36C24819Q0336 ATTACHMENT 6 QAULITY ASSURANCE SURVIELANCE PROGRAM.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24819Q0336-0002000.docx | DOCX document | |
| 36C24819Q0336-0001001.pdf | ||
| 36C24819Q0336-0001000.docx | DOCX document | |
| 36C24819Q0336-007.pdf | ||
| 36C24819Q0336-009.pdf | ||
| 36C24819Q0336-010.pdf | ||
| 36C24819Q0336-003.pdf | ||
| 36C24819Q0336-004.pdf | ||
| 36C24819Q0336-011.pdf | ||
| 36C24819Q0336-002.docx | DOCX document | |
| 36C24819Q0336-006.pdf | ||
| 36C24819Q0336-005.pdf | ||
| 36C24819Q0336-001.pdf | ||
| 36C24819Q0336-000.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan
The contractor will be evaluated in accordance with the following:
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
• What will be monitored?
• How monitoring will take place?
• Who will conduct the monitoring?
• How monitoring efforts and results will be documented?
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Cyrouse Himid Houshyani, Contracting Officer, Network Contracting Activity 8
Organization or Agency: Department of Veterans Affairs, VHA, Orlando Veterans Administration Medical Center.
b. Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR(s): Alfonso Rosado, Procurement Technician, Surgical Service
Organization or Agency: Department of Veterans Affairs, VHA, Orlando Veterans Administration Medical Center.
3. CONTRACTOR REPRESENTATIVES
The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract.
a. Primary Contact: Sarat Sabharwal, M.D., Section Chief of Urology
b. Alternate: Sean Tirney, M.D., Urologist
4. PERFORMANCE STANDARDS
The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports yearly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined. Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.
The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.
5. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. DIRECT OBSERVATION. 100% surveillance: Radiologic Technologist will be in direct observation of the Surgeon at all times to provide ESWL services.
b. PERIODIC INSPECTION. The contractor shall make equipment service records, preventive maintenance, and corrective maintenance record(s) available to the Federal Government upon request by the COR. Will randomly request maintenance documentation at minimum, ten (10) cases a year.
c. VALIDATED USER/CUSTOMER COMPLAINTS. The standard is zero (0) cancellations by contractor. ESWL procedures are scheduled by the Lake Nona VAMC and the COR will audit any cancelled ESWL procedures every three months, as they will have access of the scheduled procedures. Service not provided by contractor in fault by the contractor can result in Nonpayment and impact on CPARS rating.
d. RANDOM SAMPLING. Ten (10) randomly selected patient files will be reviewed per quarter.
All reviews and reports will be conducted in compliance with VA Privacy and Information security standards.
e. Verification and/or documentation provided by Contractor. All providers must be credentialed in accordance with Department of Veteran Affairs. Radiologic Technicians credentials will be furnished upon request, random inspection and auditing.
Measures PWS Reference
Performance Requirement
Standard Acceptable Quality Level
Surveillance Method
Met AQL/DID
NOT MEET
AQL-
CPAR
RATING/ADD
COMMENTS
Scope of Practice, Credentialing, and Certification
4.6.4.3 All providers
must be Credentialed and certified in accordance with Department of Veteran Affairs.
Ongoing Provider Performance Evaluation (OPPE) documentation for all (100%) staff providing services under the contract
100% compliance required
Upon request random inspection and auditing Based Practice
Joint Commission Standards
4.6.4.1. Compliance
with all industry Joint Commission Standards
Radiologic technologist shall be onsite during all elective scheduled ESWL procedures.
100% compliance required
Periodic inspection and random sampling.
Monthly invoices
4.6.4.2. Procedure
completion documentation to be completed weekly and turned in-to Urology Section Chief for concurrence.
Provide Monthly
Random inspection of records
Mandatory
VA
Education, Training, and
HIPPA
4.6.4.3. Information
Security, Cyber Security, and HIPPA training must be completed on an annual basis (Maintain computer access for the VA network).
100% compliance expected
All contractor personnel (s) shall comply with all laws, regulations, policies and procedures relating to Privacy, Confidentiality, and HIPAA.
The COR/ OR Manager will collect evidence of this training
100% compliance expected
OSHA
Requirement
4.6.4.4. All annual
PPD/TB
screening;
current immunizations and evidence of having been offered the HEPB vaccine for contract personnel (s) shall always be kept current.
Required to have annually PPD/TB screening;
current immunizations and evidence of having been offered the HEPB vaccine prior to commencement of work
100% Compliance required prior to commencement of work.
Upon request, Random inspection and auditing
6. Patient Safety
4.6.4.5. Patient safety
incidents shall be reported using Patient Safety Report
All of patient safety incidents are reported using Patient Safety Report within 24 hours of incident
100% Direct observation and periodic inspection
6. RATINGS
Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used:
OUTSTANDING: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT. However, a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
VERY GOOD: Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. In addition, there should have been NO significant weaknesses identified.
SATISFACTORY: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Inclusive, there should have been NO significant weaknesses identified.
MARGINAL: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g., Management, Quality, Safety or Environmental Deficiency Report or letter).
UNSATISFACTORY: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or Environmental Deficiency Reports, or letters).
7. DOCUMENTING PERFORMANCE
a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORT (CPAR).
b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO will also assure that the contractor receives impartial, fair, and equitable treatment. The
CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO. See Sample CDR below.
C. If non-performance occurs, an equitable adjustment for nonconforming services will be done in accordance with FAR 46.407
8. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement. The frequency of measurement is defined in the contract or otherwise in this document. The government (COR or CO) will periodically analyze whether the frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Reporting. The COR shall communicate with the Contractor and will provide written reports to the Contracting Officer quarterly (or as outlined in the contract or COR delegation) to review Contractor performance.
9. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP
SIGNED:
COR NAME/TITLE DATE
SIGNED:
CONTRACTOR NAME/TITLE DATE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
File details come from the government source that posted it.