36C25018B0600 0004 Revised Specification - 264100 Facility Lightning Protection 2012.12.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25018C0209-000.docx | DOCX document | |
| 36C25018B0600-012.docx | DOCX document | |
| 36C25018B0600-013.pdf | ||
| 36C25018B0600-0004004.pdf | ||
| 36C25018B0600-0004003.pdf | ||
| 36C25018B0600-0004000.docx | DOCX document | |
| 36C25018B0600-0004005.pdf | ||
| 36C25018B0600-0004001.pdf | ||
| 36C25018B0600-0002000.docx | DOCX document | |
| 36C25018B0600-0001000.docx | DOCX document | |
| 36C25018B0600-010.docx | DOCX document | |
| 36C25018B0600-011.pdf | ||
| 36C25018B0600-009.docx | DOCX document | |
| 36C25018B0600-005.pdf | ||
| 36C25018B0600-008.pdf | ||
| 36C25018B0600-003.pdf | ||
| 36C25018B0600-006.pdf | ||
| 36C25018B0600-007.pdf | ||
| 36C25018B0600-004.pdf | ||
| 36C25018B0600-002.pdf | ||
| 36C25018B0600-001.docx | DOCX document | |
| 36C25018B0600-000.docx | DOCX document |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Project No. 541-17-510 Cleveland VA Medical Center
AE Works Project No. 17010 Upgrade Lightning Protection
Addendum 1
July 6, 2018
FACILITY LIGHTNING PROTECTION
26 41 00 - 1
SECTION 26 41 00
FACILITY LIGHTNING PROTECTION
PART 1 - GENERAL
1.1 DESCRIPTION
A. This section specifies the furnishing and installation of a complete UL master labeled lightning protection system.
1.2 RELATED WORK
A. Section 07 60 00, FLASHING AND SHEET METAL: Penetrations through the roof.
B. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS:
Requirements that apply to all sections of Division 26.
C. Section 26 05 26, GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS:
Requirements for personnel safety and to provide a low impedance path to ground for possible ground faults.
D. Section 26 43 13, SURGE PROTECTIVE DEVICES: Surge protective device installed at the electrical service entrance.
1.3 QUALITY ASSURANCE
A. Refer to Paragraph, QUALIFICATIONS, (PRODUCTS AND SERVICES), in Section
26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.
1.4 SUBMITTALS
A. Submit the following in accordance with Section 26 05 11, REQUIREMENTS
FOR ELECTRICAL INSTALLATIONS.
1. Shop Drawings:
a. Submit sufficient information to demonstrate compliance with drawings and specifications.
b. Show locations of air terminals, connections to required metal surfaces, down conductors, and grounding means.
c. Show the mounting hardware and materials used to attach air terminals and conductors to the structure.
2. Certifications: Two weeks prior to final inspection, submit the following.
a. Certification by the manufacturer that the lightning protection system conforms to the requirements of the drawings and specifications.
b. Certification by the Contractor that the lightning protection system has been properly installed and inspected.
26 41 00 - 2
c. Certification that the lightning protection system has been inspected by a UL representative and has been approved by UL without variation.
1.5 APPLICABLE PUBLICATIONS
A. Publications listed below (including amendments, addenda, revisions, supplements, and errata) form a part of this specification to the extent referenced. Publications are referenced in the text by designation only.
B. National Fire Protection Association (NFPA):
70-11...................National Electrical Code (NEC)
780-11..................Standard for the Installation of Lightning
Protection Systems
C. Underwriters Laboratories, Inc. (UL):
96-05...................Lightning Protection Components
96A-07..................Installation Requirements for Lightning
Protection Systems
467-07..................Standard for Grounding and Bonding Equipment
PART 2 - PRODUCTS
2.1 GENERAL REQUIREMENTS
A. Lightning protection components shall conform to NFPA 780 and UL 96, for use on Class I and Class II structures. Aluminum materials are not allowed.
1. Class I, Class II conductors: Copper.
2. Class I air terminals: Solid copper, 460 mm (18 inches) long, not less than 9.5 mm (3/8 inch) diameter, with sharp nickel-plated points.
3. Class II air terminals: Solid copper, 460 mm (18 inches) long, not less than 12.7 mm (1/2 inch) diameter, with sharp nickel-plated points.
4. Ground rods: Copper-clad steel, 0.75 in (19 mm) diameter by 3 m (10 feet) long.
5. Ground plates: Solid copper, not less than 20 gauge.
6. Bonding plates: Bronze, 50 square cm (8 square inches).
7. Through roof connectors: Solid copper riser bar, length and type as required to accommodate roof structure and flashing requirements.
8. Down conductor guards: Stiff copper or brass.
26 41 00 - 3
9. Anchors and fasteners: Bronze bolt and clamp type shall be used for all applications except for membrane roof. Adhesive type are allowed only for attachment to membrane roof materials, using adhesive that is compatible with the membrane material.
10. Connectors: Bronze clamp-type connectors shall be used for roof conductor splices, and the connection of the roof conductor to air terminals and bonding plates. Crimp-type connectors are not allowed.
11. Exothermic welds: Exothermic welds shall be used for splicing the roof conductor to the down conductors, splices of the down conductors, and for connection of the down conductors to ground rods, ground plates, and the ground ring.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Installation shall be coordinated with the roofing manufacturer and installer.
B. Install the conductors as inconspicuously as practical.
C. Run the down conductors to the exterior at elevations below the finished grade.
D. Where down conductors are subject to damage or are accessible near grade, protect the base of each down conductor with a one (1”) inch
Schedule 80 PVC installed at ten (10’) above grade.
E. Install ground rods and ground plates not less than 600 mm (2 feet) deep and a distance not less than 900 mm (3 feet) nor more than 2.5 m
(8 feet) from the nearest point of the structure. Exothermically weld the down conductors to ground rods and ground plates in the presence of the Contracting Officer Representative (COR).
F. Bond down conductors to metal main water piping where applicable.
G. Bond down conductors to building structural steel.
H. Connect roof conductors to all metallic projections and equipment above the roof as indicated on the drawings.
I. Connect exterior metal surfaces, located within 900 mm (3 feet) of the conductors, to the conductors to prevent flashovers.
J. Maintain horizontal or downward coursing of main conductor and insure that all bends have at least a 200 mm (8 inches) radius and do not exceed 90 degrees.
26 41 00 - 4
K. Conductors shall be rigidly fastened at every thirty-six (36”) inches on center along the roof and down the building to ground. All clamps for conduit shall be malleable iron and non-rustable. All fasteners used are to be stainless steel.
L. Air terminals shall be secured against overturning either by attachment to the object to be protected or by means of a substantial tripod or other braces permanently and rigidly attached to the building or structure.
M. Install air terminal bases, cable holders and other roof-system supporting means without piercing membrane or metal roofs.
N. Contractor shall be responsible for all roof repairs required to existing roofs. Where new or existing equipment was installed, replaced or removed. Repair all pavement as required.
O. Down conductors coursed on or in reinforced concrete columns or on structural steel columns shall be connected to the reinforcing steel or the structural steel member at its upper and lower extremities. In the case of long vertical members an additional connection shall be made at intervals not exceeding 30 M (100 feet).
P. On construction utilizing post tensioning systems to secure precast concrete sections, the post tension rods shall not be used as a path for lightning to ground.
Q. Where shown, use the structural steel framework or reinforcing steel as the down conductor.
1. Weld or bond the non-electrically-continuous sections together and make them electrically continuous.
2. Verify the existing down liters electrical continuity by measuring the ground resistances to earth at the ground level, at the top of the building or stack, and at intermediate points with a sensitive ohmmeter. Compare the resistance readings.
3. Connect the air terminals together with an exterior conductor connected to the structural steel framework at not more than 18 m
(60 foot) intervals.
4. Install ground connections to earth at not more than 18 m (60 foot) intervals around the perimeter of the building.
5. Weld or braze bonding plates to cleaned sections of the steel and connect the conductors to the plates.
26 41 00 - 5
6. Do not pierce the structural steel in any manner. Connections to the structural steel shall conform to UL 96A.
R. For obstruction lights, the following additional requirements shall apply:
1. Extend air terminals 300 mm (1 foot) above the top of the light fixtures and securely clamp to the light fixture supports.
2. Install 600volt class lightning arresters. Connect the arresters to the lightning circuit conductors at suitable locations, and ground and bond them to the lightning protection system.
S. Where the drawings show the new lightning protection system connected to an existing lightning protection system with or without a UL master label, the new portion of the lightning protection system requires UL inspection and a Letter of Findings.
3.2 ACCEPTANCE CHECKS AND TESTS
A. Test the ground resistance to earth by standard methods and conform to the ground resistance requirements specified in Section 26 05 26, GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS.
B. A UL representative shall inspect the lightning protection system.
Obtain and install a UL numbered master label for each of the lightning protection systems at the location directed by the UL representative and the Contracting Officer Representative (COR).
C. Each existing down conductor shall be tested with the 3-Point Fall of
Potential method. Each down conductor will be disconnected from the
System. Leads will be connected at the roof line and the 3-Point Fall of Potential test will then administered. Current probe length should be a minimum of 100’ to a maximum of 300’ from the building. Potential readings shall be taken on the slope as site conditions allow. Readings should be taken at intervals between 40 and 70 percent. Contractor to submit resistance report on each individual ground rod stating time, date, temperature, direction of probes and mean resistance at the 62% interval. If any of the down conductors read over twenty (20Ω) ohms resistance at the 62% interval they will be considered high resistance and LP Contractor will contact the VA for additional instruction.