36C24818Q0775-00001001.docx
DOCX document 282 KB Posted
- Attached to
- SERVICES: Electrical Breaker Services- TIERED EVALUATIONS Amendment 00001 Federal contract opportunity
- Solicitation number
- 36C24818Q0775
About this file
36C24818Q0775 00001 36C24818Q0775 00001.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24818Q0775-00001000.docx | DOCX document | |
| 36C24818Q0775-001.docx | DOCX document | |
| 36C24818Q0775-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24818Q0775 Electrical Breaker Services Questions/Requests for Information with Government response
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
00001 05-23-2018
None 36C546 Department of Veterans Affairs Miami VA Healthcare System
1201 NW 16th Street Miami FL 33125
36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) Miami VA Healthcare System 1201 NW 16th Street Miami FL 33125 To all Offerors/Bidders
36C24818Q0775 05-08-2018
X
X
31 May 2018 at 11:00am EST
The purpose of this amendment to Request for Quote 36C24818Q0775 is to provide Government response to questions/Requests for Information (RFI) from industry and extend the response due date for electrical breaker services in support of the Miami VA Healthcare System.
1. See attached Government response to questions/RFI from industry (page two (2)) attached herewith.
2. The solicitation Request for Quote response due date is hereby extended to 31 May 2018 at 11:00am EST.
All other contract terms and conditions remain unchanged.
1. What hours are the work to be performed?
Most of the work will be done during the day during normal duty hours but some work will have to be done during the afterhours due to patient care.
1. What work can we perform in what areas can we perform while the generators are running?
If requested on substations and main feeder breakers. All work shall be performed at the convenience and at the discretion of the Government.
1. What generators work in sequence with what paralleling systems?
Caterpillars with non-essentials and Detroit’s with essentials.
1. Are the Breakers draw out?
Almost all are.
1. Are certain transformers included in the work?
All transformers are.
1. Where would you prefer the contractor to start first?
Most likely it will be at the Utility Plant however again all work shall be performed at the convenience and in correspondence with the Government.
1. When can we get the Line Drawings for each floor?
All one lines are posted on the walls of the rooms as well as available upon request from contractors who send separate emails requesting the release to them thereof.
1. Does the contractor need to be NETA certified? Example from other solicitations: “Contractors shall be certified by the Inter-National Electrical Testing Association (NETA) as NETA Certified Technician, and completed the Occupational Safety & Health Administration (OSHA) approved 10-hour construction safety training.”
If they have NETA it would be recommended but it is not required and yes, they should have the 10-hour OSHA course.
1. Pg. 5, Section 4.2. of the PWS reads: “The contractor shall identify all breakers in the facility as to the load they serve.” Pg. 6, Section 4.5.2 reads: “The contractor shall inspect all electrical equipment, including each breaker, and report damaged, or malfunctioning equipment, loose connections or material, or any contamination that must be corrected. Clean where appropriate.” Reading these at face value would lead you to believe these two items are to be performed for the entire facility?
This only relates to the equipment listed within the Performance Work Statement (PWS).
1. The question is this the intent of these two items or are they supposed to be limited to the equipment listing on page 7, section 4.10?
Only for the equipment listed in the PWS.
1. Additionally, section 4.2 referenced above relates to what we call “circuit tracing” to identify the load on each breaker.
There will be no circuit tracing and if needed the Government will perform circuit tracing.
1. Please provide the Site Visit Sign In Sheet.
Sign in sheet attached- see page four (4).
image1.jpg