J045--Boiler Safety Device testing Federal contract opportunity
Solicitation number
36C24622Q0127
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

View the file

Other files for this federal contract opportunity

Other files attached to J045--Boiler Safety Device testing, newest first.
File Type Posted
36C24622Q0127 0005.docx DOCX document
Revised Schedule of Services.docx DOCX document
Attachment B- Boiler Tuning Document- JUNE 2021.docx DOCX document
Attachment A- Semi-Annual Safety Device Testing Documentation Boiler Devices.pdf PDF
36C24622Q0127 0003.docx DOCX document
36C24622Q0127 0002.docx DOCX document
36C24622Q0127 0001.docx DOCX document
36C24622Q0127_1.docx DOCX document
Wage Determination (Hampton).pdf PDF
QASP.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 590-22-1-506-0013 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton

VA

23667 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton

VA

23667 To all Offerors/Bidders

36C24622Q0127 12-10-2021

X X X

4:00PM EST on Friday, December 24, 2021 X The purpose of this amendment is to:

1.) Provide responses to the technical questions. See pages 2-3 Technical Q & A.

2.) Extend the closing date to 4:00PM EST on Friday, December 24, 2021.

3.) Please see revised Schedule of Services.

Technical Q & A: Boiler Safety Device Testing

Q: What are the makes, models, manufacturer year and type (Firetube/water tube) of the 3 boilers? (photo of info plates would be best).

A: We have Water Tube Nebraska Boiler 3 each, Built 1972 and retubed in 2001.

Q: Do you have 2 tanks? DA & Condensate?

A: Both DA and Condensate Tanks.

Q: Is it one service visit per year, or 2 semi-annual visits as indicated in the VHA 1810?

A: One per year as per 1810 including tuning on gas and oil.

Q: What is your upcoming due date for Safety Device Testing?

A: That will not be determined until after the award of the 5-year Contract and will be coordinated with Plant Supervisor.

Q: Approximately how many Transmitters does your plant have between all boilers and service equipment?

A: Transmitters are not included in this RFQ / functions to maintain levels and processes. Not a Safety Device Testing item.

Q: On most recent service visit were all boilers able to be tuned to 100% on both fuel sources without major issues? How long ago was that service visit?

A: Yes, however we Tune between 10%-80%. Above 80 percent, Operationally, we bring on an additional Boiler above 74%.

Q: Do you have any faulty components which will need major attention prior to being able to complete safety device testing and tuning?

A: No

Q: Is National Board Inspections part of this contract? A: No

· If so, does your site open/close boilers and provide gaskets?

Q: Is the 6 year NDT inspection for your DA tank part of this contract, and if so, what year of the contract is it due?

A: No

Q: The COR had an extensive list from the 1810 for checks 11 through 47 on the boilers we would request a copy of that detailed list.

A: Please see Attachment A- Semi-Annual Safety Device Testing Documentation Boiler Devices and Attachment B- Boiler Tuning Document- JUNE 2021.

Q: In the SOW tuning is mentioned, if we could have a clearer more detailed description as to exactly what is expected for tuning (as man hours can drastically change).

A: Clarity on tuning requirements:

Place Boiler in Operation in manual with Boiler Stop closed Initially and as required, open Boiler Stop and adjust Steam muffler as necessary to tune Boiler from 10% to 80% Boiler load and document any changes necessary to ensure that Boilers are operating safely at its most combustion efficiency.

Document initial settings and any changes made to set points of Fuel, VFD Air and Damper positions. This process is completed on all three Boilers, on both Gas and #2 Diesel fuel.

The purpose of this amendment is to:

1) Provide response to the technical questions. See pages 2-3 Technical Q & A

2) Extend the closing date to 4:00PM EST on Friday, December 24, 2021

3) Please see revised Schedule of Services.

Technical Q & A: Boiler Safety Device Testing

Q: What are the makes, models, manufacturer year and type (Firetube/water tube) of the 3 boilers? (photo of info plates would be best).

A: We have Water Tube Nebraska Boiler 3 each, Built 1972 and retubed in 2001.

Q: Do you have 2 tanks? DA & Condensate?

A: Both DA and Condensate Tanks.

Q: Is it one service visit per year, or 2 semi-annual visits as indicated in the VHA 1810?

A: One per year as per 1810 including tuning on gas and oil.

Q: What is your upcoming due date for Safety Device Testing?

A: That will not be determined until after the award of the 5-year Contract and will be coordinated with Plant Supervisor.

Q: Approximately how many Transmitters does your plant have between all boilers and service equipment?

A: Transmitters are not included in this RFQ / functions to maintain levels and processes. Not a Safety Device Testing item.

Q: On most recent service visit were all boilers able to be tuned to 100% on both fuel sources without major issues? How long ago was that service visit?

A: Yes, however we Tune between 10%-80%. Above 80 percent, Operationally, we bring on an additional Boiler above 74%.

Q: Do you have any faulty components which will need major attention prior to being able to complete safety device testing and tuning?

A: No

Q: Is National Board Inspections part of this contract? A: No

· If so, does your site open/close boilers and provide gaskets?

Q: Is the 6 year NDT inspection for your DA tank part of this contract, and if so, what year of the contract is it due?

A: No

Q: The COR had an extensive list from the 1810 for checks 11 through 47 on the boilers we would request a copy of that detailed list.

A: Please see Attachment A- Semi-Annual Safety Device Testing Documentation Boiler Devices and Attachment B- Boiler Tuning Document- JUNE 2021.

Q: In the SOW tuning is mentioned, if we could have a clearer more detailed description as to exactly what is expected for tuning (as man hours can drastically change).

A: Clarity on tuning requirements:

Place Boiler in Operation in manual with Boiler Stop closed Initially and as required, open Boiler Stop and adjust Steam muffler as necessary to tune Boiler from 10% to 80% Boiler load and document any changes necessary to ensure that Boilers are operating safely at its most combustion efficiency.

Document initial settings and any changes made to set points of Fuel, VFD Air and Damper positions. This process is completed on all three Boilers, on both Gas and #2 Diesel fuel.