36C24618R0836-0002004.pdf

PDF 31 KB Posted

Attached to
Project 659-18-206, Parking Safety Federal contract opportunity
Solicitation number
36C24618R0836
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

36C24618R0836 0002 Amendment 0002 - RFP Questions and Answers - 7.31.18.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Project 659-18-206, Parking Safety, newest first.
File Type Posted
36C24618R0836-0006000.docx DOCX document
36C24618R0836-0005005.pdf PDF
36C24618R0836-0005001.pdf PDF
36C24618R0836-0005003.pdf PDF
36C24618R0836-0005004.pdf PDF
36C24618R0836-0005006.pdf PDF
36C24618R0836-0005000.docx DOCX document
36C24618R0836-0005002.pdf PDF
36C24618R0836-0004000.docx DOCX document
36C24618R0836-0003001.pdf PDF
36C24618R0836-0003000.docx DOCX document
36C24618R0836-0002003.pdf PDF
36C24618R0836-0002001.pdf PDF
36C24618R0836-0002000.docx DOCX document
36C24618R0836-0002002.pdf PDF
36C24618R0836-003.pdf PDF
36C24618R0836-004.docx DOCX document
36C24618R0836-002.pdf PDF
36C24618R0836-005.pdf PDF
36C24618R0836-001.docx DOCX document
36C24618R0836-000.docx DOCX document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Proposals 36C24618R0836 Project: 659-18-206, Parking Safety Amendment 0002 - Responses to RFP Questions

1. Question: Specifications for wire mesh call for 2"x2" opening. Our concern is that this design will not stop someone from climbing the mesh. Could you clarify?

Answer: Screening material with openings no greater than ¼”

2. Question: Is there any requirement on the design of the wire mesh openings, i.e. square, rectangle, etc.?

Answer: No

3. Question: The drawings show different mounting locations for the system, Could you clarify whether the system should be center mounted, front edge mounted, or rear edge mounted on the wall?

Answer: See new drawings dated 5/1/18

4. Question: Are there any restrictions for mounting the anchors from the precast company?

Answer: Not likely but verify

5. Question: Will as-builts be available before design of system?

Answer: Yes

6. Question: Does the rail on the 3rd deck in the center of the deck need to run down the entire length of the wall or can a section be installed near the stairs to keep someone from climbing in this area?

Answer: See new drawings dated 5/1/18

7. Question: Does the VA have a preferred safety fence manufacturer or preferred fence design type?

Answer: No

8. Question: Multiple projects at the VA Salisbury have the same bid date. Would the VA consider extending some of the projects to allow contractors more time to prepare proposals?

Answer: Some have been extended

9. Question: There are no specifications on the lightning system that has to be removed and reinstalled on the fall protection system. Will the lightning system have to be recertified after we move it?

Answer: No. Tested and effective but not recertified.

File details come from the government source that posted it.