36C24518Q0057-002.pdf

PDF 610 KB Posted

Attached to
UPGRADE BASEMENT PHARMACY HVAC Federal contract opportunity
Solicitation number
36C24518Q0057
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 5

About this file

36C24518Q0057 Clarksburg Pharmacy - Bid Drawings.pdf

View the file

Other files for this federal contract opportunity

Other files attached to UPGRADE BASEMENT PHARMACY HVAC, newest first.
File Type Posted
36C24518Q0057-003.rtf RTF text file
36C24518Q0057-001.docx DOCX document
36C24518Q0057-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSULTANTS:

Drawing Title

Approved: Project Director

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number

Dwg. of

Building Number

Project Number

Office of Construction and Facilities Management

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

FULLY SPRINKLERED

A

B

C

D

E

F

6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

6587 Hamilton Avenue Pittsburgh, Pennsylvania 15206 Ph: 412.287.7333 Fax: 412.287.7334 www.ae-works.com

AE Works Project Number:

ARCHITECTS/ENGINEERS:SEAL

Revision# Date

8/

/2

1:

:1

P

M

Correct Deficiencies in Basement Pharmacy HVAC

244-15-J-6373

SPL SPL

1 Medical Center Drive Clarksburg, WV 26301

G001

COVER SHEET

August 22, 2016 41 15018

100% Construction Documents

CORRECT DEFICIENCIES IN

BASEMENT PHARMACY HVAC

LOUIS A. JOHNSON VA MEDICAL CENTER

1 MEDICAL CENTER DRIVE

CLARKSBURG, WV 26301

VICINITY MAP

SITE

LOCATION MAP

SITE

PROJECT DIRECTORY

OWNER:

DEPARTMENT OF VETERANS AFFAIRS

LOUIS A. JOHNSON, VAMC

1 MEDICAL CENTER DRIVE

CLARKSBURG, WV 26301-4199

(304) 623-3461

CONTACT: GLENN HEUERMAN (COR)

ARCHITECT/ENGINEER:

AE WORKS, LTD

6587 HAMILTON AVENUE

PITTSBURGH, PA 15206

(412) 287-7333

CONTACT: TIFFANY HAILE (PM)

DRAWING INDEX

SHEET # SHEET NAME

GENERAL

G001 COVER SHEET

MECHANICAL

H001 HVAC SYMBOLS, ABBREVIATIONS AND GENERAL NOTES

H101 HVAC PARTIAL BASEMENT PLAN

H201 HVAC DETAILS AND CONTROL DIAGRAM

NORTH

PROJECT

1. NOT ALL SYMBOLS ARE NECESSARILY USED.

2. WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE PRODUCTS OF A SINGLE MANUFACTURER

SHALL BE USED.

3. DRAWINGS ARE DIAGRAMMATIC. CONTRACTOR TO FIELD VERIFY DUCT AND PIPE ROUTING AND COORDINATE INTERFERENCE

BETWEEN TRADES PRIOR TO INSTALLATION.

4. DUCTWORK TO BE INSTALLED TIGHT TO UNDERSIDE OF STRUCTURE ABOVE UNLESS NOTED OTHERWISE.

5. PROVIDE ALL MATERIALS, EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED, AND AS REQUIRED BY CODE.

6. CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY. CONTRACTOR SHALL BE RESPONSIBLE TO FIELD SURVEY ACTUAL SITE CONDITIONS AND ACCOMMODATE ACTUAL SITE CONDITIONS AS PART OF SCOPE OF WORK AT NO COST TO OWNER.

7. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, APPLICABLE BUILDING, STATE, AND LOCAL CODES, SEISMIC REQUIREMENTS, ENERGY CODES, AND

INSURANCE UNDERWRITER REQUIREMENTS.

8. MAINTAIN A MINIMUM OF 6'-8" CLEARANCE TO UNDERSIDE OF PIPES, DUCTS, CONDUITS, SUSPENDED EQUIPMENT, SUPPORTS, ETC., THROUGHOUT ACCESS ROUTES IN MECHANICAL ROOMS.

9. ALL TESTS SHALL BE COMPLETED AND ACCEPTED BY THE COR BEFORE ANY MECHANICAL EQUIPMENT OR PIPING

INSULATION IS APPLIED.

10. LOCATE ALL TEMPERATURE, PRESSURE AND FLOW MEASURING DEVICES IN ACCESSIBLE LOCATIONS WITH A STRAIGHT SECTION OF PIPE OR DUCT UPSTREAM AND DOWNSTREAM, AS RECOMMENDED BY THE MANUFACTURER FOR ACCURACY.

11. TESTING ADJUSTING AND BALANCING (TAB) AGENCY SHALL BE A MEMBER OF THE ASSOCIATED AIR BALANCING COUNCIL (AABC) OR THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB). TAB FIRM SHALL HAVE A MINIMUM OF 5 YEARS EXPERIENCE ON SIMILAR PROJECTS. PERFORM TAB IN ACCORDANCE WITH THE REQUIREMENTS OF THE TAB PROCEDURAL STANDARD RECOMMENDED BY THE TAB TRADE ASSOCIATION THAT APPROVED THE TAB FIRM'S QUALIFICATIONS.

12. COORDINATE ALL FINAL EQUIPMENT CONNECTIONS WITH MANUFACTURERS' CERTIFIED DRAWINGS. COORDINATE AND PROVIDE ALL DUCTWORK AND PIPING TRANSITIONS REQUIRED FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD

VERIFY AND COORDINATE ALL DUCTWORK AND PIPING DIMENSIONS BEFORE FABRICATION.

13. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE, ALL LOCAL CODES, AND OWNER'S INSURANCE

UNDERWRITER REQUIREMENTS.

14. THE LOCATIONS AND SIZES OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE SPECIFICATIONS THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE ONLY. THE EXACT LOCATIONS AND SIZES NECESSARY TO SECURE THE BEST CONDITIONS AND RESULTS SHALL BE DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL HAVE THE APPROVAL

OF THE ENGINEER BEFORE BEING INSTALLED. DO NOT SCALE DRAWINGS.

15. PLAN DRAWINGS AND SECTION CUTS WHICH SPECIFICALLY IDENTIFY SERVICE ROUTE OFFSETS, ELEVATION CHANGES, OBSTRUCTIONS, ACCESS DOORS, BALANCING DEVICES, ETC. ARE SHOWN FOR CLARITY WHERE SPECIFIC KNOWN CONDITIONS

EXIST. MECHANICAL CONTRACTOR SHALL COORDINATE EQUIPMENT, DUCTWORK, AND PIPING ROUTINGS WITH ALL OTHER TRADES. REQUIREMENTS NOT SPECIFICALLY IDENTIFIED SHALL NOT BE INTERPRETED AS EXCLUSION FROM CONTRACTOR'S SCOPE OF WORK. CONTRACTOR SHALL BE RESPONSIBLE FOR ACTUAL SITE CONDITIONS AND SHALL INCLUDE SUCH

CONDITIONS IN SCOPE OF WORK AT NO ADDITIONAL COST TO THE OWNER.

16. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND SUPPORT OF MECHANICAL WORK AS SHOWN IN DETAILS FOR PIPING, DUCTWORK AND EQUIPMENT (UNLESS OTHERWISE NOTED) SHALL BE FURNISHED AND INSTALLED BY THE

MECHANICAL CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.

17. ALL OPENINGS IN FIRE RATED WALLS AND SMOKE PARTITIONS DUE TO DUCTWORK, PIPING, CONDUIT, ETC., SHALL BE FIRE

STOPPED WITH APPROVED FIRESTOPPING MATERIALS.

18. ALL EQUIPMENT SUBMITTALS AND SHOP DRAWINGS REQUIRED BY THE SPECIFICATIONS SHALL BE APPROVED BY

ENGINEER PRIOR TO PURCHASE, FABRICATION, AND INSTALLATION.

DRAWING SYMBOLS

SYMBOLS DESCRIPTION

PIPELINE ABBREVIATIONS HVAC SYMBOLS

EQUIPMENT TAG ABBREVIATIONS

DESCRIPTIONSYMBOLS

PIPELINE SYMBOLS

DOUBLE LINE SHEETMETAL

SINGLE LINE - SHEET METAL

DESCRIPTIONSYMBOLS

HVAC GENERAL NOTES

DUAL TEMPERATURE WATER RETURN

DUAL TEMPERATURE WATER SUPPLY

HOT WATER HEATING RETURN

HOT WATER HEATING SUPPLY

INVERTED ECCENTRIC REDUCER

(VENTURI FLOW STATION)

TWO-WAY MODULATING

THREE-WAY MODULATING CONTROL VALVE

SAFETY VALVE OR PRESSURE RELIEF

PRESSURE REDUCING VALVE

BALANCING COCK

WATER FLOW MEASURING DEVICE

PIPING TURNED DOWN

TWO-WAY CONTROL VALVE

MOTORIZED VALVE

AUTOMATIC AIR VENT

PIPING TURNED UP

FUNNEL DRAIN

CONTROL VALVE

A

M

MANUAL AIR VENT

(TWO POSITION TYPE)

AQUASTAT

PRESSURE TAP

THERMOMETER

STRAINER

PRESSURE GAUGE

UNION

ECCENTRIC REDUCER

MANUAL VOLUME CONTROL DAMPER (VD)

RISE/DROP IN DUCTWORK

(ARROW SHOWS DIRECTION OF DROP)

SMOKE DAMPER/DETECTOR

PANEL IN DUCT AND CEILING)

EXHAUST AIR DUCT DN

SUPPLY AIR DIFFUSER

ACCESS DOOR ON SIDE OF DUCT

EXHAUST REGISTER

RETURN AIR REGISTER

ACCESS DOOR ON BOTTOM OF DUCT

DETECTOR BY E.C. DAMPER BY H.C.

FIRE DAMPER AT FIRE WALL (PROVIDE ACCESS

OR HORIZONTAL DUCT ABOVE CEILING (PROVIDE

FIRE DAMPER IN VERTICAL DUCT THRU FLOOR

ACCESS PANEL IN DUCT AND WALL OR CEILING)

SUPPLY AIR REGISTER (DUCT OR WALL)

EXHAUST/RETURN AIR REGISTER (DUCT OR WALL)

COMBINATION FIRE/SMOKE DAMPER

MOTORIZED DAMPER

SUPPLY DUCT DN

RETURN AIR DUCT DN

EXHAUST AIR DUCT UP

RETURN AIR DUCT UP

SUPPLY DUCT UP

ROUND SUPPLY, RETURN OR

OVAL SUPPLY, RETURN OR

RECTANGULAR SUPPLY, RETURN OR

DIRECTION OF AIR FLOW)

DUCT W/O TURNING VANES

DUCT MOUNTED SMOKE

BY EC, INSTALLED BY HC

RELIEF DUCT WIDTH (SHOWN)XDEPTH

RELIEF DUCT WIDTH (SHOWN)XDEPTH

LOW LOSS TAKE OFF (ARROW INDICATES

RADIUS ELBOW (DUCT WIDTH 17" AND LOWER)

(ARROW INDICATES AIR FLOW DIRECTION)

BOOT CONNECTION WITH MANUAL VD

DUCT W/TURNING VANES (DUCT WIDTH OVER 18")

WALL SWITCH

DUCT/SPACE STATIC PRESSURE SENSOR

DETECTOR PROVIDED

CONICAL SPIN-IN FITTING

24"X24"24"X24"

12"X12"

SD

S

WS

M

AD

REFRIGERANT LINE

REFRIGERANT SUCTION

RL

RS

HWHS

HWHR

DTS

DTR

THERMAL VAV DIFFUSERTF

CD CONDENSATE DRAIN LINE

MPS MEDIUM PRESSURE STEAM SUPPLY

MPCR MEDIUM PRESSURE CONDENSATE RETURN

PUMPED CONDENSATEPC

HRS ENERGY (HEAT) RECOVERY SUPPLY

HRR ENERGY (HEAT) RECOVERY RETURN

NAME PIPE TO BE REMOVED

NAME EXISTING PIPING TO REMAIN

TEE- OUTLET

SIDE CONNECTION

CAPPED OUTLET

TEE - OUTLET UP

12"X12"

12"/12"

RELIEF VALVE

BUTTERFLY VALVE

PLUG VALVE

GATE VALVE

GLOBE VALVE

PIPE BREAK (SINGLE LINE)

DIRECTION OF FLOW

FLEXIBLE CONNECTION

BACKFLOW PREVENTION DEVICE

DUCT END CAP

24X12

SQUARE ELBOW WITH

TURNING VANES

RADIUS TURN ELBOW

RETURN CROSS

SECTION DN

EXHAUST CROSS

SECTION UP

SUPPLY DUCT

CROSS SECTION DN

RETURN CROSS

SECTION UP

CROSS SECTION UP

SUPPLY DUCT

ROUND DUCT SIZE (DIAMETER)

FLEXIBLE DUCT (DIAMETER SIZE)

DUCT SIZE (WIDTH X DEPTH)

24"Ø

DUCT W/ TURNING VANES

CONDENSER WATER RETURN

CONDENSER WATER SUPPLYCWS

CWR

CTD COOLING TOWER DRAIN LINE

BALL VALVE

(HINGED & GASKETED)

(HINGED & GASKETED)

FD

F/SD

FDFD

LPS LOW PRESSURE STEAM SUPPLY

LPCR LOW PRESSURE CONDENSATE RETURN

HPS HIGH PRESSURE STEAM SUPPLY

HPCR HIGH PRESSURE CONDENSATE RETURN

BACKDRAFT DAMPER

B

DUCT/WALL TEMPERATURE SENSOR, ELECTRICT

24"Ø

12"Ø

DRAWING NUMBER WHERE DRAWN

H200

SECTION LETTER

DRAWING NUMBER WHERE DRAWNH100

DETAIL NUMBER

CONNECT TO EXISTING AT THIS POINT

DEMO/REMOVE TO THIS POINT

EQUIPMENT NUMBER1

AHU POWERED EQUIPMENT

EQUIPMENT NUMBER1

RHC NON-POWERED EQUIPMENT

CD-#

# AIRFLOW QUANTITY

DIFFUSER/GRILLE SYSTEM TYPE

STAINLESS STEEL DUCTWORK

HVAC DEMOLITION NOTES

HVAC PHASING / SHUTDOWN NOTES

DUCT/WALL TEMPERATURE SENSOR, ELECTRICT

1. THE CONTRACTOR SHALL THOROUGHLY EXAMINE THE SITE PRIOR TO SUBMITTING THEIR BID. DUE TO THE NATURE OF THIS PROJECT AND THE STATE OF THE EXISTING BUILDING, IT IS IMPOSSIBLE TO COMPLETELY RELATE THE SCOPE OF THE DEMOLITION REQUIRED TO THE CONTRACTOR THROUGH THE CONTRACT DOCUMENTS. FAILURE TO VISIT THE SITE WILL NOT RELIEVE THE CONTRACTOR OF THEIR DEMOLITION RESPONSIBILITIES UNDER THIS CONTRACT. IT IS THE CONTRACTOR’S RESPONSIBILITY TO DETERMINE AND COORDINATE THE EXACT EXTENT OF DEMOLITION NECESSARY TO PROVIDE A RENOVATED AND UPGRADED S

PACE AND TO FACILITATE NEW WORK.

2. INFORMATION REGARDING THE EXISTING CONDITIONS WAS GATHERED FROM AVAILABLE EXISTING DRAWINGS, SURVEY, AND CORRESPONDENCE WITH UTILITY, STAFF, AND FACILITIES PERSONNEL. THERE ARE NO GUARANTEES AS TO THE ACCURACY OF

THIS INFORMATION AND IT IS OFFERED FOR INFORMATION ONLY.

3. VERIFY EXISTING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING AND SYSTEM COMPONENTS PRIOR TO DEMOLITION. IF EXISTING CONDITIONS ARE DIFFERENT THAN WHAT IS INDICATED ON THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL NOTIFY THE

COR AND ARCHITECT PRIOR TO PROCEEDING WITH THE WORK.

4. MINIMIZE DISTURBANCE AND / OR DAMAGE TO EXISTING FINISHED SURFACES AND FINISHES. WHERE DEMOLITION OF MECHANICAL SYSTEM COMPONENTS DAMAGES EXISTING SURFACES TO REMAIN, RESTORE THOSE SURFACES TO THE SAME CONDITION AS THE ADJACENT SURFACES. RESTORATION MUST BE PERFORMED BY WORKMEN SKILLED IN PERFORMING SUCH WORK. ALL FIRE AND

SMOKE RATINGS SHALL BE RETAINED AS PART OF THE REPAIRS. PATCH / SEAL HOLES WEATHERTIGHT. ALL PATCHES AND

REPAIRS ARE SUBJECT TO THE REVIEW AND APPROVAL OF THE ARCHITECT.

5. ALL AREAS OF EGRESS SHALL BE KEPT OPEN AND FREE FROM DEBRIS AT ALL TIMES.

6. DO NOT REMOVE ITEMS SUPPORTING OTHER ITEMS WITHOUT PROVIDING TEMPORARY OR PERMANENT SUPPORT. PROPERLY SUPPORT ALL EXISTING ITEMS TO REMAIN. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING REQUIRED SUPPORTS FOR

AFFECTED ITEMS.

7. VERIFY EXTENT OF PIPING, EQUIPMENT, COMPONENTS, AND CONTROLS TO BE RETAINED OR REUSED PRIOR TO THE DEMOLITION OF SPECIFIC SYSTEM. PROTECT ITEMS WHICH ARE TO BE REUSED ON SITE TO MINIMIZE POST-CONSTRUCTION REPAIRS. ALL

ITEMS WHICH ARE DAMAGED SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE REPAIRED OR REPLACED AT NO

COST TO THE CONTRACT.

8. REFER TO PLANS FOR EXISTING PIPING, DUCTWORK, EQUIPMENT, AND SYSTEM COMPONENTS TO BE REUSED.

9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL CONNECTIONS TO EXISTING AND NEW SYSTEMS AS REQUIRED TO FACILITATE PROPER CONTINUAL OPERATION OF ALL SYSTEMS AND EQUIPMENT, EXISTING OR NEW, EXCEPT

WHERE IN THE CURRENT PHASE OF CONSTRUCTION.

10. THE CONTRACTOR SHALL BE AWARE THAT THE EXISTING BUILDING(S) AND ADJACENT SITE WILL BE OCCUPIED AND IN USE 24 HOURS PER DAY, 7 DAYS A WEEK. THE CONTRACTOR SHALL CONDUCT THEIR OPERATIONS SO THAT THERE WILL BE

MINIMAL INTERFERENCE WITH THE CONTINUED OPERATION OF THE EXISTING BUILDING(S) AND STAFF. ANY INTERFERENCE OR INCONVENIENCE TO BUILDING OPERATIONS SHALL BE REVIEWED WITH THE COR AND ARCHITECT PRIOR TO

COMMENCEMENT.

ACC AIR COOLED CHILLER

ACCU AIR COOLED CONDENSING UNIT

ACCUM ACCUMULATOR

AHU AIR HANDLING UNIT

ASHP AIR SOURCE HEAT PUMP

B BOILER

BB BASEBOARD HEATER

BD BAROMETRIC DAMPER

BDD BACK DRAFT DAMPER

CC CHILLED WATER COOLING COIL

CD CONDENSATE DRAIN

CIRC CIRCULATOR

CMPR COMPRESSOR

CONV CONVECTOR

CP CONDENSATE PUMP

CUH CABINET UNIT HEATER

DC DRY COOLER

EF EXHAUST FANS

ER EXHAUST REGISTER

ERW EXHAUST REGISTER WALL

ET EXPANSION TANK

ECUH ELECTRIC CABINET UNIT HEATER

EUH ELECTRIC UNIT HEATER

EWH ELECTRIC WALL HEATER

EVAP EVAPORATOR

FT FINNED TUBE RADIATION

FCU FAN COIL UNIT

FPB FAN POWERED BOX

FU FURNACE

GIV GRAVITY INTAKE VENTILATOR

GRV GRAVITY ROOF VENTILATOR

H HUMIDIFIER

HC HOT WATER HEATING COIL

HUH HORIZONTAL UNIT HEATER

P PUMP

PTAC PACKAGED TERMINAL AIR CONDITIONING UNIT

RG RETURN GRILLE

RR RETURN REGISTER

RAG RETURN AIR GRILLE

RCP RADIANT CEILING PANEL

RTU ROOF TOP UNIT

SF SUPPLY FAN

SSAC SPLIT SYSTEM AIR CONDITIONING UNIT

SSDC SECURITY SUPPLY DIFFUSER CEILING

SSEF SECURITY SMOKE EXHAUST FAN

SSGW SECURITY SUPPLY SUPPLY GRILLE WALL

SLSD SUPPLY LINEAR SLOT DIFFUSER

UH UNIT HEATER

UV UNIT VENTILATOR

UCD UNDER CUT DOOR

VAV VARIABLE AIR VOLUME

DRAWING KEYNOTE - DEMOLITION

DRAWING KEYNOTE - PLAN / ELEVATION NEW WORK

1. THE WORK UNDER THIS CONTRACT WILL REQUIRE THE SYSTEM TO BE SHUT DOWN. THIS WILL OCCUR ON A THURSDAY EVENING THROUGH SUNDAY NIGHT. AFTER THIS TIME THE VENTILATION SYSTEM WILL BE REQUIRED TO BE OPERATIONAL.

2. CONTRACTOR SHALL MINIMIZE SHUTDOWN TIMES DURING MECHANICAL SYSTEM SWITCHOVERS. ALL SHUTDOWN TIMES

AND THEIR DURATIONS SHALL BE COORDINATED WITH THE COR.

CONSULTANTS:

Drawing Title

Approved: Project Director

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number

Dwg. of

Building Number

Project Number

Office of Construction and Facilities Management

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

FULLY SPRINKLERED

A

B

C

D

E

F

6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

6587 Hamilton Avenue Pittsburgh, Pennsylvania 15206 Ph: 412.287.7333 Fax: 412.287.7334 www.ae-works.com

AE Works Project Number:

ARCHITECTS/ENGINEERS:SEAL

Revision# Date

8/

/2

1:

:1

P

M

Correct Deficiencies in Basement Pharmacy HVAC

244-15-J-6373

SPL SPL

1 Medical Center Drive Clarksburg, WV 26301

H001

HVAC SYMBOLS, ABBREVIATIONS AND

GENERAL NOTES

August 22, 2016 42 15018

100% Construction Documents

SWBD SWITCHBOARD

SWGR SWITCHGEAR

SYM SYMMETRICAL TOP

T TOP

TA THROWAWAY

TAN TANGENT

TC TELECOMMUNICATIONS

CONTRACTOR

TCV TEMPERATURE CONTROL VALVE

TDV TRIPLE DUTY VALVE

TEL TELEPHONE

TEMP TEMPERATURE

TER TERRAZZO

TG TONGUE & GROOVE

TH THERMOMETER

THRES THRESHOLD

TR TEMPERATURE RISE

TRANS TRANSITION

TRANSR TRANSFORMER

TSTAT THERMOSTAT

TV TURNING VANES OR TELEVISION

TYP TYPICAL

UC UNDER CABINET OR UNDER CUT

UFD UNDER FLOOR DUCT

UG UNDERGROUND

UH UNIT HEATER

UL UNDERWRITER'S LABORATORIES

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

UPS UNINTERRUPTIBLE POWER SUPPLY

UTIL UTILITY

V VOLT

VAL VALVE

VD VOLUME DAMPER

VENT VENTILATION

VERT VERTICAL

VFS VENTURI FLOW STATION

VIF VERIFY IN FIELD

VL VENT LINE

VR VAPOR RETARDER

VS VENT STACK

VTR VENT THROUGH ROOF

W WATT

W/ WITH

W/O WITHOUT

WB WET BULB

WC WALL COVERING

WCL WATER CLOSET

WD WOOD

WF WIDE FLANGE

WFMD WATER FLOW MEASURING DEVICE

WG WALL GUARD OR WATER GAUGE

WHCH WHEEL CHAIR

WIN WINDOW

WMS WIRE MESH SCREEN

WP WEATHERPROOF

WPS WALL PROTECTION SYSTEM

WSCT WAINSCOT

WT WINDOW TREATMENT

WTD WATER TEMPERATURE DROP

WWF WELDED WIRE FABRIC

X DEMO

XN TO BE RELOCATED / NEW LOCATION

XR EXISTING TO REMAIN

ZVB ZONE VALVE BOX

ZVC ZONE VALVE CABINET

LTG LIGHTING

LV LOW VOLTAGE

LVR LOUVER

LWB LEAVING WET BULB

LWC LINEAR WOOD CEILING

LWT LEAVING WATER TEMPERATURE

MAN MANUAL

MAT MIXED AIR TEMPERATURE

MATL MATERIAL

MAV MANUAL AIR VENT

MAX MAXIMUM

MBH ONE THOUSAND BTU / HOUR

MC MECHANICAL CONTRACTOR

MC METAL CLAD CABLE

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDP MAIN DISTRIBUTION PANEL

MECH MECHANICAL

MEMB MEMBRANE

MET METAL

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MLO MAIN LUGS ONLY

MO MASONRY OPENING

MOD MOTOR OPERATED DAMPER

MONO MONOLITHIC

MTD MOUNTED

MTG HT MOUNTING HEIGHT

MTL METAL

MTLH METAL HALIDE

MTR MOTOR

MTS MANUAL TRANSFER SWITCH

MV MEDIUM VOLTAGE

N/A NOT APPLICABLE

NEC NATIONAL ELECTRIC CODE

NEMA NATIONAL ELECTRICAL

MANUFACTURER ASSOCIATION

NIC NOT IN CONTRACT

NL NIGHT LIGHT

NO NUMBER OR NORMALLY OPEN

NOM NOMINAL

NTS NOT TO SCALE

O OXYGEN

OA OUTSIDE AIR

OBD OPPOSED BLADE DAMPER

OC ON CENTER

OD OUTSIDE DIAMETER

OPER OPERATED

OPNG OPENING

OPP OPPOSITE

ORD OVERFLOW ROOF DRAIN

PB PULL BOX

PC PLUMBING CONTRACTOR

PD PUMP DISCHARGE

PG PRESSURE GAUGE WITH COCK

PL PROPERTY LINE

PLAM PLASTIC LAMINATE

PLBG PLUMBING

PNL PANEL

PR PAIR

PRD PRESSURE DIFFERENTIAL VALVE

PRELIM PRELIMINARY

PRT PRESSURE TAP

PRV PRESSURE REDUCING VALVE

PT PAINT OR POTENTIAL

TRANSFORMER

RO ROUGH OPENING

QT QUARRY TILE

R RADIUS

RA RETURN AIR / RELIEF AIR

RB RUBBER BASE

RC REMOVE COMPLETELY

RD ROOF DRAIN

RE RELOCATE EXISTING

REC RECESSED

RECPT RECEPTACLE

REF REFERENCE

REFL REFLECTOR

REG REGISTER

REINF REINFORCING

REM REMOVE

REQD REQUIRED

RET RETURN

REV REVISE

REX REMOVE EXISTING

RF RESILIENT FLOOR

RFI REQUEST FOR INFORMATION

RGS RIGID GALVANIZED STEEL CONDUIT

RH ROOF HATCH

RM ROOM

RN REMOVE AND REPLACE WITH NEW

RR REMOVE AND REPLACE

RS RAPID START

RV RELIEF VALVE

RWC RAIN WATER CONDUCTOR

SA SUPPLY AIR

SAN SANITARY SEWER ABOVE GROUND

SAN-BXR SANITARY SEWER - BURIED

EXISTING TO REMAIN

SAN-XR SANITARY SEWER ABOVE GROUND -

EXISTING TO REMAIN

SCHED SCHEDULE

SD SMOKE DAMPER OR SMOKE

DETECTOR

SDISP SOAP DISPENSER

SF SQUARE FOOT

SHT SHEET

SHT MTL SHEET METAL

SHTG SHEATHING

SIM SIMILAR

SM SURFACE MOUNTED

SNC SANITARY NAPKIN CABINET

SND SANITARY NAPKIN DISPOSER

SP STANDPIPE OR STATIC PRESSURE

SPC SPECIMEN PASS-THRU CABINET

SPEC SPECIFICATIONS

SPS STATIC PRESSURE SENSOR

SR SERVICE RECEPTOR

SS SOIL STACK

ST PR STATIC PRESSURE

ST STL STAINLESS STEEL

STD STANDARD

STER STERILIZER

STL STEEL

STOR STORAGE

STR STRAINER

STRUCT STRUCTURAL

SUSP SUSPENDED

SW SWITCH

ELEC CAB ELECTRICAL CABINET

ELEV ELEVATOR

EMER EMERGENCY

ENCL ENCLOSURE

ENTR ENTRANCE

EO ELECTRICAL OUTLET

EQ EQUAL

EQUIP EQUIPMENT

ETR EXISTING TO REMAIN

EWB ENTERING WET BULB

EWC ELECTRIC WATER COOLER

EWT ENTERING WATER TEMPERATURE

EX EXAUST AIR

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR

XP EXPLOSION PROOF

F/S FIRE / SMOKE DAMPER

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FAT FINAL AIR TEMPERATURE

FB FIRE BLANKET

FC FLEXIBLE CONNECTION OR

FOOTCANDLE

FD FLOOR DRAIN OR FIRE DAMPER

FDN FOUNDATION

FDV FIRE DEPARTMENT VALVE

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FH FIRE HOSE

FHC FIRE HOSE CABINET

FHP FULL HEIGHT PARTITION

FHV FIRE HOSE VALVE

FIN FINISH

FIXT FIXTURE

FL FLOW LINE

FLA FULL LOAD AMPERES

FLASH FLASHING

FLEX FLEXIBLE

FLG FLANGE

FLG C FLANGE CONNECTION

FLR FLOOR

FLUOR FLUORESCENT

FP FIRE PROOFING

FRMG FRAMING

FS FLOOR SINK

FSTOP FIRESTOPPING

FT FOOT / FEET

FT HD FEET OF HEAD

FTC FOOTCANDLES

FTG FOOTING

FUR FURRING

G GAS OR ELECTRICAL GROUND

GA GAUGE

GAL GALLONS

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR

GEN GENERATOR

GENL GENERAL

GFCI GROUND FAULT CIRCUIT

INTERRUPTOR

GL GLASS

GLV GLOBE VALVE

GND GROUND

GPM GALLONS PER MINUTE

GR GRADE

GRAV GRAVITY

GRD BM GRADE BEAM

GV GATE VALVE

GWB GYPSUM BOARD

H HIGH

HB HOSE BIB

HC HEATING CONTRACTOR

HDCP HANDICAP

HDR HEADER

HDW HARDWARE

HID HIGH INTENSITY DISCHARGE

HM HOLLOW METAL

HORIZ HORIZONTAL

HP HORSE POWER

HPD HIGH PRESSURE DRIP

HPF HIGH POWER FACTOR

HR HANDRAIL

HSKP HOUSEKEEPING

HT HEIGHT

HTG HEATING

HTR HEATER

HV HIGH VELOCITY

HVAC HEATING, VENTILATING, AIR

CONDITIONING

HW HOT WATER

HWD HARD WOOD

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

HWS&R HOT WATER SUPPLY AND RETURN

HZ HERTZ

ID INSIDE DIAMETER

IER INVERTED ECCENTRIC REDUCER

IG ISOLATED GROUND

IME INSULATED METAL ENCLOSURE

IN INCH

INCAND INCANDESCENT

INCL INCLUDED

INSUL INSULATION

INT INTERIOR

INTERL INTERLOCK

INV INVERT

ISO ISOLATION

IVS ISOLATED VALVE STATION

J-BOX JUNCTION BOX

JST JOIST

JT JOINT

KO KNOCK OUT

kVA KILOVOLT AMPERE kVAR KILOVAR (REACTANCE) kW KILOWATT kWH KILOWATT HOUR METER

LAT LEAVING AIR TEMPERATURE

LAV LAVATORY

LB POUND

LDB LEAVING DRY BULB

LED LIGHT EMITTING DIODE

LF LINEAR FEET

LIN LINEAR

LOC LOCATION OR LOCATE

LPT LOW POINT

LSDC LINEAR SUPPLY DIFFUSER CEILING

LT LIGHT

& AND

A AIR (CLINICAL)

AAP ALARM ANNUNCIATOR PANEL

AAV AUTOMATIC AIR VENT

AB ANCHOR BOLT

ABV ABOVE

ACC DR ACCESS DOOR

ACFL ACCESS

ACOUS ACOUSTICAL

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICAN DISABILITIES ACT

ADD ADDENDUM

ADDL ADDITIONAL

ADJ ADJUSTABLE

ADMIN ADMINISTRATION

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISHED GRADE

AFMD AIR FLOW MEASURING DEVICE

AHU AIR HANDLING UNIT

AL ALIGN

ALT ALTERNATE

ALUM ALUMINUM

AMP AMPERE

AP ACCESS PANEL

APC ARCHITECTURAL PRECAST

CONCRETE

APPROX APPROXIMATE

ARCH ARCHITECTURAL

ASY ASYMMETRIC

ATC AUTOMATIC TEMPERATURE

CONTROL

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AWT AVERAGE WATER TEMPERATURE

BAT BATTERY

BC BALANCING COCK OR BARE COPPER

BDD BACKDRAFT DAMPER

BFC BELOW FINISH CEILING

BFE BOTTOM FOOTING ELEVATION

BFG BELOW FINISHED GRADE

BG BUMPER GUARD

BLDG BUILDING

BLKG BLOCKING

BLT BORROWED LIGHT

BLW BELOW

BM BEAM

BO BY OWNER

BOF BY OWNER FUTURE

BOT BOTTOM

BR BRICK

BRG BEARING

BRKR BREAKER

BSMT BASEMENT

BTWN BETWEEN

BUR BUILT UP ROOFING

C CONDUIT

CAB CABINET

CANTL CANTILEVER

CAP CAPACITY

CATV CABLE TELEVISION

CCT CUBICLE CURTAIN TRACK

CCTV CLOSED CIRCUIT TELEVISION

CFH CUBIC FEET / HOUR

CFM CUBIC FEET / MINUTE

CH CHANNEL

CHK V CHECK VALVE

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CHWS&R CHILLED WATER SUPPLY AND

RETURN

CJ CONTROL JOINT

CKT CIRCUIT

CKT BRKR CIRCUIT BREAKER

CL CENTERLINE

CLG CEILING

CLG MTD CEILING MOUNTED

CLR CLR

CMU CONCRETE MASONRY UNIT

CO CLEAN OUT

COL COLUMN

COMM COMMUNICATION

CONC CONCRETE

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUE / CONTINUOUS

CONTR CONTRACTOR

CONV CONVECTOR

COORD COORDINATE

CORR CORRIDOR

CPT CARPET OR CONTROL POWER

TRANSFORMER

CT CERAMIC TILE

CTR CENTER

CU COPPER

CV CONTROL VALVE

CW COLD WATER

D DEPTH OR DEEP

DB DRY BULB

dB DECIBEL

DCW DOMESTIC COLD WATER

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAILS

DF DRINKING FOUNTAIN

DHW DOMESTIC HOT WATER

DIA DIAMETER

DIAG DIAGONAL OR DIAGRAM

DIFF DIFFUSER

DIM DIMENSION

DISC DISCONNECT

DISCH DISCHARGE

DISP DISPENSER

DIST DISTRIBUTION

DIV DIVISION

DL DOWN LIGHT

DN DOWN

DP DISTRIBUTION PANEL

DPR DAMPER

DR DRAIN

DS DOWNSPOUT

DWG DRAWING

DX DIRECT EXPANSION

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC ELECTRICAL CONTRACTOR

EDB ENTERING DRY BULB

EF EXHAUST FAN

EIFS EXTERIOR INSULATION AND

FINISHING SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

ABBREVIATION LEGEND

F

1817 19 20 21 22

"ø

16"x16"

"ø

"x

"x

20"x20"

12"ø 12"x12" 12"ø

12"ø

"x

"ø

"ø

14"x14"

"x

14"x14"

"x

32"x12" 32"x12"

12"ø

12"ø

12"ø

14"ø

14"ø

14"ø

10"ø

14"ø

14"ø

14"ø

32"x12"

12"ø

12"ø

10"ø

12"ø

12"ø

12"ø

10"ø14"x6"

"x

"x

24"x20"

UP TO F-4 (525 CFM)

24x20 UP TO INTAKE LOUVER

UP TO F-3 (875 CFM)

UP TO F-1 (1300 CFM)

UP TO F-2 (1300 CFM)

4' BSC

(810 CFM)

6' BSC

1218 CFM

6' BSC

1218 CFM

PANELBOARD LP-PH

EXISTING

JUNCTION

BOX FROM LP-

PH-27, 120V.

MECHANICAL

B242

RECORD ROOM &

MECHANICAL

B241

HSKP

B236

OFFICE

B235C

OFFICE

B235B

FILE ROOM

B218B

ANTE ROOM

B215D

IV LAB

B215E

ONCOLOGY

B215F

MECHANICAL

B215C

HAZ. STOR.

B215G

SA

360 CFM

SA

380 CFM

SA

380 CFM

SA

380 CFM

SA

150 CFM

SA

380 CFM

SA

380 CFM

SA

225 CFM

SA

150 CFM

EA

365 CFM

EA

160 CFM

NOTES:

1. EXISTING EXHAUST GRILLES TO BE REBALANCED TO CFM INDICATED.

2. SUPPLY DIFFUSER AIRFLOWS INDICATED ARE APPROXIMATE AND SHALL BE ADJUSTED IN THE

FIELD DURING THE TEST AND BALANCE AND COMMISSIONING PHASES TO ACHIEVE THE DESIRED

PRESSURE RELATIONSHIPS BETWEEN THE SPACES. SEE AIRFLOW DIAGRAM ON H201 FOR

PRESSURE RELATIONSHIPS. THE FINAL AIR FLOW AT EACH SUPPLY DIFFUSER MAY BE HIGHER OR

LOWER THAN WHAT IS INDICATED ON THIS PLAN.

3. AS-BUILT DRAWINGS TO CONTAIN SUPPLY AIRFLOW READINGS RECORDED ONCE THE ROOMS ARE

MAINTAINING THE PROPER PRESSURE SET POINTS.

SA

200 CFM

SA

200 CFM

SA

360 CFM

SA

380 CFM

CLEAN EXISTING

PRE-HEAT COIL.

32"x12"

32"x12"32"x12"

12"ø

24x24

ACCESS

DOOR

(4) 2'x2' FILTERS

48x32 FILTER RACK WITH

HINGED ACCESS DOORS.

CONNECT TO EXISTING COIL.

EXISTING STEAM

HUMIDIFIERS 12

6 6 6

810"ø

EAV

EAV

EAV

EAV

SAV

SAV

SAV

SAV

SAV

SAV

NOTE:

ADJUST FANS ON ROOF TO

OBTAIN AIRFLOW AS REQUIRED

H201

LOCATION FOR NEW

TSI LAB CONTROL

MODULES 13

NEW WORK KEYNOTES

PRE-FILTER RACK TO HAVE HINGED DOORS WITH MANUAL FINGER CLIPS. CLIPS TO BE OPERABLE WITH NO TOOLS. FILTERS TO BE MINIMUM MERV 8, LINK 2-PLY. REFER TO SPECIFICATION 234000.

REPLACE THE 2 STEAM HUMIDIFIER CYLINDERS OF THE NORTEC MODEL NHTC 150 (SERIAL # 2069015).

NORTEC CYLINDERS ONLY.

REPLACE THE SUPPLY FAN BEARINGS. INSTALL A NEW 2-GROOVE SHEAVE PACKAGE FOR THE

SUPPLY FAN, NEW COG TYPE BELTS AND LASER ALIGN NEW COMPONENTS. TENSION FAN BELT TO

THE MANUFACTURER'S RECOMMENDATIONS. PRIOR TO COMMENCING THIS WORK, A DUCT

TRAVERSE SHALL BE TAKEN IN THE MAIN SUPPLY AIR DUCT TO CONFIRM EXISTING SUPPLY AIR FLOW.

AFTER COMPLETION OF THIS WORK, THE SUPPLY FAN SHALL BE REBALANCED TO ITS PRE-

CONSTRUCTION AIR FLOW.

INSTALL NEW HEPA FILTERS AND HAVE NEW HEPA FILTERS CERTIFIED ACCORDING TO THE INSTITUTE

OF ENVIRONMENTAL SCIENCES AND TECHNOLOGIES RECOMMENDED PRACTICES.

CLEAN COOLING COIL AND PREHEAT COIL WITH ENVIRONMENTALLY FRIENDLY CLEANER AND RINSE

CLEAN. CLEAN ALL INSIDE SURFACES OF AHU WITH MANUFACTURER'S RECOMMENDED CLEANING

PRODUCTS.

SEAL AIRFLOW LEAKS IN SUPPLY DUCTWORK BETWEEN AHU DISCHARGE AND THE 6 SUPPLY AIR

VALVES. AFTER DUCTWORK IS SEALED VERIFY THAT AIRFLOW LEAKAGE IS WITHIN THE ACCEPTABLE RANGE ACCORDING TO SPECIFICATION SECTION 233100 AT 4% LEAKAGE. ANY TEARS OR CUTS IN THE

INSULATION SHALL BE REPAIRED.

RESET SUPPLY AIR STATIC PRESSURE SETPOINT. ADJUST CURRENT SETTING OF 2.75" WC TO 1.5" WC.

ADD EXHAUST FAN STATUS LIGHT IN CEILING. THE LIGHT SHALL BE A GREEN LED LIGHT, NO GREATER THAN 2"Ø AND BE COMPATIBLE WITH THE BAS. FINAL LOCATION TO BE APPROVED BY THE COR AND PHARMACY STAFF PRIOR TO INSTALLATION. AN 'ON' LIGHT WILL INDICATE THAT THE FANS ARE

WORKING. THE LIGHT WILL BE OFF IN THE EVENT OF A MOTOR FAILURE OR A BROKEN BELT.

PRESSURE SENSORS TO BE INSTALLED IN EXHAUST DUCT DOWNSTREAM FROM EACH

CORRESPONDING EXHAUST AIR VALVE.

REPLACE EXHAUST FAN BELTS WITH COG TYPE V-BELTS, TENSIONED TO THE MANUFACTURER'S

RECOMMENDATIONS.

ACCESS DOOR TO BE LOCATED ON BOTTOM OF DUCT. COORDINATE EXACT LOCATION WITH THE COR.

PROVIDE NEW CONTROL WIRING FROM EAV-1 TO THE LABORATORY CONTROL MODULE.

REPAIR AND RESEAL CORNER OF EXISTING SUPPLY AIR DIFFUSER SO THAT DIFFUSER IS AIR TIGHT.

PROVIDE A UPS WITH SURGE PROTECTION ON THE CIRCUIT THAT SUPPLIES THE TSI CONTROLS.

NEW WORK GENERAL NOTES

THE INTENT OF THIS PROJECT IS CORRECT SPACE PRESSURIZATION AND HOOD EXHAUST AIRFLOW

ISSUES WITHIN THE BASEMENT PHARMACY CLEAN ROOM.

WITHIN THIS PROJECT, THE SCOPE SHALL INCLUDE, BUT IS NOT LIMITED TO, THE REPAIR AND MODIFICATIONS TO MALFUNCTIONING CONTROLS; IMPROVEMENTS TO EXISTING CONTROL SEQUENCES;

INSTALLATION OF NEW VENTURI AIR FLOW VALVES; INSTALLATION OF NEW FILTER RACKS; REBALANCE

OF SUPPLY AIRFLOWS; REBALANCE OF EXHAUST AIRFLOWS; AND VERIFICATION OF ROOM

PRESSURIZATION, CONTROLS SEQUENCES, AND HOOD EXHAUST IN ORDER TO PROVE COMPLIANCE WITH VA GUIDELINES AND WITH THE PROVISIONS OF USP <800>. THE PROJECT SHALL NOT BE ACCEPTED AS COMPLETE BY THE VA WITHOUT THESE VERIFICATIONS AND PROOF OF COMPLIANCE.

THE NEW EXHAUST AIR FLOW VENTURI AIR FLOW VALVES SHALL BE ESTABLISHED AS CONSTANT VOLUME CONTROL TO MAINTAIN THE AIRFLOW INDICATED ON PLAN. THE SUPPLY AIR VALVES SHALL BE ESTABLISHED AS VARIABLE AIR VOLUME AND SHALL UTILIZE ACTIVE PRESSURIZATION CONTROL. NEW TSI 6682 SUPERFLOW CONTROLLERS SHALL BE PROVIDED. REFER TO PLANS FOR MORE INFORMATION.

FOR SAFETY OF PHARMACY STAFF, GREEN LED LIGHTS SHALL BE ADDED IN THE ANTE ROOM AND NEAR

THE EXHAUST HOODS TO INDICATE THAT THE EXHAUST IS WORKING. SEE PLANS FOR MORE

INFORMATION.

NEW WORK SCHEDULING

THE PHARMACY IS A CRITICAL COMPONENT FOR THE OPERATION OF THE MEDICAL FACILITY.

AS SUCH, IT CANNOT BE TAKEN OUT OF SERVICE DURING THE BUSINESS WEEK. OVER A WEEKEND, THE

THE PHARMACY CANNOT BE OFFLINE FOR MORE THAN THREE CONSECUTIVE DAYS.

FOR THE CONSTRUCTION WORK ON THIS PROJECT, THE VA SHALL COORDINATE TWO CONSECTUTIVE

THREE-DAY WEEKENDS WHERE THE PHARMACY IS AVAILABLE TO THE CONTRACTORS.

THE CONTRACTORS SHALL BE PREPARED TO DO ALL SCOPE, INCLUDING EQUIPMENT INSTALLATION, DUCTING, CONTROLS, TESTING, BALANCING, COMMISSIONING AND VERIFICATIONS, WITHIN THESE TWO THREE-DAY WEEKEND TIME FRAMES. EACH THREE-DAY WEEKEND SHALL BEGIN ON A THURSDAY AT 5 PM

AND SHALL CEASE AT 7 AM ON MONDAY.

AT THE END OF THE FIRST WEEKEND, THE PHARMACY MUST BE ABLE TO BE REOPENED TO PHARMACY

STAFF. THE PHARMACY SHALL BE IN OPERATING CONDITION AND ABLE TO PERFORM NORMAL

FUNCTIONS THROUGH THE WORK WEEK.

THE CONTRACTORS SHALL HAVE ACCESS TO MECHANICAL ROOM B241 AND MECHANICAL ROOM B215C

PRIOR TO COMMENCING WORK FOR STAGING, STORAGE, AND SET-UP. THESE ROOMS SHALL BE

AVAILABLE THROUGH THE DURATION OF CONSTRUCTION.

CONSULTANTS:

Drawing Title

Approved: Project Director

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number

Dwg. of

Building Number

Project Number

Office of Construction and Facilities Management

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

FULLY SPRINKLERED

A

B

C

D

E

F

6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

6587 Hamilton Avenue Pittsburgh, Pennsylvania 15206 Ph: 412.287.7333 Fax: 412.287.7334 www.ae-works.com

AE Works Project Number:

ARCHITECTS/ENGINEERS:SEAL

Revision# Date

8/

/2

8:

:3

A

M

Correct Deficiencies in Basement Pharmacy HVAC

244-15-J-6373

JKG RAN

1 Medical Center Drive Clarksburg, WV 26301

H101

HVAC PARTIAL BASEMENT PLAN

August 22, 2016 43 15018

100% Construction Documents

NORTH

PROJECT

1/4" = 1'-0"

HVAC PARTIAL BASEMENT PLAN

EXHAUST AIR VALVE SCHEDULE

MARK INLET (IN) MIN FLOW (CFM) MAX FLOW (CFM) PRESS DROP (FULL OPEN)

ELECTRICAL

POWER

BASIS OF DESIGN

COMMENTSMANUFACTURER MODEL

EAV-1 12 90 CFM 1218 CFM 0.60 in-wg 120 V TSI CV 12 AIR VALVES TO BE COMPATIBLE WITH TSI CONTROLERS AND TSI SYSTEM

EAV-2 12 90 CFM 1218 CFM 0.60 in-wg 120 V TSI CV 12 AIR VALVES TO BE COMPATIBLE WITH TSI CONTROLERS AND TSI SYSTEM

EAV-3 12 90 CFM 810 CFM 0.60 in-wg 120 V TSI CV 12 AIR VALVES TO BE COMPATIBLE WITH TSI CONTROLERS AND TSI SYSTEM

EAV-4 10 90 CFM 525 CFM 0.60 in-wg 120 V TSI CV 10 AIR VALVES TO BE COMPATIBLE WITH TSI CONTROLERS AND TSI SYSTEM

NOTES:

1. REPLACE EXISTING VALVES WITH NEW MEDIUM PRESSURE VALVES.

2. FACTORY CALIBRATE TO CFM INDICATED.

3. AIR VALVES TO BE CONSTANT AIRFLOW.

4. CALIBRATE ALL SENSORS, ACTUATORS, AIRFLOW MONITORS, AND

REBALANCE AIRFLOW TO ENSURE ALL AIR VALVES ARE DISPLAYING

THE CORRECT READING ON ANY CONTROL PANELS AND THE ECC.

5. REPLACE ALL SENSORS THAT CANNOT BE CALIBRATED.

SUPPLY AIR VALVE SCHEDULE

MARK INLET (IN) MIN FLOW (CFM) MAX FLOW (CFM) MAX PRESS DROP (FULL OPEN)

ELECTRICAL

POWER

BASIS OF DESIGN

COMMENTSMANUFACTURER MODEL

SAV-1 12 0 CFM 1160 CFM 0.60 in-wg 120 V TSI VVT112 EXISTING TO REMAIN - CALIBRATE IN FIELD

SAV-2 12 0 CFM 760 CFM 0.60 in-wg 120 V TSI VVT112 EXISTING TO REMAIN - CALIBRATE IN FIELD

SAV-3 12 0 CFM 720 CFM 0.60 in-wg 120 V TSI VVT112 EXISTING TO REMAIN - CALIBRATE IN FIELD

SAV-4 12 0 CFM 375 CFM 0.60 in-wg 120 V TSI VVT10 EXISTING TO REMAIN - CALIBRATE IN FIELD

SAV-5 8 0 CFM 150 CFM 0.60 in-wg 120 V TSI VVT108 EXISTING TO REMAIN - CALIBRATE IN FIELD

SAV-6 12 0 CFM 760 CFM 0.60 in-wg 120 V TSI VVT112 EXISTING TO REMAIN - CALIBRATE IN FIELD

NOTES:

1. AIRFLOW INDICATED IS APPROXIMATE. ROOM PRESSURE WILL DETERMINE

FINAL AIRFLOW. AIR VALVES TO MODULATE TO MAINTAIN ROOM PRESSURE.

2. AIR VALVES TO BE VARIABLE AIRFLOW.

3. CALIBRATE ALL SENSORS, ACTUATORS, AIRFLOW MONITORS, AND

REBALANCE AIRFLOW TO ENSURE ALL AIR VALVES ARE DISPLAYING THE

CORRECT READING ON ANY CONTROL PANELS AND THE ECC.

4. REPLACE ANY SENSORS THAT CANNOT BE CALIBRATED.

COVER WITH HANDLE AND

CHAIN RETAINER

GASKETED AND PRESSURE

SEALED

ROUND OR FLAT

OVAL DUCT

SECTION

HOUSING WELDED TO

DUCT SECTION

EXISTING

PANEL AT AHU

EXISTING ENGINEERING

CONTROL CENTER -

UPGRADE ECC WITH NEW

CONTROL POINTS

ECC

EXISTING COMMUNICATION NETWORK

EXHAUST AIR

VALVE

LABORATORY

CONTROL

MODULE

EXISTING EF (TYP. 4),

ADD CURRENT

SENSOR TO EACH

FAN.

BIO-SAFETY

CABINET

BSC

CONTROLLER

EXISTING STARTER

LOCATED IN MECH

ROOM (TYP. 4)

SEQUENCE:

1. THREE (3) NEW TSI 8862-VV-LF-BAC LABORATORY CONTROL MODULES SHALL BE PROVIDED AND INSTALLED TO CONTROL THE SUPPLY AND EXHAUST AIR VALVES SERVING THE ANTE ROOM, CLEAN

LABORATORY, AND ONCOLOGY. THE LABORATORY CONTROL MODULES SHALL CONTROL THE

SEQUENCING OF EXHAUST AND SUPPLY VOLUME CONTROL UNITS, AS WELL AS REHEAT CONTROL

VALVES. CONTROL MODULE SHALL BE INTERLOCKED TO ALLOW EXISTING BAS TO MONITOR LABORATORY

CONDITIONS AND ADJUST SETPOINTS.

2. THE EXHAUST AIR VALVES SHALL MODULATE BASED ON THEIR INTERNAL AIR FLOW SENSOR TO MAINTAIN A CONSTANT VOLUME. THE SASH POSITION ON THE CORRESPONDING BIO-SAFETY CABINET SHALL BE SET AT 8".

EXHAUST AIR FLOW SHALL BE BALANCED TO ACHIEVE 105 FPM +/- 5 FPM. SEE PLANS FOR INITIAL AIR FLOWS.

3. THE STATUS OF THE PHARMACY EXHAUST FANS SHALL BE INDICATED BY A GREEN LED LIGHT. SEE PLANS FOR LIGHT LOCATION. THE LIGHTS ARE TO BE BAS COMPATIBLE AND ACCEPT A JCI BAS OUTPUT. A GREEN "ON" LIGHT SHALL INDICATE THAT THE EXHAUST FAN IS RUNNING. AN "OFF" LIGHT SHALL INDICATE A MOTOR OR BELT FAILURE. AN "OFF" LIGHT SHALL GENERATE AN ALARM WITHIN THE JCI SYSTEM.

3. THE SUPPLY AIR VALVES SHALL PROVIDE ACTIVE PRESSURIZATION CONTROL AND OPERATE OFF A SIGNAL FROM THE EXISTING TSI ROOM SENSOR IN THE ROOM THAT VALVE SERVES. THE INITIAL ROOM

PRESSURE SET POINTS (ADJ.) SHALL BE AS FOLLOWS:

ANTE ROOM: +0.02"

IV LAB: +0.05"

ONCOLOGY: -0.02"

HAZ. STOR.: -0.02"

4. THE EXISTING ROOM PRESSURE SENSORS SHALL BE PROGRAMMED WITH A HIGH AND LOW ALARM OF +/- 0.05"

WITH AND ALARM DELAY OF 60 SECONDS.

6. ALL EXISTING DOOR CONTACTORS AT ALL EXISTING DOORS WITHIN THE PHARMACY SHALL BE CONNECTED TO THE LAB CONTROL MODULES. THE 'DOOR OPEN MODE' SHALL BE ACTIVATED AND SET TO PREVENT SUPPLY AIR

VALVES FROM OVER REACTING.

7. THE REHEAT COIL AT EACH SUPPLY VALVE SHALL MODULATE TO MAINTAIN 68°F SPACE TEMPERATURE.

NEW CONTROL

WIRING

RELAY FOR

PRESSURE SENSOR

TO EXISTING

BUILDING

CONTROLLERS

SP

ON

EXHAUST FAN

STATUS LIGHT

CONTROLS SCOPE:

1. WITHIN THE JCI SOFTWARE, THE LABELLING OF THE SUPPLY AND EXHAUST AIR VALVES IS INCORRECT.

WITHIN THE JCI SOFTWARE, JOHNSON CONTROLS TO UPDATE ALL SUPPLY AND EXHAUST AIR VALVE NAMES TO

MATCH THE EQUIPEMENT LABELLING USED BY THE VA IN THE FIELD.

2. ADD CONTROL POINTS FOR THE EXISTING ROOM PRESSURE SENSORS (TSI SURE FLOW) TO THE

CONTROL SYSTEM.

3. THE POINTS LIST INDICATES THE POINTS FROM THE NEW TSI 8682 LAB CONTROL MODULES THAT ARE TO BE PASSED THROUGH AND REPRESENTED IN THE JCI SYSTEM. POINTS SHALL ALSO BE ADDED FOR THE EXISTING TSI ROOM MONITOR IN HAZARDOUS STORAGE ROOM B215G. THESE POINTS ARE NOTED WITHIN THE THE POINTS LIST WITH AN ASTERISK (*). THE INTEGRATION OF ALL POINTS SHALL BE CONFIRMED AS PART OF

THE COMMISSIONING PROCESS.

4. JCI SHALL ESTABLISH TRENDING FOR POINTS NOTED IN THE POINTS LIST TO HAVE TRENDING. RATE OF SAMPLING TO BE DETERMINED IN THE FIELD WITH THE VA. FOR EACH TRENDED POINT, TRENDING SHALL RUN CONTINOUSLY

AND SHALL STORE UP TO THREE YEARS (MINIMUM) OF DATA.

5. JCI SHALL ADD SOFTWARE LOGIC TO CALCULATE THE AIR CHANGE PER HOUR (ACPH) FOR THE ANTE ROOM B215D, LAB B215E, ONCOLOGYB215F, AND HAZARDOUS STORAGE ROOM B215G. THE ACPH FOR EACH SPACE SHALL BE TRENDED. RATE OF SAMPLING TO BE DETERMINED IN THE FIELD WITH THE VA. TRENDING SHALL RUN

CONTINOUSLY AND SHALL STORE UP TO THREE YEARS (MINIMUM) OF DATA.

6. PROVIDE VERIFICATION AND CERTIFICATION OF THE 3 BIO-SAFETY CABINETS AFTER ALL AIRFLOW CHANGES ARE MADE AND THE SYSTEM HAS BEEN BALANCED. VERFICATION SHALL PROVE COMPLIANCE

WITH VA STANDARDS AND USP<800>.

7. AT EACH OF THE EXISTING EXHAUST FANS, PROVIDE A CURRENT SENSOR AND ADD AN EXHAUST FAN STATUS

POINT TO THE JCI SYSTEM.

8. ALL PROGRAMMING CHANGES SHALL BE SUBMITTED AS PART OF THE SHOP DRAWING PROCESSS FOR REVIEW

BY THE COR.

9. ALL WORK DONE ON AND WITH THE EXISTING JOHNSON CONTROLS INC. (JCI) SYSTEM TO BE PERFORMED BY JCI TECHNICIANS EMPLOYED DIRECTLY THROUGH JCI. WORK BY THIRD PARTY CONTROLS VENDORS OR

CONTRACTORS SHALL NOT BE PERMITTED.

10.START-UP OF THE NEW TSI AIR VALVES AND TSI CONTROLLERS TO BE PERFORMED BY TSI TECHNICIANS. ALL PROGRAMMING OF TSI DEVICES AND CONTROLLERS TO BE BY TSI TECHNICIANS. WORK BY THIRD PARTY

CONTROLS VENDORS OR CONTRACTORS SHALL NOT BE PERMITTED.

11.PROVIDE CONTROLS SYSTEM SUBMITTALS AND CONTROLS SYSTEM AS-BUILT DOCUMENTATION

PER SPECIFICATIONS SECTION 23 09 23 "DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC".

12. TURN OVER ANY REMOVED CONTROL COMPONENTS TO THE VA.

SUPPLY

AIR VALVE

TS

INSTALL A TOGGLE SWITCH ONTO THE BAS PANEL.

SWITCH TO BE 2-POSITION LABELED "AUTO" AND

"SERVICE". WHEN IN THE SERVICE POSITION IT WILL

SHUT DOWN THE AHU AND EXHAUST FANS FOR

SERVICING AND MAINTENENACE PROCEDURES.

PROVIDE THREE (3) TSI 862-VV-LF-BAC

CONTROLLERS; ONE FOR EACH SET OF

VALVES SERVING THE ANTE ROOM, CLEAN

ROOM AND ONCOLOGY

POINT NAME

SUPPLY AIR FLOW

EXHAUST AIR FLOW

LAB B215E SUPPLY AIR FLOW

LAB B215E EXHAUST AIR FLOW

TOTAL LAB SPECIFIC EXHAUST AIR FLOW

SUPPLY AIR FLOW SETPOINT

EXHAUST AIR VALVE POSITION

ROOM PRESSURE SETPOINT

ROOM PRESSURE HIGH ALARM*

ROOM PRESSURE LOW ALARM*

AI

AI

AI

AI

AI

AO

AI

AO

DI

DI

TYPE NOTES

PROVIDE FOR EACH SUPPLY AIR VALVE

PROVIDE FOR EACH EXHAUST AIR VALVE

PROVIDE SUM OF AIR FLOW OF SAV-1 + SAV-2 +SAV-6

PROVIDE FOR EACH PRESSURE SENSOR

Y

TREND

Y

Y

Y

Y

Y

Y

N

N

N

PROVIDE FOR EACH SUPPLY AIR VALVE

PROVIDE FOR EACH EXHAUST AIR VALVE

PROVIDE FOR EACH PRESSURE SENSOR

PROVIDE FOR EACH PRESSURE SENSOR

POINTS LIST

ROOM PRESSURE* AI PROVIDE FOR EACH PRESSURE SENSORY

ROOM TEMPERATURE* AI PROVIDE FOR EACH TEMPERATURE SENSORY

ROOM TEMPERATURE SETPOINT AO PROVIDE FOR EACH TEMPERATURE SENSORN

TOTAL SUPPLY AIR FLOW AI PROVIDE SUM OF AIR FLOW OF SAV-1 THROUGH SAV-6Y

MINIMUM SUPPLY AIR SETPOINT AO PROVIDE FOR EACH SUPPLY AIR VALVEN

REHEAT VALVE POSITION AI PROVIDE FOR EACH REHEAT COILN

AI PROVIDE FOR EACH SUPPLY AIR VALVEN

EXHAUST AIR FLOW SETPOINT AO PROVIDE FOR EACH EXHAUST AIR VALVEN

PROVIDE SUM OF AIR FLOW OF EAV-1 + EAV-2

PROVIDE SUM OF AIR FLOW OF EAV-1 THROUGH EAV-4

ANTE ROOM B215D SUPPLY AIR FLOW AI PROVIDE SUM OF AIR FLOW OF SAV-4 + SAV-5Y

MINIMUM OFFSET SETPOINT AO N PROVIDE FOR ANTE ROOM, LAB, AND ONCOLOGY

MAXIMUM OFFSET SETPOINT AO N PROVIDE FOR ANTE ROOM, LAB, AND ONCOLOGY

SUPPLY AIR VALVE POSITION

HOOD STATUS DI PROVIDE FOR EACH HOODN

HOOD ALARM DI PROVIDE FOR EACH HOODY

NOTE: POINTS WITH AN ASTERISK (*) SHALL ALSO BE ADDED FOR THE EXISTING TSI ROOM MONITOR WITHIN HAZARDOUS STORAGE

ROOM B251G

F

( - 0.02")

EA: -160 CFM

TR: +160 CFM

(SA: +0 CFM)

(15 ACH = 116 CFM)

160 CFM

150 CFM 90 CFM

150 CFM

( - 0.02")

EA: -810 CFM

TR: +90 CFM

(SA: +720 CFM)

(30 ACH = 472 CFM)

( +0.05" )

EA: -2436 CFM

TR: -90 CFM

TR: -150 CFM

(SA: +2676 CFM)

(30 ACH = 1068 CFM)

HAZ. STOR.

B215G

ANTE ROOM

B215D

IV LAB

B215E

ONCOLOGY

B215F

MECHANICAL

B215C

FILE ROOM

B218B

( +0.02" )

EA: -365 CFM

TR: -150 CFM

TR: +150 CFM

TR: -160 CFM

(SA: +525 CFM)

(30 ACH = 840 CFM)

BALANCING SEQUENCE:

1. EXHAUST AIR VALVES TO BE SET TO CFM INDICATED.

2. ROOM PRESSURE SENSORS TO BE CALIBRATED AND IN COMMAND OF

SUPPLY AIR VALVE TO MAINTAIN THE ROOM PRESSURE INDICATED.

3. SUPPLY AIR CFM INDICATED ON THIS DIAGRAM IS APPROXIMATE ONLY.

NOTES:

1. LATCHES SHALL BE OF THE WEDGE TYPE TO CLOSE DOORS TIGHTLY, WITH NO TOOLS REQUIRED FOR OPERATION.

2. HINGES ON THE ACCESS DOORS SHALL HAVE NON-CORROSIVE PINS.

3. SEE SMACNA 2005, FIGURE 9-15

ACCESS DOOR

ACCESS PANEL

SECTION "B-B"

SECTION "A-A"

INSULATION

GASKET

DUCT

INSULATION

"A"

"A"

HANDLE INSIDE

NEOPRENE GASKET

CASING

FLEXIBLE WASHER

FACTORY FABRICATED

LATCH/HANDLE

1-1/2" MIN.

INSULATION

"B" "B"

MAX LOAD 50% OF MFR. RECOMMENDED RATING.

USE FULL THREADED RODS

CONCRETE SLAB SELF DRILLING

ANCHOR

2" DEEP, ANGLED SYSTEM PRE-

FILTERS. PROVIDE 16 SF OF

SURFACE AREA. REFER TO

PROJECT SPECIFICATIONS.

32x48 FILTER HOUSING, DOUBLE WALLED INSULATED

EXISTING 36x36 PRE-HEAT COIL

STAR STYLE KNOBS

AIRFLOW AIRFLOW

HINGED ACCESS

DOOR (BOTH SIDES)

CONCRETE SLAB

1' -2

1' -0

INSULATE ALL NEW

DUCTING TO MATCH

EXISTING DUCT INSULATION

12"x32"12"x32"

CONSULTANTS:

Drawing Title

Approved: Project Director

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number

Dwg. of

Building Number

Project Number

Office of Construction and Facilities Management

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

FULLY SPRINKLERED

A

B

C

D

E

F

6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

6587 Hamilton Avenue Pittsburgh, Pennsylvania 15206 Ph: 412.287.7333 Fax: 412.287.7334 www.ae-works.com

AE Works Project Number:

ARCHITECTS/ENGINEERS:SEAL

Revision# Date

8/

/2

8:

:3

A

M

Correct Deficiencies in Basement Pharmacy HVAC

244-15-J-6373

JKG SPL

1 Medical Center Drive Clarksburg, WV 26301

H201

HVAC DETAILS AND CONTROL DIAGRAM

August 22, 2016 44 15018

100% Construction Documents

NTS

ACCESS SECTION FOR ROUND/OVAL DUCT

NOT TO SCALE

PHARMACY LAB CONTROL DIAGRAM

1/4" = 1'-0"

HVAC AIRFLOW DIAGRAM

NTS

ACCESS PANEL & DOOR DETAIL

NTS

SUSPENDED EQUIPMENT FROM CONCRETE SLAB

1/2" = 1'-0"

FILTER HOUSING SECTION

G001 - COVER SHEET
Sheets
G001 - COVER SHEET
H001 - HVAC SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
H101 - HVAC PARTIAL BASEMENT PLAN
H201 - HVAC DETAILS AND CONTROL DIAGRAM
H001 - HVAC SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
Sheets
G001 - COVER SHEET
H001 - HVAC SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
H101 - HVAC PARTIAL BASEMENT PLAN
H201 - HVAC DETAILS AND CONTROL DIAGRAM
H101 - HVAC PARTIAL BASEMENT PLAN
Sheets
G001 - COVER SHEET
H001 - HVAC SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
H101 - HVAC PARTIAL BASEMENT PLAN
H201 - HVAC DETAILS AND CONTROL DIAGRAM
H201 - HVAC DETAILS AND CONTROL DIAGRAM
Sheets
G001 - COVER SHEET
H001 - HVAC SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
H101 - HVAC PARTIAL BASEMENT PLAN
H201 - HVAC DETAILS AND CONTROL DIAGRAM

File details come from the government source that posted it.