SO5SiteVisitQuestionsAshpalt.pdf

PDF 151 KB Posted

Attached to
Z1DA--Asphalt Patching Federal contract opportunity
Solicitation number
36C24622B0034
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This document contains questions and answers regarding a federal solicitation for asphalt patching work at a Veterans Affairs site. The solicitation seeks bids for excavation and asphalt patching at depths of at least 10 inches across multiple locations, with additional payment possible for deeper excavation. Work hours are limited to daytime only pending traffic control approval. The bid quantity is unclassified. No curb, concrete, or striping work is included. The solicitation has been reclassified to a NAICS code with a 15% minimum self-performance requirement for the contractor. Asphalt plants do not typically operate at night or weekends, so consideration will be given to daytime work if a traffic control plan is provided. Excavated materials cannot be spread on-site but must be disposed of off-site according to construction waste management specifications. Electronic bid submission may be considered in lieu of a hard copy.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Asphalt Patching, newest first.
File Type Posted
36C24622B0034 0006.pdf PDF
S07 Bid Abstract_Asphalt paving 9-1-2022.pdf PDF
BID OPENING ASPHALT PROJECT - Attendance report 9-1-22 (1).pdf PDF
S05 revised answer.pdf PDF
36C24622B0034 0005.pdf PDF
36C24622B0034 0005_1.docx DOCX document
36C24622B0034 0004.pdf PDF
36C24622B0034 0004_1.docx DOCX document
S06 36C24622B0034 0003.pdf PDF
S04SiteVisitLogAsphalt.pdf PDF
36C24622B0034 0003_1.docx DOCX document
36C24622B0034 0002.pdf PDF
36C24622B0034 0002_1.docx DOCX document
36C24622B0034 0001.pdf PDF
36C24622B0034 0001_1.docx DOCX document
Asphalt Patching - Site Drawing.pdf PDF
36C24622B0034_2.docx DOCX document
36C24622B0034.pdf PDF
Asphalt Patching - Specs.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions For Asphalt Patching:

1. Please see below. We need the VA to specify a pavement section (depths of Asphalt layers).

Also confirm that the minimum depth from the asphalt surface is 10”. Will we be paid for additional undercut below 10”? How will this be quantified?

The VA does not have a means to determine where and how much undercut will be necessary as part of this project and relies on bidders to perform all information gathering they feel is necessary during the proposal acceptance period. Bidders should estimate how much undercutting they think will be necessary and then provide a proposed cost based on their best estimate of how much the work will cost for them to perform.

2. Please confirm the work hours. Are nights and weekends. Asphalt plants aren’t usually open at night, or on weekends. We could possibly pay them a substantial fee to open for the small amounts shown in the patches, but this will be very expensive. Project is written up as nights and weekends. If a Daytime Work plan can be executed with minimal effect on traffic and a Traffic Control Plan to allow vehicular traffic to pass on one lane and conform to the requirements of the MUTCD- Part 6; Temporary traffic control and Approved by the VA Police and FMS Management and VA Safety then we can consider some daytime work if needed.

3. 31 20 11 1.4 Is the excavation classified or unclassified? Unclassified

4. Is any curb or other concrete replacement included in this project? No Concrete or Curbs to be replaced

5. Are we to restore the striping to existing condition? No Striping to be done

6. The SDVOSB is required to perform 25% of the work, not including project management.

The new NAICS code for this project will be 236220- Commercial and Institutional Building Construction, bringing the percentage of work needing to be performed by the contractor to 15%.

7. Due to asphalt plants not wanting to run at night or on weekend for the smaller quantities, would it be possible to work during normal hours? See Question 2

8. Can asphalt millings be spread onto the contractors lay down lot? No. Contractor needs to dispose off-site. Spec. 01 74 19 Construction Waste Management

9. Would you consider electronic/digital bid submission only and dropping the requirement for one hard copy?

Please see page 11 of the solicitation, requirements remain unchanged.