36C24624Q0326.docx

DOCX document 4 MB Posted

Attached to
Z1DA--Overhead Skywalk Cleaning Federal contract opportunity
Solicitation number
36C24624Q0326
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This sources sought notice seeks potential vendors to provide overhead skywalk cleaning services at the Durham Veterans Affairs Medical Center in North Carolina. The contractor shall clean the interior and exterior of the overhead skywalk from Garage A to Building 1, providing all necessary transportation, materials, equipment, labor and technical expertise on a turn-key basis. Responses to the notice should include company information, business size, socioeconomic certifications if applicable, and a description of qualifications demonstrating the ability to meet the requirement. Capability statements must be submitted no later than January 23, 2024 to Keicha Passley at the specified email address.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBJECT*

Overhead Skywalk Cleaning

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
23667
SOLICITATION NUMBER*
36C24624Q0326
RESPONSE DATE/TIME/ZONE
01-16-2024 9:30 am EASTERN TIME, NEW YORK, USA
ARCHIVE
90 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N

SET-ASIDE

PRODUCT SERVICE CODE*
Z1DA
NAICS CODE*
561790

CONTRACTING OFFICE ADDRESS

Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667

POINT OF CONTACT*

Contract Specialist Keicha Passley Keicha.Passley@va.gov 757-726-6048

PLACE OF PERFORMANCE

ADDRESS
Durham VA Medical Center

508 Fulton St

Durham NC

POSTAL CODE
27705

COUNTRY

ADDITIONAL INFORMATION

AGENCY’S URL
https://va.gov
URL DESCRIPTION
https://va.gov

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION
keicha.passley@va.gov

Sources Sought Notice

DESCRIPTION

*= Required Field
Sources Sought Notice

Sources Sought Notice

This is a sources sought announcement only. The purpose of this notice is to conduct market research and obtain information from qualified potential offerors. No formal solicitation document exists at this time. The Government is not obligated to, nor will it, pay for or reimburse any costs associated with responding to this sources sought synopsis request. This notice shall not be construed as commitment by the Government to issue a solicitation or ultimately award a contract, nor does it restrict the Government to a particular acquisition approach. The Government will in no way be bound to this information if any solicitation is issued.

The Durham Veterans Affairs Medical Center (VAMC), 508 Fulton Street, Durham, NC 27705, is seeking potential sources capable of providing Overhead SkyWalk Cleaning Services.

The NAICS code for this procurement is 561790 - Other Services to Buildings and Dwellings, Size Standard $9 Million.

The Contractor shall provide all transportation, materials, parts, tools, specialized equipment, labor, supervision, quality control, and technical expertise to clean the overhead skywalk, inside and outside, from Garage A to Building 1. This is a turn-key request with the Contractor providing all the equipment and performing all the work.

Responses to this sources sought notice should include the following: name and address of company, business size (large or small): Please identify your companies socioeconomic categories- 8(a), HUBZone, Services Disabled Veteran-Owned/Veteran-Owned Small Business, other small, small or large.

If you are an SDVOSB, VOSB or small business and plan on subcontracting, please provide a plan to show how your company will provide 50% of the work being performed.

Also, provide a brief description of qualifications and any other pertinent information which demonstrates the ability to meet the above requirement. Subject line must read: Durham VAMC Overhead Skywalk Cleaning Services. All capability statements shall be submitted in writing no later than 9:30AM, January 23, 2024 to the attention of: Keicha Passley emailed to the address of Keicha.Passley@va.gov.

See attached Performance Work Statement

Please don’t reply if your company is not capable or interested.

Sources Sought Notice

*= Required Field
Sources Sought Notice

Page 1 of

Sources Sought Notice

PERFORMANCE WORK STATEMENT

The Department of Veterans Affairs currently has the need to clean the interior and exterior of the overhead skywalk from Garage A to Building 1 at the Durham Veterans Affairs Health Care System (VAHCS), 508 Fulton St, Durham, NC 27705 in accordance with the terms and conditions herein.

1. Statement of Work: The Contractor shall provide all transportation, materials, parts, tools, specialized equipment, labor, supervision, quality control, and technical expertise to clean the interior and exterior of the overhead skywalk from Garage A to Building 1. The contractor shall use appropriate methods of cleaning for the different materials that skywalk is constructed of. The contractor may need to make repairs on the interior of the Skywalk to perform a complete cleaning. Examples of this may include drywall repair and painting. This is a turn-key request with the Contractor providing all the equipment and performing all the work. See pictures of the interior and exterior of the Skywalk in section 4.

2. Coordination. The contractor will coordinate with the Contracting Officer’s Representative (COR) with input from the Facility Operations Specialists Supervisor.

a. The Contractor shall work with the COR.

b. Operations personnel shall be responsible for securing and formally locking out utilities as needed. Contractor shall install their lock out tag out (LOTO) on the multi lock devices and provide documentation to the COR.

c. The Federal Government shall not provide any tools, parts, materials, and equipment. This is a turn-key project with the vendor providing all necessary tools, parts, materials, and equipment.

d. This work should take place during off hours or weekends. A lane of traffic must be always kept open under the skywalk during work.

3. GENERAL:

a. All contract field personnel engaged in work on this project shall be trained in accordance with current regulations and enrolled in a medical monitoring program. Training shall include 40-hour and annual update training in compliance with OSHA and EPA regulations.

b. The contractor shall provide a safety plan, that must be approved by VA safety office, for roof work prior to the performance of work. An Accident Hazard Analysis (AHA) and Accident Prevention Plan (APP) is also required

c. The contractor’s employees shall not enter the work site without appropriate identification. They may also be subject to inspection of their personal effects when entering or leaving the project site.

d. The Contractor shall be responsible for ensuring that all the employees and other personnel visiting the work site have and are using the appropriate Personal Protective Equipment (PPE) that addresses the hazards found at the site. The Contractor shall be responsible for the upkeep, issue, and training for the PPE used and maintaining all required documentation.

e. Execute work to interfere as little as possible with normal functioning of the hospital including operations of utility services, fire protection systems and any existing equipment, and with work being performed by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied jointly by patients or medical personnel, and Contractor’s personnel, except as permitted by COR where required by limited working space. All work that interferes with medical center operation will be completed in off-tour hours (outside normal business hours).

f. No utility service such as water, gas, steam sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the Medical Center Director’s prior knowledge and written approval.

g. The Durham VAHCS reserves the right to have work cease or shut down any work in progress and order the vendors employees off the premises in the event of a national emergency. The Durham VA HCS also reserves the right to have work cease when required by operational necessity or a safety situation. The COR shall immediately notify the CO upon any such action.

h. Site and Building Access: Maintain free and unobstructed access to facility emergency services and for fire, police, and other emergency response forces in accordance with NFPA 241.

i. Means of Egress: Do not block exiting for occupied buildings, including paths from exits to roads. Minimize disruptions and coordinate with COR.

j. Buildings shall be occupied during performance of work. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas against dust and debris, so that equipment and affected areas to be used in the Durham VAHCS operations shall not be hindered. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Durham VAHCS operations shall continue during the installation period.

k. The contractor shall maintain neat and orderly work areas and shall clean area of debris and rubbish daily and dispose of waste materials offsite per hospital policies. The contractor shall provide a dumpster if it is determined to be necessary and shall work with the COR in advance for a spot-on site to establish the dumpster.

l. All work shall be performed in full accordance with applicable local and Federal regulations. All materials and installation shall conform to the recommendations of National Fire Protection Association (NFPA), plumbing and mechanical codes. No departures from specification requirements shall be permitted without written approval. The Supplier shall use good safety practices while working. All hardware should be installed in such a manner to minimize damage and maximize patient and employee safety.

m. New work shall be installed and connected to existing work safely and professionally. Disturbed or damaged work shall be replaced or repaired to its prior conditions.

n. All items furnished shall be free from defects that would adversely affect the performance, maintainability and appearance of individual components and overall assembly.

o. Where the Government determines that the vendor has installed equipment not conveniently accessible for operation and maintenance, equipment shall be removed, and reinstalled or remedial action performed as directed at no additional cost to the Government.

p. Hot Work: Perform and safeguard hot work operations in accordance with NFPA 241 and NFPA 51B. Obtain daily permits from facility Safety Manager at least 24-hours in advance.

q. Welders must also be process qualified under the American Society of Mechanical Engineers (ASME) Section IX and shall provide proof of certification.

r. Contractor personnel and sub-contractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA personnel regarding information and information system security.

s. This is a federal facility as well as a medical center. As such, there is NO smoking on Federal property. Failure to follow these regulations can result in removal of the worker or Contractor from the facility and/or a US Magistrate’s ticket and fine.

t. Payment of stored materials will be accordance with the FAR. Stored materials will not be reimbursed until materials have been installed and approved by the Contracting Officer. All stored materials must be pre-approved by the Contracting Officer and Chief, Engineering Service. Storage of materials at the Durham VA Medical Center is not guaranteed. Offsite storage shall be accounted for in the Contractors Bids.

4. Pictures

End of Statement of Work image1.jpeg image2.jpeg image3.jpeg image4.jpeg image5.jpeg image6.jpeg

File details come from the government source that posted it. Updated .