36C24618R0834-0004001.pdf
PDF 333 KB Posted
- Attached to
- Project 659-16-102, Correct IT FCA Deficiencies Federal contract opportunity
- Solicitation number
- 36C24618R0834
About this file
36C24618R0834 0004 RFP Questions and Answers - Correct IT FCA Deficiencies.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24618R0834-0004000.docx | DOCX document | |
| 36C24618R0834-0003000.docx | DOCX document | |
| 36C24618R0834-0002001.docx | DOCX document | |
| 36C24618R0834-0002002.pdf | ||
| 36C24618R0834-001.docx | DOCX document | |
| 36C24618R0834-002.pdf | ||
| 36C24618R0834-007.pdf | ||
| 36C24618R0834-005.pdf | ||
| 36C24618R0834-006.docx | DOCX document | |
| 36C24618R0834-004.pdf | ||
| 36C24618R0834-003.pdf | ||
| 36C24618R0834-000.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposals 36C24618R0834
Project: 659-16-102, Correct IT Deficiencies
Responses to RFP Questions
1. Question: Upon review of the project documents we have found several drawings to be missing.
Drawing GI001 states the below missing drawings are to be part of the mechanical section:
Drawings that are missing: M109, M110, M111, M601, M602, M701, M801
Answer: These drawings were included in solicitation attachment titled, "36C24618R0834
CONTRACT ATTACHMENT A – File 2 – Construction Drawings 12-30-2016", provided with the original solicitation on 12 July 2018.
2. Question: I looked at AE‐101 & AE‐106 and both pages are not proper scale. I’m sure this is a problem with other pages as well. Can you please get these plans rescaled properly in an addendum?
AE‐101 is supposed to be 1/16” = 1’0” and is actually 1/60” = 1’0”
AE‐106 is supposed to be 1/16” = 1’0” and is actually 1/60” = 1’0”
Answer: The plans plot at the correct scale when plotted on full-size sheets.
3. Question: Please reissue the PDF plans for the above referenced project. They are formatted for 8‐1/2 x 11 and not legible when printed full‐sized.
Answer: This has been addressed in Amendment 0002.
4. Question: Do any of the rooms where we have to remove walls have a floor finish?
Answer:
• The flooring finish in Rooms 1190 & 1190A, Bldg 2 is VCT. However, the wall being removed in this space does not extend to the ground.
• Floor finish is verified in Corridor 1201 and Rooms 1021 & 1021C, Bldg 5, as well as, Room BA122B, Bldg 21.
5. Question: If any of the rooms where we have to remove walls have a floor finish, what floor finish is it?
• Rooms 1190 & 1190A, Bldg 2 have VCT. However, the wall being removed in this space does not extend to the ground.
• Corridor 1201 and Rooms 1021 & 1021C, Bldg5 have VCT and carpet
• BA122, Bldg 21 has VCT.
6. Question: Where we have to either cut new doors or replace or widen existing doors, what is the floor finish and what is the base?
Request for Proposals 36C24618R0834
Project: 659-16-102, Correct IT Deficiencies
Responses to RFP Questions
• See response to question 4 above.
• Rooms 1190 & 1190A, Bldg 2 have VCT.
• Rooms 2026A & 4156, Bldg 2 have VCT
• Room BA-122, Bldg 21 has VCT
7. Question: Where we have to either cut new doors or replace or widen existing doors is there any terrazzo base in the areas?
• See response to question 4 above
• Rooms 1190 & 1190A, Bldg 2 have terrazzo base.
• None of the remaining areas have terrazzo.
8. Question: Do any of the areas where we have to remove walls have any drywall ceilings that we would have to patch?
• Room 4156, Bldg 2 has plaster ceiling
• All other areas are either lay-in tile or are open to the deck above.