36C24918Q0120-001.docx
DOCX document 130 KB Posted
- Attached to
- Elevator Service Federal contract opportunity
- Solicitation number
- 36C24918Q0120
About this file
36C24918Q0120 36C24918Q0120_1.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24918Q0120-002.docx | DOCX document | |
| 36C24918Q0120-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24918Q0120
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
DUNS:
DUNS+4:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. 2/2012)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
621-18-1-5096-0257 36C24918Q0120 01-11-2018
STACEY MCCLENDON
615-225-6970 01-25-2018 9AM Central Time 90C Department of Veterans Affairs Network Contracting Office 9 1639 Medical Center Parkway Suite 400 Murfreesboro TN 37129 X Y 811310 $7.5 Million
NET 30
X N/A X Department of Veterans Affairs
VAMC
Mountain Home VA Medical Center Corner of Veterans Way and Sidney Mountain Home TN 37684 90C Department of Veterans Affairs Network Contracting Office - 9 1639 Medical Center Parkway Suite 400 Murfreesboro TN 37129
90C FSC e-Invoice Payment http://www.fsc.va.gov/fsc/einvoice.asp Invoice Setup Information 1-877-489-6135 Invoice must be submitted electronically
Setup 1-877-489-6135 See CONTINUATION Page
ELEVATOR MAINTENANCE AND REPAIR SERVICES
MOUNTAIN HOME VA MEDICAL CENTER
PERIOD OF PERFORMANCE:
BASE PERIOD: 3/1/2018 THROUGH 9/30/2018
OPTION YEAR ONE: 10/1/2018 THROUGH 9/30/2019
OPTION YEAR TWO: 10/1/2019 THROUGH 9/30/2020
OPTION YEAR THREE: 10/1/2020 THROUGH 9/30/2021
OPTION YEAR FOUR: 10/1/2021 THROUGH 9/30/2022
THIS SOLICITATION IS UNRESTRICTED.
PLEASE SEE INSTRUCTION TO OFFERORS FOR FURTHER INFORMATION.
WAGE DETERMINATION NO. 2008-0003, REV. 8, DATED 12/3/2016
SHALL APPLY DURING THE BASE PERIOD AND WILL CHANGE
WITH THE EXERCISE OF EACH OPTION YEAR.
See CONTINUATION Page 621-3680162-5096-854100-2543 010050192 X X X
Table of Contents
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 3 |
| B.1 CONTRACT ADMINISTRATION DATA | 3 |
| B.2 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND COMPLIANCE (JUN 2011) | 4 |
| B.3 STATEMENT OF WORK | 4 |
| B.4 PRICE/COST SCHEDULE | 20 |
| ITEM INFORMATION | 20 |
| B.5 DELIVERY SCHEDULE | 21 |
| SECTION C - CONTRACT CLAUSES | 22 |
| C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (JAN 2017) | 22 |
| C.2 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 28 |
| C.3 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999) | 28 |
| C.4 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) | 29 |
| C.5 SUPPLEMENTAL INSURANCE REQUIREMENTS | 29 |
| C.6 VAAR 852.203-70 COMMERCIAL ADVERTISING (JAN 2008) | 29 |
| C.7 VAAR 852.215-71 EVALUATION FACTOR COMMITMENTS (DEC 2009) | 30 |
| C.8 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2012) | 30 |
| C.9 VAAR 852.237-70 CONTRACTOR RESPONSIBILITIES (APR 1984) | 31 |
| C.10 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (NOV 2017) | 31 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 39 |
| D.1 LABOR RATES | 39 |
| D.2 PAST PERFORMANCE QUESTIONNAIRE | 41 |
| SECTION E - SOLICITATION PROVISIONS | 42 |
| E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL ITEMS (JAN 2017) | 42 |
| E.2 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 47 |
| E.3 52.216-1 TYPE OF CONTRACT (APR 1984) | 47 |
| E.4 52.233-2 SERVICE OF PROTEST (SEP 2006) | 47 |
| E.5 VAAR 852.215-70 SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESS EVALUATION FACTORS (JUL 2016) (DEVIATION) | 48 |
| E.6 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (JAN 2008) | 48 |
| E.7 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED BY REFERENCE (JAN 2008) | 49 |
| E.8 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008) | 49 |
| E.9 52.212-2 EVALUATION—COMMERCIAL ITEMS (OCT 2014) | 50 |
| E.10 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL ITEMS (NOV 2017) | 50 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
(continuation from Standard Form 1449, block 18A.)
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:
b. GOVERNMENT: Contracting Officer 36C621 STACEY MCCLENDON Department of Veterans Affairs Network Contracting Office 9 1639 Medical Center Parkway Suite 400 Murfreesboro TN 37129
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [] |
| c. Other | [X] MONTHLY IN ARREARS |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
FSC e-Invoice Payment http://www.fsc.va.gov/fsc/einvoice.asp Invoice Setup Information 1-877-489-6135 Invoice must be submitted electronically ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
B.2 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND COMPLIANCE (JUN 2011)
This solicitation includes VAAR 852.219-11 VA Notice of Total Veteran-Owned Small Business Set-Aside. Accordingly, any contract resulting from this solicitation will include this clause. The contractor is advised in performing contract administration functions, the CO may use the services of a support contractor(s) retained by VA to assist in assessing the contractor's compliance with the limitations on subcontracting or percentage of work performance requirements specified in the clause. To that end, the support contractor(s) may require access to contractor's offices where the contractor's business records or other proprietary data are retained and to review such business records regarding the contractor's compliance with this requirement. All support contractors conducting this review on behalf of VA will be required to sign an “Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement” to ensure the contractor's business records or other proprietary data reviewed or obtained in the course of assisting the CO in assessing the contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs. Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the contractor to protect proprietary information as required by FAR 9.505-4, obtaining access to proprietary information, paragraph (b). The contractor is required to cooperate fully and make available any records as may be required to enable the CO to assess the contractor's compliance with the limitations on subcontracting or percentage of work performance requirement.
B.3 STATEMENT OF WORK
| 1. | MAINTENANCE & REPAIR | |
| A. | Furnish inspection and maintenance service on all seventeen (17) passenger elevators, two (2) freight elevators, six (6) service elevators identified in the Schedule of Elevators continuing for one year with four option years to follow. | |
| B. | Scope of Work | |
| 1. | The Contractor shall obtain all necessary licenses and/or permits required to perform the work. |
2. The Contractor shall furnish all material, labor, lubricants, hydraulic fluids, supervision, tools, shipping, travel and equipment necessary to provide full maintenance services, including all adjustments, tests, parts replacement and repairs necessary to keep the elevators in continuous use at their initial performance ability (same speed, capacity, safety and efficiency) as originally specified by the equipment manufacturer as modified there after. All adjustments, repairs and modifications, must be in conform to the manufacturer guidelines and/or the following industry standards, as applicable, whichever is more stringent:
· ASME A17.1 Safety Code for Elevators and Escalators, latest edition
· ASME A17.2 Inspectors’ Manual for Elevators and Escalators, latest edition
· ASME A17.3 Safety Code for Existing Elevators and Escalators, latest edition
· ANSI/NFPA 70 National Electric Code, latest edition
· Manufacturer’s requirements and specifications on inspection, maintenance, and operation of each elevator model
| 3. | Contractor shall be qualified on all systems and have in his possession throughout the term of the contract all diagnostic equipment necessary to fully maintain, test, repair, adjust or reprogram the systems. |
| 4. | The Contractor shall post a check chart for each elevator in each machine room in a conspicuous place. This check chart shall list each elevator component-showing schedule of manufacturer’s recommended frequency of inspection of each component on a weekly, semi-annually, annually or other frequency. Entries shall be to indicate the status of schedule items of maintenance work performed. The check chart shall be kept up to date at all times and must be initialed and dated by the Contractor’s employee to indicate that the work has been accomplished. Check chart shall be available for review at the COR’s request and the Contractor will physically show the COR the completed work on request. |
| 5. | Safety tests and other tests and inspections shall be performed by the Contractor. Contractor shall perform all safety tests and other tests and inspections as recommended and required by ASME A17.1 LATEST EDITION AND ANSI/ASME A17.2 LATEST EDITION. |
| 6. | Contractor shall be required to attach tags after testing as specified by Code, such as at the governor-releasing carrier, and oil buffer, etc. |
| 7. | Any repairs or adjustments necessary to complete a test and return the elevator to service shall be performed by the Contractor at no additional expense to the Medical Center. |
| 8. | After completion of the required tests, submit document with information shown in Attachment B to the COR. |
| 9. | All elevators provided with firefighters’ service shall be subjected monthly to Phase I recall and a minimum of one floor operation on Phase II to assure the system is maintained in proper operating order in accordance with A17.1 Code. A written record of findings on the operation shall be made by the Contractor and kept on the premises of said operation. (See Attachment C for firefighters’ test log). Testing shall be done on weekend, holidays or the hours before 6:30 AM or after 6:30 PM, at no additional cost to the Medical Center. |
| 10. | All tests or inspections that will remove the elevator from normal operation shall be scheduled in advance with the COR. |
| C. | An adequate supply of spare parts shall be maintained at all times to ensure prompt preventive maintenance and repair services. |
| D. | Contractor shall have all maintenance tickets signed by the COR. This task should be completed during normal business hours. If maintenance is performed outside of normal business hours, this should be completed the following business day. |
| E. | The following performance levels shall be maintained at all times: |
| 1. | Contract speed and brake to brake flight time shall be maintained as originally installed and adjusted. | |
| 2. | Leveling accuracy shall be maintained at all times. | |
| 3. | Opening and closing times, door close torques of all cars shall at all times be maintained within the limits of ASME A17.1 Code with a minimum of stand open time consistent with traffic demands at each floor. | |
| 4. | Door reversal on all elevators equipped with mechanical safety shoes shall always be initiated with the stroke of the shoe. Ensure all electric eyes or door detectors are working at all times. | |
| 5. | Variable car and hall door open times shall be maintained in accordance with original field adjustments. Deviations from this will not be permitted unless requested and/or approved by this COR. | |
| 6. | Upon satisfactory completion of this or subsequent readjustments, a computerized elevator analyzer or similar type event recorder shall be utilized to accurately record the hall waiting time at each landing and other data necessary to establish that the system is operating at peak efficiency. Results shall be submitted and be labeled as to floor, time, date and identification of all other data and shall be delivered together with an analysis of the tapes/disks to the COR. | |
| F. | The Contractor shall furnish all labor and supplies, parts and materials necessary to regularly and systematically clean, examine, adjust, lubricate as required and if conditions warrant, repair or replace, as follows: | |
| 1. | Machine, worm, gear, thrust bearings, drive sheave, drive sheave shaft bearings, brake pulley, brake coil, brake contact, brake linings and component parts. | |
| 2. | Machine motor, motor generator, motor windings, rotating element, commutator, brushes, brush holders and bearings. | |
| 3. | Controller, selector and dispatching equipment, all relays, solid state components, resistors, condensers, transformers, contacts, leads, dashpots, time devices, computer devices, CRT devices, selector tape or wire and mechanical and electrical driving equipment. | |
| 4. | Governor, governor ropes, governor sheave and shaft assembly, bearings, contacts, and governor jaws. | |
| 5. | Deflector or secondary sheave, bearings, car and counterweight buffers, car and counterweight guide rails, top and bottom limit switches, governor tension sheave assembly, compensating sheave assembly, counterweight guide shoes including rollers or gibs. | |
| 6. | Hoistway door interlocks, hoistway door hangers, bottom door guides and auxiliary door closing devices. |
7. Automatic power operated door operator, car door hanger, car door contact, door protective devices, load weighing equipment, car frame, car safety mechanism, platform, wood platform flooring, car guide shoes including gibs and rollers.
8. Car operating panel(s) and equipment, hall lanterns, hall buttons and signal devices.
9. Cab Lighting
10. Where applicable to hydraulic elevators include cylinder head, plunger exposed surfaces, plunger gland and packing, pumps, exposed piping, fittings and flexible pipe connections, operating controls, check and relief valves, valves, gages and tanks.
11. All parts and materials shall be of the original manufacturer’s design and specification, or equal thereto. All lubricants shall be as recommended by the manufacturer.
| G. | The Contractor shall also: | |
| 1. | Examine monthly all safety devices and governors and conduct an annual no load safety test and each fifth year perform a full load, full speed test of safety mechanism, overhead speed governors, car and counterweight buffers. If required, the governor will be calibrated and sealed for proper tripping speed. | |
| 2. | Semi-annually equalize the tension on all hoisting ropes, repair and replace conductor cables and hoist way and machine room wiring. | |
| 3. | Keep car emergency light units in an operable condition at all times, test special emergency (fireman’s service) service and emergency power circuits, where provided in accordance with Code requirements. | |
| 4. | Furnish lubricants specified to the various lubrication needs. | |
| 5. | Maintain a supply of contacts, coils, leads, brushes, lubricants, wiping cloths and other minor parts in each machine room for the performance of routine preventative maintenance. |
6. Maintain a complete set of current, legible schematic wiring diagrams in each elevator machine room for each elevator contained therein. To the extent that any of the required schematic wiring diagrams are not available at the time of contract award, it will be the responsibility of the Contractor to provide same at no cost to the Medical Center.
7. The Contractor shall maintain a full, legible service log in each machine room and a complete, orderly chronological file including drawings, complete part lists, and copies of all service reports. Service log shall contain a printout of the controller fault log, monthly to prevent loss of data, and repeated faults shall be explained. The log shall list the date and time of all maintenance service performed. Each trouble call shall be fully described, including the nature of the call necessary service performed and any parts replaced. Service file shall be made available for inspection upon request, and a copy of the complete file furnished to VAMC during the first week of the last month of the normal contract term.
8. The Contractor shall maintain a separate maintenance record on each elevator. The maintenance record shall be kept in the elevator equipment room and shall be readily available for inspection by the COR or designee. The maintenance record is the property of the government and shall be turned over to the Government at the end of the contract. The maintenance record shall be a chronological file that includes the following information:
a) Date.
b) Nature of work (i.e. PMI or call back).
c) Description of work performed (contractor should be brief and concise).
d) Any indication of problems experienced.
e) Initial or signature of mechanics performing work.
9 . The Contractor shall instruct his personnel that when they perform work under this contract, they shall comply with the following procedures:
a) Upon arrival at the station, the Contractor shall check in with the Maintenance Unit A or his designee so that the VAMC will be aware of the Contractor’s presence at the facility at all times.
b) Upon each departure, Contractor will serve notice of disposition of work to the COR or designee. In addition the contractor shall furnish the Maintenance Unit A Supervisor or his designee a copy of a work order, service sheet or other such written notification of services performed. Such reports shall include the following information:
· Name and address of contractor
· Name of contractor employee(s) performing the work
· Date(s) work performed and hours spent.
· Brief description of work performed, including PMI’s and identification of equipment worked on.
· Signature of contractor’s employee(s) and signature of Maintenance Unit A Supervisor or designee.
· If the report is not submitted it will indicate that no inspection or maintenance was performed and payment may be withheld and/or delayed.
| 10. | Semi-annually clean hoist way including all equipment located in or moving through the hoist way, car top, car sling, safeties, appliances, pits, sills, door tracks and hangers. Clean and paint as needed machine room floors. | |
| H. | No maintenance for card reader system in contract. |
| I. | No device shall be acceptable that will not give full satisfaction without excessive maintenance and attention. If it becomes evident during guarantee period that device is not functioning properly or in accordance with manufacturer’s or specification requirements, or if in the opinion of Contracting Officer, excessive maintenance and attention must be employed to keep device operational, device shall be removed and new device meeting all requirements shall be installed as part of work until satisfactory operation of installation is obtained. Period of guarantee shall start a new for such parts from date of completion of each new installation performed, in accordance with foregoing requirements. Any components which may have suffered substantial life cycle reduction or damage due to redundant failure shall also be provided with extended guarantees. | |
| J. | Work excluded: The following work is specifically excluded from this contract. | |
| 1. | Repair or replacement made necessary due to negligence or misuse of the equipment by persons other than the Contractor, his representatives or his employees. | |
| The COR or designee must approve in advance any extra charge work attributed to vandalism or misuse. No invoice will be paid without prior approval. | ||
| Any repairs due to misuse or negligence shall be billed according to the labor rate specified in the pricing schedule. Parts will be billed at actual invoiced cost. | ||
| 2. | Installation of new attachments, which may be required or recommended by insurance agencies or Government Authorities. | |
| 3. | Repairs or replacement of cab enclosure, hoistway enclosures, door frames and sills, machine room lighting, cab tile or carpet. | |
| 4. | Replacement of underground hydraulic piping or hydraulic cylinder. |
5. For the purpose of clarification, any item not specifically excluded shall be considered the Contractor’s responsibility.
6. All travel costs associated with the performance of this contract are the responsibility of the contractor and are provided at no additional cost to the Government as part of this contract. Travel costs are defined as but are not limited to time and vehicle costs for personnel in travel to and from job site for all duties outlined in this specification, normal shipping charges on any parts or materials covered by this contract, costs associated with the normal shipping of parts or equipment out for repair that are covered under this contract, etc.
| K. | Except for emergency callback service, the Contractor shall perform all work during regular working hours of regular working days 6:45 a.m. to 3:30 p.m. excluding Federal holidays, unless specifically instructed otherwise by the COR. | |
| 1. | Emergency Callback Service shall be provided 24 hours a day, seven days per week, as requested by the COR. | |
| L. | The Contractor shall provide callback services for each elevator as follows: Callback service is defined as requests for each individual elevator, either during or after normal working hours, to correct any elevator problem or condition, which needs attention. Callbacks during normal working hours consists of responding to VAMC to each individual elevator service call and take corrective action at the site within 1 hour for passenger entrapments, 2 hour for all other service calls. Callbacks are not to take time away from preventive maintenance and other requirements required under this contract, equipment malfunctions shall be corrected the same day that the service call was issued. If circumstances beyond the contractor’s control preclude resolution of the problem that day, the COR must be notified with an explanation of the delay. | |
| 1. | The Contractor shall have service ticket on each service call signed by COR or designee. Service ticket shall identify the respective piece of equipment, description of problem, description of corrective measures taken and date and time unit was returned to regular service. Service tickets for overtime or extra charge work must be signed and a copy left with the COR. Failure to do so will result in non-payment for extra charge work. | |
| 2. | Emergency service or repairs authorized by the COR, The Medical Center will be responsible for premium portion of the overtime rate only. All overtime service calls shall be handled by one mechanic only unless approved in advance by the COR. If regular timework must be carried over and the Contractor wishes to continue to work beyond the Medical Center’s normal hours of operation, authorization for overtime work must be obtained from the COR before proceeding. | |
| 3. | Medical Center shall not be responsible for incidental charges including, but not limited to, parking, tolls, mileage, phone, etc., on straight time or overtime work. | |
| 4. | Contractor shall notify the COR or designee by telephone or in person after completion of each regular time service call and notify the Medical Center Police on overtime calls. | |
| M. | Under no circumstances will any shutdown or breakdown last longer than five (5) working days (40 working hours), from initial notification to the Contractor, without prior approval of the COR. | |
| N. | All tests, inspections, or maintenance repairs that will remove an elevator from service shall be scheduled in advance with the COR. | |
| O. | The Contractor shall comply with the following procedures when an elevator is removed from service for any reason: | |
| 1. | Notify Facilities Management Service, Maintenance Unit A, either by phone (423-926-1171 exe 7746), or in person, before removing elevator from service. If work requires more than one day, daily notification will be made. Notify Facilities Management Service when placing the elevator back in service. Contractor’s employees shall turn in Elevator Report Forms, which will furnish the information to the Maintenance Unit A and Facilities Management Service. | |
| P. | The Contractor shall immediately notify the COR in writing of the existence or the development of any defects in, or repairs required to, the elevator, which the Contractor considers are not covered by the contract and shall furnish a written estimate, when requested, of the cost. Final determination of responsibility will be by agreement between the COR and issued under a separate PO. |
| Q. | When planned, work requires an elevator to be taken out of service, the Contractor is requested, when possible, to use the Federal holidays listed below. | |
| New Years Day | ||
| Washington’s Birthday | ||
| Martin Luther King’s Birthday | ||
| Memorial Day | ||
| Independence Day | ||
| Labor Day | ||
| Columbus Day | ||
| Veterans Day | ||
| Thanksgiving Day | ||
| Christmas Day | ||
| R. | Inspection | |
| 1. | Periodic inspections of the elevators required by the National American Standard Safety Code for Elevators and Escalators (Latest Edition) will be performed under separate contract in accordance with existing Mountain Home VAMC Policy. Upon completion of a routine inspection, the Contractor will be furnished with an inspection report listing deficiencies for which he is responsible to repair within 30 days. Items marked emergency should be corrected immediately. Under no circumstances, will the Contractor allow reported deficiencies to go uncorrected beyond the contract period. | |
| 2. | The Contractor shall provide all labor and material to perform work in accordance with ASME A17.1, ASME A17.2, ASME A17.3, and ANSI/NFPA 70 standards for annual, 6 months, and five year (traction only) tests. The Contractor shall perform tests at the date and time specified by the VAMC. Inspection of work shall be conducted by an independent inspector contracted by the VAMC. Maintenance contractor performs actual test. | |
| S. | Testing | |
| 1. | The following services will be performed at intervals specified in the American National Standard Safety Code for Elevators and Dumbwaiters. The maintenance Contractor will furnish personnel to perform the 1 (one) year, and the 5 (five) year safety load test, (including weights), at no additional cost to the Medical Center. Scheduling of all tests will be handled through the COR. A Medical Center’s Contractor, authorized by the Mountain Home VAMC, will witness all tests for the Medical Center, Mountain Home VAMC personnel, as required; will be available for the tests. |
| 2. | The Contractor shall make available the uninterrupted services of at least one employee to accompany the inspector during the course of any inspection. | |
| 3. | The yearly car safeties, governor and oil buffer tests and inspections shall be complied with as per A17.1 and this specification, in the presence of the COR and his/her representative. | |
| 4. | The five-(5) year safety and buffer tests as required by the American National Standard Safety Code for Elevators and Dumbwaiters, (A17.1 and A17.2) are to be performed by the Contractor. | |
| 5. | Within six (6) months prior to the end of this contract’s period of performance, a representative of the COR shall make a thorough inspection of all equipment covered under this contract. The Contractor shall correct all defects found within thirty (30) calendar days. The Contractor shall notify the COR in writing that the deficiencies have been corrected and that re-inspection can be made. | |
| 6. | The inspectors used by the Medical Center on this contract may or may not work for the Medical Center. An outside company may be used to perform inspections as a representative of the Medical Center if so desired by the COR. | |
| T. | The following schedule for the five-year load test is required in the year 2017 & 2021 See Schedule of Elevators – All elevators to be tested. |
NOTE: THE WORD “ELEVATOR” IS THIS SOLICITATION SHALL INCLUDE ALL ELEVATORS, DUMBWAITERS, LIFTS, ETC., TO BE SERVICED UNDER THIS CONTRACT.
| U. | The following schedule for the annual test (with pressure testing) year load test is required: See Schedule of Elevators – All elevators to be tested. | |
| V. | Scheduled Maintenance Requirements | |
| 1. | The Contractor shall be responsible for establishing an effective system for accomplishing scheduled and unscheduled maintenance, including a backlog listing of work to be accomplished. The scheduling system and backlog listing shall be available for inspection by the COR at any time. |
2. Regular routine maintenance examination shall be performed at a frequency of not less than weekly for all equipment.
3. PMI’s are to be performed during administrative hours on the same day of each week. The contractor shall submit, at the beginning of the contract, to the Maintenance Unit A, the day of the week he/she intends on performing the required PMI. If the day falls on a holiday the contractor shall perform the required PMI’s on the next business day following the holiday. The contractor shall notify the Maintenance Unit A if he/she intends on changing the PMI day or if he/she cannot perform the PMI ON schedule.
4. PMI’s should ensure a safe and efficient level of operation, and all work relative to cleaning, lubricating, adjustment or part replacement of equipment that is necessary for the desired level of operation shall be performed by the Contractor. Each contract year, all items which rely on cleaning, lubrication, or routine part replacement shall receive such service at least once as indicated by service report. Any PMI required by the Equipment Manufacturer, and/or applicable laws, regulations, rules, ordinances, codes, etc, but not specifically identified by the Government, shall be performed by the Contractor at no additional cost to the Government. In addition, the contractor shall perform the following preventive maintenance and all necessary cleaning, lubricating, and adjusting pursuant to such maintenance at the frequencies identified. Frequencies shall be modified if deemed necessary by the COR or designee.
5. The Contractor is responsible for replacement of all light bulbs, including lights in elevator shafts on top and bottom of cars, HOISTWAY crawl spaces, elevator machine rooms, etc. This shall include all lights inside the elevator cabs.
6. The Contractor shall during regular PMI visits retrieve any objects such as key, wallets, glasses, etc. dropped in elevator pit by occupants of the building. Such objects shall be turned over to VA Police personnel.
7. The Contractor must maintain the efficiency, safety and speeds specified in the contract or as designated by the manufacturer of the elevators at all times; including acceleration, retardation, contact speed in feet per minute, with or without full load, floor to floor time and door opening and closing time.
| W. | Contractor shall provide qualified journeyman mechanic as needed to find and correct any deficiencies and complete all maintenance tasks. This is to be done above and beyond his/her repair time each week. Non-emergency services/repairs shall be completed at the time of inspections unless the Contractor requests, in writing, and obtains approval to perform repair work at a later date and time. The COR or designee shall be provided written notice in a timely manner. Contractor shall complete attached weekly/biweekly PM check chart to indicate whether specified key items were found to require maintenance and the nature of service performed. The check charts shall be completed and remain in the elevator machine room when work has been completed for the day. | |
| X. | The Contractor shall provide an additional qualified journeyman mechanic at the Medical Center from 6:45 a.m. to 3:30 p.m. if normal maintenance requires two journeymen to accomplish the maintenance schedule and assist in repairs, inspections and adjustments. | |
| Y. | Experience Requirements | |
| 1. | Supervision: The Contractor shall arrange for satisfactory supervision of the contract work. The Contractor or his on-site supervisors shall be available at all times when the contract work is in progress to receive notices, reports, or request from the Contracting Officer or the COR. | |
| 2. | Qualifications of Elevator Mechanics: All maintenance personnel directly engaged in the work to be accomplished under the contract shall possess, prior to their employment in a journeyman mechanic’s capacity on this contract, at least 4 (four) years of recent (within the last 6 years) experience in the operations and maintenance of the kind of elevators to be maintained under this contract. |
| 3. | In addition to the above requirements, the Contractor shall have a minimum of 5 (five) years' successful experience in maintaining equipment identical or similar to the equipment covered by this contract. Each offeror shall submit, as part of his offer, references for the previous 5 (five) years experience. The written references shall include, as a minimum, the name, address and telephone numbers of the specific companies and key personnel contacts. | |
| Z. | Condition of Equipment | |
| 1. | Upon contract award, the contractor accepts "as is" all elevator equipment specified in the contract. Failure to inspect the elevators, prior to contract award, will not relieve the contractor from performing services/repairs in accordance with the strict intent and meaning of the specifications at no additional cost to the VA. Offerors should inspect the premises prior to submitting their offers in order to be fully aware of the scope of services required. | |
| AA. | Uniforms | |
| 1. | The Contractor shall require all employees, including supervisors, to wear distinctive uniform clothing for ready identification, and assure that every employee is in uniform no later than the time specified by the COR, or otherwise no later than 10 working days from the date an employee first enters on duty. The uniform shall have the Contractor’s name, easily identifiable, a fixed thereon in a permanent manner such as a badge or monograms. | |
| AB. Safety |
1. The Contractor shall adhere to all OSHA, EPA, NFPA Life Safety Codes, and all other regulator requirements.
2. In performance of this contract, the Contractor shall follow VAMC safety policy and standard for safe work practices, and take such safety precautions as the Safety Officer or designee may determine to be reasonably necessary to protect the lives and health of occupants of the building. The Contractor shall comply with VAMC smoking policy, which designates all interior space as non-smoking areas.
3. Patient, employee, visitors, and contractor personnel safety shall be maintained at all times. The contractor is responsible for the occupation safety and health of his/her employees. The Contractor shall comply with all applicable OSHA safety and health standards. The Contractor shall replace all safety guards, equipment, devices, etc. removed to service or repair the elevator immediately after completion of work or when leaving the job unattended.
4. The Contractor shall submit to the Contracting Officer, prior to the start of the contract, the Material Safety Data Sheets (MSDS) for all potentially hazardous materials (lubricants, cleaners, working fluids, etc.) to be used in the facility in performance of the contract, and will not use, in the facility, such materials which have not been so cleared in advance with the VAMC. MSDS for new chemicals shall be furnished concurrently with arrival of the chemical on site. The Contractor shall maintain a copy of all MSDS at the chemical storage site in a location accessible to VAMC personnel to assure compliance with all laws and requirements regarding the “Right to Know” law.
5. The Contractor is responsible to identify, provide and maintain all personal protective equipment required to perform the duties outlined in the contract. In addition, the contractor is responsible for identifying and providing all applicable safety programs (i.e. lockout/tag out, confined space entry, universal precautions, etc.) required to perform the work. Training on required safety programs and the proper use of PPE’s shall be provided, and documentation maintained by the contractor.
The Contractor shall obtain a Hot Work Permit from the Safety Office Bldg. 37 whenever soldering, welding, using a cutting torch, or other open flame, spark, or heat producing equipment.
6. The Contractor shall be notified of any non-compliance with the pervious provisions. The contractor shall, after receipt of such notice, immediately correct the condition and notify the contracting officer in writing that the condition has been corrected. It, in the opinion of the Safety Officer or designee the condition is life threatening he/she shall instruct the contractor to stop work until the condition has been corrected. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue and order halting of all or any part of the work, and Contractor may be held in default. The Contractor bears all costs of stop work time and correcting safety hazards.
7. The contractor shall provide within ten (10) working days after receipt of this contract a detailed listing of the following information:
a) Safety program/procedures are required to be followed by the contractor’s personnel in the performance of their duties and when such procedures are required.
b) Listing of personal protective equipment(s) required to be utilized by the contractor’s personnel in the performance of their duties. Also, when equipment will be required.
c) Material Safety Data Sheet (MSDS’S) for any chemical(s) utilized by the contractor in the performance of this contract.
8. Contractor is responsible for the supervision of all their employees while on government property. It is the Contractor’s responsibility to assure compliance with the scope of work and requirements referenced in this contract. Provisions provided in the scope of work are not intended to relieve the Contractor of this responsibility.
AC. Injury or Accident
1. Contractor shall submit a written report to the VAMC within five work (5) days of any incident of a major malfunction, accident or injury involving an elevator. The report shall state the cause, what and when repairs and tests were or are to be made to correct the cause of the incident.
| AD. | Quality Control Program | |
| 1. | The Contractor shall establish a complete quality control program to assure the requirements of the contract are provided as specified, within five (5) work days prior to the starting date of the contract, the Contractor shall submit a copy of his program to the COR, for approval. The program shall include, but not be limited to, the following: |
| 2. | An inspection system covering all the services described in the contract. A checklist used in inspecting contract performance during regularly scheduled or unscheduled inspections. The name(s) of the individual(s) who will perform the inspection. | |
| 3. | The checklist shall include every area of the Contractor’s operation as well as every task required to be performed. | |
| 4. | A system for identifying and correcting deficiencies in the quality of services before the level of performance becomes unacceptable and/or the Medical Center inspectors point out the deficiencies. | |
| 5. | A file of all inspections conducted by the Contractor and the corrective action taken. This documentation shall be made available to the Medical Center upon request, at any time during the term of the contract. | |
| AE. | Emergency Telephone Numbers | |
| 1. | The Contractor shall provide the COR with pertinent emergency telephone numbers, in order to summon assistance in case an emergency develops. At least one of the emergency telephone numbers shall be manned twenty-four (24) hours per day. This information shall be provided in writing to the COR, prior to the contract start date. | |
| AF. | Information Relating to Conduct of Contractor’s Employees | |
| 1. | The Contractor shall prohibit his employees form disturbing papers on desks, opening desk drawers or cabinets, or using telephones or office equipment provided for official Medical Center use. | |
| 2. | Contractor shall require his employees to comply with the instructions pertaining to conduct and other regulations called to the Contractor’s attention by the CO/COR, Federal Protective Officers, Inspectors, etc. | |
| 3. | Contractor shall use firefighter’s service test log for monthly and yearly log, starting October to September. | |
| 4. | Contractor shall use elevator report where there is a passenger trap incident, or safety incident. Elevator failure of more than 8 (eight) hours of downtime. Stating date when parts are available and expected time of repair tested and back useful service. | |
| AG. | General Information |
1. The Contractor shall immediately notify the contracting office and contracting officer’s representative (in writing) of the existence of the development of any defects in, or repairs required to the elevators which the contractor considers he is not responsible for under the terms of the contract, and shall furnish him a written estimate of the cost to make necessary repairs. The contracting officer reserves the right to make final determination of the responsibility. The contacting officer also reserves the right to solicit the services of other contractors to make said repairs.
2. The Government reserves the right to perform emergency repairs to any elevator which is disabled if, in the Government’s opinion, it jeopardizes patient or employee safety.
3. The Contractor shall ensure that the elevator pits(s) and elevator machine room(s) are kept clean and free from dirt and debris. Contractor shall clean and vacuum all HOISTWAY(s), pit(s) and machine rooms once a month to remove dust and debris accumulation.
4. NO Smoking in any Federal Building.
5. Contractor shall have use of station telephones to make business calls related to Medical Center’s equipment. Misuse of this privilege will necessitate the need to require the contractor to use public telephones.
SCHEDULE OF ELEVATORS
| Building # |
| Quantity |
| Elevator Designation |
| Equipment # |
| Manufacturer |
| Building 160 |
| 1 |
| Passenger # 1 |
| 20064692 |
| Montgomery |
| Building 160 |
| 1 |
| Passenger # 2 |
| 20064698 |
| Montgomery |
| Building 160 |
| 1 |
| Passenger # 3 |
| 20064704 |
| Montgomery |
| Building 160 |
| 1 |
| Passenger # 4 |
| 20064667 |
| Montgomery |
| Building 160 |
| 1 |
| Service # 5 |
| 20064586 |
| Montgomery |
| Building 200 |
| 1 |
| Passenger # 1 |
| 20064592 |
| Montgomery |
| Building 200 |
| 1 |
| Passenger # 2 |
| 20064598 |
| Montgomery |
| Building 200 |
| 1 |
| Passenger # 3 |
| 20064604 |
| Montgomery |
| Building 200 |
| 1 |
| Passenger # 4 |
| 20064610 |
| Montgomery |
| Building 200 |
| 1 |
| Passenger # 5 |
| 20064617 |
| Montgomery |
| Building 200 |
| 1 |
| Passenger # 6 |
| 20064623 |
| Montgomery |
| Building 34 |
| 1 |
| Passenger # 1 |
| 20064673 |
| Otis |
| Building 69 |
| 1 |
| Passenger # 1 |
| 20064686 |
| Otis |
| Building 8 |
| 1 |
| Passenger # 1 |
| 20064679 |
| Otis |
| Building 204 |
| 1 |
| Passenger # 1 |
| 20218297 |
| United (Northern) |
| Building 204 |
| 1 |
| Passenger # 2 |
| 20218298 |
| United (Northern) |
| Building 5 |
| 1 |
| Passenger # 1 |
| 20254288 |
| Thyssenkrupp |
| Building 3 |
| 1 |
| Passenger # 1 |
| 20254289 |
| Thyssenkrupp |
| Building 205 |
| 1 |
| Service # 1 |
| 20068319 |
| Montgomery |
| Building 77 |
| 1 |
| Service # 1 |
| 20064648 |
| Dover |
| Building 77 |
| 1 |
| Passenger # 1 |
| 20064635 |
| Dover |
| Building 77 |
| 1 |
| Passenger # 2 |
| 20064642 |
| Dover |
| Building 37 |
| 1 |
| Passenger # 1 |
| 20064629 |
| Dover |
| Building 162 |
| 1 |
| Passenger # 1 |
| 20064573 |
| Montgomery |
| Building 162 |
| 1 |
| Passenger # 2 |
| 20064579 |
| Montgomery |
NOTE: THE WORD “ELEVATOR” IS THIS SOLICITATION SHALL INCLUDE ALL ELEVATORS, DUMBWAITERS, LIFTS, ETC., TO BE SERVICED UNDER THIS CONTRACT.
B. INSPECTION OF PREMISES
1. The Contractor accepts “as is” existing condition of equipment and government furnished parts covered under this full-service agreement at time of contract award.
2. Equipment deficiencies not meeting manufacturer’s operational standards shall be corrected by the Contractor at no additional cost to the Government.
C. QUALIFICATIONS OF MECHANICS
1. All work under this contract shall be performed by an Elevator Mechanic. Elevator Mechanic Helpers or Probationary Helpers will be allowed to assist in maintaining specified equipment only in the presence of an Elevator mechanic. Helpers will only be allowed to work themselves if performing lubrication or cleaning service.
B.4 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0001 |
| ELEVATOR MAINTENANCE AND REPAIR SERVICE |
Contract Period: Base POP Begin: 03-01-2018 POP End: 09-30-2018
| 7.00 |
| MO |
| ____________ |
| ______________ |
| 1001 |
| ELEVATOR MAINTENANCE AND REPAIR SERVICE |
Contract Period: Option 1 POP Begin: 10-01-2018 POP End: 09-30-2019
| 12.00 |
| MO |
| ____________ |
| ________________ |
| 2001 |
| ELEVATOR MAINTENANCE AND REPAIR SERVICE |
Contract Period: Option 2 POP Begin: 10-01-2019 POP End: 09-30-2020
| 12.00 |
| MO |
| ____________ |
| ______________ |
| 3001 |
| ELEVATOR MAINTENANCE AND REPAIR SERVICE |
Contract Period: Option 3 POP Begin: 10-01-2020 POP End: 09-30-2021
| 12.00 |
| MO |
| ____________ |
| _______________ |
| 4001 |
| ELEVATOR MAINTENANCE AND REPAIR SERVICE |
Contract Period: Option 4 POP Begin: 10-01-2021 POP End: 09-30-2022
| 12.00 |
| MO |
| ____________ |
| _______________ |
| GRAND TOTAL |
| __________________ |
B.5 DELIVERY SCHEDULE
| ITEM NUMBER |
| QUANTITY |
| DELIVERY DATE |
| 0001 |
| SHIP TO: |
| VA MEDICAL CENTER |
CORNER OF SIDNEY AND VETERANS WAY
MOUNTAIN HOME, TN 37684
USA
| 7.00 |
| 09/30/2018 |
| MARK FOR: |
| 423-926-1171 |
JONATHAN.MENDO@VA.GOV
| 1001 |
| SHIP TO: |
| VA MEDICAL CENTER |
CORNER OF SIDNEY AND VETERANS WAY
MOUNTAIN HOME, TN 37684
USA
| 12.00 |
| 09/30/2019 |
| MARK FOR: |
| 423-926-1171 |
| 2001 |
| SHIP TO: |
| VA MEDICAL CENTER |
CORNER OF SIDNEY AND VETERANS WAY
MOUNTAIN HOME, TN 37684
USA
| 12.00 |
| 09/30/2020 |
| MARK FOR: |
| 423-926-1171 |
| 3001 |
| SHIP TO: |
| VA MEDICAL CENTER |
CORNER OF SIDNEY AND VETERANS WAY
MOUNTAIN HOME, TN 37684
USA
| 12.00 |
| 09/30/2021 |
| MARK FOR: |
| 423-926-1171 |
| 4001 |
| SHIP TO: |
| VA MEDICAL CENTER |
CORNER OF SIDNEY AND VETERANS WAY
MOUNTAIN HOME, TN 37684
USA
| 12.00 |
| 09/30/2022 |
| MARK FOR: |
| 423-926-1171 |
SECTION C - CONTRACT CLAUSES
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (JAN 2017)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers.
This is the start of the file's text. The full file is on GovTribe.