36C24918R0088-002.docx
DOCX document 13 KB Posted
- Attached to
- Project # 596A4-18-103 AE Upgrade Service Elevators S4 & S5 CD Federal contract opportunity
- Solicitation number
- 36C24918R0088
About this file
36C24918R0088 36C24918R0088_1.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24918C0064-000.docx | DOCX document | |
| 36C24918R0088-000.docx | DOCX document | |
| 36C24918R0088-001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FedBizOpps Modification to a Previous Notice
CLASSIFICATION CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
BASE NOTICE TYPE
RESPONSE DATE (MM-DD-YYYY)
ARCHIVE
DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION
See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
* = Required Field FedBizOpps Modification to a Previous Notice Rev. March 2010 C A/E Service to Upgrade Service Elevators S4 & S5 at the Lexington VAMC, Cooper Division, Project # 596A4-18-103 **This modification serves to remove Part 5. Mileage Restriction, see page 2.** 37129 36C24918R0088 12-02-2017 N 541330 Department of Veterans Affairs Network Contracting Office 9 2250 Leestown Road Lexington, KY 40511 Matthew R. Whisman, Contracting Officer Matthew.Whisman@va.gov Lexington, VAMC Cooper Division 1101 Veterans Drive Lexington, KY 40502 40502 U.S.
www.va.gov Veterans Affairs Matthew.Whisman@va.gov VHA NCO-09 Contracting Officer The purpose of this modification is to remove Part 5. “Mileage Restriction” from the Pre-Sol Notice and implement a new Part 5. “Response Time” requirement instead. The below paragraph 5 replaces the original paragraph 5 in its entirety;
5. RESPONSE TIME
The successful A-E shall abide by a four (4) hour response time for Lexington VAMC, Cooper Division, during the design phase and the construction period services (CPS) phase, as appropriate. The VA has no preference on the method utilized by contractors on achieving the four (4) hour response time. The response time will be determined from the moment the request to the A-E to be on site is submitted. The individual or individuals responding can be either the prime contractor or a subcontractor that’s part of the design team.
All other terms and conditions of Pre-Sol Notice remain unchanged.
END OF PRE-SOL MODIFICATION
File details come from the government source that posted it.