36C24918R0340-0004000.docx
DOCX document 22 KB Posted
- Attached to
- 621-16-108 Replace Building 200 Roof Federal contract opportunity
- Solicitation number
- 36C24918R0340
About this file
36C24918R0340 0004 36C24918R0340 0004.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24918R0340-0006000.docx | DOCX document | |
| 36C24918R0340-0005001.pdf | ||
| 36C24918R0340-0005000.docx | DOCX document | |
| 36C24918R0340-0004001.pdf | ||
| 36C24918R0340-0004002.pdf | ||
| 36C24918R0340-0004003.pdf | ||
| 36C24918R0340-0003001.pdf | ||
| 36C24918R0340-0003000.docx | DOCX document | |
| 36C24918R0340-0003002.pdf | ||
| 36C24918R0340-0003003.pdf | ||
| 36C24918R0340-0002000.docx | DOCX document | |
| 36C24918R0340-002.pdf | ||
| 36C24918R0340-004.pdf | ||
| 36C24918R0340-001.docx | DOCX document | |
| 36C24918R0340-006.xlsx | XLSX spreadsheet | |
| 36C24918R0340-005.docx | DOCX document | |
| 36C24918R0340-003.pdf | ||
| 36C24918R0340-00001000.docx | DOCX document | |
| 36C24918R0340-000.docx | DOCX document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 08-02-2018 621-16-108 90C Department of Veterans Affairs Network Contracting Office 9 1639 Medical Center Parkway Suite 400 Murfreesboro
TN
37129 90C Department of Veterans Affairs Network Contracting Office - 9 1639 Medical Center Parkway Suite 400 Murfreesboro
TN
37129 To all Offerors/Bidders
36C24918R0340 08-02-2018
X x x The purpose of this amendent is to post questions and answers, incorporate 2 additional drawings, a revivsed spec change and change the date for receipt of proposals.
A. The questions and answers are attached.
B. The two additional drawings are attached.
C. The date for receipt of proposals is changed to August 20, 2018 2 PM CST.
D. The revised spec section is attached.
Jason K. Kinchen Contracting Officer
1. Can you please identify lay down and parking areas for the project? Lay down area will be determined when awarded.
1. Can you please identify locations for cranes/fork lifts sets? Areas will be determined when awarded.
1. Are electronic submittals acceptable? Yes
1. Can the superintendent hold a duel role of SSHO? Yes as long as they have their 30 hour OSHA card.
1. Is a certified safety professional required on this project? No
1. Can we use the service elevator and stairs to access the roof or will outside scaffold and or ladders be required? Can use service elevator but will be held to cleaning the stairs and elevator.
1. In numerous places in both general and key notes on the demo drawings such as AD101 key note “1,4 and 10 calls for demo of existing equipment. In all instances where demo is called out on the drawing can you please clarify what is required and limits of work. I.E. how far back do we demo elec. to the panel? Only wire or conduit and wire? Do we abandon in place just below roof deck? Duct work do we demo to source or outlet or cap below roof deck?
Refer to General Note “E” on drawing EP101 for additional information. Cap all ductwork below roof and remove curb. Repair existing roof.
1. Where demo work is required inside bldg.. 200,can this be done during normal working hour? After hours work.
1. Where demo work is required inside bldg.. 200, what departments will we be required to work in? At this time not sure of exact locations.
1. If we are required to demo mech. and or electric systems beyond the roof deck, can you provide as built drawings of those areas? Refer to General Note “E” on drawing EP101 for additional information.
1. Drawing G1003 shows in the key plan A1 is shaded but the alt. plan shows NIC on a portion of it. Could the exact area to be included be determined? Refer to AD101 for scope limits of roof area A1.
1. Could you verify the wage rates for the project? (16.82/4.77 for Rubber roofs)
1. Does the project have liquidated damages? If yes what is the rate?
1. Roof area D has many roof penetrations and units present that are not on the plans. Will more be added prior to commencement of work? See new drawings.
1. Will the new MRI construction site impact the work? Are there any new tie ins? No new tie ins.
1. Can you please provide updated drawings for “D/E” wing? (units severing OR are not shown) See new drawings.
1. AD101 General note “K” can you please identify inactive vents? Contractor to coordinate inactive and active roof vents with the VAMC.
1. AD101 General note “K”, what are the limits of the demo? All areas within the scope of the project shall receive demolition as indicated on AD drawings.
1. Specs call for adhered EPDM membrane. Due to odors from bonding adhesive (people start complaining and making a fuss) would you consider changing the spec to require LVOC or solvent free bonding adhesive?(water base cannot be used in temp. below 50 degrees) The current spec reflects the VAMC standard requirements. The A/E has no exception to using a low VOC adhesive, provide substitution as a submittal as required by specification 01 33 23
1. Are there any work hour restrictions or work that must be done on weekends or after normal work hours? Just inside work will have to be done during afterhours or the weekend.
1. Where existing curbs are too short to meet warranty requirements are new curbs required or can they be raised with wood blocking? Where existing curbs do not meet this requirement, existing curbs may be extended with curb adaptors or may be replaced.
1. Are there any waste management/recycling requirements? No
1. The roof insulation spec does not specify whether to adhere, attach or both attached and adhere are to be used? (Lists all three methods but doesn't say which one to use) Fully adhered membrane per specification 07 53 23.
1. Roof pavers are listed in the EPDM spec. Are these required and where/what is the application? Are these to be used as walk-pads? Roof pavers have been removed from specification. Walk-off mats have been added to specification.
1. Spec calls for a vapor retarder and a base sheet. If you apply a vapor retarder over lightweight concrete it traps residual moisture and manufactures will not warrant this assembly. Please clarify what is to be done here. The as built drawings the AE was given show a metal deck.
1. Spec call for a base sheet to be mopped down in hot asphalt. This will require a kettle on the ground which will cause odors. This must be a vented base sheet per manufacture requirements. No base sheet is required per manufacture requirements as insulation can be adhered in two part foam adhesive directly to the deck. Is adhering direct to the deck acceptable to the VA? (This affects question 6.) Yes
1. Is the existing concrete deck light weight concrete? Per as built drawings, the roof deck is metal. The specification has been updated. Per as built drawings, the roof deck is metal. The specification has been updated.
See attached document: 01 Mountain Home Building 200 Re-Roof COMPLETE SET 2018-0731 PART 1.
See attached document: 01 Mountain Home Building 200 Re-Roof COMPLETE SET 2018-0731 PART 2.
See attached document: 075323 EPDM Roofing_2018 updated2 spec.
File details come from the government source that posted it.