systematic examination of all system components.
(2) Contractor shall perform testing, cleaning, adjusting of all components as necessary to keep the system in reliable condition and proper working order.
(3) Contractor shall furnish all tools, and cleaning materials, and parts required to perform inspections and testing.
(4) Contractor shall perform battery and charger maintenance. Replace as necessary.
(5) Fire damper inspection in accordance with NFPA 105, (6-yr. cycle, FY 2017-2018).
(6) Standpipe inspection in accordance with NFPA 14, 25 & 72, (5 yr. Cycle, FY 2017-18) followed by annual inspections thereafter..
b. Emergency Service:
(1) Contractor shall respond within six (6) hours upon notification of system trouble.
(2) Emergency call-back service shall be limited to minor adjustments. Any major repairs to affect the integrity of the system to include panic alarm system components shall be covered under separate Purchase Order.
5. Contractor shall perform inspections during normal work hours as defined herein.
6. Contractor shall contact COR at (989) 497-2500, ext. 13901, prior to and upon completion of work and shall provide work ticket and/or report. Work ticket shall include complete description of the work performed and parts replaced.
7. Contractor shall notify COR at (989) 497-2500, ext. 13901, at least one month in advanced prior to conducting inspections and/or maintenance.
8. Contractor should be aware that from time to time the fire alarm system will undergo changes as new systems are added and systems are replaced or deleted. VA will maintain an inventory and schedule up to date and will ensure that the contractor is provided with a current copy at all times. Contractor to verify component list prior to start of inspections. Inspection of minor additions/deletions of components (less than 5%) will be done at no additional cost to the VA Saginaw Healthcare System. Substantial change (> 5 %) to the configuration of the Alarm and Suppression Systems should be noted by the vendor, and a modification to adjust the contract will be submitted to the Contracting Officer prior to conducting the next quarterly inspection.
9. Contractor shall maintain a log at the fire alarm control panel (Room B140-1). The log shall include the date, type of trouble, condition of the system, and the name of the technician responding to the trouble call. Each trouble call shall be fully described to include but not limited to the nature of the trouble, corrective action taken and what parts replaced.
10. Non-emergency adjustments shall be accomplished during quarterly visits or at the hourly rate previously defined. A separate PO must be issued prior to start of work.
11. The following is a list of systems and components that shall be maintained and tested to included but not limited to the following:
a. Fire alarm panels including batteries (12-volt; approximately 26 total) and battery chargers. Shall include testing and inspection of all functions.
b. Initiating devices to include:
(1) Manual Pull Stations
(2) Heat Detectors
(3) Area Smoke Detectors
(4) HVAC Duct Smoke Detectors
(5) Fire Sprinkler Water Flow Switches
(6) Fire sprinkler valve supervisory switches
(7) Fire sprinkler hi/low air supervisory switches
c. Notification Appliances to Include:
(1) Audible Signals (bells, speakers and horns)
(2) Visual signals (lights & strobes)
d. Auxiliary Devices to Include:
(1) Magnetic Door Holders
(2) Fire Shutter Door Releases
(3) HVAC Fan Shut Down
(4) Fire Department Remote Alarm
(5) Elevator Fire Service Recall
(6) Fire-Smoke Dampers (30 total)
e. United Technologies (manufacturer) Reporting System to Include:
(1) Remote Monitor Panels
(2) Central Reviewing Equipment
(3) Maintain Software, Database & Server, with back-up software and database. Annual and quarterly software/database reviews of Edwards EST-3 ©, Fireworks© and BuildingReports.com ©. Vendor shall perform software/database for standard factory revisions and patches to systems, as needed, to ensure proper operation of all systems involved. Systems described are NOT connected to the VA Secure Networks. Systems are standalone, air-gapped, IAW Dept. of VA Air Gap requirements. Systems are not capable of remote connection outside of VAMC Saginaw campus. If additional time is needed for factory version upgrades or repairs of the system, the contractor must contact the CO and COR in writing. Addition time shall be billed under CLIN (line item) 0003, portal to portal fire alarm and suppression system maintenance and repair. If additional funding is not made available, line item 3 will be put on hold until further notice and funding is made available.
f. Single Stations Stand Alone Systems:
(1) HVAC Duct Smoke Detectors and Fan Shut Down
(2) Fire Smoke Dampers
12. Contractor shall maintain an updated back up disc for the United Technologies-Edwards Fire Alarm System and Fireworks© server(s).
13. Contractor shall submit a quarterly report to COR and the Contracting Officer to include but not limited to the following information:
a. Testing Schedule:
(1) Building number.
(2) System type tested.
(3) What was tested.
b. Detailed report:
(1) Building number.
(2) Location of device.
(3) Type of Device.
(4) Test Results.
i) Original.
ii) Current.
(5) Zone (Zone FACP).
(6) Code (Chime Code).
(7) Quarter.
(8) 6 months.
(9) Year.
(10) Date.
(11) Comments.
c. Fire Alarm Discrepancy Report:
(1) Building Number.
(2) Device and location.
(3) Type of Discrepancy.
14. The publications listed below shall be followed and adhered to while conducting repairs, testing, maintenance and inspections.
a. Manufacturer’s maintenance manuals.
b. Manufacturer’s recommendations.
c. National Fire Protection Association Standards. (NFPA 25, 72 & 105)
d. National Electrical Code (NEC).
e. National Fire Code.
f. Joint Commission (TJC) Requirements. (VA will provide. Contact COR).
15. Contractor shall report to Facility Management Team, Building #1, PRIOR TO STARTING AND AFTER COMPLETION OF WORK. Contact COR at (989) 497-2500, ext. 13901.
16. Fire Alarm and Suppression Systems include the following components:
| Item | Qty | Unit | ||
| a. FIRE ALARM PANELS (13); TESTING YEARLY. | 13 | EA |
b. SMOKE DETECTORS (50); TESTING YEARLY. 146 EA
c. DUCT DETECTORS (142); TESTING YEARLY. 142 EA
d. SPEAKERS (299) /HORNS/BELLS/LIGHTS (21); 165 EA
TESTING YEARLY.
e. SMOKE-FIRE DAMPER-TAMPER SWITCHES (34); 2 JB
TESTING SEMI-ANNUAL. PERFORMED DURING
WET RISER TESTING. (INCLUDES CONTROL RELAYS
TO SHUT DOWN VENTILATION FANS).
f. WATER FLOWS (13); TESTING SEMI-ANNUALLY.
PERFORMED DURING WET RISER TESTING. 2 JB
g. SMOKE BARRIER DOOR (60); TESTING YEARLY. 60 EA (Magnetic release)
| h. HEAT DETECTORS (16); TESTING YEARLY: | 16 | EA | ||
| i. SPRINKLER RISER (WET) (9); TESTING SEMI-ANNUAL. | 9 | EA | ||
| j. SPRINKLER RISER (DRY) (1); TESTING YEARLY. | 1 | EA | ||
| k. FUSIBLE LINKS (30) controlling Fire Dampers; TESTING YEARLY. 30 | EA | |||
| l. ANTI-FREEZE SPRINKLER SYSTEM (1) TESTING YEARLY. | 1 | EA | ||
| m. FIRE HYDRANTS AND CONNECTIONS (17); TESTING YEARLY | 17 | EA | ||
| n. BUILDINGS 2, 3, 4, 6, 9, 21, & 35, TESTING OF | 34 | EA |
(APPROXIMATELY 34) COMBINATION HORN/STROBES.
o. PORTABLE FIRE EXTINGUISHERS, ANNUAL TESTING
OF TEN-LB. ABC EXTINGUISHERS. 165 EA
p. PORTABLE FIRE EXTINGUISHERS, ANNUAL TESTING 6 EA
OF TEN-LB. CO2 EXTINGUISHERS. (SURGERY WARD)
q. PORTABLE FIRE EXTINGUISHERS, ANNUAL 20 EA
TESTING OF FIVE-LB. ABC EXTINGUISHERS.
(Kiddie brand, for VA vehicles).
| Item | Qty | Unit | ||
| r. ANSUL R-102 KITCHEN HOOD SUPPRESSION | 4 | EA |
SYSTEMS. SEMI-ANNUAL TESTING. (INCLUDES
SHUNT-TRIP ACTIVATION TEST.)
s. CO2 SUPPRESSION SYSTEM FOR HAZ-MAT 1 EA
LOCKER (CONEX) BLDG. 21 (GARAGE).
SEMI-ANNUAL TESTING.
t. Annually Review As-Built: ( AutoCAD (2015 version or newer) 1 JB Drawings to include Sprinkler (Wet/Dry/Glycol) Systems;
Ventilation and other barrier/suppression Systems throughout campus.
u. BUILDINGS 2, 3, 4, 6, 9, AND 21, TESTING 20 EA
OF APPROXIMATELY 20 SMOKE DETECTORS.
v. BUILDINGS 2, 3, 4, 6, 9, AND 21 TESTING 122 EA
OF APPROXIMATELY 12 PULL STATIONS.
w. Five-Year NFPA 25 Compliant Standpipe Flow Test 1 JB Inspection, Bldgs. 1 & 22. Consists of 12 standpipes.
| x. Sprinkler Tamper Switches Testing Semi-annually | 79 | EA | |
| An initial inventory during fist annual fire alarm inspection and test should be conducted to confirm existing numbers. |
Building: VA Medical Center-Saginaw
The Service Summary section provides an overview of the services performed in this report.
| Device or Item |
| Category |
| % of Inventory |
| Quantity |
| Air Pressure Switch |
| Supervisory |
| 0.17% |
| 2 |
| Annunciator |
| Control |
| 0.26% |
| 3 |
| Battery |
| Control |
| 3.26% |
| 38 |
| Control Panel |
| Control |
| 0.60% |
| 7 |
| Damper Control |
| Auxiliary |
| 0.26% |
| 3 |
| Duct Detector |
| Initiating |
| 4.29% |
| 50 |
| Elevator |
| Auxiliary |
| 0.69% |
| 8 |
| Fan Shutdown |
| Auxiliary |
| 2.57% |
| 30 |
| Gas Shutdown |
| Auxiliary |
| 0.09% |
| 1 |
| Heat Detector |
| Initiating |
| 1.80% |
| 21 |
| Horn/Strobe |
| Indicating |
| 1.89% |
| 22 |
| Power Supply |
| Control |
| 1.03% |
| 12 |
| Printer |
| Control |
| 0.09% |
| 1 |
| Pull Station |
| Initiating |
| 10.46% |
| 122 |
| Releasing Device |
| Auxiliary |
| 2.32% |
| 27 |
| Smoke Detector |
| Initiating |
| 13.29% |
| 155 |
| Speaker |
| Indicating |
| 28.22% |
| 329 |
| Speaker/Strobe |
| Indicating |
| 2.74% |
| 32 |
| Special Control |
| Control |
| 0.09% |
| 1 |
| Strobe |
| Indicating |
| 14.15% |
| 165 |
| Tamper Switch |
| Supervisory |
| 6.78% |
| 79 |
| Waterflow Switch |
| Initiating |
| 4.89% |
| 57 |
| Total: |
| 99.94% |
| 1165 |
17. TESTING PROCEDURES:
General Description A. This specification provides the requirements for cleaning and testing the existing Life Safety System.
B. Periodic inspection and testing shall be in accordance with all applicable NFPA codes.
Clean All Detectors.
A. Disassemble, clean with vacuum or cloth, reassemble, and replace as necessary.
B. Test sensitivity voltage using a UL listed test meter. If detector is out of range, adjust and repeat.
C. Record test results on inspection report.
Test All Pull Stations.
A. Check for any physical damage.
B. Activate pull station to verify alarm signal and then reset pull station.
C. Record test results on inspection report.
Test Water flow or Tamper Switches (if applicable) A. Check for any physical damage.
B. Activate valve or flow water to test switch and then reset devices.
C. Record test results on inspection report.
Verify operation of Audible and Visual Systems A. Activate alarm signals.
B. Verify proper operation of each unit.
C. Record test results on inspection report.
Functional Test A. Put control panel into alarm mode.
B. Verify operation of Fan shutdown, remote signal transmission and all other automatic functions that have been designed into the system.
C. Also verify that smoke fire and dampers close in alarm conditions.
D. Verify operation of Elevator Recall for seven elevators, Power Shunt Breaker and Elevator Shaft Smoke Sensors.
E. Verify smoke/fire barrier door closures.
F. Record test results on inspection report.
G. Check smoke fire dampers.
Control Panel Test – Secondary Power Supply A. Measure voltage at incoming power, battery charger, batteries, and all other critical points. (Specific points are defined by system used).
B. Record test results on inspection report.
Review As-Built CAD Drawings to show all Alarm and Suppression System Panels, Components, Sensors and Wiring. Download & Update all Latest Software Revisions for Edwards EST-3 SDU Software and Fireworks Software.
A. Verify As-Built drawings are accurate. Annual review by vendor to ensure accuracy.
B. Current As-Built drawings will be provided by VA upon Contract Award. Vendor shall review and redline As-Built AutoCAD drawing layers to show location and identify the following components:
1) All Sprinkler Systems, to include: flow switches; gauges; valves; check valves; standpipes and drains; hydrants and fittings. Layers shall show all components.
2) All ventilation fire-smoke dampers; tampers; control relays and natural gas shut off valves.
3) Ansul R-102 Kitchen Hood Suppression System. Include electrical shunt trips.
4) Portable fire extinguisher stations.
5) Magnetic release fire boundary doors.
6) Any functional fire suppression or alarm component not shown on existing drawings. This is requested in order that VA shall have comprehensive Fire Alarm and Suppression System Plans.
C. Record test results using on-line inspection report, using http://www.buildingreports.com .
Test results must be completed within two (2) weeks of inspection/tests. Any deficiencies must be noted and System component tagged (using VA approved/supplied tags). A written report of deficiencies must be provided in a daily report, submitted to COR, in order for VA Safety Manager to log and track remediation of all deficiencies. Daily deficiency reports must include component, nature of deficiency and location.
D. Finalize Inspection Report, using http://www.buildingreports.com . A quarterly meeting shall be held with Vendor Inspection Team Leader, VA Safety Manager and COR to review Inspection Report and any remediation plans.
E. Software Programming for the Edwards EST-3 Fire Alarm System shall be provided by qualified, certified EST 3 System Technician/Programmers. Any System Programming deficiencies should be noted and remediated by the vendor’s UT/Edwards EST-3 technician. Valid certificate from United Technologies Edwards required for Alarm System technicians and Edwards EST-3 SDU programmer. Documentation will be verified with Edwards EST-3 database to ensure valid training is certified and current.
18. Quality Assurance Procedure A. Vendor shall have NICET qualified staff and OEM (UTC-Edwards) authorized Edwards EST-3 certified Strategic Partnerships that ensure technicians have the required training on the Fire Alarm System and provide OEM-issued (UTC-Edwards EST) certificates for documentation of training.
-Testing Procedures shall be performed in accordance with NFPA 25, 72 & 105, or more frequently, in accordance with of Authority Having Jurisdiction. The NFPA 72 shows testing frequencies.
-WET SPRINKLER SYSTEM INSPECTION SUMMARY
A. Inspect general items such as:
Are all systems in service?
Visualize location of heads in relationship to the distance of walls, ceilings & objects.
Does the building appear to be properly heated in all areas?
Do all exterior openings appear to be protected against freezing?
B. Inspect control valves:
Are all valves in the appropriate open or closed position?
Make sure all shut off valves are chained, locked & tamper proof.
Exercise all O, S, & Y valves.
C. Water supplies:
Do a full flow of water test of the main drain at the sprinkler riser.
D. Inspect Fire Department Connections:
Confirm that fire dept. connections are in satisfactory condition Confirm that the connection is couplings free, caps in place & check valves tight.
Confirm that the connection is accessible and visible.
E. Alarms:
Test water motor and gong.
Test electric alarm.
Test supervisory alarm service.
F. Sprinklers:
Verify that all sprinklers are free from corrosion, loading, or obstruction to spray discharge.
Check that sprinklers are less than 50 years old - thus not requiring sample testing.
Verify that there is a stock of spare sprinklers available.
Check that the exterior condition of the sprinkler system appears to be satisfactory. Verify that all sprinklers are of proper temperature ratings for their locations.
G. Replace gauges if necessary - all gauges must be calibrated or changed out every 5 years.
H. Inspect tamper and flow switches. Note sprinkler valve size, static pressure and residual pressure for report.
I. All activities (Inspection, testing and maintenance) shall be noted in written Service Report to COR. Final periodic Inspection/Tests shall be reported electronically, using http://www.buildingreports.com.
19. Fire Alarm and Suppression System Maintenance and Repairs:
In the event of Fire Alarm and Suppression System deficiencies and/or failures discovered during Quarterly or Annual Inspections, the vendor shall provide an estimate for said maintenance, repairs, labor and parts. Below is a list of Edwards EST-3 Standard components used in the system(s) located at the VA Medical Center, Saginaw, MI. Maintenance and repairs are not limited to Standard components list. Contractor shall commence repairs with approval from the contracting officer (CO) or contracting officer representative (COR). Maintenance and repairs shall not exceed $20,000.00 on an annual basis. Contractor must notify the CO or COR when 90% has been expended for the year. If additional funding is not available, line item 3 will be put on hold until further notice and funding is made available.
1) Smoke detectors
2) Heat detectors
3) Duct detectors
4) Fusible links
5) Pull stations
6) Control relays
7) Flow switches
8) Ansul suppression agent containers
9) 10 lb. ABC fire extinguishers
10) 10 CO2 fire extinguishers
11) Strobes/audible alarms
12) Gauges
13) Alarm panels
14) Annual Software license fees
SECTION C - CONTRACT CLAUSES
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (JAN 2017)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment.—
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.
(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.
(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected line item or subline item, if applicable; and
(D) Contractor point of contact.
(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(6) Interest.
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—
(A) The date on which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.
(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.
(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.
(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 41 U.S.C. 4712 and 10 U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C. chapter 21 relating to procurement integrity.
(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The schedule of supplies/services.
(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;
(3) The clause at 52.212-5.
(4) Addenda to this solicitation or contract, including any license agreements for computer software.
(5) Solicitation provisions if this is a solicitation.
(6) Other paragraphs of this clause.
(7) The Standard Form 1449.
(8) Other documents, exhibits, and attachments
(9) The specification.
(t) System for Award Management (SAM).
(1) Unless exempted by an addendum to this contract, the Contractor is responsible during performance and through final payment of any contract for the accuracy and completeness of the data within the SAM database, and for any liability resulting from the Government's reliance on inaccurate or incomplete data. To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and complete. Updating information in the SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.
(2)(i) If a Contractor has legally changed its business name, "doing business as" name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in FAR subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day's written notification of its intention to (A) change the name in the SAM database; (B) comply with the requirements of subpart 42.12; and (C) agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.
(ii) If the Contractor fails to comply with the requirements of paragraph (t)(2)(i) of this clause, or fails to perform the agreement at paragraph (t)(2)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the SAM information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the "Suspension of Payment" paragraph of the electronic funds transfer (EFT) clause of this contract.
(3) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims (see Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the SAM database. Information provided to the Contractor's SAM record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the "Suspension of payment" paragraph of the EFT clause of this contract.
(4) Offerors and Contractors may obtain information on registration and annual confirmation requirements via SAM accessed through https://www.acquisition.gov.
(u) Unauthorized Obligations.
(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the following shall govern:
(i) Any such clause is unenforceable against the Government.
(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.