36C24919R0105-032.docx
DOCX document 30 KB Posted
- Attached to
- V9 PRESCRIPTION EYEGLASSES CONTRACT Federal contract opportunity
- Solicitation number
- 36C24919R0105
About this file
This document outlines a Quality Assurance Surveillance Plan (QASP) for a prescription eyeglasses contract to be awarded by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9. The contract will provide prescription eyeglasses to veterans across multiple VA medical centers and clinics in Tennessee, Kentucky, and one in Nashville, Tennessee. Performance will be monitored on a periodic basis through random sampling of patient satisfaction surveys, billing audits, and quality inspections of delivered eyeglasses to ensure at least a 90% acceptance quality level. The contractor must employ a licensed dispensing optician at each medical center five days a week to fit eyeglasses.
36C24919R0105 Quality Assurance Surveillance Plan Prescription Eyeglasses.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24919R0105-0002009.pdf | ||
| 36C24919R0105-0002005.pdf | ||
| 36C24919R0105-0002002.pdf | ||
| 36C24919R0105-0002006.pdf | ||
| 36C24919R0105-0002008.pdf | ||
| 36C24919R0105-0002000.docx | DOCX document | |
| 36C24919R0105-0002001.pdf | ||
| 36C24919R0105-0002004.pdf | ||
| 36C24919R0105-0002010.pdf | ||
| 36C24919R0105-0002003.pdf | ||
| 36C24919R0105-0002007.pdf | ||
| 36C24919R0105-0001000.docx | DOCX document | |
| 36C24919R0105-030.docx | DOCX document | |
| 36C24919R0105-040.pdf | ||
| 36C24919R0105-041.pdf | ||
| 36C24919R0105-039.pdf | ||
| 36C24919R0105-033.pdf | ||
| 36C24919R0105-035.pdf | ||
| 36C24919R0105-036.pdf | ||
| 36C24919R0105-037.pdf | ||
| 36C24919R0105-043.pdf | ||
| 36C24919R0105-034.pdf | ||
| 36C24919R0105-038.pdf | ||
| 36C24919R0105-031.pdf | ||
| 36C24919R0105-042.pdf | ||
| 36C24919R0105-001.docx | DOCX document | |
| 36C24919R0105-000.docx | DOCX document |
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24919R0105
QUALITY ASSURANCE SURVEILLANCE PLAN
Prescription Eyeglasses
VISN 09
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored?
· How monitoring will take place?
· Who will conduct the monitoring?
· How monitoring efforts and results will be documented?
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance. Assigned CO: Pam Phillips
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Assigned COR
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s program manager for this contract. (Fill In Names below)
a. Program Manager –
b. Other Contractor Personnel -
4. PERFORMANCE REQUIREMENT STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
| Description |
| SOW Reference |
| Numerator and Denominator |
| Quantity of Surveillance |
| AQL |
| Method of Surveillance |
| Audit of VA patient satisfaction with timeliness of deliveries and quality of product |
| 9 (A). |
| n= # of VA patients satisfied with the delivery time for their eyeglasses and the condition of eyeglasses upon arrival (delivery locations noted on purchase order). Patient satisfaction survey developed and implemented by VA to assess contract vendor’s services (quality), shipped product arrived undamaged, and general satisfaction with eyeglass frame selection. |
| Randomly pull 10% of veterans issued eyeglasses each quarter. |
| 90% |
| Random Sampling |
| Audit of VA patient records for proof of timely and accurate billing |
| 9 (E). |
| COR or designee will randomly review eyeglass orders for timely billing of correct VA purchase card. |
| Randomly assess correct purchase cards is being billed within 5 days of shipping date of eyeglasses |
| 95% |
| Random Sampling |
| Audit of eyeglass quality |
| 9 (C) |
| COR or designee will randomly pull 15 patient records per quarter. N= # of deficiencies, repairs or replacement eyeglasses due to deficiencies or poor quality. D= of eyeglass files audits of eyewear issued within year of prescription |
| 15 case reviews / quarter |
| 95% |
| Periodic Inspection |
The Government shall use the standards below to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
5. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. PERIODIC INSPECTION. (Evaluates outcomes on a periodic basis. Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.)
b. USER SURVEY. (Combines elements of validated user complaints and random sampling. Random survey is conducted to solicit user satisfaction. May also generate inspections and sampling.)
c. VALIDATED USER/CUSTOMER COMPLAINTS. (Relies on the patient to identify deficiencies. Complaints are then investigated and validated.)
d. 100% INSPECTION. (Evaluates all outcomes.)
e. RANDOM SAMPLING. (Designed to evaluate performance by randomly selecting and inspecting a sample of cases.
f. Progress or status meetings.
g. Analysis of contractor's progress reports. (Evaluate cost, schedule, etc.)
6. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
7. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE
The Government shall document positive performance.
b. UNACCEPTABLE PERFORMANCE
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's program manager.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
8. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement.
During contract performance, the COR will periodically analyze whether the frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings.
The COR shall meet or have a conference call with the contractor minimally 120 days out from the end of the base or option year if performance is less than satisfactory and shall provide a written assessment.