36C24818R0002-A00004000.docx

DOCX document 19 KB Posted

Attached to
Replace Finishes in CLC North Federal contract opportunity
Solicitation number
36C24818R0002
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8

About this file

36C24818R0002 A00004 36C24818R0002 A00004.docx

View the file

Other files for this federal contract opportunity

Other files attached to Replace Finishes in CLC North, newest first.
File Type Posted
36C24818C0166-000.docx DOCX document
36C24818R0002-A00005000.docx DOCX document
36C24818R0002-A00003000.docx DOCX document
36C24818R0002-A00002000.docx DOCX document
36C24818R0002-A00001000.docx DOCX document
36C24818R0002-008.pdf PDF
36C24818R0002-001.docx DOCX document
36C24818R0002-002.docx DOCX document
36C24818R0002-009.pdf PDF
36C24818R0002-010.docx DOCX document
36C24818R0002-005.docx DOCX document
36C24818R0002-006.docx DOCX document
36C24818R0002-003.docx DOCX document
36C24818R0002-007.pdf PDF
36C24818R0002-004.docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) A00004 03-27-2018 548-18-602 36C548 Department of Veterans Affairs West Palm Beach VA Medical Center 7305 North Military Trail Palm Beach Gardens

FL

33410-6400 36C548 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) West Palm Beach VA Medical Center 7305 North Military Trail Palm Beach Gardens

FL

33410-6400 To all Offerors/Bidders

36C24818R0002 03-27-2018

X X X X The purpose of this amendment to post the attached answers to submitted RFIs.

Jose Delagdo Contracting Officer

1. On the Solicitation scope of Work, page 5 of 53, the project is entitled “Replace Finishes CLC North Clinical and Admin Areas. A few lines below that on the same page it is stated that 35,000 square feet of finishes are to be replaced. From an archived plan of the CLC we have on file we have measured about 36,000 square feet of patient areas (areas A & C below) and another 15,200 square feet of Administration areas (area B below) totaling about 51,200 square feet all within the original CLC Building #3. Does this project include the 15,200 square feet of Admin area as well as the 36,000 square feet of patient areas for a total of 51,200 square feet?

Answer: Area of work encompasses approximately 33,000 square feet. By the drawing above, all of AREA C, all of AREA B excluding mechanical areas and the corridor connecting the CLC to the main building, the nurse station area of Area A. New Addition (Hospice) is not included in this scope of work.

2. Do the proposed renovations also include the 12,400 square feet of building additions that have been done on the northwest and northeast of the facility since original construction (1,200 & 11,200 sf below)?

Answer: The 1,200-square foot addition noted above is included in the scope of work. The 11,200-square foot addition (Hospice) is not included in the scope of work.

3. What does the word “North” convey in the project title, “Replace Finishes CLC North Clinical and Admin Areas? Is the scope of work limited to the north section of the building in some way? If so, please describe.

Answer: CLC North is intended to include the patient bedrooms, restrooms, lounges and common areas of the “Area C”. Clinical and Admin areas encompass all other areas as described in the response to question 1.

4. Original Solicitation, page 5 of 53, 7th bullet point states, “at the end of each daily shift, spaces must be patient ready”. This won’t be possible in occupied patient rooms requiring new ceramic tile, plumbing, flooring and wall protection, etc. Can the patient rooms be vacated, barricaded and contained under negative air for progressing rolling room shut downs of a week at a time to allow at least 4 rooms to be done at once? This information is required to thoroughly answer the Phase 1 proposal requirement for technical methods and procedures we will employ to construct this project.

Answer: Areas requiring to be patient ready will be limited to corridors. Other areas such as patient rooms and offices may be closed for the duration of construction activity.

5. In order to determine and describe our phasing plan in our Phase 1 technical approach, What percentage occupancy is the CLC expected to be during our work?

Answer: Patient bedrooms will be available to close 1 wing at a time in 3 phases. Other areas will be completed in additional phases.

6. What is the maximum number of patient rooms that can be remodeled at a time?

Answer: Patient bedrooms will be available to close 1 wing at a time in 3 phases. Other areas will be completed in additional phases.

7. Will portions of the Administration area be unoccupied during our work there, or will all the Admin areas need to be done on weekends and nights and be ready for use each regular weekday?

Answer: Admin areas will be emptied during each construction phase. Work to occur during normal operating hours.

8. In order to determine and describe our technical approach for the two (2) Nursing Stations at corridor intersections what is the intent of The VA here? What problems are being experienced that we must resolve through remodeling in these two (2) areas?

Answer: Nurse stations should be configured to allow a more relaxed homelike environment. A more open floor plan is desired allowing seating for patients in the common areas.