36C24818Q0839-0003002.pdf
PDF 207 KB Posted
- Attached to
- Switchgear NiCad Battery Replacement Federal contract opportunity
- Solicitation number
- 36C24818Q0839
About this file
36C24818Q0839 0003 Questions and Answers - 2.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24818Q0839-0003000.docx | DOCX document | |
| 36C24818Q0839-0003001.pdf | ||
| 36C24818Q0839-0002003.pdf | ||
| 36C24818Q0839-0002002.pdf | ||
| 36C24818Q0839-0002000.docx | DOCX document | |
| 36C24818Q0839-0002001.pdf | ||
| 36C24818Q0839-0001004.docx | DOCX document | |
| 36C24818Q0839-0001005.pdf | ||
| 36C24818Q0839-0001002.pdf | ||
| 36C24818Q0839-0001000.docx | DOCX document | |
| 36C24818Q0839-0001001.pdf | ||
| 36C24818Q0839-0001003.pdf | ||
| 36C24818Q0839-001.pdf | ||
| 36C24818Q0839-000.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers – 36C24818Q0839 # 2
Question No 1: Is there a pallet jack on site available?
Answer: Yes.
Question No 2: How far into the building does this need to go?
Answer: An estimate as short as 20 feet to 200 feet between several doors of varying size. There are 4 racks of 96 batteries each in 4 different of the electrical utility/switchgear location of the CEP.
Question No. 3: How many doors does this have to go through (door and hallway widths and how many)
Answer: Including the entrance and the doors leading to the battery racks, between 3 and 4 doors total. Doors width range from 33” to 70” and hallways are wider.
Question No. 4: Does this need to go to different floor? If so, what floor?
Answer: Ground level.
Question No. 5: Is there a freight elevator on site?
Answer: N/A
Question No. 6: Does the floor need to be coo red (sic) by Masonite or plywood?
Answer: No.
Question No. 7: Can the items stay on the pallet? If no, are there specific requirements for getting the times to the UPS Room?
Answer: No to the first part of the question and do not understand the second part.
Question No. 8: Is a temporary battery required during changeout of the switchgear?
Answer: Brought to the room, yes. Stacked, no.
Question No. 9: Do t he (sic) pallets need to be taken off site when they are unloaded?
Answer: Yes.
Question No. 10: How long can batteries sit until disposal?
Answer: They need to be removed immediately.
Question No. 11: Where can batteries be stored for disposal?
Answer: They need to be removed immediately.
Question No 12: What does CEP stand mean?
Answer: Central Energy Plant.