36C24619Q0292-001.docx
DOCX document 110 KB Posted
- Attached to
- Cook Chill Equipment Maintenance for the Hampton VAMC Federal contract opportunity
- Solicitation number
- 36C24619Q0292
About this file
36C24619Q0292 36C24619Q0292_1.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| -16831.docx | DOCX document | |
| 36C24619Q0292-002.docx | DOCX document | |
| 36C24619Q0292-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24619Q0292
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
DUNS:
DUNS+4:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. 2/2012)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
36C24619Q0292 04-15-2019 Diane Stoskopf 757-728-3449 04-26-2019 3:00 pm Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton
VA
23667 X X 811310 $7.5 Million X N/A X SERVICE: See Schedule
Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton
VA
23667
Financial Services Center
PO BOX 149971
Austin
TX
78714-9971 X Preventative maintenance and repair service for Cleveland Cook Chill Equipment at the Hampton VA Medical Center, Hampton Virginia.
This requirement is set-aside 100% for small business.
X X
DIANE STOSKOPF
Contracting Officer Table of Contents
| SECTION A | 1 |
| A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS | 1 |
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 3 |
| B.1 CONTRACT ADMINISTRATION DATA | 3 |
| B.2 SCHEDULE OF SERVICES | 4 |
| B.3 PERFORMANCE WORK STATEMENT | 7 |
| B.4 SPECIAL CONTRACTING REQUIREMENTS | 29 |
| SECTION C - CONTRACT CLAUSES | 35 |
| C.1 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999) | 35 |
| C.2 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) | 35 |
| C.3 SUPPLEMENTAL INSURANCE REQUIREMENTS | 35 |
| C.4 VAAR 852.237-70 CONTRACTOR RESPONSIBILITIES (APR 1984) | 36 |
| C.5 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 36 |
| C.6 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (OCT 2018) | 37 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 45 |
| D.1 WAGE DETERMINATION | 45 |
| D.2 ATTACHMENT A - Quality Assurance Surveillance Plan (QASP) | 45 |
| SECTION E - SOLICITATION PROVISIONS | 46 |
| E.1 INSTRUCTIONS TO OFFERORS | 46 |
| E.2 52.233-2 SERVICE OF PROTEST (SEP 2006) | 49 |
| E.3 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (SEP 2018) | 49 |
| E.4 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (SEP 2018) | 50 |
| E.5 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 50 |
| E.6 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL ITEMS (OCT 2018) | 51 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:
b. GOVERNMENT: Contracting Officer 36C246
Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [] |
| c. Other | [X] Monthly |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
Department of Veterans Affairs Financial Services Center
PO BOX 149971
Austin TX 78714-9971 ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
B.2 SCHEDULE OF SERVICES
Contractor shall provide the manufacturer’s required maintenance as a normal part of this contract and as set forth below. In addition, contractor shall provide repair service for refrigeration as required for an established hourly rate. Travel time to the Hampton VA Medical Center and to acquire parts will not be chargeable. Hourly rate shall be charged from the time the contractor is on station until he/she leaves the station. The Contracting Officer’s Representative (COR) must authorize any repair work prior to proceeding with a repair.
This contract is 24 hours / 7 days a week / 365 day a year contract. The established hourly rate for repairs is for the same time frame. Overtime rates or premium rates are not authorized.
Preventative Maintenance will be conducted monthly, quarterly (January, April, July, and October), and semi-annually (January and July).
BASE YEAR: 25 May 2019 through 24 May 2020
| CLIN |
| DESCRIPTION |
| QTY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 0001 |
| Preventative maintenance services for equipment scheduled on the SOW. |
| 12 |
| mos |
| $ |
| $ |
| 0002 |
| Hourly rate for repairs to highly technical Cook Chill equipment scheduled but not covered under warranty. |
| 150 |
| hr |
| $ |
| $ |
| 0003 |
| Hourly rate for light maintenance for unscheduled kitchen equipment. |
| 20 |
| hr |
| $ |
| $ |
| 0004 |
| Quarterly maintenance on Cook Chill equipment. |
| 4 |
| qtr |
| $ |
| $ |
| 0005 |
| Semi-annual Maintenance on Cook Chill equipment. |
| 2 |
| ea |
| $ |
| $ |
| 0006 |
| Annual Maintenance on Cook Chill equipment. |
| 1 |
| ea |
| $ |
| $ |
| 0007 |
| Parts for equipment repair |
| 1 |
| lot |
| Not to Exceed: |
| $20,000.00 |
| Total Estimated Cost of Base Year: |
| $ |
OPTION YEAR 1: 25 May 2020 through 24 May 2021
| CLIN |
| DESCRIPTION |
| QTY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 1001 |
| Preventative maintenance services for equipment scheduled on the SOW. |
| 12 |
| mos |
| $ |
| $ |
| 1002 |
| Hourly rate for repairs to highly technical Cook Chill equipment scheduled but not covered under warranty. |
| 150 |
| hr |
| $ |
| $ |
| 1003 |
| Hourly rate for light maintenance for unscheduled kitchen equipment. |
| 20 |
| hr |
| $ |
| $ |
| 1004 |
| Quarterly maintenance on Cook Chill equipment. |
| 4 |
| qtr |
| $ |
| $ |
| 1005 |
| Semi-annual Maintenance on Cook Chill equipment. |
| 2 |
| ea |
| $ |
| $ |
| 1006 |
| Annual Maintenance on Cook Chill equipment. |
| 1 |
| ea |
| $ |
| $ |
| 1007 |
| Parts for equipment repair |
| 1 |
| lot |
| Not to Exceed: |
| $20,000.00 |
| Total Estimated Cost Option Year 1: |
| $ |
OPTION YEAR 2: 25 May 2021 through 24 May 2022
| CLIN |
| DESCRIPTION |
| QTY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 2001 |
| Preventative maintenance services for equipment scheduled on the SOW. |
| 12 |
| mos |
| $ |
| $ |
| 2002 |
| Hourly rate for repairs to highly technical Cook Chill equipment scheduled but not covered under warranty. |
| 150 |
| hr |
| $ |
| $ |
| 2003 |
| Hourly rate for light maintenance for unscheduled kitchen equipment. |
| 20 |
| hr |
| $ |
| $ |
| 2004 |
| Quarterly maintenance on Cook Chill equipment. |
| 4 |
| qtr |
| $ |
| $ |
| 2005 |
| Semi-annual Maintenance on Cook Chill equipment. |
| 2 |
| ea |
| $ |
| $ |
| 2006 |
| Annual Maintenance on Cook Chill equipment. |
| 1 |
| ea |
| $ |
| $ |
| 2007 |
| Parts for equipment repair |
| 1 |
| lot |
| Not to Exceed: |
| $20,000.00 |
| Total Estimated Cost Option Year 2: |
| $ |
OPTION YEAR 3: 25 May 2022 through 24 May 2023
| CLIN |
| DESCRIPTION |
| QTY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 3001 |
| Preventative maintenance services for equipment scheduled on the SOW. |
| 12 |
| mos |
| $ |
| $ |
| 3002 |
| Hourly rate for repairs to highly technical Cook Chill equipment scheduled but not covered under warranty. |
| 150 |
| hr |
| $ |
| $ |
| 3003 |
| Hourly rate for light maintenance for unscheduled kitchen equipment. |
| 20 |
| hr |
| $ |
| $ |
| 3004 |
| Quarterly maintenance on Cook Chill equipment. |
| 4 |
| qtr |
| $ |
| $ |
| 3005 |
| Semi-annual Maintenance on Cook Chill equipment. |
| 2 |
| ea |
| $ |
| $ |
| 3006 |
| Annual Maintenance on Cook Chill equipment. |
| 1 |
| ea |
| $ |
| $ |
| 3007 |
| Parts for equipment repair |
| 1 |
| lot |
| Not to Exceed: |
| $20,000.00 |
| Total Estimated Cost Option Year 3: |
| $ |
OPTION YEAR 4: 25 May 2023 through 24 May 2024
| CLIN |
| DESCRIPTION |
| QTY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 4001 |
| Preventative maintenance services for equipment scheduled on the SOW. |
| 12 |
| mos |
| $ |
| $ |
| 4002 |
| Hourly rate for repairs to highly technical Cook Chill equipment scheduled but not covered under warranty. |
| 150 |
| hr |
| $ |
| $ |
| 4003 |
| Hourly rate for light maintenance for unscheduled kitchen equipment. |
| 20 |
| hr |
| $ |
| $ |
| 4004 |
| Quarterly maintenance on Cook Chill equipment. |
| 4 |
| qtr |
| $ |
| $ |
| 4005 |
| Semi-annual Maintenance on Cook Chill equipment. |
| 2 |
| ea |
| $ |
| $ |
| 4006 |
| Annual Maintenance on Cook Chill equipment. |
| 1 |
| ea |
| $ |
| $ |
| 4007 |
| Parts for equipment repair |
| 1 |
| lot |
| Not to Exceed: |
| $20,000.00 |
| Total Estimated Cost Option Year 4: |
| $ |
Total Estimated Cost of Base and 4 Option Years: $_____________
B.3 PERFORMANCE WORK STATEMENT
Nutrition and Food Service Maintenance and Repair Contract Kitchen Equipment
A. GENERAL REQUIREMENT
The contractor shall, upon successful award of the contract, provide to the Hampton Veterans Affairs Medical Center (VAMC), 100 Emancipation Dr, Hampton, Virginia 23667 services in the form of labor, materials and expertise to maintain kitchen Cook Chill equipment and other food preparation equipment as set for in this contract in peak operating condition.
The Nutrition and Food Service Department is tasked with food preparation to support at a minimum of seven (7) hospitals located in North Carolina and Virginia. This food production involves state of the art equipment and extremely tight schedules. Operational equipment is mission critical and therefore of paramount importance.
The contractor shall provide the manufacturer’s required maintenance as a normal part of this contract and as set forth in this contract. In addition, contractor shall provide repair service for Advanced Food Production (AFP) equipment as required for an established hourly rate. Travel time to the Medical Center and to acquire parts will not be chargeable. Hourly rate will be charged from the time the contractor is on station until he/she leaves the station. The Contracting Officer’s Representative (COR) prior to any repair work proceeding must authorize repair work.
This contract is a 24 hour / 7 day a week / 365 day a year contract. The established hourly rate for repairs is for the same time frame. Overtime rates or premium rates are not authorized.
Preventative Maintenance will be conducted monthly, quarterly (January, April, July, and October), semi-annually (April and October) and annually in August/September (as scheduled).
B. SPECIFIC REQUIREMENTS
Service technicians working on all equipment shall be factory trained and certified as well as have experience working on food service equipment and specifically Cook Chill equipment.
· The service technicians working on the Cleveland Cook Chill equipment will be factory trained by Cleveland.
· Each technician shall provide a certificate of Cleveland Cook Chill training prior to contract award and have one-year field experience working on Cook Chill equipment. If technicians are not Cleveland Factory Certified, they must attend a 3-day training within two (2) months of award at the contractor’s expense. The training will be held at the Hampton VAMC on VA equipment by a Cleveland representative.
· Only technicians who have provided Cleveland Certification will be allowed to work on Cleveland Cook Chill Equipment.
· As the contractor experiences technician turnover, each new technician will have to be trained and certified by Cleveland to be allowed to service Cleveland Cook Chill Equipment.
· Contractor must have a minimum of 2 technicians certified to work on Cleveland Cook Chill Equipment. Contractor shall give staffing numbers of cook chill technicians who are currently and/or to be Cleveland trained.
Contractor must be an Authorized Cleveland Parts Dealer or have a letter from Cleveland stating that they will approve authorization if awarded the contract. Parts cannot be ordered through a secondary vendor.
Cleaning products and lubricants must be approved in advance to ensure they are USDA compliant. MSDS must also be provided before use of product.
Contractor will perform a quarterly inventory of all cook chill parts and provide the list to COR. Any cook chill parts will need to be routed through NFS appropriately to ensure proper inventory accountability. Any part removed from stock will be noted on the service ticket and approval for a replacement part will need to be approved. Contractor will be responsible for maintaining appropriate PAR levels for any part in inventory.
Any equipment used for calibrating temperatures must be calibrated and certified per manufacturer’s standards on the anniversary of the last calibration. A copy of the certification will be provided to the COR. Proof of recalibration will be required if the equipment has been exposed to unusual conditions (i.e. accidently dropped, etc.).
Preventive Maintenance (PM) will be performed on a routine basis (monthly, quarterly, semi-annually or annually as outlined in the Preventive Maintenance Schedule). Maintenance WILL be split into 2 or more visits to ensure a thorough and detailed overview of EACH piece of equipment outlined within this document has been inspected. Each monthly PM visit will be split by a minimum of ten (10) calendar days, unless other arrangements have been made and agreed upon by the department. This will ensure that the PM is not interrupted by unforeseen emergencies requiring immediate technician support. If the contractor chooses to use two (2) or more technicians to meet the obligated contractual hours the maintenance visits will still need to be split by a minimum of ten (10) calendar days, unless other arrangements have been made and agreed upon by the department. Recommend that PM be conducted every 2 weeks or more often until all equipment has been inspected. If a service call is initiated on (1) one business day after the PM and the issue is related to an oversight or improper PM, service call will be resolved with no service or travel cost to the government. Business days are Monday – Friday.
Any work performed under a warranty visit will require its own separate service ticket. Any work performed under a PM visit will require its own separate service ticket. Deficiencies noted on PM should be corrected during PM visit if parts are available. Deviations from this must be approved by the COR.
Contractor will ensure that any and all areas which they are granted access to are secured prior to departure. Any area left unsecure (i.e. fenced in areas, etc) by the contractor may be held liable for any damage that occurs.
Records for maintenance and inspection will be maintained for a period of three years and a hard copy given to the COR for government records. Equipment subject to this contract and its recommended maintenance schedules are listed below.
C. SERVICE CALLS
Upon notification of a trouble call or problem, the contractor shall acknowledge the call within 30 minutes and be on the facility ready to work within 2 hours. The time starts when the initial call is made from the facility. The contractor will maintain a human interface (answering center or on duty maintenance mechanic) with up-to-date contact information to receive the call. Use of pagers or answering machines is not acceptable.
The contractor will develop a source of supply parts to repair equipment in a timely manner. In the event a part is required to be shipped overnight, the government will pay the shipping charge.
The contractor will submit a detailed list of equipment parts required for repairs with their costs to the government. The government reserves the right to order parts or to have the contractor order parts with an established mark up. The government reserves the right to select shipping speed for ordered parts.
Provide written reports following each regular inspection or emergency call, i.e. Work Order slip.
D. SERVICE RECALLS
If called back for the same problem within 3 days, contractor shall not charge the government for follow-on work. If production schedule has to be stopped due to the inability to fix the problem for more than 3 days, then a 5% credit will be credited to the original invoice for each day that production is ceased. This does not include waiting for parts to be shipped. The following are considered critical equipment:
Cook Tanks (2) Kettles (2) - 100 Gallon Tilt Ice Builder and Condensing Unit Aquasnap Glycol Units (2)
E. SAFETY
All work will be accomplished to industry standards and compliant with the LIFE SAFETY Code, edition 2012 and all its referenced codes and regulations. All Dept. of Veteran Affairs, Federal, Commonwealth of Virginia laws, regulations and codes will be complied with.
In particular, all refrigerant handling will be IAW EPA Section 608 regulations. The refrigerant removed from the equipment may not be reintroduced unless the contractor can prove to the COR the refrigerant is not contaminated otherwise new or virgin refrigerant will be used. The contractor will supply to the government copies of the documents certifying the proper disposal of the reclaimed refrigerant. Once refrigerant level has been successfully achieved any loss of more than 10# of refrigerant will constitute an initiation of an inspection for the entire refrigeration line for any potential leaks.
F. SECURITY
Prior to any hot work commencing, the contractor must obtain a hot work permit from the Fire Safety Division of the medical center on a daily basis. All provisions of the permit must be complied with.
Parking will be in designated lots. Consult with the COR as to allowable parking and material drop-off.
Any work requiring a shutdown or utility outage will be requested in advance and scheduled by the COR prior to the work being accomplished.
This is a hospital environment. The contractor and his personnel are expected to be appropriately dressed (uniformed), wear a hairnet and, if needed, a beard guard in the production area and conduct themselves in a professional manner.
Normal work hours of the medical center are from 7:30 AM to 4:00 PM, Monday through Friday. Due to the potential emergent nature of this contract, work outside the normal working hours (to include evenings and weekends) will be required. The contractor will coordinate any work outside normal working hours with the COR and the kitchen supervisor.
Since the incidents of September 11, 2001, the Federal Government has begun to implement new security measures to help protect federal facilities. The contractor will provide to the COR a list of employees expected to work on this contract. This list will be on company letterhead and contain the employees’ name, driver’s license number, address and nationality. This list will be verified and signed by a corporate officer.
All mechanics and technicians will need to obtain a permanent Contractor ID badge from the Police Department. They will need to coordinate this with the COR before any work can be done. Badge must be worn and visible at all times when on VA property. Loss of badges can result in administrative fees and fines not to exceed $50.00 USD to replace them. Keys to gate and other areas are available in the Main Office. The key must be returned promptly. Loss of keys can result in administrative fees and labor/material costs to re-key all locks on the facility serviced by that key. All contractors must complete all applicable privacy and Rules of Behavior online training on a yearly basis. A copy of the completed certificate must be provided to the COR.
G. MAINTENANCE PROGRAM: ADVANCED FOOD PREPARATION EQUIPMENT SCHEDULE
Provide scheduled maintenance on listed kitchen equipment. Maintenance may require shutting down equipment. This will be coordinated with Facilities and Nutrition and Food Service and may require after hours or weekend service.
| Location |
| Type/Model/Manufacturer |
| Kitchen |
| Food Pump, Cleveland, M/N MFS S/N WT6682-07D-01 |
| Kitchen |
| Food Pump, Cleveland, M/N MFS S/N 8300-04K-01 |
| Kitchen |
| Stapler/Tipper Tie, MN SZ-4135-L #1 |
| Kitchen |
| Stapler/Tipper Tie, MN SZ-4135-L #2 |
| Kitchen |
| Vacuum Clipper, pneumatic, Cleveland |
| Kitchen |
| Combi Oven#1, Cleveland, M/N 0GB-20.20, S/N 0911230000042 |
| Kitchen |
| Combi Oven#2, Cleveland, M/N 0GB-20.20, S/N 02036-07F-01 |
| Kitchen |
| Combi Oven#3, Cleveland, M/N 0GB-20.20, S/N 0911230000086 |
| Kitchen |
| Combi Oven#4, Cleveland, M/N 0GB-20.20, S/N 1304230000896 |
| Kitchen |
| Combi Oven#5, Cleveland, M/N 0GB-20.20, S/N 1305230001675 |
| Kitchen |
| Chain Hoist, Lodestar, C-H-101-M S/N L2489SM |
| Kitchen |
| Chain Hoist, Lodestar, C-H-101-M S/N L0368RK |
| Kitchen |
| Hydraulic pump |
| Kitchen |
| Hood Exhaust and make up air fans, Halton, #1 |
| Kitchen |
| Hood Exhaust and make up air fans, Halton, #2 |
| Kitchen |
| Control Panel for Ice Builder, Cleveland, M/N IW-CP |
| Kitchen |
| Air Pump, Condon |
| Kitchen |
| Chill water pump, Gould, M/N 3657- 7.5 HP |
| Kitchen |
| Ice building tank, Continental, M/N IBC-150 |
| Kitchen |
| Condensing unit, Bohn, M/N BVL2500M63 |
| Kitchen |
| Vertical tumble chiller, Cleveland, M/N P-TC-220 #1 |
| Kitchen |
| Vertical tumble chiller, Cleveland, M/N P-TC-220 #2 |
| Kitchen |
| 100 gal. Tilt kettle, VC Pardo and Son, M/N 3038 |
| Kitchen |
| 100 gal. Tilt kettle, VC Pardo and Son, M/N 3039 |
| Kitchen |
| Cook /Chill tank # 1, Cleveland, M/N TJ-100-CC |
| Kitchen |
| Cook/Chill tank # 2, Cleveland, M/N CT-1000 |
| Kitchen |
| Dual Control panel, Partlow, M/N HA-DE-CC |
| Kitchen |
| Air cooled condensing unit for Glycol chiller (Cook Tank #2) TJ-100 GHEP |
| Kitchen |
| 45T Air cooler chiller unit for Glycol chiller (S/N 8956) (Glycol Tumble Chiller #2) |
| Kitchen |
| Heat-exchange tank (190 gal) with glycol circulation pump. TJ-100-CC (Cook Tank #2) |
| Kitchen |
| 300-GHEP Gal Glycol Reservoir (300 gal) with glycol circulation pump (S/N 8955). (Glycol Tumble Chiller #2) |
H. PREVENTIVE MAINTENANCE
1. COOK/CHILL MIXER KETTLES
MONTHLY:
AUTOMATIC DUMP VALVE / KETTLE
| - Check air collector regulator for moister, dirt, and proper pressure |
| - Check all o-rings and seals and gaskets |
| - Check valve operation |
| - Lubricate with light oil when needed |
| - Check air hose for leaks or signs or wear |
- Check for leaking seals on agitator arm by filling with water and turning on agitator arm. Monitor for a minimum of 5 minutes for signs of leaking.
- Grease agitator arm bearings with food grade grease (Chevron FM ALC EP2 or its equivalent)
| TILT MECHANISM (Hydraulic Tilt) | |
| - Check for leaks | |
| - Check for smooth operation | |
| - Check switches |
| AIR PRESSURE | |
| - 45 psi dump valve - 15 psi for jacket purge | |
| - Air must be clean and dry | |
| - Check all air lines & fittings for leaks |
STEAM TRAP
- Check proper operation
| SAFETY VALVE | |
| - Check for leakage | |
| - Steam pressure 65 psi. max. | |
| - Safety set at 100 psi |
| LEAKS | |
| - Check for leaks of any type (water - steam - hydraulic) |
| CONTROL PANELS | |
| - Signs of water damage | |
| - Check operation of all controls | |
| - Water meter operation | |
| - Temp controlling | |
| - RTD adjustments | |
| - Mixer operation & speed control | |
| - Gentle heat operation | |
| - Product valve operation |
- Calibrate probe, digital display, and pen chart to read within +/- 2o F utilizing certified calibrated equipment and noted on inspection form. Must use chart recorder and log provided. Must be done the first week of the month and scheduled a week in advance to coordinate with the production schedule.
ANNUALLY:
TILT MECHANISM (Hydraulic Tilt)
- Change hydraulic fluid every two years. (1 1/2 gallons of FOOD GRADE HYDRAULIC FLUID) (Shell Telis #5)
2. MFS METERING FILL STATION
MONTHLY:
AIR PRESSURE
| - 95 to 100 psi when on continuous stroke |
| - Air must be clean and dry |
| - Check air filter collector |
| - Check all fittings for leakage |
| - Oil Level |
| - Lubricator should be adjusted to disperse 1 drop of oil per 10-15 |
| cycles. (use only mineral oil) |
| - The flapper valve assembly must be removed and inspected for |
| signs of wear and proper adjustment |
| - Check for loose fasteners, switches, piston heads, etc… |
| - Gaskets and o-ring wear |
3. TUMBLE CHILLERS 1&2
MONTHLY:
MAIN CONTROL PANEL
| - Check complete operation |
| - Should never spray with water |
| DRIVE COMPONENTS | |
| - Check for loose hardware | |
| - Inspected motor mounting bolts |
| DOOR | |
| - Check for proper operation of safety latch | |
| - Check for gasket wear and proper care |
| MOTORS | |
| - Check motors for dirt and grease | |
| - Check mounting bolts | |
| - Lubricate per manufacturer's instructions |
WATER TEMPERATURE
| - Check water temperature |
| - Must maintain 32-34 degrees |
- Calibrate probe and digital display to read within +/- 2o F utilizing certified calibrated equipment and notate on inspection form.
| CHLORINE DISPENSER | |
| - Check supply tubing for signs of leakage | |
| - Check if chlorine container is full |
SEMI-ANNUALLY:
MOTORS
- Check Chain Tension (1/4” -3/8” Slack)
4. ICE BUILDER
MONTHLY:
| WATER TEMPERATURE | |
| - Must be 34 degrees or less. Check regularly |
AIR AGITATOR
| - Check motor mounting for loose fasteners |
| - Check water movement in tank - adjust if need be |
ICE THICKNESS
- Ice thickness approximately 2 1/2” in diameter around each refrigerant coil
| - Check for excessive ice build |
| - Check low ice circuit |
| WATER | |
| - Check fill circuit | |
| - Check water circulation | |
| - Check all chill water strainers |
- Inspect thermistor wires and ice thickness control sensors for signs of shearing, breakage or corrosion.
- Inspect mounting wire contact points for any signs of corrosion.
ANNUALLY:
CLEANING
| - Drain and clean annually |
| - Clean with high pressure hose and a non-chloride based cleaner |
- Water treatment must be coordinated with Facilities Management Service
- Watch closely when putting back on line
- Must be scheduled a month in advance for August or September
5. CLIPPER (Z-4135) CLIPPER VAC (CV4100) TIPPER TIE
MONTHLY:
- Check air pressure 80 to 100 psi (air pressure should never be over 100 psi)
| - Check air filter |
| - Check oiler (3 to 5 drops of oil per minute) |
| - Check for air leaks |
| - Check for proper sealing and clipping |
| - Check knife operation (use a wet stone when sharpening) |
| - Check vacuum tank (make sure it's being cleaned properly) |
| - Check gaskets and seals for wear |
- Check oil reservoir containing wick for proper oil level. Add/replace oil to meet OEM specifications (use food grade mineral oil or its equivalent)
- Remove and clean knife blade housing
- Check knife for signs of chipping
- Check punch for signs for burrs
- Check guards for safe function
- Clean lubricator
- Check air muffler
QUARTERLY:
- Clean air filter
- Clean regulator (using only denatured alcohol)
6. COOK TANKS #1 & 2
MONTHLY:
| - Check complete operation |
| - Make sure tank is being cleaned properly |
| - Check water level sensors and RTD probes are clean |
| - Check all connections for leakage |
| - Check lid springs |
| - Check all line strainers |
| - Check all motor mounting bolts |
| - Check circulation impeller and protective screen are secure |
| - Check meat probe cable for signs of wear |
- Check safety valve operation
- Check solenoid valve for proper functionality
- Lubricate motor per factory specs
- Check complete operation, switches, lights, emergency stops
- Check panel for condensation
- Check controller operation, time, temp, chart rotation, etc…
- Check quad ring for proper cleaning and greasing
- Calibrate probe, digital display, and pen chart to read within +/- 2o F utilizing certified calibrated equipment and noted on inspection form. Must use chart recorder and log provided. Must be done the first week of the month and scheduled a week in advance to coordinate with the production schedule.
SEMI-ANNUALLY:
- Lubricate all valve gaskets with DOW CORNING 111 compound lubricant or equivalent high-grade silicone grease.
- Clean valve strainer per manufactures specifications.
ANNUALLY:
- Dismantle and clean solenoid valve per manufactures specifications.
7. AIR COOLED CONDENSING UNITS (AQUASNAP) – FOR CT #2 & TC #2
MONTHLY:
- Check condenser coils
- Check moisture indicator sight glass for refrigerant loss and presence of moisture
- Check refrigerant charge
- Check all refrigerant joints and valves for leaks
- Check chilled water flow switch operation
- Check condenser fan operation
- Check crank case heater operation
- Inspect all contactors and relays
- Check thermistor operation
- Inspect contactors for pitting, corrosion, increased amperage draw or any other signs of wear.
- Check glycol percentage and note on inspection form (Should be a minimum of 30%).
- Check refrigerant filter dryers, replace if necessary
- Check cooling water strainers
8. HEAT EXCHANGE TANK
MONTHLY:
- Make sure tank is being cleaned properly
- Check control panel function, switches, lamps, read outs, chart recorders
- Check inside control panel for signs of water damage and corrosion
- Check meat probe cable for signs of wear
- Check lid springs adjust if needed
- Check the impeller and protective screen inside the tank
- Check all motor mounting bolts
- Lubricate motor per factory specs
- Check all steam and water connections for leaks
- Check all in line strainers for debris
- Run operational test
- Check water fill system
- Compare actual temps with read out temps
- Check meat probe operation
- Check safety valve operation
- Check drain operation
SEMI-ANNUALLY:
- All Aquasnap Condensers need to have coils and strainers cleaned semi-annually or more often if needed. When cleaned, contractor will need to program cleaning into main controller board to prevent alarm.
9. WATER & GLYCOL CIRCULATION PUMP
MONTHLY:
- Check casing gasket for leakage
- Check for any signs of leakage (i.e. water, air, etc)
- Ensure PSI gauge is working correctly.
QUARTERLY:
COMPONENT CHECK
| - Inspect components for wear |
| - Visually inspect for leaks |
LUBRICATION:
| - Whenever inspecting or replacing components, o-rings should be |
| lubricated (use o-ring lube or any light oil) |
WEATHER PROTECTION:
| - Check weather protection during winter months |
| - Proper covering of components |
| - Heat tape if necessary |
10. CAS7-5 AIR COMPRESSOR
MONTHLY:
| - Check oil level |
| - Drain condensate from tank |
| - Check for unusual noise and vibration |
| - Air leaks |
| - Check air filter (clean or replace) |
| - Operate safety valves (manually) |
| - Clean cylinder fins |
| - Check oil level |
- Inspect belt for signs of wear (i.e. cracking etc.,). Replace as necessary.
- Check belt tension
| - Motor bearings (check and lubricate) |
| - Check for loose bolts |
| - Check any attached driers to the air line for signs of moisture and |
| replace as needed. |
11. CHR-102 HOIST
MONTHLY:
| - Check for proper operation of hoist |
| - Check for smooth travel on rail |
| - Check brake operation for slippage |
| - Check control functions for proper operation |
| - Check hooks for damage, cracks, twists, and excessive throat |
| opening or latch failure |
| - Check load chain for signs of wear and for proper lubrication |
| - Lubricate chain lubri-plate, bar, and chain oil (10-R oil from Fiske |
| Bros. Refining Co. or an equal) |
| - Check for loose bolts |
| - Check for lubrication leakage |
| - Check electrical cords and cables |
12. MHD-10 HP MAIN HYDRAULIC DRIVE (TILT OR MIXING OPTION)
MONTHLY:
| - Check for any hydraulic leakage |
| - Check for proper operation |
| - Check for loose motor mounting and other fasteners |
| - Check oil levels |
- Check oil fill level in Gearbox (Use only ISO 60 Food Grade oil or equal).
ANNUALLY:
- Change oil and filter (ISO 46 20 Weight Food Grade as specified per manufacture)
13. CLEVELAND COMBI OVEN
MONTHLY:
| - Inspect drain screen and drain line for blockage. |
| - Rotate the drain screen 90 degrees to inspect the drain opening. |
| - Clean opening and restore the screen to its operating position. |
- Clean drain with a USDA approved drain cleaner.
- Follow the instructions of the manufacturer of the cleaner.
| - Flush drain with clean water. | |
| - De-scale steam generator according to manufactures recommendations. Check probe | for scales. |
QUARTERLY:
· Inspect the flues, vents and vacuum reliefs for signs of soot, blockage or other Malfunction
14. HALTON, CAPTURE JET HOOD(S)
MONTHLY:
- Check motor and fan assembly to insure they are installed as designed
- Inspect and adjust belt tension as needed. Replace belts as necessary
- Assure mechanical fasteners associated with motor and fan assembly are secure
15. AIR COOLED CONDENSING UNIT (ICE BUILDER) - FOR CT#1 & TC#1
MONTHLY:
· Check refrigerant and oil level in system
· Check for proper defrosting
· Check for proper voltage and amp draws
· Check discharge and suction pressures
· Check liquid, suction and crank case temperatures
· Check oil pressure
· Change oil per factory specifications
· Check superheat
· Check oil sight glass
· Check refrigerant site glass
· Check for oil and refrigerant leaks
· Check fan cycling components
· Clean and or replace filters and dryers
· Perform as acid test
· Inspect contactors for pitting, corrosion, increased amperage draws or any other signs of wear.
· Check for loose fastener and worn components
· Inspect drive belt for signs of wear and tear. Replace as necessary.
SEMI-ANNUALLY:
· Check and tighten ALL electrical connections
· Check all wiring and insulators
· Check contactors for proper operation and for worn contact points
· Check all fan motors – tighten all motor mount bolts/nuts and tighten fan set screws
· Clean condenser coil surface
· Check operation of the control system. Make sure all safety controls are operating correctly.
· Check that all defrost controls are operating correctly.
· Clean evaporator coil surface
· Clean drain pan and check the drain pan and drain line for proper drainage
· Check drain line heater for proper operation, cuts and abrasions.
· Check and tighten all flare connections.
I. LIGHT MAINTENANCE
Light maintenance to include limited preventative maintenance for equipment located in Building 116 not listed on the equipment schedule in the solicitation.
Hours required: As needed, scheduled Monday-Friday as agreed upon with Nutrition and Food Service Management.
Work will provide for general and routine maintenance in Building 116 to include production kitchen, Domiciliary dining and server area, all storage, Central Tray Unit, scullery, break room, loading dock, locker rooms and hallways, as well as office and conference space.
General assignments may include but are not limited to:
· Change filters, air and water
· Clean vents, steam traps, floor drains and equipment drainage tubes
· Mobile Equipment – replace gaskets, lubricate wheels, and adjust hinges as required.
· Carts, dollies and dunnage racks
· Thermalization Carts
· Patient dining room serving equipment
· Tray assembly area tray line equipment
- Dining Area – tables and chairs.
- Calibrate steam tables
- Reach in refrigeration and freezers – periodic cleaning, replace gaskets, lubricate and adjust hinges
- Others as assigned
J. NO SMOKING POLICY
Except in designated areas smoking is strictly prohibited inside. This is a federal facility as well as a medical center. As such, there is NO tobacco usage allowed inside any federal building or on the grounds except in designated areas. This includes the back dock and parking lot. The COR will brief the contractor as to designated smoking areas prior to commencement of the contract. Failure to follow these regulations can result in removal of the worker or contractor from the facility and/or a US Magistrate’s ticket and fine.
K. EATING & DRINKING POLICY
Eating and drinking is not permitted in the kitchen or back dock areas. Contractors may eat in their vehicles or at picnic tables and benches on the VA property.
L. CONTINGENCY PLAN
The Contractor shall have in place and maintain a valid contingency plan to meet the requirements of the contract. The Contractor shall incur all costs associated with fulfilling this contingency plan as well as alternate contingency plans at no additional expense to the Government. Written documentation shall be made available to the Government. Additionally, the Contractor shall be liable for all expenses incurred by the Government due to Contractor inability to
B.4 SPECIAL CONTRACTING REQUIREMENTS
1. KEY PERSONNEL
Key personnel will be identified in the proposal and shall be considered key personnel essential for the successful completion of the work performed under the contract. The contractor agrees that such personnel shall not be removed, diverted, or replaced from the work without prior written approval of the Contracting Officer. The contractor shall submit written notice of proposed personnel changes to the Contracting Officer for approval at least thirty (30) business days in advance.
2. RESPONSIBILITY FOR LOSS, PERSONAL INJURY OF CONTRACTOR PERSONNEL
The Government will7 not be responsible or held liable for any loss, damage, personal injury or loss of life of Contractor personnel, not caused by the Fault, negligence, wrongful omission of the Government, its agents or its employees, occurring at any time such personnel are entering, exiting, using, or occupying Government property or facilities in performance of this contract.
The Contractor shall be liable and will indemnify and hold harmless the Government, its agents and employees, against all actions or claims for damages to persons, property, including death not caused by the fault, negligence, wrongful act, or wrongful omission of the Government, its agents, or employees. The Contractor shall be liable and will indemnify and hold harmless the Government, its agents and employees against all action or claims for all damages to persons or property, including death arising or resulting from the fault, negligence, wrongful act, or wrongful omission of the Contractor personnel in accordance with the Federal Tort Claim Act (28 U.S.C. 2671-2680)
3. SPECIAL CONTRACT REQUIREMENTS
The contractor shall be responsible for protecting the personnel furnishing services under this contract. To carry out this responsibility, the contractor shall provide the following for these personnel:
· Worker’s compensation
· Professional liability insurance
· Health examinations
· Income tax withholding
· Social security payments Personnel shall be considered employees of the contractor.
4. CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (CPARS)
(a) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of Veterans Affairs has implemented use of the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15
(b) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
(c) Please furnish the Contracting Officer with the name, position title, phone number, and email address for each person designated to have access to your firm’s past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official. The report information must be protected as source selection sensitive information not releasable to the public.
(d) When your Contractor Representative(s) (Past Performance Points of Contact) are registered in CPARS, they will receive an automatically-generated email with detailed login instructions. Further details, system requirements, and training information for CPARS are available at www.cpars.gov. The CPARS User Manual, registration for online training for Contractor Representatives may be found at this site.
(e) Within 60 days after the end of a performance period, the Contracting Officer will complete an interim or final past performance evaluation and the report will be accessible at www.cpars.gov Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment. Comments are limited to the space provided in Block 22. Your comments should focus on objective facts in the Assessing Official’s narrative and should provide your views on the causes and ramifications of the assessed performance. In addition to the ratings and supporting narratives, blocks 1-17 should be reviewed for accuracy, as these include key fields that will be used by the Government to identify your firm in future source selection evaluations. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating, “No Comment” in Block 22, and then signing and dating Block 23 of the form. Without a statement in Block 22, you will be unable to sign and submit the evaluation back to the Government. If you do not sign and submit the CPAR within 30 days, it will automatically be returned to the Government and will be annotated: “The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment.” Your response is due within 30 calendar days after receipt of the CPAR.
(f) The following guidelines apply concerning your use of the past performance evaluation:
(1) Protect the evaluation as “source selection information.” After review, transit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the Contracting Officer for instructions.
(2) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
(3) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determination, production readiness reviews, or other similar purposes.
(g) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the Contracting Officer no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 30-day review period.
(h) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been completed.
5. BILLING AND PAYMENT
The contractor shall submit payment requests in electronic form via VA’s Electronic Invoice Presentment and Payment System http://www.fsc.va.gov/einvoice.asp.
Invoices shall be submitted monthly, in arrears, and shall include, at a minimum, the following. Invoices submitted without the following information may be rejected for payment
· Date of Invoice
· Contract Number
· Purchase Order Number
· Contractor Name
· Invoice Number
· CLIN/Contract Line Item and associated cost
· Date/Dates of Service
6. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
The Government intends to utilize a Quality Assurance Surveillance Plan (QASP) to monitor the quality of the contractor’s performance. The oversight provided for in the order and in the QASP will help to ensure that service levels reach and maintain the required levels throughout the contract term. Further, the QASP provides the COR with a proactive way to avoid unacceptable or deficient performance, and provides verifiable input for the required Past Performance Information Assessments. The QASP will be finalized immediately following award and a copy provided to the Contractor after award. The QASP is a living document and may be updated by the Government as necessary.
7. BACKGROUND INVESTIGATIONS
A full background check is not required for this position, however all contract employees must bring photo identification and advance notice from the requiring service to obtain a VA Badge in order to work on a VA Facility. Upon award, the CO shall provide the contractor with detailed instructions on fulfilling security requirements.
8. CONTRACT ADMINISTATION
Notwithstanding the Contractor's responsibility for total management during the performance of this contract, the administration of the contract will require maximum coordination between the Government and the Contractor.
The Contracting Officer (CO) is the only person authorized to approve changes or modify any of the requirements of this contract. The Contractor shall communicate with the Contracting Officer on all matters pertaining to contract administration. Only the Contracting Officer is authorized to make commitments or issue changes that shall affect price, quantity, or quality of performance of this contract.
The COR shall be responsible for the overall technical administration of this contract as outlined in the COR Delegation of Authority.
In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer without authority, no adjustment shall be made in the contract price to cover an increase in costs incurred as a result thereof.
POINTS OF CONTACT
Contracting Officer Diane Stoskopf Network Contracting Office (NCO) 6 100 Emancipation Drive, Building 27 Hampton, Virginia 23667
(757) 728-3449 Diane.stoskopf@va.gov
Contracting Officer’s Representative (COR)
TBD
36C24619Q0292
Page 1 of Page 1 of
SECTION C - CONTRACT CLAUSES
ADDENDUM to FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS Clauses that are incorporated by reference (by Citation Number, Title, and Date), have the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
The following clauses are incorporated into 52.212-4 as an addendum to this contract:
C.1 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days.
(End of Clause)
C.2 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed five (5) years.
(End of Clause)
C.3 SUPPLEMENTAL INSURANCE REQUIREMENTS
In accordance with FAR 28.307-2 and FAR 52.228-5, the following minimum coverage shall apply to this contract:
(a) Workers' compensation and employers liability: Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 is required, except in States with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers.
(b) General Liability: $500,000.00 per occurrences.
(c) Automobile liability: $200,000.00 per person; $500,000.00 per occurrence and $20,000.00 property damage.
(d) The successful bidder must present to the Contracting Officer, prior to award, evidence of general liability insurance without any exclusionary clauses for asbestos that would void the general liability coverage.
(End of Clause)
C.4 VAAR 852.237-70 CONTRACTOR RESPONSIBILITIES (APR 1984)
The contractor shall obtain all necessary licenses and/or permits required to perform this work. He/she shall take all reasonable precautions necessary to protect persons and property from injury or damage during the performance of this contract. He/she shall be responsible for any injury to himself/herself, his/her employees, as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by his/her employees fault or negligence, and shall maintain personal liability and property damage insurance having coverage for a limit as required by the laws of the State of Virginia. Further, it is agreed that any negligence of the Government, its officers, agents, servants and employees, shall not be the responsibility of the contractor hereunder with the regard to any claims, loss, damage, injury, and liability resulting there from.
(End of Clause)
C.5 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/
(End of Clause)
| FAR Number |
| Title |
| Date |
| 52.203-17 |
| CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS |
| APR 2014 |
| 52.204-4 |
| PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER |
| MAY 2011 |
| 52.204-18 |
| COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE |
| JUL 2016 |
| 52.228-5 |
| INSURANCE—WORK ON A GOVERNMENT INSTALLATION |
This is the start of the file's text. The full file is on GovTribe.