36C24518Q0057-002.pdf
PDF 610 KB Posted
- Attached to
- UPGRADE BASEMENT PHARMACY HVAC Federal contract opportunity
- Solicitation number
- 36C24518Q0057
About this file
36C24518Q0057 Clarksburg Pharmacy - Bid Drawings.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24518Q0057-003.rtf | RTF text file | |
| 36C24518Q0057-001.docx | DOCX document | |
| 36C24518Q0057-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Dwg. of
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
FULLY SPRINKLERED
A
B
C
D
E
F
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
6587 Hamilton Avenue Pittsburgh, Pennsylvania 15206 Ph: 412.287.7333 Fax: 412.287.7334 www.ae-works.com
AE Works Project Number:
ARCHITECTS/ENGINEERS:SEAL
Revision# Date
8/
/2
1:
:1
P
M
Correct Deficiencies in Basement Pharmacy HVAC
244-15-J-6373
SPL SPL
1 Medical Center Drive Clarksburg, WV 26301
G001
COVER SHEET
August 22, 2016 41 15018
100% Construction Documents
CORRECT DEFICIENCIES IN
BASEMENT PHARMACY HVAC
LOUIS A. JOHNSON VA MEDICAL CENTER
1 MEDICAL CENTER DRIVE
CLARKSBURG, WV 26301
VICINITY MAP
SITE
LOCATION MAP
SITE
PROJECT DIRECTORY
OWNER:
DEPARTMENT OF VETERANS AFFAIRS
LOUIS A. JOHNSON, VAMC
1 MEDICAL CENTER DRIVE
CLARKSBURG, WV 26301-4199
(304) 623-3461
CONTACT: GLENN HEUERMAN (COR)
ARCHITECT/ENGINEER:
AE WORKS, LTD
6587 HAMILTON AVENUE
PITTSBURGH, PA 15206
(412) 287-7333
CONTACT: TIFFANY HAILE (PM)
DRAWING INDEX
SHEET # SHEET NAME
GENERAL
G001 COVER SHEET
MECHANICAL
H001 HVAC SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
H101 HVAC PARTIAL BASEMENT PLAN
H201 HVAC DETAILS AND CONTROL DIAGRAM
NORTH
PROJECT
1. NOT ALL SYMBOLS ARE NECESSARILY USED.
2. WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE PRODUCTS OF A SINGLE MANUFACTURER
SHALL BE USED.
3. DRAWINGS ARE DIAGRAMMATIC. CONTRACTOR TO FIELD VERIFY DUCT AND PIPE ROUTING AND COORDINATE INTERFERENCE
BETWEEN TRADES PRIOR TO INSTALLATION.
4. DUCTWORK TO BE INSTALLED TIGHT TO UNDERSIDE OF STRUCTURE ABOVE UNLESS NOTED OTHERWISE.
5. PROVIDE ALL MATERIALS, EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED, AND AS REQUIRED BY CODE.
6. CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY. CONTRACTOR SHALL BE RESPONSIBLE TO FIELD SURVEY ACTUAL SITE CONDITIONS AND ACCOMMODATE ACTUAL SITE CONDITIONS AS PART OF SCOPE OF WORK AT NO COST TO OWNER.
7. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, APPLICABLE BUILDING, STATE, AND LOCAL CODES, SEISMIC REQUIREMENTS, ENERGY CODES, AND
INSURANCE UNDERWRITER REQUIREMENTS.
8. MAINTAIN A MINIMUM OF 6'-8" CLEARANCE TO UNDERSIDE OF PIPES, DUCTS, CONDUITS, SUSPENDED EQUIPMENT, SUPPORTS, ETC., THROUGHOUT ACCESS ROUTES IN MECHANICAL ROOMS.
9. ALL TESTS SHALL BE COMPLETED AND ACCEPTED BY THE COR BEFORE ANY MECHANICAL EQUIPMENT OR PIPING
INSULATION IS APPLIED.
10. LOCATE ALL TEMPERATURE, PRESSURE AND FLOW MEASURING DEVICES IN ACCESSIBLE LOCATIONS WITH A STRAIGHT SECTION OF PIPE OR DUCT UPSTREAM AND DOWNSTREAM, AS RECOMMENDED BY THE MANUFACTURER FOR ACCURACY.
11. TESTING ADJUSTING AND BALANCING (TAB) AGENCY SHALL BE A MEMBER OF THE ASSOCIATED AIR BALANCING COUNCIL (AABC) OR THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB). TAB FIRM SHALL HAVE A MINIMUM OF 5 YEARS EXPERIENCE ON SIMILAR PROJECTS. PERFORM TAB IN ACCORDANCE WITH THE REQUIREMENTS OF THE TAB PROCEDURAL STANDARD RECOMMENDED BY THE TAB TRADE ASSOCIATION THAT APPROVED THE TAB FIRM'S QUALIFICATIONS.
12. COORDINATE ALL FINAL EQUIPMENT CONNECTIONS WITH MANUFACTURERS' CERTIFIED DRAWINGS. COORDINATE AND PROVIDE ALL DUCTWORK AND PIPING TRANSITIONS REQUIRED FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD
VERIFY AND COORDINATE ALL DUCTWORK AND PIPING DIMENSIONS BEFORE FABRICATION.
13. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE, ALL LOCAL CODES, AND OWNER'S INSURANCE
UNDERWRITER REQUIREMENTS.
14. THE LOCATIONS AND SIZES OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE SPECIFICATIONS THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE ONLY. THE EXACT LOCATIONS AND SIZES NECESSARY TO SECURE THE BEST CONDITIONS AND RESULTS SHALL BE DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL HAVE THE APPROVAL
OF THE ENGINEER BEFORE BEING INSTALLED. DO NOT SCALE DRAWINGS.
15. PLAN DRAWINGS AND SECTION CUTS WHICH SPECIFICALLY IDENTIFY SERVICE ROUTE OFFSETS, ELEVATION CHANGES, OBSTRUCTIONS, ACCESS DOORS, BALANCING DEVICES, ETC. ARE SHOWN FOR CLARITY WHERE SPECIFIC KNOWN CONDITIONS
EXIST. MECHANICAL CONTRACTOR SHALL COORDINATE EQUIPMENT, DUCTWORK, AND PIPING ROUTINGS WITH ALL OTHER TRADES. REQUIREMENTS NOT SPECIFICALLY IDENTIFIED SHALL NOT BE INTERPRETED AS EXCLUSION FROM CONTRACTOR'S SCOPE OF WORK. CONTRACTOR SHALL BE RESPONSIBLE FOR ACTUAL SITE CONDITIONS AND SHALL INCLUDE SUCH
CONDITIONS IN SCOPE OF WORK AT NO ADDITIONAL COST TO THE OWNER.
16. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND SUPPORT OF MECHANICAL WORK AS SHOWN IN DETAILS FOR PIPING, DUCTWORK AND EQUIPMENT (UNLESS OTHERWISE NOTED) SHALL BE FURNISHED AND INSTALLED BY THE
MECHANICAL CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
17. ALL OPENINGS IN FIRE RATED WALLS AND SMOKE PARTITIONS DUE TO DUCTWORK, PIPING, CONDUIT, ETC., SHALL BE FIRE
STOPPED WITH APPROVED FIRESTOPPING MATERIALS.
18. ALL EQUIPMENT SUBMITTALS AND SHOP DRAWINGS REQUIRED BY THE SPECIFICATIONS SHALL BE APPROVED BY
ENGINEER PRIOR TO PURCHASE, FABRICATION, AND INSTALLATION.
DRAWING SYMBOLS
SYMBOLS DESCRIPTION
PIPELINE ABBREVIATIONS HVAC SYMBOLS
EQUIPMENT TAG ABBREVIATIONS
DESCRIPTIONSYMBOLS
PIPELINE SYMBOLS
DOUBLE LINE SHEETMETAL
SINGLE LINE - SHEET METAL
DESCRIPTIONSYMBOLS
HVAC GENERAL NOTES
DUAL TEMPERATURE WATER RETURN
DUAL TEMPERATURE WATER SUPPLY
HOT WATER HEATING RETURN
HOT WATER HEATING SUPPLY
INVERTED ECCENTRIC REDUCER
(VENTURI FLOW STATION)
TWO-WAY MODULATING
THREE-WAY MODULATING CONTROL VALVE
SAFETY VALVE OR PRESSURE RELIEF
PRESSURE REDUCING VALVE
BALANCING COCK
WATER FLOW MEASURING DEVICE
PIPING TURNED DOWN
TWO-WAY CONTROL VALVE
MOTORIZED VALVE
AUTOMATIC AIR VENT
PIPING TURNED UP
FUNNEL DRAIN
CONTROL VALVE
A
M
MANUAL AIR VENT
(TWO POSITION TYPE)
AQUASTAT
PRESSURE TAP
THERMOMETER
STRAINER
PRESSURE GAUGE
UNION
ECCENTRIC REDUCER
MANUAL VOLUME CONTROL DAMPER (VD)
RISE/DROP IN DUCTWORK
(ARROW SHOWS DIRECTION OF DROP)
SMOKE DAMPER/DETECTOR
PANEL IN DUCT AND CEILING)
EXHAUST AIR DUCT DN
SUPPLY AIR DIFFUSER
ACCESS DOOR ON SIDE OF DUCT
EXHAUST REGISTER
RETURN AIR REGISTER
ACCESS DOOR ON BOTTOM OF DUCT
DETECTOR BY E.C. DAMPER BY H.C.
FIRE DAMPER AT FIRE WALL (PROVIDE ACCESS
OR HORIZONTAL DUCT ABOVE CEILING (PROVIDE
FIRE DAMPER IN VERTICAL DUCT THRU FLOOR
ACCESS PANEL IN DUCT AND WALL OR CEILING)
SUPPLY AIR REGISTER (DUCT OR WALL)
EXHAUST/RETURN AIR REGISTER (DUCT OR WALL)
COMBINATION FIRE/SMOKE DAMPER
MOTORIZED DAMPER
SUPPLY DUCT DN
RETURN AIR DUCT DN
EXHAUST AIR DUCT UP
RETURN AIR DUCT UP
SUPPLY DUCT UP
ROUND SUPPLY, RETURN OR
OVAL SUPPLY, RETURN OR
RECTANGULAR SUPPLY, RETURN OR
DIRECTION OF AIR FLOW)
DUCT W/O TURNING VANES
DUCT MOUNTED SMOKE
BY EC, INSTALLED BY HC
RELIEF DUCT WIDTH (SHOWN)XDEPTH
RELIEF DUCT WIDTH (SHOWN)XDEPTH
LOW LOSS TAKE OFF (ARROW INDICATES
RADIUS ELBOW (DUCT WIDTH 17" AND LOWER)
(ARROW INDICATES AIR FLOW DIRECTION)
BOOT CONNECTION WITH MANUAL VD
DUCT W/TURNING VANES (DUCT WIDTH OVER 18")
WALL SWITCH
DUCT/SPACE STATIC PRESSURE SENSOR
DETECTOR PROVIDED
CONICAL SPIN-IN FITTING
24"X24"24"X24"
12"X12"
SD
S
WS
M
AD
REFRIGERANT LINE
REFRIGERANT SUCTION
RL
RS
HWHS
HWHR
DTS
DTR
THERMAL VAV DIFFUSERTF
CD CONDENSATE DRAIN LINE
MPS MEDIUM PRESSURE STEAM SUPPLY
MPCR MEDIUM PRESSURE CONDENSATE RETURN
PUMPED CONDENSATEPC
HRS ENERGY (HEAT) RECOVERY SUPPLY
HRR ENERGY (HEAT) RECOVERY RETURN
NAME PIPE TO BE REMOVED
NAME EXISTING PIPING TO REMAIN
TEE- OUTLET
SIDE CONNECTION
CAPPED OUTLET
TEE - OUTLET UP
12"X12"
12"/12"
RELIEF VALVE
BUTTERFLY VALVE
PLUG VALVE
GATE VALVE
GLOBE VALVE
PIPE BREAK (SINGLE LINE)
DIRECTION OF FLOW
FLEXIBLE CONNECTION
BACKFLOW PREVENTION DEVICE
DUCT END CAP
24X12
SQUARE ELBOW WITH
TURNING VANES
RADIUS TURN ELBOW
RETURN CROSS
SECTION DN
EXHAUST CROSS
SECTION UP
SUPPLY DUCT
CROSS SECTION DN
RETURN CROSS
SECTION UP
CROSS SECTION UP
SUPPLY DUCT
ROUND DUCT SIZE (DIAMETER)
FLEXIBLE DUCT (DIAMETER SIZE)
DUCT SIZE (WIDTH X DEPTH)
24"Ø
DUCT W/ TURNING VANES
CONDENSER WATER RETURN
CONDENSER WATER SUPPLYCWS
CWR
CTD COOLING TOWER DRAIN LINE
BALL VALVE
(HINGED & GASKETED)
(HINGED & GASKETED)
FD
F/SD
FDFD
LPS LOW PRESSURE STEAM SUPPLY
LPCR LOW PRESSURE CONDENSATE RETURN
HPS HIGH PRESSURE STEAM SUPPLY
HPCR HIGH PRESSURE CONDENSATE RETURN
BACKDRAFT DAMPER
B
DUCT/WALL TEMPERATURE SENSOR, ELECTRICT
24"Ø
12"Ø
DRAWING NUMBER WHERE DRAWN
H200
SECTION LETTER
DRAWING NUMBER WHERE DRAWNH100
DETAIL NUMBER
CONNECT TO EXISTING AT THIS POINT
DEMO/REMOVE TO THIS POINT
EQUIPMENT NUMBER1
AHU POWERED EQUIPMENT
EQUIPMENT NUMBER1
RHC NON-POWERED EQUIPMENT
CD-#
# AIRFLOW QUANTITY
DIFFUSER/GRILLE SYSTEM TYPE
STAINLESS STEEL DUCTWORK
HVAC DEMOLITION NOTES
HVAC PHASING / SHUTDOWN NOTES
DUCT/WALL TEMPERATURE SENSOR, ELECTRICT
1. THE CONTRACTOR SHALL THOROUGHLY EXAMINE THE SITE PRIOR TO SUBMITTING THEIR BID. DUE TO THE NATURE OF THIS PROJECT AND THE STATE OF THE EXISTING BUILDING, IT IS IMPOSSIBLE TO COMPLETELY RELATE THE SCOPE OF THE DEMOLITION REQUIRED TO THE CONTRACTOR THROUGH THE CONTRACT DOCUMENTS. FAILURE TO VISIT THE SITE WILL NOT RELIEVE THE CONTRACTOR OF THEIR DEMOLITION RESPONSIBILITIES UNDER THIS CONTRACT. IT IS THE CONTRACTOR’S RESPONSIBILITY TO DETERMINE AND COORDINATE THE EXACT EXTENT OF DEMOLITION NECESSARY TO PROVIDE A RENOVATED AND UPGRADED S
PACE AND TO FACILITATE NEW WORK.
2. INFORMATION REGARDING THE EXISTING CONDITIONS WAS GATHERED FROM AVAILABLE EXISTING DRAWINGS, SURVEY, AND CORRESPONDENCE WITH UTILITY, STAFF, AND FACILITIES PERSONNEL. THERE ARE NO GUARANTEES AS TO THE ACCURACY OF
THIS INFORMATION AND IT IS OFFERED FOR INFORMATION ONLY.
3. VERIFY EXISTING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING AND SYSTEM COMPONENTS PRIOR TO DEMOLITION. IF EXISTING CONDITIONS ARE DIFFERENT THAN WHAT IS INDICATED ON THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL NOTIFY THE
COR AND ARCHITECT PRIOR TO PROCEEDING WITH THE WORK.
4. MINIMIZE DISTURBANCE AND / OR DAMAGE TO EXISTING FINISHED SURFACES AND FINISHES. WHERE DEMOLITION OF MECHANICAL SYSTEM COMPONENTS DAMAGES EXISTING SURFACES TO REMAIN, RESTORE THOSE SURFACES TO THE SAME CONDITION AS THE ADJACENT SURFACES. RESTORATION MUST BE PERFORMED BY WORKMEN SKILLED IN PERFORMING SUCH WORK. ALL FIRE AND
SMOKE RATINGS SHALL BE RETAINED AS PART OF THE REPAIRS. PATCH / SEAL HOLES WEATHERTIGHT. ALL PATCHES AND
REPAIRS ARE SUBJECT TO THE REVIEW AND APPROVAL OF THE ARCHITECT.
5. ALL AREAS OF EGRESS SHALL BE KEPT OPEN AND FREE FROM DEBRIS AT ALL TIMES.
6. DO NOT REMOVE ITEMS SUPPORTING OTHER ITEMS WITHOUT PROVIDING TEMPORARY OR PERMANENT SUPPORT. PROPERLY SUPPORT ALL EXISTING ITEMS TO REMAIN. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING REQUIRED SUPPORTS FOR
AFFECTED ITEMS.
7. VERIFY EXTENT OF PIPING, EQUIPMENT, COMPONENTS, AND CONTROLS TO BE RETAINED OR REUSED PRIOR TO THE DEMOLITION OF SPECIFIC SYSTEM. PROTECT ITEMS WHICH ARE TO BE REUSED ON SITE TO MINIMIZE POST-CONSTRUCTION REPAIRS. ALL
ITEMS WHICH ARE DAMAGED SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE REPAIRED OR REPLACED AT NO
COST TO THE CONTRACT.
8. REFER TO PLANS FOR EXISTING PIPING, DUCTWORK, EQUIPMENT, AND SYSTEM COMPONENTS TO BE REUSED.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL CONNECTIONS TO EXISTING AND NEW SYSTEMS AS REQUIRED TO FACILITATE PROPER CONTINUAL OPERATION OF ALL SYSTEMS AND EQUIPMENT, EXISTING OR NEW, EXCEPT
WHERE IN THE CURRENT PHASE OF CONSTRUCTION.
10. THE CONTRACTOR SHALL BE AWARE THAT THE EXISTING BUILDING(S) AND ADJACENT SITE WILL BE OCCUPIED AND IN USE 24 HOURS PER DAY, 7 DAYS A WEEK. THE CONTRACTOR SHALL CONDUCT THEIR OPERATIONS SO THAT THERE WILL BE
MINIMAL INTERFERENCE WITH THE CONTINUED OPERATION OF THE EXISTING BUILDING(S) AND STAFF. ANY INTERFERENCE OR INCONVENIENCE TO BUILDING OPERATIONS SHALL BE REVIEWED WITH THE COR AND ARCHITECT PRIOR TO
COMMENCEMENT.
ACC AIR COOLED CHILLER
ACCU AIR COOLED CONDENSING UNIT
ACCUM ACCUMULATOR
AHU AIR HANDLING UNIT
ASHP AIR SOURCE HEAT PUMP
B BOILER
BB BASEBOARD HEATER
BD BAROMETRIC DAMPER
BDD BACK DRAFT DAMPER
CC CHILLED WATER COOLING COIL
CD CONDENSATE DRAIN
CIRC CIRCULATOR
CMPR COMPRESSOR
CONV CONVECTOR
CP CONDENSATE PUMP
CUH CABINET UNIT HEATER
DC DRY COOLER
EF EXHAUST FANS
ER EXHAUST REGISTER
ERW EXHAUST REGISTER WALL
ET EXPANSION TANK
ECUH ELECTRIC CABINET UNIT HEATER
EUH ELECTRIC UNIT HEATER
EWH ELECTRIC WALL HEATER
EVAP EVAPORATOR
FT FINNED TUBE RADIATION
FCU FAN COIL UNIT
FPB FAN POWERED BOX
FU FURNACE
GIV GRAVITY INTAKE VENTILATOR
GRV GRAVITY ROOF VENTILATOR
H HUMIDIFIER
HC HOT WATER HEATING COIL
HUH HORIZONTAL UNIT HEATER
P PUMP
PTAC PACKAGED TERMINAL AIR CONDITIONING UNIT
RG RETURN GRILLE
RR RETURN REGISTER
RAG RETURN AIR GRILLE
RCP RADIANT CEILING PANEL
RTU ROOF TOP UNIT
SF SUPPLY FAN
SSAC SPLIT SYSTEM AIR CONDITIONING UNIT
SSDC SECURITY SUPPLY DIFFUSER CEILING
SSEF SECURITY SMOKE EXHAUST FAN
SSGW SECURITY SUPPLY SUPPLY GRILLE WALL
SLSD SUPPLY LINEAR SLOT DIFFUSER
UH UNIT HEATER
UV UNIT VENTILATOR
UCD UNDER CUT DOOR
VAV VARIABLE AIR VOLUME
DRAWING KEYNOTE - DEMOLITION
DRAWING KEYNOTE - PLAN / ELEVATION NEW WORK
1. THE WORK UNDER THIS CONTRACT WILL REQUIRE THE SYSTEM TO BE SHUT DOWN. THIS WILL OCCUR ON A THURSDAY EVENING THROUGH SUNDAY NIGHT. AFTER THIS TIME THE VENTILATION SYSTEM WILL BE REQUIRED TO BE OPERATIONAL.
2. CONTRACTOR SHALL MINIMIZE SHUTDOWN TIMES DURING MECHANICAL SYSTEM SWITCHOVERS. ALL SHUTDOWN TIMES
AND THEIR DURATIONS SHALL BE COORDINATED WITH THE COR.
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Dwg. of
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
FULLY SPRINKLERED
A
B
C
D
E
F
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
6587 Hamilton Avenue Pittsburgh, Pennsylvania 15206 Ph: 412.287.7333 Fax: 412.287.7334 www.ae-works.com
AE Works Project Number:
ARCHITECTS/ENGINEERS:SEAL
Revision# Date
8/
/2
1:
:1
P
M
Correct Deficiencies in Basement Pharmacy HVAC
244-15-J-6373
SPL SPL
1 Medical Center Drive Clarksburg, WV 26301
H001
HVAC SYMBOLS, ABBREVIATIONS AND
GENERAL NOTES
August 22, 2016 42 15018
100% Construction Documents
SWBD SWITCHBOARD
SWGR SWITCHGEAR
SYM SYMMETRICAL TOP
T TOP
TA THROWAWAY
TAN TANGENT
TC TELECOMMUNICATIONS
CONTRACTOR
TCV TEMPERATURE CONTROL VALVE
TDV TRIPLE DUTY VALVE
TEL TELEPHONE
TEMP TEMPERATURE
TER TERRAZZO
TG TONGUE & GROOVE
TH THERMOMETER
THRES THRESHOLD
TR TEMPERATURE RISE
TRANS TRANSITION
TRANSR TRANSFORMER
TSTAT THERMOSTAT
TV TURNING VANES OR TELEVISION
TYP TYPICAL
UC UNDER CABINET OR UNDER CUT
UFD UNDER FLOOR DUCT
UG UNDERGROUND
UH UNIT HEATER
UL UNDERWRITER'S LABORATORIES
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
UPS UNINTERRUPTIBLE POWER SUPPLY
UTIL UTILITY
V VOLT
VAL VALVE
VD VOLUME DAMPER
VENT VENTILATION
VERT VERTICAL
VFS VENTURI FLOW STATION
VIF VERIFY IN FIELD
VL VENT LINE
VR VAPOR RETARDER
VS VENT STACK
VTR VENT THROUGH ROOF
W WATT
W/ WITH
W/O WITHOUT
WB WET BULB
WC WALL COVERING
WCL WATER CLOSET
WD WOOD
WF WIDE FLANGE
WFMD WATER FLOW MEASURING DEVICE
WG WALL GUARD OR WATER GAUGE
WHCH WHEEL CHAIR
WIN WINDOW
WMS WIRE MESH SCREEN
WP WEATHERPROOF
WPS WALL PROTECTION SYSTEM
WSCT WAINSCOT
WT WINDOW TREATMENT
WTD WATER TEMPERATURE DROP
WWF WELDED WIRE FABRIC
X DEMO
XN TO BE RELOCATED / NEW LOCATION
XR EXISTING TO REMAIN
ZVB ZONE VALVE BOX
ZVC ZONE VALVE CABINET
LTG LIGHTING
LV LOW VOLTAGE
LVR LOUVER
LWB LEAVING WET BULB
LWC LINEAR WOOD CEILING
LWT LEAVING WATER TEMPERATURE
MAN MANUAL
MAT MIXED AIR TEMPERATURE
MATL MATERIAL
MAV MANUAL AIR VENT
MAX MAXIMUM
MBH ONE THOUSAND BTU / HOUR
MC MECHANICAL CONTRACTOR
MC METAL CLAD CABLE
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MEMB MEMBRANE
MET METAL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MLO MAIN LUGS ONLY
MO MASONRY OPENING
MOD MOTOR OPERATED DAMPER
MONO MONOLITHIC
MTD MOUNTED
MTG HT MOUNTING HEIGHT
MTL METAL
MTLH METAL HALIDE
MTR MOTOR
MTS MANUAL TRANSFER SWITCH
MV MEDIUM VOLTAGE
N/A NOT APPLICABLE
NEC NATIONAL ELECTRIC CODE
NEMA NATIONAL ELECTRICAL
MANUFACTURER ASSOCIATION
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO NUMBER OR NORMALLY OPEN
NOM NOMINAL
NTS NOT TO SCALE
O OXYGEN
OA OUTSIDE AIR
OBD OPPOSED BLADE DAMPER
OC ON CENTER
OD OUTSIDE DIAMETER
OPER OPERATED
OPNG OPENING
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN
PB PULL BOX
PC PLUMBING CONTRACTOR
PD PUMP DISCHARGE
PG PRESSURE GAUGE WITH COCK
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PNL PANEL
PR PAIR
PRD PRESSURE DIFFERENTIAL VALVE
PRELIM PRELIMINARY
PRT PRESSURE TAP
PRV PRESSURE REDUCING VALVE
PT PAINT OR POTENTIAL
TRANSFORMER
RO ROUGH OPENING
QT QUARRY TILE
R RADIUS
RA RETURN AIR / RELIEF AIR
RB RUBBER BASE
RC REMOVE COMPLETELY
RD ROOF DRAIN
RE RELOCATE EXISTING
REC RECESSED
RECPT RECEPTACLE
REF REFERENCE
REFL REFLECTOR
REG REGISTER
REINF REINFORCING
REM REMOVE
REQD REQUIRED
RET RETURN
REV REVISE
REX REMOVE EXISTING
RF RESILIENT FLOOR
RFI REQUEST FOR INFORMATION
RGS RIGID GALVANIZED STEEL CONDUIT
RH ROOF HATCH
RM ROOM
RN REMOVE AND REPLACE WITH NEW
RR REMOVE AND REPLACE
RS RAPID START
RV RELIEF VALVE
RWC RAIN WATER CONDUCTOR
SA SUPPLY AIR
SAN SANITARY SEWER ABOVE GROUND
SAN-BXR SANITARY SEWER - BURIED
EXISTING TO REMAIN
SAN-XR SANITARY SEWER ABOVE GROUND -
EXISTING TO REMAIN
SCHED SCHEDULE
SD SMOKE DAMPER OR SMOKE
DETECTOR
SDISP SOAP DISPENSER
SF SQUARE FOOT
SHT SHEET
SHT MTL SHEET METAL
SHTG SHEATHING
SIM SIMILAR
SM SURFACE MOUNTED
SNC SANITARY NAPKIN CABINET
SND SANITARY NAPKIN DISPOSER
SP STANDPIPE OR STATIC PRESSURE
SPC SPECIMEN PASS-THRU CABINET
SPEC SPECIFICATIONS
SPS STATIC PRESSURE SENSOR
SR SERVICE RECEPTOR
SS SOIL STACK
ST PR STATIC PRESSURE
ST STL STAINLESS STEEL
STD STANDARD
STER STERILIZER
STL STEEL
STOR STORAGE
STR STRAINER
STRUCT STRUCTURAL
SUSP SUSPENDED
SW SWITCH
ELEC CAB ELECTRICAL CABINET
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENTR ENTRANCE
EO ELECTRICAL OUTLET
EQ EQUAL
EQUIP EQUIPMENT
ETR EXISTING TO REMAIN
EWB ENTERING WET BULB
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX EXAUST AIR
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
XP EXPLOSION PROOF
F/S FIRE / SMOKE DAMPER
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FAT FINAL AIR TEMPERATURE
FB FIRE BLANKET
FC FLEXIBLE CONNECTION OR
FOOTCANDLE
FD FLOOR DRAIN OR FIRE DAMPER
FDN FOUNDATION
FDV FIRE DEPARTMENT VALVE
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FH FIRE HOSE
FHC FIRE HOSE CABINET
FHP FULL HEIGHT PARTITION
FHV FIRE HOSE VALVE
FIN FINISH
FIXT FIXTURE
FL FLOW LINE
FLA FULL LOAD AMPERES
FLASH FLASHING
FLEX FLEXIBLE
FLG FLANGE
FLG C FLANGE CONNECTION
FLR FLOOR
FLUOR FLUORESCENT
FP FIRE PROOFING
FRMG FRAMING
FS FLOOR SINK
FSTOP FIRESTOPPING
FT FOOT / FEET
FT HD FEET OF HEAD
FTC FOOTCANDLES
FTG FOOTING
FUR FURRING
G GAS OR ELECTRICAL GROUND
GA GAUGE
GAL GALLONS
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GEN GENERATOR
GENL GENERAL
GFCI GROUND FAULT CIRCUIT
INTERRUPTOR
GL GLASS
GLV GLOBE VALVE
GND GROUND
GPM GALLONS PER MINUTE
GR GRADE
GRAV GRAVITY
GRD BM GRADE BEAM
GV GATE VALVE
GWB GYPSUM BOARD
H HIGH
HB HOSE BIB
HC HEATING CONTRACTOR
HDCP HANDICAP
HDR HEADER
HDW HARDWARE
HID HIGH INTENSITY DISCHARGE
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HORSE POWER
HPD HIGH PRESSURE DRIP
HPF HIGH POWER FACTOR
HR HANDRAIL
HSKP HOUSEKEEPING
HT HEIGHT
HTG HEATING
HTR HEATER
HV HIGH VELOCITY
HVAC HEATING, VENTILATING, AIR
CONDITIONING
HW HOT WATER
HWD HARD WOOD
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HWS&R HOT WATER SUPPLY AND RETURN
HZ HERTZ
ID INSIDE DIAMETER
IER INVERTED ECCENTRIC REDUCER
IG ISOLATED GROUND
IME INSULATED METAL ENCLOSURE
IN INCH
INCAND INCANDESCENT
INCL INCLUDED
INSUL INSULATION
INT INTERIOR
INTERL INTERLOCK
INV INVERT
ISO ISOLATION
IVS ISOLATED VALVE STATION
J-BOX JUNCTION BOX
JST JOIST
JT JOINT
KO KNOCK OUT
kVA KILOVOLT AMPERE kVAR KILOVAR (REACTANCE) kW KILOWATT kWH KILOWATT HOUR METER
LAT LEAVING AIR TEMPERATURE
LAV LAVATORY
LB POUND
LDB LEAVING DRY BULB
LED LIGHT EMITTING DIODE
LF LINEAR FEET
LIN LINEAR
LOC LOCATION OR LOCATE
LPT LOW POINT
LSDC LINEAR SUPPLY DIFFUSER CEILING
LT LIGHT
& AND
A AIR (CLINICAL)
AAP ALARM ANNUNCIATOR PANEL
AAV AUTOMATIC AIR VENT
AB ANCHOR BOLT
ABV ABOVE
ACC DR ACCESS DOOR
ACFL ACCESS
ACOUS ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICAN DISABILITIES ACT
ADD ADDENDUM
ADDL ADDITIONAL
ADJ ADJUSTABLE
ADMIN ADMINISTRATION
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISHED GRADE
AFMD AIR FLOW MEASURING DEVICE
AHU AIR HANDLING UNIT
AL ALIGN
ALT ALTERNATE
ALUM ALUMINUM
AMP AMPERE
AP ACCESS PANEL
APC ARCHITECTURAL PRECAST
CONCRETE
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASY ASYMMETRIC
ATC AUTOMATIC TEMPERATURE
CONTROL
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AWT AVERAGE WATER TEMPERATURE
BAT BATTERY
BC BALANCING COCK OR BARE COPPER
BDD BACKDRAFT DAMPER
BFC BELOW FINISH CEILING
BFE BOTTOM FOOTING ELEVATION
BFG BELOW FINISHED GRADE
BG BUMPER GUARD
BLDG BUILDING
BLKG BLOCKING
BLT BORROWED LIGHT
BLW BELOW
BM BEAM
BO BY OWNER
BOF BY OWNER FUTURE
BOT BOTTOM
BR BRICK
BRG BEARING
BRKR BREAKER
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT UP ROOFING
C CONDUIT
CAB CABINET
CANTL CANTILEVER
CAP CAPACITY
CATV CABLE TELEVISION
CCT CUBICLE CURTAIN TRACK
CCTV CLOSED CIRCUIT TELEVISION
CFH CUBIC FEET / HOUR
CFM CUBIC FEET / MINUTE
CH CHANNEL
CHK V CHECK VALVE
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CHWS&R CHILLED WATER SUPPLY AND
RETURN
CJ CONTROL JOINT
CKT CIRCUIT
CKT BRKR CIRCUIT BREAKER
CL CENTERLINE
CLG CEILING
CLG MTD CEILING MOUNTED
CLR CLR
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUE / CONTINUOUS
CONTR CONTRACTOR
CONV CONVECTOR
COORD COORDINATE
CORR CORRIDOR
CPT CARPET OR CONTROL POWER
TRANSFORMER
CT CERAMIC TILE
CTR CENTER
CU COPPER
CV CONTROL VALVE
CW COLD WATER
D DEPTH OR DEEP
DB DRY BULB
dB DECIBEL
DCW DOMESTIC COLD WATER
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAILS
DF DRINKING FOUNTAIN
DHW DOMESTIC HOT WATER
DIA DIAMETER
DIAG DIAGONAL OR DIAGRAM
DIFF DIFFUSER
DIM DIMENSION
DISC DISCONNECT
DISCH DISCHARGE
DISP DISPENSER
DIST DISTRIBUTION
DIV DIVISION
DL DOWN LIGHT
DN DOWN
DP DISTRIBUTION PANEL
DPR DAMPER
DR DRAIN
DS DOWNSPOUT
DWG DRAWING
DX DIRECT EXPANSION
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC ELECTRICAL CONTRACTOR
EDB ENTERING DRY BULB
EF EXHAUST FAN
EIFS EXTERIOR INSULATION AND
FINISHING SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ABBREVIATION LEGEND
F
1817 19 20 21 22
"ø
16"x16"
"ø
"x
"x
20"x20"
12"ø 12"x12" 12"ø
12"ø
"x
"ø
"ø
14"x14"
"x
14"x14"
"x
32"x12" 32"x12"
12"ø
12"ø
12"ø
14"ø
14"ø
14"ø
10"ø
14"ø
14"ø
14"ø
32"x12"
12"ø
12"ø
10"ø
12"ø
12"ø
12"ø
10"ø14"x6"
"x
"x
24"x20"
UP TO F-4 (525 CFM)
24x20 UP TO INTAKE LOUVER
UP TO F-3 (875 CFM)
UP TO F-1 (1300 CFM)
UP TO F-2 (1300 CFM)
4' BSC
(810 CFM)
6' BSC
1218 CFM
6' BSC
1218 CFM
PANELBOARD LP-PH
EXISTING
JUNCTION
BOX FROM LP-
PH-27, 120V.
MECHANICAL
B242
RECORD ROOM &
MECHANICAL
B241
HSKP
B236
OFFICE
B235C
OFFICE
B235B
FILE ROOM
B218B
ANTE ROOM
B215D
IV LAB
B215E
ONCOLOGY
B215F
MECHANICAL
B215C
HAZ. STOR.
B215G
SA
360 CFM
SA
380 CFM
SA
380 CFM
SA
380 CFM
SA
150 CFM
SA
380 CFM
SA
380 CFM
SA
225 CFM
SA
150 CFM
EA
365 CFM
EA
160 CFM
NOTES:
1. EXISTING EXHAUST GRILLES TO BE REBALANCED TO CFM INDICATED.
2. SUPPLY DIFFUSER AIRFLOWS INDICATED ARE APPROXIMATE AND SHALL BE ADJUSTED IN THE
FIELD DURING THE TEST AND BALANCE AND COMMISSIONING PHASES TO ACHIEVE THE DESIRED
PRESSURE RELATIONSHIPS BETWEEN THE SPACES. SEE AIRFLOW DIAGRAM ON H201 FOR
PRESSURE RELATIONSHIPS. THE FINAL AIR FLOW AT EACH SUPPLY DIFFUSER MAY BE HIGHER OR
LOWER THAN WHAT IS INDICATED ON THIS PLAN.
3. AS-BUILT DRAWINGS TO CONTAIN SUPPLY AIRFLOW READINGS RECORDED ONCE THE ROOMS ARE
MAINTAINING THE PROPER PRESSURE SET POINTS.
SA
200 CFM
SA
200 CFM
SA
360 CFM
SA
380 CFM
CLEAN EXISTING
PRE-HEAT COIL.
32"x12"
32"x12"32"x12"
12"ø
24x24
ACCESS
DOOR
(4) 2'x2' FILTERS
48x32 FILTER RACK WITH
HINGED ACCESS DOORS.
CONNECT TO EXISTING COIL.
EXISTING STEAM
HUMIDIFIERS 12
6 6 6
810"ø
EAV
EAV
EAV
EAV
SAV
SAV
SAV
SAV
SAV
SAV
NOTE:
ADJUST FANS ON ROOF TO
OBTAIN AIRFLOW AS REQUIRED
H201
LOCATION FOR NEW
TSI LAB CONTROL
MODULES 13
NEW WORK KEYNOTES
PRE-FILTER RACK TO HAVE HINGED DOORS WITH MANUAL FINGER CLIPS. CLIPS TO BE OPERABLE WITH NO TOOLS. FILTERS TO BE MINIMUM MERV 8, LINK 2-PLY. REFER TO SPECIFICATION 234000.
REPLACE THE 2 STEAM HUMIDIFIER CYLINDERS OF THE NORTEC MODEL NHTC 150 (SERIAL # 2069015).
NORTEC CYLINDERS ONLY.
REPLACE THE SUPPLY FAN BEARINGS. INSTALL A NEW 2-GROOVE SHEAVE PACKAGE FOR THE
SUPPLY FAN, NEW COG TYPE BELTS AND LASER ALIGN NEW COMPONENTS. TENSION FAN BELT TO
THE MANUFACTURER'S RECOMMENDATIONS. PRIOR TO COMMENCING THIS WORK, A DUCT
TRAVERSE SHALL BE TAKEN IN THE MAIN SUPPLY AIR DUCT TO CONFIRM EXISTING SUPPLY AIR FLOW.
AFTER COMPLETION OF THIS WORK, THE SUPPLY FAN SHALL BE REBALANCED TO ITS PRE-
CONSTRUCTION AIR FLOW.
INSTALL NEW HEPA FILTERS AND HAVE NEW HEPA FILTERS CERTIFIED ACCORDING TO THE INSTITUTE
OF ENVIRONMENTAL SCIENCES AND TECHNOLOGIES RECOMMENDED PRACTICES.
CLEAN COOLING COIL AND PREHEAT COIL WITH ENVIRONMENTALLY FRIENDLY CLEANER AND RINSE
CLEAN. CLEAN ALL INSIDE SURFACES OF AHU WITH MANUFACTURER'S RECOMMENDED CLEANING
PRODUCTS.
SEAL AIRFLOW LEAKS IN SUPPLY DUCTWORK BETWEEN AHU DISCHARGE AND THE 6 SUPPLY AIR
VALVES. AFTER DUCTWORK IS SEALED VERIFY THAT AIRFLOW LEAKAGE IS WITHIN THE ACCEPTABLE RANGE ACCORDING TO SPECIFICATION SECTION 233100 AT 4% LEAKAGE. ANY TEARS OR CUTS IN THE
INSULATION SHALL BE REPAIRED.
RESET SUPPLY AIR STATIC PRESSURE SETPOINT. ADJUST CURRENT SETTING OF 2.75" WC TO 1.5" WC.
ADD EXHAUST FAN STATUS LIGHT IN CEILING. THE LIGHT SHALL BE A GREEN LED LIGHT, NO GREATER THAN 2"Ø AND BE COMPATIBLE WITH THE BAS. FINAL LOCATION TO BE APPROVED BY THE COR AND PHARMACY STAFF PRIOR TO INSTALLATION. AN 'ON' LIGHT WILL INDICATE THAT THE FANS ARE
WORKING. THE LIGHT WILL BE OFF IN THE EVENT OF A MOTOR FAILURE OR A BROKEN BELT.
PRESSURE SENSORS TO BE INSTALLED IN EXHAUST DUCT DOWNSTREAM FROM EACH
CORRESPONDING EXHAUST AIR VALVE.
REPLACE EXHAUST FAN BELTS WITH COG TYPE V-BELTS, TENSIONED TO THE MANUFACTURER'S
RECOMMENDATIONS.
ACCESS DOOR TO BE LOCATED ON BOTTOM OF DUCT. COORDINATE EXACT LOCATION WITH THE COR.
PROVIDE NEW CONTROL WIRING FROM EAV-1 TO THE LABORATORY CONTROL MODULE.
REPAIR AND RESEAL CORNER OF EXISTING SUPPLY AIR DIFFUSER SO THAT DIFFUSER IS AIR TIGHT.
PROVIDE A UPS WITH SURGE PROTECTION ON THE CIRCUIT THAT SUPPLIES THE TSI CONTROLS.
NEW WORK GENERAL NOTES
THE INTENT OF THIS PROJECT IS CORRECT SPACE PRESSURIZATION AND HOOD EXHAUST AIRFLOW
ISSUES WITHIN THE BASEMENT PHARMACY CLEAN ROOM.
WITHIN THIS PROJECT, THE SCOPE SHALL INCLUDE, BUT IS NOT LIMITED TO, THE REPAIR AND MODIFICATIONS TO MALFUNCTIONING CONTROLS; IMPROVEMENTS TO EXISTING CONTROL SEQUENCES;
INSTALLATION OF NEW VENTURI AIR FLOW VALVES; INSTALLATION OF NEW FILTER RACKS; REBALANCE
OF SUPPLY AIRFLOWS; REBALANCE OF EXHAUST AIRFLOWS; AND VERIFICATION OF ROOM
PRESSURIZATION, CONTROLS SEQUENCES, AND HOOD EXHAUST IN ORDER TO PROVE COMPLIANCE WITH VA GUIDELINES AND WITH THE PROVISIONS OF USP <800>. THE PROJECT SHALL NOT BE ACCEPTED AS COMPLETE BY THE VA WITHOUT THESE VERIFICATIONS AND PROOF OF COMPLIANCE.
THE NEW EXHAUST AIR FLOW VENTURI AIR FLOW VALVES SHALL BE ESTABLISHED AS CONSTANT VOLUME CONTROL TO MAINTAIN THE AIRFLOW INDICATED ON PLAN. THE SUPPLY AIR VALVES SHALL BE ESTABLISHED AS VARIABLE AIR VOLUME AND SHALL UTILIZE ACTIVE PRESSURIZATION CONTROL. NEW TSI 6682 SUPERFLOW CONTROLLERS SHALL BE PROVIDED. REFER TO PLANS FOR MORE INFORMATION.
FOR SAFETY OF PHARMACY STAFF, GREEN LED LIGHTS SHALL BE ADDED IN THE ANTE ROOM AND NEAR
THE EXHAUST HOODS TO INDICATE THAT THE EXHAUST IS WORKING. SEE PLANS FOR MORE
INFORMATION.
NEW WORK SCHEDULING
THE PHARMACY IS A CRITICAL COMPONENT FOR THE OPERATION OF THE MEDICAL FACILITY.
AS SUCH, IT CANNOT BE TAKEN OUT OF SERVICE DURING THE BUSINESS WEEK. OVER A WEEKEND, THE
THE PHARMACY CANNOT BE OFFLINE FOR MORE THAN THREE CONSECUTIVE DAYS.
FOR THE CONSTRUCTION WORK ON THIS PROJECT, THE VA SHALL COORDINATE TWO CONSECTUTIVE
THREE-DAY WEEKENDS WHERE THE PHARMACY IS AVAILABLE TO THE CONTRACTORS.
THE CONTRACTORS SHALL BE PREPARED TO DO ALL SCOPE, INCLUDING EQUIPMENT INSTALLATION, DUCTING, CONTROLS, TESTING, BALANCING, COMMISSIONING AND VERIFICATIONS, WITHIN THESE TWO THREE-DAY WEEKEND TIME FRAMES. EACH THREE-DAY WEEKEND SHALL BEGIN ON A THURSDAY AT 5 PM
AND SHALL CEASE AT 7 AM ON MONDAY.
AT THE END OF THE FIRST WEEKEND, THE PHARMACY MUST BE ABLE TO BE REOPENED TO PHARMACY
STAFF. THE PHARMACY SHALL BE IN OPERATING CONDITION AND ABLE TO PERFORM NORMAL
FUNCTIONS THROUGH THE WORK WEEK.
THE CONTRACTORS SHALL HAVE ACCESS TO MECHANICAL ROOM B241 AND MECHANICAL ROOM B215C
PRIOR TO COMMENCING WORK FOR STAGING, STORAGE, AND SET-UP. THESE ROOMS SHALL BE
AVAILABLE THROUGH THE DURATION OF CONSTRUCTION.
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Dwg. of
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
FULLY SPRINKLERED
A
B
C
D
E
F
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
6587 Hamilton Avenue Pittsburgh, Pennsylvania 15206 Ph: 412.287.7333 Fax: 412.287.7334 www.ae-works.com
AE Works Project Number:
ARCHITECTS/ENGINEERS:SEAL
Revision# Date
8/
/2
8:
:3
A
M
Correct Deficiencies in Basement Pharmacy HVAC
244-15-J-6373
JKG RAN
1 Medical Center Drive Clarksburg, WV 26301
H101
HVAC PARTIAL BASEMENT PLAN
August 22, 2016 43 15018
100% Construction Documents
NORTH
PROJECT
1/4" = 1'-0"
HVAC PARTIAL BASEMENT PLAN
EXHAUST AIR VALVE SCHEDULE
MARK INLET (IN) MIN FLOW (CFM) MAX FLOW (CFM) PRESS DROP (FULL OPEN)
ELECTRICAL
POWER
BASIS OF DESIGN
COMMENTSMANUFACTURER MODEL
EAV-1 12 90 CFM 1218 CFM 0.60 in-wg 120 V TSI CV 12 AIR VALVES TO BE COMPATIBLE WITH TSI CONTROLERS AND TSI SYSTEM
EAV-2 12 90 CFM 1218 CFM 0.60 in-wg 120 V TSI CV 12 AIR VALVES TO BE COMPATIBLE WITH TSI CONTROLERS AND TSI SYSTEM
EAV-3 12 90 CFM 810 CFM 0.60 in-wg 120 V TSI CV 12 AIR VALVES TO BE COMPATIBLE WITH TSI CONTROLERS AND TSI SYSTEM
EAV-4 10 90 CFM 525 CFM 0.60 in-wg 120 V TSI CV 10 AIR VALVES TO BE COMPATIBLE WITH TSI CONTROLERS AND TSI SYSTEM
NOTES:
1. REPLACE EXISTING VALVES WITH NEW MEDIUM PRESSURE VALVES.
2. FACTORY CALIBRATE TO CFM INDICATED.
3. AIR VALVES TO BE CONSTANT AIRFLOW.
4. CALIBRATE ALL SENSORS, ACTUATORS, AIRFLOW MONITORS, AND
REBALANCE AIRFLOW TO ENSURE ALL AIR VALVES ARE DISPLAYING
THE CORRECT READING ON ANY CONTROL PANELS AND THE ECC.
5. REPLACE ALL SENSORS THAT CANNOT BE CALIBRATED.
SUPPLY AIR VALVE SCHEDULE
MARK INLET (IN) MIN FLOW (CFM) MAX FLOW (CFM) MAX PRESS DROP (FULL OPEN)
ELECTRICAL
POWER
BASIS OF DESIGN
COMMENTSMANUFACTURER MODEL
SAV-1 12 0 CFM 1160 CFM 0.60 in-wg 120 V TSI VVT112 EXISTING TO REMAIN - CALIBRATE IN FIELD
SAV-2 12 0 CFM 760 CFM 0.60 in-wg 120 V TSI VVT112 EXISTING TO REMAIN - CALIBRATE IN FIELD
SAV-3 12 0 CFM 720 CFM 0.60 in-wg 120 V TSI VVT112 EXISTING TO REMAIN - CALIBRATE IN FIELD
SAV-4 12 0 CFM 375 CFM 0.60 in-wg 120 V TSI VVT10 EXISTING TO REMAIN - CALIBRATE IN FIELD
SAV-5 8 0 CFM 150 CFM 0.60 in-wg 120 V TSI VVT108 EXISTING TO REMAIN - CALIBRATE IN FIELD
SAV-6 12 0 CFM 760 CFM 0.60 in-wg 120 V TSI VVT112 EXISTING TO REMAIN - CALIBRATE IN FIELD
NOTES:
1. AIRFLOW INDICATED IS APPROXIMATE. ROOM PRESSURE WILL DETERMINE
FINAL AIRFLOW. AIR VALVES TO MODULATE TO MAINTAIN ROOM PRESSURE.
2. AIR VALVES TO BE VARIABLE AIRFLOW.
3. CALIBRATE ALL SENSORS, ACTUATORS, AIRFLOW MONITORS, AND
REBALANCE AIRFLOW TO ENSURE ALL AIR VALVES ARE DISPLAYING THE
CORRECT READING ON ANY CONTROL PANELS AND THE ECC.
4. REPLACE ANY SENSORS THAT CANNOT BE CALIBRATED.
COVER WITH HANDLE AND
CHAIN RETAINER
GASKETED AND PRESSURE
SEALED
ROUND OR FLAT
OVAL DUCT
SECTION
HOUSING WELDED TO
DUCT SECTION
EXISTING
PANEL AT AHU
EXISTING ENGINEERING
CONTROL CENTER -
UPGRADE ECC WITH NEW
CONTROL POINTS
ECC
EXISTING COMMUNICATION NETWORK
EXHAUST AIR
VALVE
LABORATORY
CONTROL
MODULE
EXISTING EF (TYP. 4),
ADD CURRENT
SENSOR TO EACH
FAN.
BIO-SAFETY
CABINET
BSC
CONTROLLER
EXISTING STARTER
LOCATED IN MECH
ROOM (TYP. 4)
SEQUENCE:
1. THREE (3) NEW TSI 8862-VV-LF-BAC LABORATORY CONTROL MODULES SHALL BE PROVIDED AND INSTALLED TO CONTROL THE SUPPLY AND EXHAUST AIR VALVES SERVING THE ANTE ROOM, CLEAN
LABORATORY, AND ONCOLOGY. THE LABORATORY CONTROL MODULES SHALL CONTROL THE
SEQUENCING OF EXHAUST AND SUPPLY VOLUME CONTROL UNITS, AS WELL AS REHEAT CONTROL
VALVES. CONTROL MODULE SHALL BE INTERLOCKED TO ALLOW EXISTING BAS TO MONITOR LABORATORY
CONDITIONS AND ADJUST SETPOINTS.
2. THE EXHAUST AIR VALVES SHALL MODULATE BASED ON THEIR INTERNAL AIR FLOW SENSOR TO MAINTAIN A CONSTANT VOLUME. THE SASH POSITION ON THE CORRESPONDING BIO-SAFETY CABINET SHALL BE SET AT 8".
EXHAUST AIR FLOW SHALL BE BALANCED TO ACHIEVE 105 FPM +/- 5 FPM. SEE PLANS FOR INITIAL AIR FLOWS.
3. THE STATUS OF THE PHARMACY EXHAUST FANS SHALL BE INDICATED BY A GREEN LED LIGHT. SEE PLANS FOR LIGHT LOCATION. THE LIGHTS ARE TO BE BAS COMPATIBLE AND ACCEPT A JCI BAS OUTPUT. A GREEN "ON" LIGHT SHALL INDICATE THAT THE EXHAUST FAN IS RUNNING. AN "OFF" LIGHT SHALL INDICATE A MOTOR OR BELT FAILURE. AN "OFF" LIGHT SHALL GENERATE AN ALARM WITHIN THE JCI SYSTEM.
3. THE SUPPLY AIR VALVES SHALL PROVIDE ACTIVE PRESSURIZATION CONTROL AND OPERATE OFF A SIGNAL FROM THE EXISTING TSI ROOM SENSOR IN THE ROOM THAT VALVE SERVES. THE INITIAL ROOM
PRESSURE SET POINTS (ADJ.) SHALL BE AS FOLLOWS:
ANTE ROOM: +0.02"
IV LAB: +0.05"
ONCOLOGY: -0.02"
HAZ. STOR.: -0.02"
4. THE EXISTING ROOM PRESSURE SENSORS SHALL BE PROGRAMMED WITH A HIGH AND LOW ALARM OF +/- 0.05"
WITH AND ALARM DELAY OF 60 SECONDS.
6. ALL EXISTING DOOR CONTACTORS AT ALL EXISTING DOORS WITHIN THE PHARMACY SHALL BE CONNECTED TO THE LAB CONTROL MODULES. THE 'DOOR OPEN MODE' SHALL BE ACTIVATED AND SET TO PREVENT SUPPLY AIR
VALVES FROM OVER REACTING.
7. THE REHEAT COIL AT EACH SUPPLY VALVE SHALL MODULATE TO MAINTAIN 68°F SPACE TEMPERATURE.
NEW CONTROL
WIRING
RELAY FOR
PRESSURE SENSOR
TO EXISTING
BUILDING
CONTROLLERS
SP
ON
EXHAUST FAN
STATUS LIGHT
CONTROLS SCOPE:
1. WITHIN THE JCI SOFTWARE, THE LABELLING OF THE SUPPLY AND EXHAUST AIR VALVES IS INCORRECT.
WITHIN THE JCI SOFTWARE, JOHNSON CONTROLS TO UPDATE ALL SUPPLY AND EXHAUST AIR VALVE NAMES TO
MATCH THE EQUIPEMENT LABELLING USED BY THE VA IN THE FIELD.
2. ADD CONTROL POINTS FOR THE EXISTING ROOM PRESSURE SENSORS (TSI SURE FLOW) TO THE
CONTROL SYSTEM.
3. THE POINTS LIST INDICATES THE POINTS FROM THE NEW TSI 8682 LAB CONTROL MODULES THAT ARE TO BE PASSED THROUGH AND REPRESENTED IN THE JCI SYSTEM. POINTS SHALL ALSO BE ADDED FOR THE EXISTING TSI ROOM MONITOR IN HAZARDOUS STORAGE ROOM B215G. THESE POINTS ARE NOTED WITHIN THE THE POINTS LIST WITH AN ASTERISK (*). THE INTEGRATION OF ALL POINTS SHALL BE CONFIRMED AS PART OF
THE COMMISSIONING PROCESS.
4. JCI SHALL ESTABLISH TRENDING FOR POINTS NOTED IN THE POINTS LIST TO HAVE TRENDING. RATE OF SAMPLING TO BE DETERMINED IN THE FIELD WITH THE VA. FOR EACH TRENDED POINT, TRENDING SHALL RUN CONTINOUSLY
AND SHALL STORE UP TO THREE YEARS (MINIMUM) OF DATA.
5. JCI SHALL ADD SOFTWARE LOGIC TO CALCULATE THE AIR CHANGE PER HOUR (ACPH) FOR THE ANTE ROOM B215D, LAB B215E, ONCOLOGYB215F, AND HAZARDOUS STORAGE ROOM B215G. THE ACPH FOR EACH SPACE SHALL BE TRENDED. RATE OF SAMPLING TO BE DETERMINED IN THE FIELD WITH THE VA. TRENDING SHALL RUN
CONTINOUSLY AND SHALL STORE UP TO THREE YEARS (MINIMUM) OF DATA.
6. PROVIDE VERIFICATION AND CERTIFICATION OF THE 3 BIO-SAFETY CABINETS AFTER ALL AIRFLOW CHANGES ARE MADE AND THE SYSTEM HAS BEEN BALANCED. VERFICATION SHALL PROVE COMPLIANCE
WITH VA STANDARDS AND USP<800>.
7. AT EACH OF THE EXISTING EXHAUST FANS, PROVIDE A CURRENT SENSOR AND ADD AN EXHAUST FAN STATUS
POINT TO THE JCI SYSTEM.
8. ALL PROGRAMMING CHANGES SHALL BE SUBMITTED AS PART OF THE SHOP DRAWING PROCESSS FOR REVIEW
BY THE COR.
9. ALL WORK DONE ON AND WITH THE EXISTING JOHNSON CONTROLS INC. (JCI) SYSTEM TO BE PERFORMED BY JCI TECHNICIANS EMPLOYED DIRECTLY THROUGH JCI. WORK BY THIRD PARTY CONTROLS VENDORS OR
CONTRACTORS SHALL NOT BE PERMITTED.
10.START-UP OF THE NEW TSI AIR VALVES AND TSI CONTROLLERS TO BE PERFORMED BY TSI TECHNICIANS. ALL PROGRAMMING OF TSI DEVICES AND CONTROLLERS TO BE BY TSI TECHNICIANS. WORK BY THIRD PARTY
CONTROLS VENDORS OR CONTRACTORS SHALL NOT BE PERMITTED.
11.PROVIDE CONTROLS SYSTEM SUBMITTALS AND CONTROLS SYSTEM AS-BUILT DOCUMENTATION
PER SPECIFICATIONS SECTION 23 09 23 "DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC".
12. TURN OVER ANY REMOVED CONTROL COMPONENTS TO THE VA.
SUPPLY
AIR VALVE
TS
INSTALL A TOGGLE SWITCH ONTO THE BAS PANEL.
SWITCH TO BE 2-POSITION LABELED "AUTO" AND
"SERVICE". WHEN IN THE SERVICE POSITION IT WILL
SHUT DOWN THE AHU AND EXHAUST FANS FOR
SERVICING AND MAINTENENACE PROCEDURES.
PROVIDE THREE (3) TSI 862-VV-LF-BAC
CONTROLLERS; ONE FOR EACH SET OF
VALVES SERVING THE ANTE ROOM, CLEAN
ROOM AND ONCOLOGY
POINT NAME
SUPPLY AIR FLOW
EXHAUST AIR FLOW
LAB B215E SUPPLY AIR FLOW
LAB B215E EXHAUST AIR FLOW
TOTAL LAB SPECIFIC EXHAUST AIR FLOW
SUPPLY AIR FLOW SETPOINT
EXHAUST AIR VALVE POSITION
ROOM PRESSURE SETPOINT
ROOM PRESSURE HIGH ALARM*
ROOM PRESSURE LOW ALARM*
AI
AI
AI
AI
AI
AO
AI
AO
DI
DI
TYPE NOTES
PROVIDE FOR EACH SUPPLY AIR VALVE
PROVIDE FOR EACH EXHAUST AIR VALVE
PROVIDE SUM OF AIR FLOW OF SAV-1 + SAV-2 +SAV-6
PROVIDE FOR EACH PRESSURE SENSOR
Y
TREND
Y
Y
Y
Y
Y
Y
N
N
N
PROVIDE FOR EACH SUPPLY AIR VALVE
PROVIDE FOR EACH EXHAUST AIR VALVE
PROVIDE FOR EACH PRESSURE SENSOR
PROVIDE FOR EACH PRESSURE SENSOR
POINTS LIST
ROOM PRESSURE* AI PROVIDE FOR EACH PRESSURE SENSORY
ROOM TEMPERATURE* AI PROVIDE FOR EACH TEMPERATURE SENSORY
ROOM TEMPERATURE SETPOINT AO PROVIDE FOR EACH TEMPERATURE SENSORN
TOTAL SUPPLY AIR FLOW AI PROVIDE SUM OF AIR FLOW OF SAV-1 THROUGH SAV-6Y
MINIMUM SUPPLY AIR SETPOINT AO PROVIDE FOR EACH SUPPLY AIR VALVEN
REHEAT VALVE POSITION AI PROVIDE FOR EACH REHEAT COILN
AI PROVIDE FOR EACH SUPPLY AIR VALVEN
EXHAUST AIR FLOW SETPOINT AO PROVIDE FOR EACH EXHAUST AIR VALVEN
PROVIDE SUM OF AIR FLOW OF EAV-1 + EAV-2
PROVIDE SUM OF AIR FLOW OF EAV-1 THROUGH EAV-4
ANTE ROOM B215D SUPPLY AIR FLOW AI PROVIDE SUM OF AIR FLOW OF SAV-4 + SAV-5Y
MINIMUM OFFSET SETPOINT AO N PROVIDE FOR ANTE ROOM, LAB, AND ONCOLOGY
MAXIMUM OFFSET SETPOINT AO N PROVIDE FOR ANTE ROOM, LAB, AND ONCOLOGY
SUPPLY AIR VALVE POSITION
HOOD STATUS DI PROVIDE FOR EACH HOODN
HOOD ALARM DI PROVIDE FOR EACH HOODY
NOTE: POINTS WITH AN ASTERISK (*) SHALL ALSO BE ADDED FOR THE EXISTING TSI ROOM MONITOR WITHIN HAZARDOUS STORAGE
ROOM B251G
F
( - 0.02")
EA: -160 CFM
TR: +160 CFM
(SA: +0 CFM)
(15 ACH = 116 CFM)
160 CFM
150 CFM 90 CFM
150 CFM
( - 0.02")
EA: -810 CFM
TR: +90 CFM
(SA: +720 CFM)
(30 ACH = 472 CFM)
( +0.05" )
EA: -2436 CFM
TR: -90 CFM
TR: -150 CFM
(SA: +2676 CFM)
(30 ACH = 1068 CFM)
HAZ. STOR.
B215G
ANTE ROOM
B215D
IV LAB
B215E
ONCOLOGY
B215F
MECHANICAL
B215C
FILE ROOM
B218B
( +0.02" )
EA: -365 CFM
TR: -150 CFM
TR: +150 CFM
TR: -160 CFM
(SA: +525 CFM)
(30 ACH = 840 CFM)
BALANCING SEQUENCE:
1. EXHAUST AIR VALVES TO BE SET TO CFM INDICATED.
2. ROOM PRESSURE SENSORS TO BE CALIBRATED AND IN COMMAND OF
SUPPLY AIR VALVE TO MAINTAIN THE ROOM PRESSURE INDICATED.
3. SUPPLY AIR CFM INDICATED ON THIS DIAGRAM IS APPROXIMATE ONLY.
NOTES:
1. LATCHES SHALL BE OF THE WEDGE TYPE TO CLOSE DOORS TIGHTLY, WITH NO TOOLS REQUIRED FOR OPERATION.
2. HINGES ON THE ACCESS DOORS SHALL HAVE NON-CORROSIVE PINS.
3. SEE SMACNA 2005, FIGURE 9-15
ACCESS DOOR
ACCESS PANEL
SECTION "B-B"
SECTION "A-A"
INSULATION
GASKET
DUCT
INSULATION
"A"
"A"
HANDLE INSIDE
NEOPRENE GASKET
CASING
FLEXIBLE WASHER
FACTORY FABRICATED
LATCH/HANDLE
1-1/2" MIN.
INSULATION
"B" "B"
MAX LOAD 50% OF MFR. RECOMMENDED RATING.
USE FULL THREADED RODS
CONCRETE SLAB SELF DRILLING
ANCHOR
2" DEEP, ANGLED SYSTEM PRE-
FILTERS. PROVIDE 16 SF OF
SURFACE AREA. REFER TO
PROJECT SPECIFICATIONS.
32x48 FILTER HOUSING, DOUBLE WALLED INSULATED
EXISTING 36x36 PRE-HEAT COIL
STAR STYLE KNOBS
AIRFLOW AIRFLOW
HINGED ACCESS
DOOR (BOTH SIDES)
CONCRETE SLAB
1' -2
1' -0
INSULATE ALL NEW
DUCTING TO MATCH
EXISTING DUCT INSULATION
12"x32"12"x32"
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Dwg. of
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
FULLY SPRINKLERED
A
B
C
D
E
F
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
6587 Hamilton Avenue Pittsburgh, Pennsylvania 15206 Ph: 412.287.7333 Fax: 412.287.7334 www.ae-works.com
AE Works Project Number:
ARCHITECTS/ENGINEERS:SEAL
Revision# Date
8/
/2
8:
:3
A
M
Correct Deficiencies in Basement Pharmacy HVAC
244-15-J-6373
JKG SPL
1 Medical Center Drive Clarksburg, WV 26301
H201
HVAC DETAILS AND CONTROL DIAGRAM
August 22, 2016 44 15018
100% Construction Documents
NTS
ACCESS SECTION FOR ROUND/OVAL DUCT
NOT TO SCALE
PHARMACY LAB CONTROL DIAGRAM
1/4" = 1'-0"
HVAC AIRFLOW DIAGRAM
NTS
ACCESS PANEL & DOOR DETAIL
NTS
SUSPENDED EQUIPMENT FROM CONCRETE SLAB
1/2" = 1'-0"
FILTER HOUSING SECTION
| G001 - COVER SHEET |
| Sheets |
| G001 - COVER SHEET |
| H001 - HVAC SYMBOLS, ABBREVIATIONS AND GENERAL NOTES |
| H101 - HVAC PARTIAL BASEMENT PLAN |
| H201 - HVAC DETAILS AND CONTROL DIAGRAM |
| H001 - HVAC SYMBOLS, ABBREVIATIONS AND GENERAL NOTES |
| Sheets |
| G001 - COVER SHEET |
| H001 - HVAC SYMBOLS, ABBREVIATIONS AND GENERAL NOTES |
| H101 - HVAC PARTIAL BASEMENT PLAN |
| H201 - HVAC DETAILS AND CONTROL DIAGRAM |
| H101 - HVAC PARTIAL BASEMENT PLAN |
| Sheets |
| G001 - COVER SHEET |
| H001 - HVAC SYMBOLS, ABBREVIATIONS AND GENERAL NOTES |
| H101 - HVAC PARTIAL BASEMENT PLAN |
| H201 - HVAC DETAILS AND CONTROL DIAGRAM |
| H201 - HVAC DETAILS AND CONTROL DIAGRAM |
| Sheets |
| G001 - COVER SHEET |
| H001 - HVAC SYMBOLS, ABBREVIATIONS AND GENERAL NOTES |
| H101 - HVAC PARTIAL BASEMENT PLAN |
| H201 - HVAC DETAILS AND CONTROL DIAGRAM |
File details come from the government source that posted it.