36C25018B0806-003.pdf

PDF 3 MB Posted

Attached to
Re-Solicitation - Upgrade UPS and AC Federal contract opportunity
Solicitation number
36C25018B0806
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

36C25018B0806 Attachment 2 Upgrade UPS and AC in Computer Room Drawings 02-16-2018.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Re-Solicitation - Upgrade UPS and AC, newest first.
File Type Posted
36C25018B0806-0002000.docx DOCX document
36C25018B0806-0001000.docx DOCX document
36C25018B0806-002.pdf PDF
36C25018B0806-001.docx DOCX document
36C25018B0806-004.docx DOCX document
36C25018B0806-005.docx DOCX document
36C25018B0806-006.docx DOCX document
36C25018B0806-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Drawing Title

Approved: Project Director

Location

Building Number

Project Tit le

Checked DrawnDate

Project No.

Drawing Number

D w g . o f o n e -e ig h th i n c h o n e f o o t o n e

-q u a rt e r in c h o n e f o o t th re e

-e ig h th s i n c h o n e f o o t o n e

-h a lf i n c h o n e f o o t th re e

-q u a rt e rs i n c h o n e fo o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

FFE, Inc.

420 Springfield Pike Cincinnati OH, 45215 513-522-0956

Cincinnati, Ohio

Upgrade UPS and AC in Computer Room

06/09/17

COVER SHEET

GI001

539-18-202

RG JK

BLDG 1

1 13

DRAWING SHEET INDEX

Sheet Number Sheet Name

Sheet Discipline

GI001 COVER SHEET GENERAL

E001 ELECTRICAL LEGENDS ELECTRICAL

EP101 PARTIAL FIRST FLOOR PLAN ELECTRICAL

EP102 PHASE 1 PARTIAL THIRD FLOOR PLAN ELECTRICAL

EP103 POWER PLAN - PHASE 1 PARTIAL FOURTH

FLOOR IT ROOM A437C

ELECTRICAL

EP104 POWER PLAN - PHASE 2 PARTIAL FOURTH

FLOOR IT ROOM A437C

ELECTRICAL

EP105 POWER PLAN - PHASE 3 PARTIAL FOURTH

FLOOR IT ROOM A437C

ELECTRICAL

EP301 NORMAL & EMERGENCY POWER BRANCHES -

80kVA UPS - "1E7" / ATS-"1E7" SINGLE LINE

DIAGRAM

ELECTRICAL

EP302 POWER BRANCH - 100kVA UPS2, PANEL

EDPEQ3 SINGLE LINE DIAGRAM

ELECTRICAL

EP501 ELECTRICAL DETAILS ELECTRICAL

EP601 EXISTING UPS1 POWER PANEL SCHEDULES ELECTRICAL

EP602 NEW WORK - EDPEQ3 POWER PANEL

SCHEDULE

ELECTRICAL

EP603 NEW UPS1 AND UPS2 POWER PANEL

SCHEDULES

ELECTRICAL

UPGRADE UPS AND AC IN

COMPUTER ROOM

CINCINNATI VA MEDICAL CENTER

3200 VINE STREET CINCINNATI OHIO 45220

PROJECT NO. 539-18-202

AREA MAP

PROJECT LOCATION

Revisions Date

0 ISSUED FOR CONSTRUCTION 06-09-2017

1 ADDENDUM 1 11-03-2017

*** R.I.D. = RESIDENT INTERIOR DESIGNER. ***

** U.N.O. = UNLESS NOTED OTHERWISE.**

* C.O.R. = CONTRACTING OFFICER'S REPRESENTATIVE. THIS IS USED IN LIEU OF THE TERM OWNER.*

1. ALL WORK SHALL COMPLY WITH ALL APPLICABLE NATIONAL, STATE AND LOCAL CODES, RULES, ORDINANCES AND REGULATIONS INCLUDING THE AMERICAN DISABILITIES ACT (ADA), ARCHITECTURAL

BARRIERS ACT(ABA), THE VA BARRIER FREE DESIGN GUIDELINES AND THE AMERICAN

NATIONALSTANDARDS INSTITUTE (ANSI) GUIDELINES.

2. THE C.O.R. SHALL WORK WITH THE CONTRACTOR TO PROVIDE ACCESS TO TEMPORARY SERVICES REQUIRED TO PROVIDE THE WORK INDICATED. SEE SPECIFICATION SECTION 01 00 00 FOR ADDITIONAL

REQUIREMENTS ON TEMPORARY ACCESS TO VA UTILITIES.

3. THE GENERAL CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE PROVISIONS OF THE SPECIFICATIONS, INCLUDING ALL GENERAL CONDITIONS, SUPPLEMENTARY GENERAL CONDITIONS, AND MATERIAL AND CONSTRUCTION PROVISIONS, WHICH APPLY TO MATERIALS OR CONSTRUCTION METHODS REQUIRED BY

THIS PROJECT.

4. PRIOR TO BIDDING, THE GENERAL CONTRACTOR SHALL VISIT THE SITE, EXAMINE, AND ACCEPT ALL EXISTING CONDITIONS. DATES FOR SITE VISITS WILL BE POSTED IN THE CONTRACT DOCUMENTS AS POSTED ON THE FEDERAL BUSINESS OPPURTUNITIES WEBPAGE FOR THIS PROJECT. UNSCHEDULED VISITS

WILL NOT BE ALLOWED.

5. DO NOT PAINT ANY CAULKING OR SEALANTS WHICH ARE SUBJECT TO MOVEMENT - CONTROL JOINTS SHALL BE CAULKED AFTER PAINT AND SPECIAL COATING APPLICATIONS. PROVIDE CAULKING OR

SEALANTS IN COLORS WHICH MATCH ADJACENT FINISHED SURFACE COLORS.

6. VERIFY ALL CONDITIONS AND DIMENSIONS IN THE FIELD BEFORE FABRICATING ANY MATERIALS.

7. IT IS THE INTENT OF THE DOCUMENTS TO INDICATE COMPLETE AND OPERATIONAL SYSTEMS (I.E.

STRUCTURAL, HVAC, PLUMBING, ELECTRICAL, ETC.) THE CONTRACTOR SHALL PROVIDE THE SYSTEMS AS OPERATIONAL SYSTEMS WHICH COMPLY WITH APPLICABLE CODES AND REGULATIONS. THIS NOTE SHALL BE LIMITED TO THE SYSTEMS AS INDICATED BY THE DOCUMENTS AND SHALL NOT INCLUDE CHANGES TO

THE SYSTEMS WHICH ALTER INDICATED CAPACITIES, OPERATIONAL CHARACTERISTICS, ETC.

8. THE GENERAL CONTRACTOR SHALL VERIFY THE SIZES OF ALL EQUIPMENT OR FIXTURES TO BE INSTALLED IN THE BUILDING THROUGH THE SUBMITTAL PROCESS, AND SHALL MAKE SPECIAL PROVISIONS FOR INSTALLATION OF ANY EQUIPMENT WHICH IS TOO LARGE TO FIT THROUGH A FINISHED OPENING.

9. ALL CONTRACTORS SHALL BE RESPONSIBLE TO PATCH AND REPAIR ALL SURFACES WHERE EXISTING

CONSTRUCTION IS REMOVED OR DISTURBED BY WORK UNDER THEIR CONTRACT.

10. ALL SUSPENDED ITEMS SUCH AS CEILINGS, DUCTS, PIPES, CONDUITS, ETC., SHALL BE SUSPENDED (ATTACHED) DIRECTLY TO STRUCTURE AND SHALL NOT BE ATTACHED OR ANCHORED TO EXISTING

PLASTER, ACOUSTIC TILE, ETC.

11. NEW PENETRATIONS SUCH AS DUCTS, CONDUITS, PIPING, ELECTRICAL OUTLETS, LIGHT SWITCHES, RECESSED DEVICES OR ITEMS, HOLES, VOIDS, CRACKS, ETC. IN MODIFIED AND NEW CORRIDOR WALLS, SMOKE PARTITIONS, AND FLOOR SLABS SHALL BE SEALED TO PREVENT PASSAGE OF ANY SMOKE, FLAME, GASES, ETC. AS INDICATED IN THE CONTRACT DOCUMENTS.

12. WHERE NEW CONSTRUCTION REQUIRES CORE DRILLING THROUGH EXISTING STRUCTURAL CONCRETE FLOOR SLABS, AND WALLS THE CONTRACTOR SHALL COORDINATE HIS DRILLING WORK TO AVOID DRILLING INTO A STRUCTURAL ELEMENT, INCLUDING JOISTS, BEAMS, COLUMNS, ETC. ALSO SEE

ELECTRICAL. DRAWINGS AND SPECIFICATIONS.

13. WHERE NEW CONSTRUCTION IS INDICATED TO BE INSTALLED IN EXISTING CONSTRUCTION, THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS FOR PROPER FIT AND FOR ACCESS INTO THE BUILDING

PRIOR TO SHOP DRAWING SUBMITTAL, ORDERING AND DELIVERING TO THE SITE.

14. FOR INFECTION CONTROL REASONS, WORK CONDUCTED IN THE CORRIDOR THAT DOES NOT GENERATE DUST MAY ONLY REMOVE UP TO 16 SQUARE FEET OF CEILING TILE AT ONCE. AS LONG AS THIS STANDARD IS FOLLOWED NEGATIVE AIR AND BARRIERS ARE NOT REQUIRED BY THE INFECTION CONTROL NURSES. IF DUST IS GENERATED AND GREATER THAN 16 SF OF CEILING TILES ARE DISTURBED AT ONCE THEN THE WORK AREA SHALL BE SEALED OFF WITH 6 MIL FIRE RETARDANT POLYETHYLENE AND NEGATIVE AIR PROVIDED. MAINTAIN 5' MINIMUM ACCESS IN CORRIDORS AT ALL TIMES. CLEAN THOROUGHLY PRIOR TO COMPLETION OF A GIVEN WORK AREA BY HEPA VACUUM AND WET MOP. REFER TO SPECIFICATION 01 35

26 FOR ADDITIONAL INFORMATION.

D P # _ _

LP

PB

R

T

PB

S

S

R

VFD

ELECTRICAL ABBREVIATIONS

IMC INTERMEDIATE METAL CONDUIT

J-BOX JUNCTION BOX

kV KILOVOLT kVA KILOVOLT AMPERE kVAH KILOVOLT AMPERE PER HOUR kVAR KILOVOLT AMPERE REACTIVE kW KILOWATT kWH KILOWATT HOUR kWHM KILOWATT HOUR METER

LV LOW VOLTAGE

MC METAL-CLAD

MCA MINIMUM CIRCUIT AMPS

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDP MAIN DISTRIBUTION PANEL

MOCP MAXIMUM OVERCURRENT PROTECTION

MLO MAIN LUGS ONLY

MT MOUNT

MTD MOUNTED

MTG MOUNTING

MTS MANUAL TRANSFER SWITCH

NA NOT APPLICABLE

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL

MANUFACTURERS ASSOCIATION

NEUT OR N NEUTRAL

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NTS NOT TO SCALE

OC ON CENTER

OL OVERLOAD

PB PANELBOARD

PH PHASE

PNL PANEL

PT POTENTIAL TRANSFORMER

PWR POWER

REC RECESSED

RECPT RECEPTACLE

SCC SHORT CIRCUIT CAPACITY

TP TWISTED PAIR

TPS TWISTED PAIR SHIELDED

TYP TYPICAL

UFD UNDERFLOOR DUCT

UGND UNDERGROUND

UL UNDERWRITERS LABORATORY

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER SUPPLY

V VOLT

VA VOLT AMPERE

VAR VOLT AMPERE REACTIVE

VOLT VOLTAGE

W WATT

WP WEATHERPROOF

XFMR TRANSFORMER

FUSE WITH RATING

NORMALLY CLOSED RELAY CONTACT

NORMALLY OPEN RELAY CONTACT

MOLDED CASE CIRCUIT BREAKER

LOW-VOLTAGE DRAWOUT AIR CIRCUIT BREAKER

SWITCH AND FUSE UNIT

FUSED DRAWOUT POTENTIAL TRANSFORMER

ELECTRICAL SYMBOLS - DIAGRAM

MOTOR, SINGLE-PHASE

MOTOR, THREE-PHASE

DELTA CONNECTION

TRANSFORMER

WYE CONNECTION

EARTH GROUND

JUNCTION BOX

PULL BOX

FUSIBLE LINK

BATTERY

RELAY

50 = INSTANTANEOUS OVERCURRENT OR RATE-OF-RISE

51 = AC-TIME OVERCURRENT

67 = AC-DIRECTIONAL OVERCURRENT

86 LOCKING OUT

DISCONNECT SWITCH, FUSED

DISCONNECT SWITCH, UNFUSED

STARTER, COMBINATION WITH DISCONNECT SWITCH

STARTER OR MOTOR CONTROLLER

METER

AMMETER

VOLTMETER

WATTMETER

WATT-HOUR METER

DISCONNECT SWITCH, FUSED

DISCONNECT SWITCH, UNFUSED

STARTER, COMBINATION WITH DISCONNECT SWITCH

STARTER OR MOTOR CONTROLLER

CONDUIT TERMINATED 6" [152mm] AFF IN STANDARD BOX FOR

EXTENSION TO EQUIPMENT AS DIRECTED.

CONDUIT TERMINATED W/COUPLING (FLUSH W/FINISHED FLOOR)

FOR EXTENSION TO EQUIPMENT AS DIRECTED.

ELECTRICAL SYMBOLS - POWER PLAN

JUNCTION BOX

TRANSFORMER, PLAN

MOTOR, SINGLE-PHASE

MOTOR, THREE-PHASE

WYE CONNECTION

DUCT, CELL FLOOR HEADER

DUCT, TROLLEY

DUCT, UNDERFLOOR JUNCTION BOX

EARTH GROUND

LADDER CABLE TRAY

BRANCH CIRCUIT HOMERUN. LINES INDICATE NUMBER OF

CIRCUITS, NEUTRAL, AND SWITCH LEG CONDUCTORS. ONE

SEPARATE GREEN GROUNDING CONDUCTOR SHALL BE PROVIDED

FOR EACH HOMERUN; NOT SHOWN

PULL BOX

WIREWAY

RIGID CONDUIT LINE = RC

BUSWAY

FLOOR OUTLET, DATA COMMUNICATION

OUTLET, DATA COMMUNICATION

PUSH BUTTON

DISTRIBUTION PANEL

LIGHTING PANEL

PANELBOARD CABINET, FLUSH MOUNTED

PANELBOARD CABINET, SURFACE MOUNTED

RECEPTACLE, CLOCK HANGER

RECEPTACLE, DUPLEX

RECEPTACLE, DUPLEX ON EMERGENCY POWER

RECEPTACLE, DUPLEX WITH GROUND FAULT CIRCUIT INTERRUPTER

RECEPTACLE, QUADRAPLEX

RECEPTACLE, SINGLE

RECEPTACLE, SINGLE WITH SWITCH

RECEPTACLE, SPECIAL PURPOSE

A = 120V, 20A, 1 PHASE, 2-POLE, 3W, NEMA 5-20R.

B = 208V, 20A, 1 PHASE, 2-POLE, 3W, NEMA 6-20R.

C = 120V, 30A, 1 PHASE, 2-POLE, 3W, NEMA 5-30R.

D = 208V, 30A, 1 PHASE, 2-POLE, 3W, NEMA 6-30R.

E = 208V, 60A, 1 PHASE, 3-POLE, 4W, NEMA 14-60R.

F = 208V, 30A, 3 PHASE, 3-POLE 4W, NEMA 15-30R.

G = 208V, 50A, 3 PHASE, 3 POLE, 4W, NEMA 15-30R.

H = 208V, 60A, 3 PHASE, 3 POLE, 4W, NEMA 15-60R.

RECEPTACLE, SWITCHED DUPLEX

DIRECT BURIAL CABLE = DB

POWER DUCT = P

DROP CORD, SINGLE CONVENIENCE OUTLET, 3-WIRE, GROUNDING

TYPE, 20A, W/#12 CONDUCTORS IN FLEXIBLE CORD (CENTER LINE

OF OUTLET: 6'-6" [1981mm] AFF. MINIMUM).

ELECTRICAL STRIP MOLD (OUTLETS ON 2'-0" [610mm] CENTERS OR AS DESIGNATED ON DRAWINGS), MTD 3'-6" [1067mm] AFF OR AS

INDICATED.

3-GANG COMPARTMENT BOX IN FLOOR FOR TELEPHONE, DATA &

RECEPTACLE.

RELAY; LETTER INDICATES RELAY TYPE

50 = INSTANTANEOUS OVERCURRENT OR RATE-OF-RISE

51 = AC-TIME OVERCURRENT

67 = AC-DIRECTIONAL OVERCURRENT

86 = LOCK OUT

ELECTRICAL SYMBOLS - POWER PLAN

SWITCH

F = FUSED SWITCH K = KEY OPERATED

L = LOCK LM= LOW VOLTAGE MASTER

M = MANUAL MOTOR STARTING MC= MOMENTARY CONTACT

MP= MOTOR SNAP WITH PILOT LIGHT P = WITH PILOT LIGHT

(THERMAL TYPE)

PB= PUSH BUTTON STATION RC= REMOTE CONTROL

WP= WEATHER PROOF X = EXPLOSION PROOF

VARIABLE FREQUENCY DRIVE

A. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE NO MORE THAN THREE

CIRCUITS. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE A SEPARATE

GREEN INSULATED EQUIPMENT GROUNDING CONDUCTOR.

B. MULTI-GANG BACKBOXES FOR DIFFERENT VOLTAGES AND TYPES OF

EMERGENCY AND NORMAL BRANCH WIRING DEVICES SHALL HAVE

DIVIDERS BETWEEN DEVICES.

C. COORDINATE ALL SHUT-DOWNS OF EXISTING ELECTRICALSYSTEMS WITH

OWNER A MINIMUM OF FOURTEEN (14) WORKING DAYS IN ADVANCE. ALL

SHUT-DOWNS SHALL OCCUR DURING WEEKENDS OR UNOCCUPIED TIMES,

INCLUDE ALL PREMIUM TIME CHARGES IN BID.

D. ALL NOISE GENERATING OPERATIONS, INCLUDING CUTTING OF CEILINGS,

WALLS AND FLOORS, CORING, DRILLING,ETC. SHALL BE SCHEDULED ON

WEEKENDS OR BETWEEN 8:00PM AND 7:00AM ON WEEKDAYS. INCLUDE

ALL PREMIUM TIME CHARGES IN BID.

E. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND

REPLACEMENT OF CEILINGS REQUIRED FOR ELECTRICAL WORK.

ELECTRICAL CONTRACTOR SHALL REPLACE ANY DAMAGED CEILING

MATERIAL.

F. ALL NEW WALL MOUNTED ELECTRICAL DEVICES ARE TO BE INSTALLED

FLUSH IN WALL UNLESS OTHERWISE NOTED. ALL ELECTRICAL CONDUIT

SHALL BE CONCEALED BEHIND FINISHED WALLS AND ABOVE FINISHED

CEILING UNLESS OTHERWISE NOTED. THE COST TO CUT AND PATCH

WALLS SHALL BE THE RESPONSIBILITY OF THE TRADE REQUIRING THE

CUTTING.

G. ALL WORK SHALL BE PERFORMED IN STRICT CONFORMANCE WITH THE

PHASING REQUIREMENTS OF THE PROJECT. ALL COSTS ASSOCIATED

WITH THESE REQUIREMENTS SHALL BE INCLUDED IN THE BID SUBMITTAL.

REFER TO ARCHITECTURAL PLANS FOR PHASING AND AREAS

DESIGNATED AS "OFF HOURS" CONSTRUCTION AREAS.

H. DEFINITION: "PROVIDE" - FURNISH, INSTALL AND CONNECT COMPLETE.

A. FOR EXISTING EQUIPMENT, SUCH AS LIGHTING FIXTURES, WIRING

DEVICES, CONDUITS, ETC., SHOWN ON PLANS TO BE REMOVED,

COMPLETELY CUT/CAP CONDUITS AT THE AREA OF WORK PERIMETER

AND REMOVE CONDUIT WITHIN THE WORK AREA, DISCONNECT WIRING AT

THE OVERCURRENT PROTECTIVE DEVICE AND REMOVE WIRING

COMPLETELY FROM THE ABANDONED CONDUITS.

B. DISCONNECT ALL ABANDONED WIRING OF ALL TYPES AT THE

OVERCURRENT PROTECTIVE DEVICE. COMPLETELY REMOVE ALL

ABANDONED WIRING.

C. MAINTAIN AND RESTORE, IF INTERRUPTED, ALL CONDUITS AND

CONDUCTORS PASSING THROUGH RENOVATED AREAS AND SERVICING

UNDISTURBED AREAS.

GENERAL NOTES

GENERAL NOTES - DEMOLITION

1PH SINGLE-PHASE

1P SINGLE POLE

2/C TWO-CONDUCTOR

3/C THREE-CONDUCTOR

3PH THREE-PHASE

4/C FOUR-CONDUCTOR

4W FOUR-WIRE

AFC ABOVE FINISHED COUNTER,

AUTOMATIC FREQUENCY CONTROL, OR

AVAILABLE FAULT CURRENT

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AH AMPERE HOUR

AHJ AUTHORITY HAVING JURISDICTION

AIC AMPERE INTERRUPTING CAPACITY

AMP AMPERE

ASC AMPS SHORT CIRCUIT

AT AMPERE TRIP

ATS AUTOMATIC TRANSFER SWITCH

BAT BATTERY

BC BARE COPPER

BFF BELOW FINISH FLOOR

BRKR BREAKER

BYP BY PASS

C CONDUIT

CAB CABINET

CAP CAPACITY

CKT CIRCUIT

CKT BRKR CIRCUIT BREAKER

CLF CURRENT LIMITING FUSE

CPT CONTROL POWER TRANSFORMER

CT CURRENT TRANSFORMER

CU COPPER

CU FT CUBIC FEET

CUR CURRENT

DC DIRECT CURRENT

DISC DISCONNECT

DISTR DISTRIBUTION

DISTR PNL DISTRIBUTION PANEL

DMR SW DIMMER SWITCH

DN DOWN

DPDT DOUBLE POLE, DOUBLE THROW

DPST DOUBLE POLE, SINGLE THROW

DRSW DOOR SWITCH

DS DISCONNECT SWITCH

EG EQUIPMENT GROUND

ELEV ELEVATOR

EMT ELECTRICAL METALLIC TUBING

ENCL ENCLOSURE

EXIST EXISTING

FLA FULL LOAD AMPS

FLEX FLEXIBLE METALLIC CONDUIT

FU SW FUSED SWITCH

G GROUND

GFCI GROUND FAULT CIRCUIT INTERRUPTER

GTB GROUND TERMINAL BOX

Drawing Title

Approved: Project Director

Location

Building Number

Project Tit le

Checked DrawnDate

Project No.

Drawing Number

D w g . o f o n e -e ig h th i n c h o n e f o o t o n e

-q u a rt e r in c h o n e f o o t th re e

-e ig h th s i n c h o n e f o o t o n e

-h a lf i n c h o n e f o o t th re e

-q u a rt e rs i n c h o n e fo o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

FFE, Inc.

420 Springfield Pike Cincinnati OH, 45215 513-522-0956

Cincinnati, Ohio

Upgrade UPS and AC in Computer Room

06/09/17

ELECTRICAL LEGENDS

E001

539-18-202

RG JK 2 13

Revisions Date

0 ISSUED FOR CONSTRUCTION 06-09-2017

NFPA 2017

CHAPTER 6 - SPECIAL EQUIPMENT

ARTICLE 645 - INFORMATION TECHNOLOGY EQUIPMENT

645.5 SUPPLY CIRCUITS AND INTERCONNECTING CABLES

645.5(A) BRANCH CIRCUIT CONDUCTORS SHALL HAVE AN AMPACITY OF NOT

LESS THAN 125% OF THE TOTAL CONNECTED LOAD.

645.5(B)(1) POWER SUPPLY CORDS SHALL NOT EXCEED 15 FEET IN LENGTH.

645.5(B)(2) POWER CORDS SHALL BE LISTED AND OF A TYPE PERMITTED FOR

USE ON LISTED IT EQUIPMENT OR CONSTRUCTED FROM LISTED

CORD WITH LISTED ATTACHMENT PLUGS AND CORD CONNECTORS

OF A TYPE PERMITTED FOR IT EQUIPMENT.

645.5(C) INTERCONNECTING CABLES SHALL BE LISTED CABLES OR

ASSEMBLIES.

645.5(D) WHERE EXPOSED TO PHYSICAL DAMAGE, SUPPLY CIRCUITS AND

INTERCONNECTING CABLES SHALL BE PROTECTED FROM HARM.

645.5(E) FLOOR OPENINGS SHALL MINIMIZE THE ENTRANCE OF DEBRIS

BENEATH THE FLOOR.

645.5(E)(1)(A) BRANCH CIRCUIT SUPPLY CONDUCTORS SHALL BE INSTALLED IN

ACCORDANCE WITH THE REQUIREMENTS OF 300.11.

645.5(E)(1)(B) IN ADDITION TO THE WIRING METHODS OF 300.22(C), THE

FOLLOWING WIRING METHODS ARE ALSO PERMITTED: (1) RIGID

METAL CONDUIT, (2) RIGID NONMETALLIC CONDUIT, (3)

INTERMEDIATE METAL CONDUIT, (4) ELECTRICAL METALLIC

TUBING, (5) ELECTRICAL NONMETALLIC TUBING, (6) METAL WIREWAY,

(7) NONMETALLIC WIREWAY, (8) SURFACE METAL RACEWAY

WITH METAL COVER, (9) SURFACE NONMETALLIC RACEWAY, (10)

FLEXIBLE METAL CONDUIT, (11) LIQUIDTIGHT FLEXIBLE METAL

CONDUIT, (12) LIQUIDTIGHT NONMETALLIC CONDUIT, (13) TYPE MI

CABLE, (14) TYPE MC CABLE, (15) TYPE AC CABLE, (16) ASSOCIATED

METALLIC AND NONMETALLIC BOXES OR ENCLOSURES, (17) TYPE TC

POWER AND CONTROL TRAY CABLE.

645.10 DISCONNECTING MEANS

645.10(B) REMOTE DISCONNECTING CONTROLS SHALL NOT BE REQUIRED FOR

CRITICAL OPERATIONS DATA SYSTEMS WHEN ALL OF THE

FOLLOWING ARE MET:

(1) AN APPROVED PROCEDURE HAS BEEN ESTABLISHED AND

MAINTAINED FOR REMOVING POWER AND AIR MOVEMENT WITHIN

THE ROOM OR ZONE. (2) QUALIFIED PERSONNEL ARE

CONTINUOUSLY AVAILABLE TO ADVISE EMERGENCY RESPONDERS

AND TO INSTRUCT THEM OF DISCONNECTING METHODS. (3) A

SMOKE-SENSING FIRE DETECTION SYSTEM IS IN PLACE. (4) AN

APPROVED FIRE SUPPRESSION SYSTEM SUITABLE FOR THE

APPLICATION IS IN PLACE. (5) CABLES INSTALLED UNDER A RAISED

FLOOR, OTHER THAN BRANCH CIRCUIT WIRING, AND POWER CORDS

ARE INSTALLED IN COMPLIANCE WITH 645.5(E)(2) OR (E)(3), OR IN

COMPLIANCE WITH TABLE 645.10(B)(5).

645.11 UPS SYSTEMS INSTALLED WITHIN THE INFORMATION TECHNOLOGY

EQUIPMENT ROOM, AND THEIR SUPPLY AND OUTPUT CIRCUITS,

SHALL COMPLY WITH 645.10. THE DISCONNECTING MEANS SHALL

ALSO DISCONNECT THE BATTERY FROM ITS LOAD.

645.15 ALL EXPOSED NON-CURRENT CARRYING METAL PARTS OF AN IT

SYSTEM SHALL BE BONDED TO THE EQUIPMENT GROUNDING

CONDUCTOR IN ACCORDANCE WITH PARTS I, V, VI, VII, AND VIII OF

ARTICLE 250 OR SHALL BE DOUBLE INSULATED.

645.16 EACH UNIT OF AN IT SYSTEM SUPPLIED BY A BRANCH CIRCUIT SHALL

BE PROVIDED WITH A MANUFACTURER'S NAMEPLATE, WHICH SHALL

ALSO INCLUDE THE INPUT POWER REQUIREMENTS FOR VOLTAGE,

FREQUENCY, AND MAXIMUM RATED LOAD IN AMPERES.

645.18 SURGE PROTECTION SHALL BE PROVIDED FOR CRITICAL

OPERATIONS DATA SYSTEMS.

645.27 OVERCURRENT DEVICES FOR CRITICAL OPERATION DATA SYSTEMS

SHALL BE SELECTIVELY COORDINATED WITH ALL SUPPLY-SIDE

OVERCURRENT PROTECTIVE DEVICES.

CODE COMPLIENCE

CHAPTER 7 - SPECIAL CONDITIONS

ARTICLE 700 EMERGENCY SYSTEMS

700.8 A LISTED SURGE PROTECTION DEVICE SHALL BE INSTALLED IN ALL

EMERGENCY SYSTEM SWITCHBOARDS AND PANELBOARDS.

700.32 EMERGENCY SYSTEM OVERCURRENT DEVICES SHALL BE SELECTIVELY

COORDINATED WITH ALL SUPPLY-SIDE OVERCURRENT PROTECTIVE

DEVICES.

DN

3 1/2"ø

3 1/2"ø

IE3 IE7

EXISTING 3-1/2" C.

NOTE: EXISTING SUB-FLOOR CONDUIT

ROUTING FROM 1E7 TO 80kVA UPS

(APPROXIMATE).

B013B

TRANSFORMER ROOM

B013A

ELECTRIC ROOM

C-1-7

CORRIDOR

B107A

TELE CLOS.

C-1-9A

CORRIDOR

C-1-7A

CORRIDOR

B101

RETAIL STORE

A128

FOOD SERVICE

A. ALL ELECTRIC WIRING & CONDUITS SHALL BE INSTALLED PER LOCAL CODES AND AS DIRECTED BY

THE LOCAL ELECTRIC CODE OFFICIAL. VERIFY ALL REQUIREMENTS PRIOR TO ROUGH-IN.

B. SUPPLY ARC FAULT WARNING LABELS AS REQUIRED BY N.E.C. 110.16

C. ALL MULTI-WIRE CIRCUITS SHALL HAVE COMMON TRIP OVER-CURRENT PROTECTION DEVICES.

D. ROUTING OF CONDUIT IS ESTIMATED. FIELD VERIFICATION OF CONDUIT ROUTING & PULLBOX

LOCATIONS IS REQUIRED.

E. PROVIDE FIRESTOPPING AT ALL RATED WALL PENETRATIONS - SEE PLANS FOR RATED WALLS.

PROVIDE ACOUSTICAL WALL SEALANT AT ALL OTHER WALL PENETRATIONS.

F. CONTRACTOR TO PROTECT EXISTING INSTALLATIONS FROM DAMAGE. ANY DAMAGE TO EXISTING

FACILITY WILL BE REPAIRED AT CONTRACTOR'S EXPENSE.

GENERAL POWER NOTES:

Drawing Title

Approved: Project Director

Location

Building Number

Project Tit le

Checked DrawnDate

Project No.

Drawing Number

D w g . o f o n e -e ig h th i n c h o n e f o o t o n e

-q u a rt e r in c h o n e f o o t th re e

-e ig h th s i n c h o n e f o o t o n e

-h a lf i n c h o n e f o o t th re e

-q u a rt e rs i n c h o n e fo o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

FFE, Inc.

420 Springfield Pike Cincinnati OH, 45215 513-522-0956

Cincinnati, Ohio

Upgrade UPS and AC in Computer Room

06/09/17

PARTIAL FIRST FLOOR PLAN

EP101

539-18-202

RG JK

SCALE: 1/8" = 1'-0"

PARTIAL FIRST FLOOR ELECTRIC PLAN - EXISTING UPS POWER (REFERENCE ONLY)

3 13 Revisions Date

0 ISSUED FOR CONSTRUCTION 06-09-2017

UP

A. ALL ELECTRIC WIRING & CONDUITS SHALL BE INSTALLED PER LOCAL CODES AND AS DIRECTED BY

THE LOCAL ELECTRIC CODE OFFICIAL. VERIFY ALL REQUIREMENTS PRIOR TO ROUGH-IN.

B. SUPPLY ARC FAULT WARNING LABELS AS REQUIRED BY N.E.C. 110.16

C. ALL MULTI-WIRE CIRCUITS SHALL HAVE COMMON TRIP OVER-CURRENT PROTECTION DEVICES.

D. ROUTING OF CONDUIT IS ESTIMATED. FIELD VERIFICATION OF CONDUIT ROUTING & PULLBOX

LOCATIONS IS REQUIRED.

E. PROVIDE FIRESTOPPING AT ALL RATED WALL PENETRATIONS - SEE PLANS FOR RATED WALLS.

PROVIDE ACOUSTICAL WALL SEALANT AT ALL OTHER WALL PENETRATIONS.

F. CONTRACTOR TO PROTECT EXISTING INSTALLATIONS FROM DAMAGE. ANY DAMAGE TO EXISTING

FACILITY WILL BE REPAIRED AT CONTRACTOR'S EXPENSE.

GENERAL POWER NOTES:

PHASING NOTES:

L

L

M

M

N

N

3 3

4a 4a

5 5

6 6

7 7

J

J

Jb

Jb

UP TO ELECTRIC

ROOM A436B

A338B

ELECTRIC

A338

SERVICE LOBBY

CORE ABANDONED WINDOW

HEADER - DO NOT PENETRATE BEAM

SEAL PENETRATION AT

EXISTING FIRE WALLS

TRANSITION TO CENTER OF CORRIDOR

AND TIGHT TO STRUCTURE BEFORE

EXISTING FIRE DOORS

RUN BETWEEN CABLE TRAY

AND CHILLED WATER PIPING

RUN PARALLEL TO EXISTING BANK OF CONDUIT.

SEAL PENETRATION AT

EXISTING FIRE WALLS

MATCH LINE

BB

6 7

4.7

4.7

AA

A.6A.6

7'-8"B.O.C.

10' 0"B.O.S.

8'-0"B.O.C.

10'-6"B.O.S.

9'-0"B.O.C.

11 '-9"B.O.S.

M

M

2 2

3 3

(4) 600 MCM, (1) #1 GND. IN 3" CONDUIT

- REUSE EXISTING CONDUIT SUPPORTS

WHERE PRACTICABLE

- VERIFY STRUCTURAL CAPACITY PRIOR

EXISTING CONDUIT

CORE DRILL NEAR EXISTING PENETRATION

EXISTING 12" CONCRETE WALL

RUN CONDUIT TIGHT TO

EXISTING STRUCTURE

100KVA UPS/BATTERY PACK

A3002-2

MECHANICAL-2

TRANSFORMER

DPF3

EDPEQ3

CDP3

DPLF3

EEQM3

1-EF5

1-EF4

1-EF3

1-EF2

DISCONNECT

TR-UPS2

MATCH LINE

EDPLEQ3

UPS2

BB

CC

4.7

4.7

AA

A.6A.6

2" HOUSEKEEPING PAD

21'-7"B.O.S.21'-7"B.O.S.

10'-5"B.O.S.

EDPEQ3 PANEL

UPS2

TR-UPS2 DISCONNECT

FROM TO

UPS2

TR-UPS2

UPS2 PANEL 1

CABLE SIZE

REFER TO SINGLE LINE

REFER TO SINGLE LINE

REFER TO SINGLE LINE

CABLE TYPE

THWN-2

THWN-2

THWN-2

CABLE LENGTH

35'

25'

210'

CABLE SCHEDULE

UPS2 PANEL 1 UPS2 PANEL 2 REFER TO SINGLE LINE THWN-2 5'

Drawing Title

Approved: Project Director

Location

Building Number

Project Tit le

Checked DrawnDate

Project No.

Drawing Number

D w g . o f o n e -e ig h th i n c h o n e f o o t o n e

-q u a rt e r in c h o n e f o o t th re e

-e ig h th s i n c h o n e f o o t o n e

-h a lf i n c h o n e f o o t th re e

-q u a rt e rs i n c h o n e fo o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

FFE, Inc.

420 Springfield Pike Cincinnati OH, 45215 513-522-0956

Cincinnati, Ohio

Upgrade UPS and AC in Computer Room

06/09/17

PHASE 1 PARTIAL THIRD FLOOR

PLAN

EP102

539-18-202

RG JK

PHASE 1

1. PROVIDE 100KVA UPS AND ASSOCIATED TRANSFORMER. INSTALL UPON 2" POURED CONCRETE PAD WITHIN MECHANICAL ROOM A3002-2.

FURNISH ALL ASSOCIATED COMPONENTS AND PROVIDE INSTALLATION, PROGRAMMING, STARTUP, ASSOCIATED CONTROL WIRING AND ALL

ASSOCIATED TERMINATIONS.

2. PROVIDE 200A CIRCUIT BREAKER IN PANEL EDPEQ3 - VERIFY CAPACITY. ROUTE FEEDER IN CONDUIT FROM NEW CIRCUIT BREAKER TO UPS.

3. PROVIDE 125kVA, 480V-208Y/120V TRANSFORMER IN MECHANICAL ROOM A3002-2.

4. PROVIDE 600V 200A 3P NON-FUSED DISCONNECT (14,000AIC RATED). ROUTE CONDUIT AND WIRE TO SERVE TR-UPS2 PRIMARY.

5. PROVIDE CONDUIT AND WIRE FROM TRANSFORMER TO UPS INPUT BREAKER.

6. PROVIDE CONDUIT AND WIRE FROM UPS SHUNT TRIP OUTPUT BREAKER TO DISTRIBUTION PANELS IN ROOM A4037C ON THE 4TH FLOOR.

REFER TO SHEET EP103.

4 13

SCALE: 1/4" = 1'-0"

ELECTRICAL POWER THIRD FLOOR PLAN - PANEL EDPEQ3

Revisions Date

0 ISSUED FOR CONSTRUCTION 06-09-2017

1 ADDENDUM 1 11-03-2017

06-09-2017

ABBREVIATIONS

B.O.C. = BOTTOM OF CEILING

B.O.S. = BOTTOM OF STRUCTURE

A. ALL ELECTRIC WIRING & CONDUITS SHALL BE INSTALLED PER LOCAL CODES AND AS DIRECTED BY

THE LOCAL ELECTRIC CODE OFFICIAL. VERIFY ALL REQUIREMENTS PRIOR TO ROUGH-IN.

B. SUPPLY ARC FAULT WARNING LABELS AS REQUIRED BY N.E.C. 110.16

C. ALL MULTI-WIRE CIRCUITS SHALL HAVE COMMON TRIP OVER-CURRENT PROTECTION DEVICES.

D. ROUTING OF CONDUIT IS ESTIMATED. FIELD VERIFICATION OF CONDUIT ROUTING & PULLBOX

LOCATIONS IS REQUIRED.

E. PROVIDE FIRESTOPPING AT ALL RATED WALL PENETRATIONS - SEE PLANS FOR RATED WALLS.

PROVIDE ACOUSTICAL WALL SEALANT AT ALL OTHER WALL PENETRATIONS.

F. CONTRACTOR TO PROTECT EXISTING INSTALLATIONS FROM DAMAGE. ANY DAMAGE TO EXISTING

FACILITY WILL BE REPAIRED AT CONTRACTOR'S EXPENSE.

GENERAL POWER NOTES:

PHASING NOTES:

L

L

M

M

7 7

10 10

11 11

12 12

Kb

Kb

AC

SW

LAN RACK 3

LAN RACK 2

LAN RACK 1

PLASMA

CRAC-3

C R

A C

-2

PLASMA

PLASMA

WAN 2

WAN 1

EXISTING

80kVA UPS1

EXISTING 3-1/2"C. FROM SWITCHBOARD "1E7"

4A1

4A2

E4A

A436B

ELECTRIC CL

A437C

COMPUTER RM

NEW

PANELBOARD AND

DISTRIBUTION PANEL

UPS2 PANEL1

UPS2 PANEL 2

EX. PANEL #1

EX. PANEL #2

TO PANEL EPEDQ3 ON

LEVEL 3 MECHANICAL ROOM A3002-2, SEE

SHEET EP102 FOR CONTINUATION

SEAL PENETRATION AT

EXISTING FIRE WALLS

SEAL PENETRATION AT

EXISTING FIRE WALLS

NEW

CABLE

SUPPORTS

EPSMS

Drawing Title

Approved: Project Director

Location

Building Number

Project Tit le

Checked DrawnDate

Project No.

Drawing Number

D w g . o f o n e -e ig h th i n c h o n e f o o t o n e

-q u a rt e r in c h o n e f o o t th re e

-e ig h th s i n c h o n e f o o t o n e

-h a lf i n c h o n e f o o t th re e

-q u a rt e rs i n c h o n e fo o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

FFE, Inc.

420 Springfield Pike Cincinnati OH, 45215 513-522-0956

Cincinnati, Ohio

Upgrade UPS and AC in Computer Room

06/09/17

POWER PLAN - PHASE 1 PARTIAL

FOURTH FLOOR IT ROOM A437C

EP103

539-18-202

RG JK

PHASE 1

1. PROVIDE AND INSTALL NEW DISTRIBUTION PANEL AND PANELBOARD AS INDICATED ON EP603.

2. PROVIDE AND INSTALL CONDUIT AND WIRE FROM UPS OUTPUT BREAKER TO NEW DISTRIBUTION PANELS AS INDICATED ON EP102.

3. PROVIDE AND INSTALL APPROXIMATELY 24" LONG SECTIONS OF UNISTRUT TO SUPPORT AND ORGANIZE THE POWER CABLES. UNISTRUT IS TO BE

SUPPORTED FROM THE RAISED FLOOR SUPPORTS. INSTALL ON APPROXIMATELY 4'-0" CENTERS.

SCALE: 1/4" = 1'-0"

PHASE 1 FOURTH FLOOR COMPUTER ROOM POWER PLAN

5 13 Revisions Date

0 ISSUED FOR CONSTRUCTION 06-09-2017

1 ADDENDUM 1 11-03-2017

AC

SW

LAN RACK 3

LAN RACK 2

LAN RACK 1

PLASMA

AC-2

A C

-1

PLASMA

PLASMA

WAN 2

WAN 1

EXISTING

80kVA UPS1

EXISTING 3-1/2"C. FROM SWITCHBOARD "1E7"

A436B

ELECTRIC CL

A437C

COMPUTER RM

NEW

CABLE SUPPORT

ROUTING

RACK 1 ATS-A

UPS2 PANEL 2

UPS2 PANEL1

RACK 2 ATS-A

RACK 3 ATS

RACK 5 ATS-A

RACK 7 ATS-B

RACK 21 ATS-C

RACK 20 ATS-C

RACK 19 ATS-D

RACK 16 ATS-A

RACK 11 ATS-A

RACK 10 ATS-A

RACK 4 ATS

RACK 6 ATS-A

RACK 7 ATS-A

RACK 9 ATS-B

RACK 23 ATS-A

RACK 22 ATS-A

RACK 19 ATS-C

RACK 17 ATS

RACK 16 ATS-B

RACK 15 ATS

RACK 14 ATS

RACK 12 ATS-A

RACK 6 ATS-B

RACK 1 ATS-B

RACK 5 ATS-B

RACK 9 ATS-A

RACK 9 ATS-C

RACK 9 ATS-D

RACK 10 ATS-B

RACK 11 ATS-B

RACK 12 ATS-B

RACK 12 ATS-C

RACK 20 ATS-B

RACK 20 ATS-A

RACK 19 ATS-A

RACK 19 ATS-B

RACK 21 ATS-B

RACK 22 ATS-B

RACK 23 ATS-B

RACK 24 ATS

RACK 25 ATS-A

RACK 25 ATS-D

RACK 25 ATS-B

RACK 25 ATS-C

RACK 7 ATS-C

RACK 7 ATS-D

RACK 16 ATS-C

RACK 16 ATS-D

RACK 2 ATS-B

RACK 8 ATS

RACK 21 ATS-A

1 2 3 4 5 6 7 8 (TYP)

A. ALL ELECTRIC WIRING & CONDUITS SHALL BE INSTALLED PER LOCAL CODES AND AS DIRECTED BY

THE LOCAL ELECTRIC CODE OFFICIAL. VERIFY ALL REQUIREMENTS PRIOR TO ROUGH-IN.

B. SUPPLY ARC FAULT WARNING LABELS AS REQUIRED BY N.E.C. 110.16

C. ALL MULTI-WIRE CIRCUITS SHALL HAVE COMMON TRIP OVER-CURRENT PROTECTION DEVICES.

D. ROUTING OF CONDUIT IS ESTIMATED. FIELD VERIFICATION OF CONDUIT ROUTING & PULLBOX

LOCATIONS IS REQUIRED.

E. PROVIDE FIRESTOPPING AT ALL RATED WALL PENETRATIONS - SEE PLANS FOR RATED WALLS.

PROVIDE ACOUSTICAL WALL SEALANT AT ALL OTHER WALL PENETRATIONS.

F. CONTRACTOR TO PROTECT EXISTING INSTALLATIONS FROM DAMAGE. ANY DAMAGE TO EXISTING

FACILITY WILL BE REPAIRED AT CONTRACTOR'S EXPENSE.

GENERAL POWER NOTES:

PHASING NOTES:

RACK 1 ATS-A

RACK 1 ATS-B

RACK 2 ATS-A

RACK 2 ATS-B

RACK 4 ATS-A

RACK 5 ATS-A

RACK 5 ATS-B

RACK 6 ATS-A

RACK 6 ATS-B

RACK 7 ATS-A

RACK 7 ATS-B

RACK 7 ATS-C

RACK 7 ATS-D

RACK 8 ATS

RACK 9 ATS-A

ATS NAME VOLTAGE PANEL

RACK 9 ATS-B

RACK 9 ATS-C

RACK 9 ATS-D

RACK 10 ATS-A

RACK 10 ATS-B

RACK 11 ATS-A

RACK 11 ATS-B

RACK 12 ATS-A

RACK 12 ATS-B

RACK 12 ATS-C

RACK 14 ATS

RACK 15 ATS

RACK 16 ATS-A

RACK 16 ATS-B

RACK 16 ATS-C

RACK 16 ATS-D

RACK 17 ATS

RACK 19 ATS-A

RACK 19 ATS-B

RACK 19 ATS-C

RACK 19 ATS-D

RACK 20 ATS-A

RACK 20 ATS-B

RACK 20 ATS-C

RACK 21 ATS-A

RACK 21 ATS-B

RACK 22 ATS-A

RACK 22 ATS-B

RACK 23 ATS-A

RACK 23 ATS-B

208V

208V

208V

208V

120V

208V

208V

120V

208V

120V

208V

120V

120V

120V

120V

120V

120V

120V

208V

208V

208V

208V

120V

120V

120V

120V

120V

208V

120V

208V

120V

120V

208V

208V

208V

120V

208V

208V

208V

120V

208V

120V

120V

120V

120V

UPS2 PANEL 1

UPS2 PANEL 1

UPS2 PANEL 1

UPS2 PANEL 2

UPS2 PANEL 1

UPS2 PANEL 1

UPS2 PANEL 2

UPS2 PANEL 1

UPS2 PANEL 2

UPS2 PANEL 2

UPS2 PANEL 1

UPS2 PANEL 1

UPS2 PANEL 2

UPS2 PANEL 2

UPS2 PANEL 2

UPS2 PANEL 1

UPS2 PANEL 1

UPS2 PANEL 2

UPS2 PANEL 1

UPS2 PANEL 2

UPS2 PANEL 1

UPS2 PANEL 2

UPS2 PANEL 1

UPS2 PANEL 2

UPS2 PANEL 1

UPS2 PANEL 2

UPS2 PANEL 2

UPS2 PANEL 1

UPS2 PANEL 1

RACK 24 ATS

RACK 25 ATS-A

RACK 25 ATS-B

RACK 25 ATS-C

120V

120V

120V

120V

RACK 25 ATS-D 120V

UPS2 PANEL 2

UPS2 PANEL 2

UPS2 PANEL 2

UPS2 PANEL 2

UPS2 PANEL 1

UPS2 PANEL 2

UPS2 PANEL 1

UPS2 PANEL 1

UPS2 PANEL 2

UPS2 PANEL 2

UPS2 PANEL 1

UPS2 PANEL 1

UPS2 PANEL 1

UPS2 PANEL 2

UPS2 PANEL 1

UPS2 PANEL 2

UPS2 PANEL 2

UPS2 PANEL 1

UPS2 PANEL 2

UPS2 PANEL 2

UPS2 PANEL 2

CIRCUIT

21, 23

37,39

30, 32

18, 20

34, 36

39, 41

36, 38

24, 26

8, 10

4, 6

8, 10

4, 6

40, 42

17, 19

7, 9

13, 15

31, 33

16, 18

28, 30

35, 37

31, 33

RECEPTACLE

NEMA L6-30

NEMA L6-30

NEMA L6-30

NEMA L6-30

NEMA L5-20

NEMA L6-30

NEMA L6-30

NEMA L5-30

NEMA L6-30

NEMA L5-20

NEMA L6-30

NEMA L5-30

NEMA L5-20

NEMA L5-20

NEMA L5-30

NEMA L5-30

NEMA L5-30

NEMA L5-30

NEMA L6-30

NEMA L6-30

NEMA L6-30

NEMA L6-30

NEMA L5-20

NEMA L5-30

NEMA L5-30

NEMA L5-20

NEMA L5-20

NEMA L6-30

NEMA L5- 20

NEMA L6-30

NEMA L5-20

NEMA L5-20

NEMA L6-20

NEMA L6-20

NEMA L6-20

NEMA L5-30

NEMA L6-20

NEMA L6-20

NEMA L6-20

NEMA L5-20

NEMA L6-30

NEMA L5-30

NEMA L5-30

NEMA L5-30

NEMA L5-30

NEMA L5-20

NEMA L5-30

NEMA L5-30

NEMA L5-30

NEMA L5-30

CABLE SIZE

(2) #10 AWG / # 8 GND

(2) #12 AWG / #10 GND

CABLE TYPE

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

CABLE LENGTH

47' - 10"

47' - 2"

45' - 10"

44' - 11"

36' - 4"

26' - 1"

26' - 4"

27' - 8"

28' - 11"

30' - 0"

30' - 0"

30' - 7"

30' - 7"

31' - 9"

40' - 0"

40' - 0"

40' - 0"

40' - 0"

37' - 4"

36' - 7"

35' - 3"

34' - 5"

33' - 3"

33' - 3"

33' - 3"

22' - 11"

20' - 0"

9' - 5"

9' - 5"

9' - 5"

9' - 5"

7' - 3"

9' - 10"

9' - 10"

9' - 10"

9' - 10"

12' - 0"

12' - 0"

12' - 0"

13' - 11"

13' - 11"

13' - 11"

15' - 10"

15' - 10"

17' - 10"

21' - 2"

23' - 5"

23' - 5"

23' - 5"

23' - 5"

RACK 21 ATS-C 208V UPS2 PANEL 2 32, 34 NEMA L6-30 MC

17' - 10"

UPS2 PANELS 1 AND 2 CABLE SCHEDULE

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #12 AWG / #10 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #12 AWG / #10 GND

(2) #12 AWG / #10 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #12 AWG / #10 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #12 AWG / #10 GND

(2) #12 AWG / #10 GND

(2) #10 AWG / # 8 GND

(2) #12 AWG / #10 GND

(2) #10 AWG / # 8 GND

(2) #12 AWG / #10 GND

(2) #12 AWG / #10 GND

(2) #12 AWG / #10 GND

(2) #12 AWG / #10 GND

(2) #12 AWG / #10 GND

(2) #10 AWG / # 8 GND

(2) #12 AWG / #10 GND

(2) #12 AWG / #10 GND

(2) #12 AWG / #10 GND

(2) #12 AWG / #10 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #12 AWG / #10 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

Drawing Title

Approved: Project Director

Location

Building Number

Project Tit le

Checked DrawnDate

Project No.

Drawing Number

D w g . o f o n e -e ig h th i n c h o n e f o o t o n e

-q u a rt e r in c h o n e f o o t th re e

-e ig h th s i n c h o n e f o o t o n e

-h a lf i n c h o n e f o o t th re e

-q u a rt e rs i n c h o n e fo o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

FFE, Inc.

420 Springfield Pike Cincinnati OH, 45215 513-522-0956

Cincinnati, Ohio

Upgrade UPS and AC in Computer Room

06/09/17

POWER PLAN - PHASE 2 PARTIAL

FOURTH FLOOR IT ROOM A437C

EP104

539-18-202

RG JK

SCALE: 1/4" = 1'-0"

PHASE 2 FOURTH FLOOR COMPUTER ROOM POWER PLAN

PHASE 2

1. PROVIDE AND INSTALL NEW RACK AUTO TRANSFER SWITCHES AND POWER DISTRIBUTION UNITS IN EACH RACK. (SEE HEX NOTE 1 ON

PLANS)

2. PROVIDE AND INSTALL NEW CABLE FROM PANELS UPS2-1 AND UPS2-2 TO EACH RACK ATS IN ACCORDANCE WITH THE ASSOCIATED PANEL SCHEDULE. INSTALL NEW POWER CIRCUITS IN A NEAT AND ORGANIZED MANNER. SECURE TO NEW CABLE SUPPORTS USING CABLE ACCESSORIES THAT ARE EITHER METAL OR THAT ARE LISTED AS HAVING LOW SMOKE OR HEAT RELEASE PROPERTIES.

CONNECT NEW CIRCUITS TO ATS SECONDARY INPUT. (SEE HEX NOTE 2 ON PLANS)

3. VERIFY SECONDARY POWER IS AVAILABLE AT EACH ATS. (SEE HEX NOTE 3 ON PLANS)

4. CONNECT CONTROL CIRCUIT FROM EACH ATS AND EACH PDU TO LOCAL NETWORK. (SEE HEX NOTE 4 ON PLANS)

5. INSTALL ATS AND PDU MONITORING SOFTWARE IN HMI DESIGNATED BY VA IT DEPARTMENT. (SEE HEX NOTE 5 ON PLANS)

6. VERIFY CONTROL AND POWER FUNCTIONS FOR EACH ATS AND EACH PDU. (SEE HEX NOTE 6 ON PLANS)

7. COORDINATE WITH VA IT DEPARTMENT FOR SEQUENCING OF SWITCHING RACK EQUIPMENT OVER TO NEW RACK PDUs. (SEE HEX NOTE 7

ON PLANS)

8. AS EACH DEVICE IS ADDED TO A PDU, CHECK THE PDU POWER METER TO ENSURE THE CIRCUIT IS NOT OVERLOADED. IF THE LOAD

EXCEEDS 80% OF THE CAPACITY OF THE CIRCUIT, ADD AN ADDITIONAL CIRCUIT INCLUDING ATS AND PDU. FOR BIDDING PURPOSES, ASSUME NO MORE THAN TWO ADDITIONAL 120V, 30 AMP CIRCUITS. (SEE HEX NOTE 8 ON PLANS)

9. RACK 3 POWER FEED FROM UPS1 ONLY. EXISTING TO REMAIN. (SEE HEX NOTE 9 ON PLANS)

Revisions Date

6 13

PHASING NOTES:

A. ALL ELECTRIC WIRING & CONDUITS SHALL BE INSTALLED PER LOCAL CODES AND AS DIRECTED BY

THE LOCAL ELECTRIC CODE OFFICIAL. VERIFY ALL REQUIREMENTS PRIOR TO ROUGH-IN.

B. SUPPLY ARC FAULT WARNING LABELS AS REQUIRED BY N.E.C. 110.16

C. ALL MULTI-WIRE CIRCUITS SHALL HAVE COMMON TRIP OVER-CURRENT PROTECTION DEVICES.

D. ROUTING OF CONDUIT IS ESTIMATED. FIELD VERIFICATION OF CONDUIT ROUTING & PULLBOX

LOCATIONS IS REQUIRED.

E. PROVIDE FIRESTOPPING AT ALL RATED WALL PENETRATIONS - SEE PLANS FOR RATED WALLS.

PROVIDE ACOUSTICAL WALL SEALANT AT ALL OTHER WALL PENETRATIONS.

F. CONTRACTOR TO PROTECT EXISTING INSTALLATIONS FROM DAMAGE. ANY DAMAGE TO EXISTING

FACILITY WILL BE REPAIRED AT CONTRACTOR'S EXPENSE.

GENERAL POWER NOTES:

AC

SW

LAN RACK 3

LAN RACK 2

LAN RACK 1

PLASMA

AC-2

A C

-1

PLASMA

PLASMA

WAN 2

WAN 1

EXISTING

80kVA UPS1

EXISTING 3-1/2"C. FROM SWITCHBOARD "1E7"

DISTRIBUTION

A436B

ELECTRIC CL

A437C

COMPUTER RM

NEW

DISTRIBUTION

PANEL

NEW

CABLE SUPPORT

ROUTING

1 2 3 4 5 (TYP)

Drawing Title

Approved: Project Director

Location

Building Number

Project Tit le

Checked DrawnDate

Project No.

Drawing Number

D w g . o f o n e -e ig h th i n c h o n e f o o t o n e

-q u a rt e r in c h o n e f o o t th re e

-e ig h th s i n c h o n e f o o t o n e

-h a lf i n c h o n e f o o t th re e

-q u a rt e rs i n c h o n e fo o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

FFE, Inc.

420 Springfield Pike Cincinnati OH, 45215 513-522-0956

Cincinnati, Ohio

Upgrade UPS and AC in Computer Room

06/09/17

POWER PLAN - PHASE 3 PARTIAL

FOURTH FLOOR IT ROOM A437C

EP105

539-18-202

RG JK

PHASE 3

1. AFTER RACK EQUIPMENT IS SWITCHED OVER TO UPS2 RECONFIGURE UPS1 CIRCUITS TO MATCH NEW SCHEDULE ON SHEET EP602.

2. ROUTE UPS1 WIRING IN A NEAT AND ORGANIZED MANNER. SECURE TO NEW CABLE SUPPORTS USING CABLE ACCESSORIES THAT ARE EITHER METAL

OR THAT ARE LISTED AS HAVING LOW SMOKE OR HEAT RELEASE PROPERTIES. (EXHIBIT A MAXIMUM PEAK OPTICAL DENSITY OF 0.5 OR LESS, AN AVERAGE OPTICAL DENSITY OF 0.15 OR LESS, AND A PEAK HEAT RELEASE RATE OF 100kW OR LESS WHEN TESTED IN ACCORDANCE WITH ANSI/UL 2043-2008)

3. REMOVE UNUSED RECEPTACLES AND CABLES. INSTALL NEW RECEPTACLES AND CONNECT TO NEW RACK ATS UNITS.

4. VERIFY ATS SWITCHES TO PRIMARY POWER WHEN UPS1 CIRCUIT IS ENERGIZED.

5. CLOSE ALL FLOOR PENETRATIONS WITH 1" THICK, FIRE RETARDANT, FLEXIBLE FOAM SHEETING, FOAM TO MEET UL94, HF1 RATING.

SCALE: 1/4" = 1'-0"

PHASE 3 FOURTH FLOOR COMPUTER ROOM POWER PLAN

7 13 Revisions Date

E NE NE NE NE NE N

400A 400A 600A 400A 800A 200A

A.T.S.

"1E15"

BLDG. 15

A.T.S.

"1E15""TO 1E8"

TO

A.T.S.

"1E3" 600A

CRITICAL

BRANCH

A.T.S.

1E4

400A

EQUIPMENT

BRANCH

1000 AMP BUS, 65 KAIC

"ESB" 1000 AMP, 208Y/120V, 3 PH, 4W, GENERAL ELECTRIC SPECTRA SERIES, RM B13B

EMERGENCY POWER

2000A

800A800A800A800A

1000 AMP BUS, 65 KAIC

"US1B" 3000 AMP, 208Y/120V, 3 PH, 4W,

GENERAL ELECTRIC MICRO VERSA TRIP, RM B13B

NORMAL POWER

SWBD

METERING

400A

SPD

32 4 5 6 7

12,470V, 750KVA LF OIL

-208Y/120V,3P,4W

32,000A

400A

800A

600A

400A

800A

SPARESPARE

#600

50ASELECTOR

SWITCH

A

B

TO US-1A

SPARE

TO 400A TIE-BUS

SPARE

TO

PANELS

"PP-1"

800A

800A

800A

SPARE SPARE

TO

"DPP"

TO

"DPE"

TO

PANEL

"IE5"

TO

WIREWAY

BLDG. 15

34651515

TO FIRE

PUMP &

JOCKEY

PUMP

TO SWBD

"1E3"

E N

600A

A.T.S.

1E5

400A

EQUIPMENT

BRANCH

A.T.S.

1E6

600A

EQUIPMENT

BRANCH

E N

600A

A.T.S.

1E7

800A

EQUIPMENT

BRANCH

TO

WIREWAY

BLDG. 15

300A 200A 200A 200A 400A

1000 AMP BUS, 65 KAIC

"1E7" 800 AMP, 208Y/120V, 3 PH, 4W, GENERAL

ELECTRIC SPECTRA SERIES, RM B13B

12345

TO

PANELS

PSBE

CSB

TO PANEL

E4A

TO PANEL

MCP-E

TO PANELS

P1 P2

TO 3RD

FLOOR 80kVA

UPS #1

(2) 500 KCMIL

(3

K

C M

IL

(3

K

C M

IL

G G

2500A

NO

2500A

NO

2500A

NO

1600A

NC

400A

NC

2000A

NC

1000A

NC

1500KW

GENSET

1500KW

GENSET

CONNECTION TO

LOAD BANK/TRAILER

GENSET

CONTROLLED

GENERATOR PARALLELING SWITCHGEAR

NEMA 1 5000A 480Y/277V 3PH, 4W, 100KAIC

RM B13 480Y/277V

3PH, 4W

RM B13 480Y/277V

3PH, 4W

TGEN #1

750KVA

480-208Y/120V,3P,4W

300KVA

480-208Y/120V,3P,4W

TO "ESWB"

#600

SPARE

TO BUILDINGS

15 & 16 ATS

TO ATS-16

TO ATS-SURGERY

(2

K

C M

IL

TO

SWITCHBOARD

"GDE"

Drawing Title

Approved: Project Director

Location

Building Number

Project Tit le

Checked DrawnDate

Project No.

Drawing Number

D w g . o f o n e -e ig h th i n c h o n e f o o t o n e

-q u a rt e r in c h o n e f o o t th re e

-e ig h th s i n c h o n e f o o t o n e

-h a lf i n c h o n e f o o t th re e

-q u a rt e rs i n c h o n e fo o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

FFE, Inc.

420 Springfield Pike Cincinnati OH, 45215 513-522-0956

Cincinnati, Ohio

Upgrade UPS and AC in Computer Room

06/09/17

NORMAL & EMERGENCY POWER

BRANCHES - 80kVA UPS - "1E7" /

ATS-"1E7" SINGLE LINE DIAGRAM

EP301

539-18-202

CL JK

NOT TO SCALE

EMERGENCY POWER BRANCH - 80kVA UPS - "IE7" / ATS-"IE7" SINGLE LINE DIAGRAM

EXISTING 80kVA UPS FEEDER

SHOWN FOR INFORMATION

ONLY

8 13 Revisions Date

0 ISSUED FOR CONSTRUCTION 06-09-2017

DRAWING NOTES:

1. PROVIDE (2)#12, 3/4"C TO TIE UPS OUTPUT SHUNT TRIP BREAKER INTO EXISTING SHUNT TRIP

CIRCUIT, FED FROM THE EMERGENCY POWER SHUTDOWN MANAGEMENT SYSTEM (EPSMS). REFER

TO PLAN FOR EPSMS LOCATION.

UPS - 3RD FLOOR 80kVA

UPS SHUNT TRIP

OUTPUT BREAKER

120V

20A TO 1E7

TO UPS BUS

"EDPEQ3" 400 AMP, 480Y/277V, 3 PH, 4W,

MECHANICAL 2, RM A23

SWBD

METERING

30A

SPD

50A 400A

G G

2500A

NO

2500A

NO

2500A

NO

1600A

NC

400A

NC

2000A

NC

1000A

NC

1500KW

GENSET

1500KW

GENSET

CONNECTION TO

LOAD BANK/TRAILER

GENSET

CONTROLLED

GENERATOR PARALLELING SWITCHGEAR

NEMA 1 5000A 480Y/277V 3PH, 4W, 100KAIC

RM B13 480Y/277V

3PH, 4W

RM B13 480Y/277V

3PH, 4W

TGEN #1

750KVA

480-208Y/120V,3P,4W

300KVA

480-208Y/120V,3P,4W

#600

TO "ESB"

SPARE

TO BUILDINGS

15 & 16 ATS

TO ATS-16

TO ATS-SURGERY

(2

K

C M

IL

250A 400A 600A 400A

3465 3 3

250A 200A

300A

200A

N E

ATS "ESWB-F-3"

400A EQUIPMENT

BRANCH, RM. C008

DISTRIBUTION SWITCHBOARD "ESWB" 1600 AMP, 480Y/277V, 3 PH, 4W,

GENERAL ELECTRIC SPECTRA SERIES, RM

EMERGENCY POWER

400A

"US-1X" 3000 AMP, 208Y/120V, 3 PH, 4W,

GENERAL ELECTRIC MICRO VERSA TRIP, RM A023

NORMAL POWER

SWBD

METERING

3 4 6 7

750KVA

12,470V-480Y/277V,3P,4W

1200A

TO MV "PS1"

SWITCHGEAR 8 9 10 11 12

TO

"MULTI-

STACK"

TO

"X-RAY"

T O

A

T S

E S

W B

-F

IM

A G

IN

G

TO

PANEL

"4P1"

TO

PANEL

"MCC-2"

800A

225A 600A 600A 600A 600A400A 400A600A

"US-1P" 2500 AMP, 480Y/277V, 3 PH, 4W,

GENERAL ELECTRIC MICRO VERSA TRIP, RM A23

NORMAL POWER

4 5 6 7

1000KVA

12,470V-480Y/277V,3P,4W

2500A

TO MV "PS1"

SWITCHGEAR 8 9 10 11 12

TO

PANEL

"MCP2"

TO

PANEL

"MCC-C"

TO

PANEL

"MCCB"

300A

400A 300A 800A 600A 600A600A 800A400A

K K K

TO

PANEL

"MCC-G"

TLPB

5KVA

480-208Y/120V,3P,4W

PANEL

"PP1"

PANEL

"LPB"

TO

300KVA

TEMP

PANEL

CH-1

TO

DISTRIB

PANEL

"DS-1P"

TO

PANEL

"MCC-D"

CH-2

TO

PANEL

"DS-1A"

2500A BUSWAY

TO

PANEL

"DS-1X"

TO

PANEL

"DPF"

(IMAGING)

TO

PANEL

"US-1P"

400A

N E

ATS-12

"ESWB-50 250A

TO

SUB

"US-1A"

TO

ELEVATORS

"E-15" & "E-16"

N E

ATS-11

600A EQP.

BRANCH

TO

"ESWB-40"

TO

SUB

"US-1A"

TO

"ESWB-20"

N E

ATS -10 400A

CRITICAL BRANCH

TO

DISTRIB

"DS-1A"

N E

ATS-9

200A LIFE

SAFETY. BRANCH

TO

SWBD

"ESWB-10"

TO

SUB

"US-1A"

N E

ATS-1

EQPUIP

BRANCH

TO

ATS-2 "MCC-F"

TO

SUB

"US-1C"

TO

SURGERY

SUITE, 3rd

FLOOR

N E

ATS -SURGERY 225A

CRITICAL BRANCH

TO

DISTRIB

"DS-1A"

"EDPLEQ3"

30KVA

480-208Y/120V,3P,4W

PANEL

"EDPLEQ3"

SPD

M

200A

30,089 SCA

13,275 SCA

SPARE

100kVA MODULAR STATIC UPS: UPS2 ON

LEVEL 3, RM. A3002-2

(1

S E

T O

F

(3

/0

/0 N

G

"C

TO

"GDE"

TO "GDE"

(1) SET OF:

(3) #600, (1) #600N, #1G, 3"C

PROVIDE NEW BREAKER IN EXISTING PANELBOARD

TO MATCH FULL AIC RATING OF PANELBOARD, FIELD

VERIFY PANELBOARD EDPEQ3 AIC RATING

"TR-UPS2"

125KVA

480-208Y/120V,3P,4W

PROVIDE FULL SYSTEM GROUNDING

FOR SEPARATELY DERIVED SYSTEM

PER NEC REQUIREMENTS. PROVIDE

#4 CONDUCTOR

600A

600V 200A 3P

NON-FUSED

DISCONNECT

100kVA

N E

INPUT

BREAKER

600A

SHUNT TRIP

OUTPUT

BREAKER

MODULAR

BATTERY BANK(S)

DISTRIBUTION

PANEL

"UPS2 PANEL 1"

600A MCB

PANELBOARD

"UPS2 PANEL 2"

225A MCB

FEED-THRU LUGS

(1) SET OF:

(3) #600, (1) #600N, #1G, 3"C

(1) SET OF:

(3) #3/0, (1) #3/0N, #4G, 2"C

4 4

UPS #1 (80kVA)

EXISTING - REF 1/EP301

UPS SHUNT TRIP

OUTPUT BREAKER

EXISTING

120V

20A, 1P

TO 1E7

TO UPS BUS

H N

EXISTING EPSMS

SHUNT TRIP CONTACT

UPS2 (100kVA)

NEW - REF 1/EP302

UPS SHUNT TRIP

OUTPUT BREAKER

TO EDPEQ3

TO UPS BUS

DIN MOUNT TERMINAL STRIP

IN JUNCTION BOX

(2)#12,3/4"C(2)#12,3/4"C

(2)#12,3/4"C(2)#12,3/4"C

Drawing Title

Approved: Project Director

Location

Building Number

Project Tit le

Checked DrawnDate

Project No.

Drawing Number

D w g . o f o n e -e ig h th i n c h o n e f o o t o n e

-q u a rt e r in c h o n e f o o t th re e

-e ig h th s i n c h o n e f o o t o n e

-h a lf i n c h o n e f o o t th re e

-q u a rt e rs i n c h o n e fo o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

FFE, Inc.

420 Springfield Pike Cincinnati OH, 45215 513-522-0956

Cincinnati, Ohio

Upgrade UPS and AC in Computer Room

06/09/17

POWER BRANCH - 100kVA UPS2, PANEL EDPEQ3 SINGLE LINE

DIAGRAM

EP302

539-18-202

RG JK

SCALE: N.T.S.

EMERGENCY POWER BRANCH - 80 kVA UPS SINGLE LINE - PANEL EPEDQ3

9 13 Revisions Date

0 ISSUED FOR CONSTRUCTION 06-09-2017

1 ADDENDUM 1 11-03-2017

SCALE: N.T.S.

WIRING DIAGRAM - EPSMS SHUNT TRIP

1. PROVIDE NEMA 1 JUNCTION BOX WITH DIN RAIL MOUNTED TERMINAL STRIP WITH 12

TERMINAL CONTACTS RATED FOR #12 WIRING AT STRUCTURE ABOVE UPS #1. PROVIDE ALL

CONDUIT AND WIRING ASSOCIATED WITH EXTENSION OF EMERGENCY POWER SHUTDOWN

MANAGEMENT SYSTEM (EPSMS) TO SHUTDOWN UPS2. CONNECT WIRING IN PARALLEL PER

WIRING DIAGRAM. EXTEND EXISTING CONDUIT.

2. RECONNECT SHUNT TRIP WIRING TO OUTPUT BREAKER WITHIN UPS #1.

3. CONNECT SHUNT TRIP WIRING TO OUTPUT BREAKER WITHIN UPS2.

4. EQUIPMENT SHALL BE FULLY RATED FOR A MINIMUM INTERRUPT RATING OF 14,000AIC.

DRAWING NOTES:

LENGTH AS REQUIRED

CONDUIT TRAPEZE MOUNTING DETAIL

NTS

CONDUIT CLAMP.

SIZE AS REQUIRED

INTEGRAL

GALVANIZED

LIPPED STEEL

MOUNTING

CHANNEL

REFER TO PLANS FOR

QUANTITY & SIZE OF

CONDUITS

GENERAL NOTES:

1. INTEGRAL GALVANIZED LIPPED STEEL MOUNTING

CHANNEL LONGER THAN 915mm (36") SHALL BE

INSTALLED WITH A CENTER SUPPORT ROD.

2. FASTEN THREADED ROD TO STRUCTURE BY APPROVED

METHOD PER SPECIFICATION 26 05 33, RACEWAY AND

BOXES FOR ELECTRICAL SYSTEMS. FIELD VERIFY

EXACT CONDITIONS.

3. FOR TRAPEZE INSTALLATIONS IN SEISMIC AREAS REFER

TO SPECIFICATION SECTION 13 05 41, SEISMIC

RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL

COMPONENTS.

LOCKING SQUARE

WASHER &

LOCKNUT

9.52mm (3/8") MIN

GALVANIZED THREADED

ROD, TYP.

WASHER

LOCKNUT

INTEGRAL

GALVANIZED

LIPPED

STEEL

MOUNTING

CHANNEL

FLOOR SLAB PENETRATION DETAIL

NTS

CONDUIT, TYP MINERAL WOOL

(FIRMLY

PACKED)FIRESTOP SEALANT

PER SECTION 07 84 00,

FIRESTOPPING

JUNCTION BOX

(SIZE AS

REQUIRED)

CONDUIT FITTING

SPRING

NUT,

TYP

INTEGRAL GALVANIZED

LIPPED STEEL

MOUNTING

CHANNEL, TYP.FLOOR SLAB,

TYP.

STEEL

EXPANSION

ANCHOR, TYP

(3/8") MAX

RACK 1

RACK 1

RACK 2

RACK 2

RACK 3

RACK 4

RACK 5

RACK 5

RACK 6

RACK 6

RACK 7

RACK 7

RACK 7

RACK 7

RACK 8

RACK 9

RACK NUMBER VOLTAGE PANEL

RACK 9

RACK 9

RACK 9

RACK 10

RACK 10

RACK 11

RACK 11

RACK 12

RACK 12

RACK 12

RACK 14

RACK 15

RACK 16

RACK 16

RACK 16

RACK 16

RACK 17

RACK 19

RACK 19

RACK 19

RACK 19

RACK 20

RACK 20

RACK 20

RACK 21

RACK 21

RACK 22

RACK 22

RACK 23

RACK 23

208V

208V

208V

208V

208V

120V

208V

208V

120V

208V

120V

208V

120V

120V

120V

120V

120V

120V

120V

208V

208V

208V

208V

120V

120V

120V

120V

120V

208V

120V

208V

120V

120V

208V

208V

208V

120V

208V

208V

208V

120V

208V

120V

120V

120V

120V

EX. PANEL #1

EX. PANEL #1

EX. PANEL #1

EX. PANEL #2

EX. PANEL #1

EX. PANEL #1

EX. PANEL #1

EX. PANEL #2

EX. PANEL #1

EX. PANEL #2

EX. PANEL #1

EX. PANEL #1

EX. PANEL #2

E4A

EX. PANEL #1

EX. PANEL #2

EX. PANEL #1

EX. PANEL #2

EX. PANEL #1

EX. PANEL #2

EX. PANEL #1

EX. PANEL #2

EX. PANEL #1

EX. PANEL #2

EX. PANEL #1

EX. PANEL #2

EX. PANEL #2

EX. PANEL #1

EX. PANEL #1

RACK 24

RACK 25

RACK 25

RACK 25

120V

120V

120V

120V

RACK 25 120V

EX. PANEL #2

EX. PANEL #2

EX. PANEL #2

EX. PANEL #1

EX. PANEL #2

EX. PANEL #2

EX. PANEL #1

EX. PANEL #1

EX. PANEL #2

EX. PANEL #2

EX. PANEL #1

EX. PANEL #1

EX. PANEL #1

EX. PANEL #2

EX. PANEL #1

EX. PANEL #2

EX. PANEL #2

EX. PANEL #1

EX. PANEL #2

EX. PANEL #2

EX. PANEL #2

CIRCUIT

25, 27

26, 28

30, 32

33, 35

38, 40

37, 39

11, 13

25, 27

33, 35

34, 36

34, 36

34, 36

34, 36

6, 8

6, 8

1, 3

1, 3

39, 41

2, 4

2, 4

40, 42

29, 31

RECEPTACLE

NEMA L6-30

NEMA L6-30

NEMA L6-30

NEMA L6-30

NEMA L6-30

NEMA L5-20

NEMA L6-30

NEMA L6-30

NEMA L5-30

NEMA L6-30

NEMA L5-20

NEMA L6-30

NEMA L5-30

NEMA L5-20

NEMA L5-20

NEMA L5-30

NEMA L5-30

NEMA L5-30

NEMA L5-30

NEMA L6-30

NEMA L6-30

NEMA L6-30

NEMA L6-30

NEMA L5-20

NEMA L5-30

NEMA L5-30

NEMA L5-20

NEMA L5-20

NEMA L6-30

NEMA L5- 20

NEMA L6-30

NEMA L5-20

NEMA L5-20

NEMA L6-20

NEMA L6-20

NEMA L6-20

NEMA L5-30

NEMA L6-20

NEMA L6-20

NEMA L6-20

NEMA L5-20

NEMA L6-30

NEMA L5-30

NEMA L5-30

NEMA L5-30

NEMA L5-30

NEMA L5-20

NEMA L5-30

NEMA L5-30

NEMA L5-30

NEMA L5-30

CABLE SIZE

(2) #10 AWG / # 8 GND

(2) #12 AWG / #10 GND

CABLE TYPE

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

CABLE LENGTH

47' - 10"

47' - 2"

45' - 10"

44' - 11"

43' - 6"

36' - 4"

26' - 1"

26' - 4"

27' - 8"

28' - 11"

30' - 0"

30' - 0"

30' - 7"

30' - 7"

31' - 9"

40' - 0"

40' - 0"

40' - 0"

40' - 0"

37' - 4"

36' - 7"

35' - 3"

34' - 5"

33' - 3"

33' - 3"

33' - 3"

22' - 11"

20' - 0"

9' - 5"

9' - 5"

9' - 5"

9' - 5"

7' - 3"

9' - 10"

9' - 10"

9' - 10"

9' - 10"

12' - 0"

12' - 0"

12' - 0"

13' - 11"

13' - 11"

13' - 11"

15' - 10"

15' - 10"

17' - 10"

21' - 2"

23' - 5"

23' - 5"

23' - 5"

23' - 5"

RACK 21 208V EX. PANEL #2 29, 31 NEMA L6-30 MC

17' - 10"

EXISTING UPS1 PANELS 1 AND 2 CABLE SCHEDULE

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #12 AWG / #10 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #12 AWG / #10 GND

(2) #12 AWG / #10 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #12 AWG / #10 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #12 AWG / #10 GND

(2) #12 AWG / #10 GND

(2) #10 AWG / # 8 GND

(2) #12 AWG / #10 GND

(2) #10 AWG / # 8 GND

(2) #12 AWG / #10 GND

(2) #12 AWG / #10 GND

(2) #12 AWG / #10 GND

(2) #12 AWG / #10 GND

(2) #12 AWG / #10 GND

(2) #10 AWG / # 8 GND

(2) #12 AWG / #10 GND

(2) #12 AWG / #10 GND

(2) #12 AWG / #10 GND

(2) #12 AWG / #10 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #12 AWG / #10 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

(2) #10 AWG / # 8 GND

RACK 17 120V E4A 2 NEMA L5-20 MC 7' - 3"(2) #12 AWG / #10 GND

Drawing Title

Approved: Project Director

Location

Building Number

Project Tit le

Checked DrawnDate

Project No.

Drawing Number

D w g . o f o n e -e ig h th i n c h o n e f o o t o n e

-q u a rt e r in c h o n e f o o t th re e

-e ig h th s i n c h o n e f o o t o n e

-h a lf i n c h o n e f o o t th re e

-q u a rt e rs i n c h o n e fo o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

FFE, Inc.

420 Springfield Pike Cincinnati OH, 45215 513-522-0956

Cincinnati, Ohio

Upgrade UPS and AC in Computer Room

06/09/17

ELECTRICAL DETAILS

EP501

539-18-202

RG JK

Revisions Date

10 13

Location

Building Number

Project Tit le

Checked DrawnDate

Project No.

Drawing Number

D w g . o f o n e -e ig h th i n c h o n e f o o t o n e

-q u a rt e r in c h o n e f o o t th re e

-e ig h th s i n c h o n e f o o t o n e

-h a lf i n c h o n e f o o t th re e

-q u a rt e rs i n c h o n e fo o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

FFE, Inc.

420 Springfield Pike Cincinnati OH, 45215 513-522-0956

Cincinnati, Ohio

Upgrade UPS and AC in Computer Room

06/09/17

EXISTING UPS1 POWER PANEL

SCHEDULES

EP601

539-18-202

RG JK

Revisions Date

0 ISSUED FOR CONSTRUCTION 06-09-2017

Notes:

Total Est. Demand: 94 A

Total Conn.: 94 A

Total Est. Demand: 33798 VA

Total Conn. Load: 33798 VA

Computer Receptacle 33798 VA 100.00% 33798 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 122 A 115 A 59 A

Total Load: 13745 VA 12957 VA 7096 VA

41 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 42

39 1014... 3381... 40

Rack #5 30 A 2

1014... 3381...

2 100 A Rack #3

35 1014... 1014... 36

Rack #7 30 A 2

1014... 1014...

2 30 A Rack #10 & Rack #11

31 1014... 1014... 32

Rack #21 30 A 2

1014... 1014...

2 30 A Rack #2

27 1014... 1014... 28

Rack #1 30 A 2

1014... 1014...

2 30 A Rack #1

23 Console 20 A 1 450 VA 450 VA 1 20 A Rack # 12 24

21 Spare 20 A 1 0 VA 450 VA 1 20 A Test Bench 22

19 Rack 7, OPEN 20 A 1 450 VA 450 VA 1 20 A Rack #4 20

17 Rack #16 20 A 1 450 VA 0 VA 1 20 A Spare 18

15 Rack #21 20 A 1 676 VA 676 VA 1 30 A…