36C24818R0446_SOLICITATION

View the file

Other files for this federal contract opportunity

Other files attached to Construction, Correct Access and Storm Water Deficiencies Project 675-16-650, newest first.
File Type Posted
36C24818R0446-0002003.pdf PDF
36C24818R0446-0002001.pdf PDF
36C24818R0446-0002000.docx DOCX document
36C24818R0446-0002002.pdf PDF
36C24818R0446-0001000.pdf PDF
36C24818R0446-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES NO

a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

1 424

36C24818R0446 X

06-12-2018

675-18-1-3411-0001 675-16-650

36C675

Department of Veterans Affairs Orlando VA Medical Center

13800 Veterans Way Orlando FL 32827

Department of Veterans Affairs Network Contracting Office (NCO) 8

2500 Lakemont Avenue, Rm #114 Orlando FL 32814

Elizabeth Romero 407-646-4062

Project Title: Correct Access and Storm Water Deficiencies-Viera

Project Location: Viera Outpatient Clinic (OPC), 2900 Veterans Way, Viera, Florida 32940

Contracting Officer (CO): Elizabeth Romero; elizabeth.romero@va.gov

Magnitude of this project is between $500,000 and $1,000,000

The North American Industry Classification Code (NAICS) for the procurement is 236220 Commercial and Institutional Building Construction. The corresponding small business size standard is $36.5 Million.

Project Overview: Contractor shall provide all construction services, labor, equipment, materials, supervision and all other resources necessary to remove and replace existing east side fence and gate system located at the Viera OPC in accordance with this solicitation, scope of work, included specifications and drawings.

This is a 100% Service Disabled Veteran Owned Small Business (SDVOSB) Set Aside. Prospective firms are cautioned that any proposal submitted in response to this solicitation must meet the criteria identified by 38 CFR, Part 74. Any person, persons or business entity suspected of misrepresenting itself for the purpose of securing a government contract may be criminally investigated and prosecuted for fraud against the United States of America. Parties found misrepresenting their status also risk debarment from further Government contracts.

10 120

X X 52.211-10

X 10

1 Electronic 1:00 PM EST

07-12-2018(hour) local time ______________ _______ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed

X

36C24818R0446

14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

PHONE: FAX:

28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code)

(Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

(Type or print)

(4 copies unless otherwise specified)

(Type or print) (Type or print)

(Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror)

(To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

See Price Offer Schedule, page 11

36C248

Department of Veterans Affairs Network Contracting Office (NCO) 8

2500 Lakemont Avenue, Rm #114 Orlando FL 32814

Department of Veterans Affairs Financial Services Center

P.O. Box 149971 Austin TX 78714-9971

X

Elizabeth Romero

NCO816L2-1631

Table of Contents

PART I - THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM

SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)

A.1 GENERAL PROPOSAL INFORMATION

A.2 PROPOSAL PREPARATION AND EVALUATION

A.3 PRICE OFFER SCHEDULE

A.4 SCOPE OF WORK

A.5 GENERAL DECISION FOR CONSTRUCTION

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 52.216-1 TYPE OF CONTRACT (APR 1984)

2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF

THE WORK (MAY 2014)

2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE

EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION

MATERIALS (MAY 2014)

2.5 52.228-1 BID GUARANTEE (SEP 1996)

2.6 52.233-2 SERVICE OF PROTEST (SEP 2006)

2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB

1998)

2.9 VAAR 852.215-70 SERVICE-DISABLED VETERAN-OWNED AND VETERAN-

OWNED SMALL BUSINESS EVALUATION FACTORS (JUL 2016)(DEVIATION)

2.10 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND

VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)

2.11 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION

(JAN 2008)

2.12 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (JAN 1998)

REPRESENTATIONS AND CERTIFICATIONS

3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2018)

3.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)

GENERAL CONDITIONS

4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND

CERTIFICATIONS (DEC 2014)

4.2 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING

RESPONSIBILITY MATTERS (JUL 2013)

4.3 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR

1984)

4.4 52.216-18 ORDERING (OCT 1995) – Not Applicable

4.5 52.216-19 ORDER LIMITATIONS (OCT 1995) – Not Applicable

4.6 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL

2013)

4.7 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)

4.8 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR

RELATIONS ACT (DEC 2010)

4.9 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)

4.10 SUPPLEMENTAL INSURANCE REQUIREMENTS

4.11 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

4.12 52.244-2 SUBCONTRACTS (OCT 2010)

4.13 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

4.14 VAAR 852.203-70 COMMERCIAL ADVERTISING (JAN 2008)

4.15 VAAR 852.215-71 EVALUATION FACTOR COMMITMENTS (DEC 2009)

4.16 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)

4.17 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV

2012)

4.18 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (JUL

2002)

4.19 VAAR 852.236-72 PERFORMANCE OF WORK BY THE CONTRACTOR (JUL 2002) 45

4.20 VAAR 852.236-74 INSPECTION OF CONSTRUCTION (JUL 2002)

4.21 VAAR 852.236-76 CORRESPONDENCE (APR 1984)

4.22 VAAR 852.236-77 REFERENCE TO "STANDARDS" (JUL 2002)

4.23 VAAR 852.236-78 GOVERNMENT SUPERVISION (APR 1984)

4.24 VAAR 852.236-79 DAILY REPORT OF WORKERS AND MATERIAL (APR 1984)

4.25 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 1984)

4.26 VAAR 852.236-82 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION

CONTRACTS (WITHOUT NAS) (APR 1984)

4.27 VAAR 852.236-84 SCHEDULE OF WORK PROGRESS (NOV 1984)

ADDITIONAL REQUIREMENTS FOR BAR CHART SCHEDULE

4.28 VAAR 852.236-85 SUPPLEMENTARY LABOR STANDARDS PROVISIONS (APR

1984)

4.29 VAAR 852.236-86 WORKER'S COMPENSATION (JAN 2008)

4.30 VAAR 852.236-87 ACCIDENT PREVENTION (SEP 1993)

4.31 VAAR 852.236-88 CONTRACT CHANGES--SUPPLEMENT (JUL 2002)

4.32 VAAR 852.236-89 BUY AMERICAN ACT (JAN 2008)

4.33 VAAR 852.236-91 SPECIAL NOTES (JUL 2002)

4.34 VAAR 852.246-74 SPECIAL WARRANTIES (JAN 2008)

4.35 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND COMPLIANCE (JUN

2011)

4.36 SUBCONTRACTING COMMITMENTS--MONITORING AND COMPLIANCE (JUN

2011)

4.37 LIST OF ATTACHMENTS

36C24818R0446

Attachment 1: Release of Claims Attachment 2: 01 00 00 General Requirements Attachment 3: 100% Drawings Attachment 4: Viera Site Plan

A.1 GENERAL PROPOSAL INFORMATION

GENERAL PROPOSAL INFORMATION – CONSTRUCTION

1. Service Disabled Veteran-Owned Small Business Verification: This requirement is 100% set aside for verified Service Disabled Veteran Owned Small Business (SDVOSB). The award of this requirement shall not be delayed due to loss of SDVOSB verification. Proposals submitted by non-verified SDVOSB’s will be excluded from evaluation and award consideration.

2. Work Effort: This project is a Bid/Build Effort: The contractor shall construct this project pursuant to the project design documentation including drawings, specifications, design analysis, etc.

3. RFP Issue Date: June 12, 2018

4. Site Visit: An organized site visit is scheduled for Monday, June 18, 2018 at 1:00 PM EST.

a. Only one site visit will be conducted. Participants are to meet at the VA Viera Outpatient Clinic, located at 2900 Veterans Way, Viera FL 32940, Room D211.

b. Contact the following individuals by email: elizabeth.romero@va.gov and mary.dumont@va.gov to confirm attendance.

5. Requests for Information (RFIs): Due Date Friday, June 22, 2018 at 1:00 PM EST.

a. RFI’s should be submitted to the Contracting Officer by email as follows:

elizabeth.romero@va.gov. RFI's received after June 22nd will only be answered if they have an impact on the project or solicitation. Responses will be provided in a question and answer format in coordination with the COR. Example: Subject Line of the RFI e-mail should be as follows: “RFI #1, 36C24818R0446, Project Title and Company Name”.

Note: RFI’s will not be accepted after due date.

6. Proposal Due Date: Proposals are due as follows:

a. July 12, 2018 NLT 1:00 PM EST by email to elizabeth.romero@va.gov.

b. The VA has a limit on the Meg size. The size of your file shall not exceed 5 Meg. If you have multiple documents, please submit as separate emails. Proposals received after that time will not be considered.

7. Magnitude of Construction: Pursuant to FAR 36.204(e) the following is provided: The magnitude of construction is between $500,000 and $1,000,000. This is the estimated range for Construction.

36C24818R0446 mailto:elizabeth.romero@va.gov mailto:mary.dumont@va.gov mailto:elizabeth.romero@va.gov mailto:elizabeth.romero@va.gov http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/36.htm

8. North American Industry Classification (NAICS) code: The applicable NAICS code for this procurement is 236220 Commercial and Institutional Building Construction Contractors. The Small Business size standard is $36.5 Million.

9. Wage Determination (WD): The applicable WD for this solicitation is incorporated in this document.

10. Superintendence: The Prime contractor shall provide, from his own staff, a competent 30-hour OSHA certified superintendent. This individual shall be 100% full time dedicated and assigned to this project while work is being performed on site. The prime contractor shall not divide or split up their superintendence duties among multiple projects at the same facility. Each project stands alone and requires a dedicated superintendent to be allocated and funded to that particular project.

11. Proposal Development: The Government does not compensate vendors for proposal development and submission.

A.2 PROPOSAL PREPARATION AND EVALUATION

1. Proposal Preparation and Submission Instruction: Lowest Price Technically Acceptable (LPTA) Selection and Evaluation Procedures

a. Technical Proposal Format: Technical Proposal shall address all information requested and will then be evaluated against the stated factors. The following format shall be used:

(1) TAB A: General Information

(2) TAB B: Technical Proposal

(3) TAB C: Price Proposal

b. Evaluation Factors and Proposal Requirements. Proposal shall include:

(1) TAB A: GENERAL INFORMATION

(a) Cover Page with Solicitation Number, Project Title

(b) Table of Contents

(c) Signed offer/Acknowledgement of Amendments (SF1442)

(d) Copy of current vetBiz.gov SDVOSB certification

(e) DUNS Number

(f) Cage Code

(g) Tax ID number

(h) EMR

(i) Principle points of contact, address, phone numbers, etc.

(j) Reps and Certs

(k) Offer Guarantee Bond

(2) TAB B: TECHNICAL PROPOSAL

• Factor 1 – Relevant and Recent Past Performance

(a) To be Technically Acceptable, offerors shall present documentation that their firm, or a proposed subcontractor, has successfully performed a minimum of (1) but not more than five (5) projects.

(b) Relevant performance means construction projects similar in scope and magnitude, which were issued by the VA, Federal, State, Local Government agencies, and/or commercial facilities.

(c) Recent is defined as performance within the last three (3) years, to include ongoing projects.

(d) Provide a written statement describing how construction will occur inside the building while also preventing dust and debris from migrating beyond the construction site.

(e) For each of the submitted Relevant and Recent Past Performance contracts, provide the following information:

i. Project name and contract number

ii. Customer and location where work was performed

iii. Customer name and contact information, telephone and email

iv. Total project value

v. Narrative - 10 page maximum

• Technical Evaluation Criterion: Factor – Relevant and Recent Past Performance

Acceptable Offeror factor response validates that the offeror or offeror team has performed on a project similar in scope and has received a satisfactory rating.

Unacceptable Offeror factor response fails to validate that the offeror or offeror team has performed on a project similar in scope and received a satisfactory rating.

• Factor 2 - Bonding Capacity

(a) To be Technically Acceptable, offerors shall present documentation from an approved registered surety company demonstrating a surety line of credit equivalent to 100% or greater of the proposed offer for a single project. The surety letter shall also outline the Offeror’s total (aggregate) bonding capacity.

• Technical Evaluation Criterion: Factor – Bonding Capacity

Acceptable

Offeror factor response validates that the offeror or offeror team has presented documentation from an approved registered surety company demonstrating a surety line of credit equivalent to 100% or greater of the proposed offer for a single project

Unacceptable Offeror factor response fails to validate the necessary documentation from an approved registered surety company as outlined above.

(3) TAB C: PRICE PROPOSAL – Note: Submit under a Separate Cover from Technical

• Price Breakdown: The following cost elements shall be addressed:

(a) Labor (Direct & Indirect),

(b) Materials, Material Markups, Materials overhead,

(c) Equipment

(d) Subcontractor Cost

(e) General Conditions

(f) Profit

***Price breakdown shall be indicative of the 15% of contract performance that will be incurred for SDVOSB personnel in accordance with VAAR 852.219-10. ***

(1) The Government may use various price analysis techniques and procedures to make a price reasonableness determination. Offerors should assure that their ability to meet or exceed the minimum needs of the Government is adequately described in the offer. The Government reserves the right to evaluate proposals and award a contract without discussions (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a price and technical standpoint.

(2) The Government will evaluate price based on the total price. Total price consists may include alternate bid items such as, deductive, or options. Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:

i. Comparison of proposed competitive prices received in response to the RFP.

2. Evaluation and Award Determination:

A. Source Selection Using Lowest Price Technically Acceptable Process (LPTA): This is a competitive Request for Proposal (RFP) that represents the best value to the Government conducted under FAR Part 15, Lowest Price Technically Acceptable (LPTA) source selection process. Award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors.

B. Evaluation Overview: Proposals will be evaluated and ranked according to price, from lowest to highest. The Government reserves the right to evaluate only the technical proposal of the lowest price offeror. Other technical proposals may not be evaluated unless the Government determines the lowest price offeror to be unacceptable or non-responsive. In the event the Government determines the lowest price offeror to be unacceptable, the technical proposal of the next lowest price offeror will be evaluated.

This process will continue until a technical proposal is determined to be acceptable. This is a firm-fixed price award. It is the Offeror’s responsibility to ensure the submitted cost proposal includes all costs for total project requirements and completion in accordance with the specifications and drawings herein.

The Offeror assumes all risk for omissions in subcontractor proposals.

C. SDVOSB Verification: The Government will review VetBiz (https://www.vip.vetbiz.gov/) to confirm Service Disabled Veteran-owned Small Business (SDVOSB) status verification for the submitted proposals. Evaluations will be performed on proposals submitted by verified SDVOSBs only.

Subsequent confirmation of SDVOSB verification status will be performed for the apparent awardee.

D. Technical Evaluation: Technical acceptability is an assessment of each offeror’s ability to successfully accomplish the technical requirements. The technical acceptability factors shall be rated as acceptable or unacceptable based on the information submitted by the offeror in response to the criteria of the evaluation factor. Note: All factors must be rated acceptable in order to be considered technically acceptable. If one factor is rated unacceptable, then the government will move onto the next proposal.

The Government expects a qualified team to provide project management oversight, quality assurance, and monitor safety compliance for timely completion of tasks.

E. Proposal Instructions: Contractor must provide all requested information for each factor/sub-factor.

Proposals must separately address each element of the factor/sub-factors as applicable to be considered responsive to this RFP. Factor/sub-factors headings must be highlighted in yellow or typed in bold text for identification. Recommend each titled sub-factor heading in the submitted proposal be stated in the chronological order shown below. This format establishes a direct correlation between the information provided and the sub-factor for evaluation. It is the contractor’s responsibility to ensure the submitted proposal is in the proper format, the provided information is clearly understood and free of ambiguities.

36C24818R0446 https://www.vip.vetbiz.gov/

F. Discussions: The Government intends to evaluate proposals and award a contract without discussions.

Communication between the Government and offerors will be limited to exchanges for clarification as described in FAR 15.306(a). The Government reserves the right to enter into discussions if necessary.

Thus, an offeror’s proposal should contain the offeror’s best terms from a price and technical standpoint.

Communication conducted to resolve minor or clerical errors would not constitute discussions and the Contracting Officer reserves the right to award a contract without the opportunity for proposals revisions or discussions.

G. Safety or Environmental Violations and Experience Modification Rate (EMR)

i. All Offerors shall submit the following information pertaining to their past Safety and Environmental record. The information shall contain, at a minimum, a certification that the offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violations(s) in the past three years.

ii. All Offerors shall submit information regarding their current Experience Modification Rate (EMR) equal to or less than 1.0. This information shall be obtained from the offeror’s insurance company and be furnished on the insurance carrier’s letterhead.

iii. Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note:

Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau.

iv. A Determination of Responsibility will be accomplished for the apparent awardee prior to processing the award. If the apparent awardee fails to provide required documentation, then the matter will be referred to the Small Business Administration (SBA) for a certificate of competency or a determination of responsibility by the

SBA.

v. This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors.

A.3 PRICE OFFER SCHEDULE

Price Offer Schedule

Description U/I QTY UNIT PRICE TOTAL PRICE

GENERAL CONSTRUCTION: Bid/Build construction to complete Project #675-16-650 titled Correct Access and Storm Water Deficiencies at the Viera Outpatient Clinic in Viera Florida.

BID ITEM NO. 1 (BASE BID): The Contractor shall provide all labor, equipment, materials, supervision, and all other resources necessary for construction of the project described as further defined by the Scope of Work (SOW), specifications and drawings.

The scope for this project is to remove and replace the existing east side fence and gate system. This project will also include new gate camera(s) providing better visibility, new lighting, replacing both the card reader and push button access at the front entrance, modifying the landscaping and sprinkler system both along the fence line and at the front entrance. This project will also repair the various cracked or trip hazard sidewalks as indicated in the plans.

Period of Performance - 120 calendar days upon issuance of Notice to Proceed (NTP).

BID ITEM NO. 2 (DEDUCT ALTERNATE #1)

same as Bid Item 1 except:

1. As defined in the construction plans: Do not provide work associated with Landscaping and Irrigation.

BID ITEM NO. 3 (DEDUCT ALTERNATE #2)

same as Bid Item 2 except:

1. As defined in the construction plans: Do not provide work associated to crossings and sidewalk replacement.

BID ITEM NO. 4 (DEDUCT ALTERNATE #3)

same as Bid Item 3 except:

1. As defined in the construction plans: Do not provide work to install wall.

JB

JB

JB

JB

Reference Price Proposal Submission Requirements

A.4 SCOPE OF WORK

CONSTRUCTION

CORRECT ACCESS AND STORM WATER DEFICIENCIES - VIERA

PROJECT NO. 675-16-650

VIERA OUTPATIENT CLINIC

2900 VETERANS WAY, VIERA FL 32940

I. DEFINITION AND ACRONYMS:

A. Construction: as defined by the Department of Veterans Affairs (DVA) Is the procurement by the

Government, under one contract, with one firm for the construction services on a specific project.

B. Contracting Officer (CO): The services to be performed under this contract are subject to the general supervision, direction, control and approval of the Contracting Officer.

C. Project Manager (PM)/Contracting Officers Representative (COR): The Contracting Officer's representative responsible for administering contracts under the immediate direction of the Contracting Officer.

D. Contractor: This term, as used herein, refers to the contractor under this contract.

E. Pre-Construction Risk Assessment (PRCA): Used to identify potential risks associated with the renovation, construction and some maintenance & repair activities and to develop risk mitigation strategies to minimize these risks. Prior to beginning work this assessment will be completed.

F. Interim Life Safety Measures (ILSM): Measures that are instituted to compensate for significant hazards posed by existing life safety (fire) code deficiencies or construction/renovation activities.

G. Request for Proposal (RFP): Is a solicitation made, often through a bidding process, by an agency or company interested in procurement of a commodity or service, to potential suppliers to submit proposals.

H. National Fire Protection Association (NFPA): The world's leading advocate of fire prevention and an authoritative source on public safety, NFPA develops, publishes, and disseminates codes and standards intended to minimize the possibility and effects of fire and other risks.

I. The Joint Commission (TJC): Formerly the Joint Commission on Accreditation of Healthcare Organizations (JCAHO) and before that the Joint Commission on Accreditation of Hospitals (JCAH).

The Joint Commission provides evaluation, accreditation and disease-specific certification programs for healthcare facilities.

J. Competent Person (CP): One who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them.

II. SCOPE OF WORK:

A. Overview: Orlando VA Medical Center strives to support both patients and staff in a healthcare setting.

Protection of patient’s, visitor’s and staff’s health from risks associated with the environment and construction activities is the highest priority. This is a bid/build construction project where the contractor is to provide all construction services, labor, materials, tools, and equipment necessary to meet the requirements set forth in the specifications and drawings. It is the contractor’s responsibility to familiarize themselves with all the specifications and drawings.

B. General Requirements: The scope of this project is to remove and replace the existing east side fence and gate system located at the Viera Outpatient Clinic (OPC). This project will also include new gate camera(s) providing better visibility, new lighting, replacing both the card reader and push button access at the front entrance, modifying the landscaping and sprinkler system both along the fence line and at the front entrance. This project will also repair the various cracked of trip hazard sidewalks as indicated in the plans. Contractor shall completely prepare the site for building operations and other construction safety measures, and furnish all labor, material and equipment necessary to complete all renovation work which includes but is not limited to Civil, Landscape, and Electrical as shown and specified per specifications and drawings.

C. Specific Project Requirements:

1. Contractor shall complete the following in accordance with the provided specifications and drawings.

2. 100% specification and drawings will be provided as part of this contract. No deviation from the VA-issued specification and drawings will be allowed without prior approval by the CO/COR.

3. Contractor shall perform all work specified in this solicitation.

4. All construction phasing shall be approved by the COR, prior to beginning work.

5. Contractor shall be responsible for all infection control measures both outside and inside the facility related to the project.

6. The contractor must comply with all federal, state and local environmental regulations as it pertains to

NEPA (National Environmental Policy Act). While it doesn’t appear, there are any endangered species in the construction site, the Contractor shall provide a licensed wildlife professional to evaluate and appropriately handle, or otherwise take care of any endangered species discovered, either before construction or at any time during the construction project.

III. SPECIAL REQUIREMENTS:

1. Badges: Security will issue “visitor” badges at the front entrance anytime a contractor, subcontractor or anyone involved in this project enters the facility. All contractor personnel must wear an identifying shirt or logo at all times while on property.

2. Contractor shall provide a list of all personnel who will participate on the project and ensure all personnel sign in/out daily. Personnel can be subjected to a background investigation prior to commencement of work and at any time during the contract.

3. Contractor shall keep the area cleaned daily and haul away all construction debris. All materials shall be tracked and logged to be reported back to the GEMS coordinator for recycling tracking purposes.

When removing construction debris from facility it must be in a covered cart when entering and exiting the building and great care must be taken when leaving the property.

IV. SCHEDULING, PHASING, AND WORKING HOURS:

A. All work hours MUST be coordinated with the project’s COR to minimize interference with normal clinic functions. Normal business hours are 7:30 am to 4:00 pm Monday through Friday. However, some clinics, within Viera, provide patient care OUTSIDE normal business hours. This could mean anytime between 4:00 pm and 7:00 pm or on Saturday until 2:00pm. Patient care times outside normal business hours vary.

B. Assume all work must be accomplished during WHEN hours (Weekends/Holidays/Evenings/Nights).

Non-disruptive work may be permitted during the day, if approved by the COR two weeks in advance.

Work along the grassy part of the fence, may be permitted during normal work hours, as long as, it does not impede the flow of traffic. The COR reserves the right to stop work during normal business hours if work either impedes the flow of traffic or causes disruption to the clinic. Any work near the front gate or parking areas must be accomplished during WHEN hours. Additionally, construction shall be performed (scheduled and phased) to ensure that areas which can be completed ahead of schedule or priority for early acceptance and operation can be rendered back to facility.

C. Length of Project:

1. Project’s construction phase MUST be completed in no more than 120 calendar days from issuance of

Notice of Proceed (NTP).

2. Contractor shall submit a Critical Path Method (CPM) schedule for the Construction with estimated dates and itemized cost of work to the Contracting Officer for review and approval before Notice to proceed.

D. Contractor shall submit a Critical Path Method (CPM) schedule for the Construction with estimated dates and itemized cost of work to the Contracting Officer for review and approval before Notice to Proceed.

E. Utility shutdowns/Outages: All shutdowns involving temporary impairment of utilities shall be requested by the Contractor at least 14 calendar days in advance.

V. SITE VISITS

A. Job site shall be visited to verify all existing conditions and dimensions and the extent of work involved with the Viera OPC COR. Visits to site may be made by appointment only and be previously approved by the CO.

VI. PROJECT CLASSIFICATION:

A. Contractor shall secure area prior to commencement of work and follow the Orlando VA Medical Center guidelines and policies for Pre-Construction Risk Assessment (PCRA) and Interim Live Safety Measures

(ILSM).

B. Risk Assessment: This project has been classified per the Construction Infection Control Risk Assessment as a Type A, Low Risk Group, Class I (ISLM Level 1).

VII. SAFETY REQUIREMENTS:

A. All Contractor's personal are required to have completed an OSHA-approved 10-hour construction worker course prior to working on the site. The On-site general superintendent/supervisor is required to have completed an OSHA-approved 30-hour construction course prior to working on the site. Every worker must provide the Contracting Officer a copy of current certificates identifying successful completion of the training prior to executing work for the Veterans Administration. In addition, Contractor shall provide submittals for contract construction or renovation work which include the names, qualifications, and training dates for Contractor’s Competent Persons (CP), who has been designated to administer the site-specific safety program, as well as the CP for other activities as required by OSHA regulation 29 CFR

1926.32 (such as scaffolds, cranes, excavations, etc.). Contractor’s CP are required to implement and maintain effective safety programs that identify and control hazards that may cause injury or illness to VA patients, staff, visitors, and contractor employees. The VA CP does not take the place of Contractor’s CP nor acts on their behalf. The VA CP determines if Contractor is meeting VA standards and contractual requirements for safety and OSHA compliance. When these standards and contract requirements are not being met, the VA COR and/or CP will take immediate action to prevent injury, non-compliance, and/or property damage. The Contractor shall submit an Activity Hazard Analysis, and an Accident Prevention Plan as per FAR 52.236-13 prior to commencement of site activities. The Government shall have 21 calendar days to review the AHA and APP.

B. Contractor shall submit documentation proof of OSHA construction safety course for all personnel.

VIII. GOVERNMENT FURNISHED INFORMATION:

All available record drawings will be provided upon request to the Contractor. They should not however, be considered “as-built”. These drawing files are provided without warranty or obligation as to the accuracy or information contained in the files. All information in the files shall be independently verified by the user. Any user shall agree to indemnify and hold the VA harmless from any and all claims, damages, losses, and expenses, including, but not limited to, attorney fees arising out of the use of the Computer Aided Design and Drafting (CADD) drawing files.

IX. RESOURCES:

A. Department of Veteran Affairs Personnel:

1. Engineering Facilities Management (FMS)

a) Primary:

(1) COR Name: Mary (Melisse) Dumont

(2) COR Email: mary.dumont@va.gov

b) Secondary:

(1) COR Name: Darren C. Matteson

36C24818R0446 mailto:mary.dumont@va.gov

(2) COR Email: darren.matteson@va.gov

2. Contracting Office: Elizabeth Romero

a) Contracting Officer Email: elizabeth.romero@va.gov

X. SUBMITTALS:

A. Contractor shall submit documentation proof of OSHA construction safety course.

B. General Contractor License and Insurance.

C. Submittal as per Construction Documents and Specifications.

D. Warranties

XI. QUALITY ASSURANCE/QUALITY CONTROL:

A. The Construction Contractor shall develop and execute a QA/QC plan that demonstrates the project plans and specifications have gone through a rigorous, thorough review and coordination effort.

B. Within 2 weeks of receipt of Notice to Proceed, the Construction Contractor will submit a detailed QA/QC plan describing each QA/QC task that will be taken during the construction phase and the name of the Contractor’s team member responsible for QA/QC.

C. Upon its completion, each task shall be initialed and dated by the responsible Contractor’s team member.

-- END --

mailto:darren.matteson@va.gov mailto:elizabeth.romero@va.gov

A.5 GENERAL DECISION FOR CONSTRUCTION

General Decision Number: FL180240 03/16/2018 FL240

Superseded General Decision Number: FL20170240

State: Florida

Construction Type: Building

County: Brevard County in Florida.

Does not include Cape Canaveral Air Force Station, Patrick Air Force Base, Kennedy Space Flight Center and Melbar Radar Site BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.

Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2018 1 01/12/2018 2 03/16/2018

* ASBE0067-003 01/01/2018

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 27.89 15.19

ELEV0139-002 01/01/2018

Rates Fringes

ELEVATOR MECHANIC................$ 41.40 32.645

FOOTNOTE:

A. Employer contributions 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; Employer contributions 6% of regular hourly rate to vacation pay credit for employee who has worked in business less than 5 years.

Paid Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; The Friday after Thanksgiving Day; and Christmas Day.

ENGI0487-022 07/01/2016

Rates Fringes

OPERATOR: Forklift..............$ 23.25 9.20 OPERATOR: Mechanic..............$ 32.05 9.20 OPERATOR: Oiler.................$ 23.50 9.20

ENGI0673-016 05/01/2016

Rates Fringes

OPERATOR: Crane Gantry Crane; Bridge Crane..$ 26.09 13.00 Tower Crane; Crawler Crane; Truck Crane; Hydro Crane.......................$ 28.25 13.00

IRON0402-001 02/01/2017

Rates Fringes

IRONWORKER, ORNAMENTAL...........$ 23.00 10.99

* PLUM0295-004 01/01/2018

Rates Fringes

PIPEFITTER (Includes HVAC Pipe and Unit Installation)......$ 34.11 18.78

SFFL0821-004 01/01/2018

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 27.68 18.89

SUFL2014-004 08/16/2016

Rates Fringes

CARPENTER, Includes Form Work....$ 19.33 2.73

CEMENT MASON/CONCRETE FINISHER...$ 19.27 0.00

ELECTRICIAN, Includes Low Voltage Wiring...................$ 17.38 4.46

IRONWORKER, REINFORCING..........$ 22.81 11.58

IRONWORKER, STRUCTURAL...........$ 19.80 0.00

LABORER: Common or General, Including Cement Mason Tending...$ 12.07 1.81

LABORER: Pipelayer..............$ 15.00 0.54

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 19.00 3.43

OPERATOR: Bulldozer.............$ 15.40 1.90

OPERATOR: Grader/Blade..........$ 18.97 0.00

OPERATOR: Loader................$ 17.83 0.00

OPERATOR: Roller................$ 14.43 4.78

PAINTER: Brush, Roller and Spray............................$ 13.22 0.00

PLUMBER..........................$ 23.88 5.69

ROOFER...........................$ 17.60 1.39

SHEET METAL WORKER, Includes HVAC Duct Installation...........$ 23.50 0.57

TILE SETTER......................$ 17.25 1.74

TRUCK DRIVER: Dump Truck........$ 12.95 2.28

TRUCK DRIVER: Lowboy Truck......$ 14.24 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO

BIDDERS/OFFERORS

2.1 52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed-Price, Requirements contract resulting from this solicitation.

(End of Provision)

2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF

THE WORK (MAY 2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of Provision)

2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE

EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade Goals for female participation for each trade

10.7 % 6.9 %

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action…