36C24822Q0524_2.docx

DOCX document 18 KB Posted

Attached to
4130--Chiller Rental Federal contract opportunity
Solicitation number
36C24822Q0524
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8

View the file

Other files for this federal contract opportunity

Other files attached to 4130--Chiller Rental, newest first.
File Type Posted
36C24822Q0524.docx DOCX document
36C24822Q0524_1.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment to a Previous Combined Solicitation

Amendment to a Previous Combined Solicitation

SUBJECT*
Chiller Rental

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
32601-3460
SOLICITATION NUMBER*
36C24822Q0524
RESPONSE DATE/TIME/ZONE
03-11-2022 16:00 EASTERN TIME, NEW YORK, USA
ARCHIVE
30 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N
SET-ASIDE
VSA
PRODUCT SERVICE CODE*
4130
NAICS CODE*
334512
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

Network Contracting Office 8 (NCO 8) Commerce Building 300 E. University Ave. Ste. 170 Gainesville FL 32601-3460

POINT OF CONTACT*

Contract Officer John H. Shultzaberger John.Shultzaberger@va.gov 352-381-5728

PLACE OF PERFORMANCE

ADDRESS
Department of Veterans Affairs

North Florida/South Georgia VHS

Malcom Randall VA Medical Center

1601 SW Archer RD

Gainesville FL

POSTAL CODE
32608
COUNTRY
USA

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

DESCRIPTION

The purpose of this amendment is:

1. Publish the answers for questions received during the solicitation process.

a. See Below

2. Change closing date from February 25, 2022 to March 11, 2022.

3. Add location and date for site visit.

a. Date: March 3, 2022 at 13:00 EST.

b. Meeting Place: Engineering Office located in the basement floor of Malcom Randall VA Medical Center

Questions and Answers

1. How far away is the power source from the planed chiller/s placement?

<100 feet

1. How far are the chilled water loop supply and return headers from the planed chiller/s placement?

<100 feet

1. What is the diameter of the chiller water connections?

Ewing -6” Main Building – 6”

1. Will both proposed chillers be feeding the same chilled water loop?

No

1. Will the government accept one 1000-ton chiller?

No

1. Will the government accept two 600-ton chillers?

Yes

1. Will the government accept three 350-ton chillers?

No

1. Will the government accept four 250-ton chillers?

No

1. Will the government accept any combination of chiller/s and tonnage that meet or exceed the 1000-ton requirement?

No

1. Will the government accept any combination of chillers that best meet available circuit amperage?

No

1. What is the voltage and phase of the three provided power sources (US8, US9 and US10)?

US8 provides 400 amps. US9 provides 400 amps. US10 provides 800amps via parallel feeds.

1. Two-part question:

11. Considering the available amperage, do you prefer a generator for the necessary power, or the chillers being derated to work off house power?

No Generator needed

11. If derated over a Generator is the preference, will two (2) 400-Ton Chiller at maximum capacity be acceptable?

No - 400 Ton Chillers are not acceptable

1. Does the government have larger/more power sources?

No

1. Are there existing chilled water taps and if so, what size/connection type(s)?

Yes, Victolic 6” – Main Building. Flanges 6’ - Ewing.

1. Are existing water taps located above grade and if so, what is the elevation from grade?

Main Building – 7 feet high. Ewing - 3 feet high.

1. What is the distance from chiller placement to tap points?

<100 feet

1. Are chiller water taps contained inside of a room or enclosed area otherwise?

Main Building – Yes. Ewing – no.

1. What is the distance from chiller placement to MCC or utility power connections?

<100 feet

1. Are there any existing water treatment systems online?

Yes, for Ewing. Main Building will be online soon.

1. Is the operating specification nominal or outside of nominal related to PSI, flow rate, set point temps, etc.?

No idea what this means. We rent chillers every summer and do not have a problem.

1. Each 500-ton chiller will require a designated 480v/3P 1000A power circuit, will these circuits be provided?

No

*= Required Field